Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20211358 Ver 1_Shoreline Stabilization_20210907
val ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: !f sending via US Postal Service Paul Wojoski DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or F1 rre to view the form. Attach documentation of Pre -Filing Meeting Request to this application. Date of Pre -filing Meeting Request: (, / 02./02.D4 (required) RECEIVED DWR ID # Version (if applicable) A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Edward Cooper S E P 7 2021 DEQ-WATER RESOURCES 401 & BUFFER PERMITTING Mailing Address: 411 Harbor Dr. West Lexington, NC 27292 Telephone Number: 336/859-0641 Fax Number: E-mail Address: EJCoop@triad.rr.com North Carolina Department r Envirormtenral Quality ; Division of Water Resources 512 North Salisbury Street ! 1617 Mail Service Center Raleigh North Carolina 27b99-1617 9t9.707 9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Lexington Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 1.18 acres Subdivision name or site address (include phase/lot number): Lot 40, Stoney Point Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Lexington exit for NC Hwy 8, go south on NC Hwy 8, R on Stoney Point Drive, R on Harbor Dr. West, property is on the L side of road. Latitude (in decimal degrees) 35.37.0881 Longitude (decimal degrees) 80.13.1718 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Single-family residential community FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? El From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 406 Sq. Ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 812 Sq. Ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 1015 Sq. Ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 10 to 12 trees of varied species size and condition will be removed in order to complete the stabilization project. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Owner/agent's Signature" [ ] Date "Agen 4s signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level Shoreline Plan View M—itiN— Full Pond/ Normal Water Level Shoreline 2 ft. x150 ft. additional clearing • if necessary Lake (At Full Pond/ Normal Water Lovell Riprap EXAMV L Plan View 3 ft x 150ft WOW full pond/ NWL 4ftx150ft A5Jve full pond/ NWL FORM: SSGP 09-2020 Page 4 of 6 OZOZ-60 d9SS : V *O: Full Pond/ Normal Water Level Shoreline 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing *if necessary 10 ft. bank height Side Vi Existing bank FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Edward Cooper Lot 40, Stoney Point STABIUZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 203 LF of proposed shoreline stabilization measures. Detail 2 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope = (203') x (1') x (2) = 406 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 203 LF of Shoreline = 2 ft. Above Normal Pool Area of Impact = Length x Height x Slope = (203' x 2' x 2) = 812 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 203 x 5 ft. = 1015 sq. ft. Total Area of Impact Above Normal Pool Level = 1827 sq. ft. Davidson County GIS 1.11A tr 1573 0 39 11 64.18 41 Edward Cooper, Lot 40, Stoney Point g %� \ \��i i\\ VEGETATE DISTURBED AREA ABOVE SLOPE 1 2 EROSION CONTROL FABRIC --------4F- TYPICAL CONDITIONS • 12" TO 36" ERODED CUT • WAVE EXPOSURE 1 1 1 1 1 1 1 EXISTING GRADE \ LAKE _ --- BO�OM FOR: LOCA11ON: RESERVOIR: EDWARD COOPER LOT 40, STONEY POINT HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: MINOR RIP RAP STABILIZATION DETAIL 2 /M. • r .� 8/31/2021 411 Harbor Dr W - Google Maps Go: gle Maps 411 Harbor Dr W Scuthrnount Abbotts Creek Boat Access Budd:e C,o:•ek Gn rr, :a0a9 Pooietown Pebble Beach9 ♦11 Harbor Dr W. Letongton. NC 27292 Heaiing Spings - o' Algr Rod, Google • lri 130, aw+ `Randy s Used Coif Cats ` 9 The Classicr7 Denton 1.* u...a., Dantnn FarmnarkO Map data ©2021 1 mi t i https://www.google.com/maps/place/411 +Harbor+Dr+W,+Lexington,+NC+27292/@35.6381215,-80.1897185,13z/data=!4m5!3m4! 1 s0x885384309971... 1/1 Contact Name * Contact Email Address* Project Owner* Project Name * Project. County* Owner Address:* Karen Baldwin, Agent for Edward and Elizabeth Cooper karen.baidwin c@eaglecreekre,com Eagle.CreekRenewable Energy High Rock Reservoir Davidson St!€c A k» 411 Harbor.Drive West • Adde:,^, lir 2 e, Slue;R -1O1; 0r1 Lexington NORTH CAROLINA rcrsrz.d i Zip (rile ',`..a lry 27292 United States. Is this a transportation project?* r Yes r No Type(s) of approval .sought from the DWR:. 1- :401 Water Quality Certification - r" 401 Water Quality .Certification - Regtdar Express r hdividual Permit r Modification 1 Shoreline Stabilization Does this project have an existing project JD#?* i' Yes r• No Do you know the name of the staff me rnber you would like to request ;a meeting with? N/A Please give a brief project description below and Include Iocatlon information.* Shoreline Stabilization in accordance v,rith Cube Hydro's $horeline Managernent Plan Guidelines. By digitally signing below, I certify that I have read -and understood that per the Federal Cleary Water Act Section 401 Certification Rulethe following statements; • This form completes the requirement of the Pre -Filing Meeting Request in the Clean. Water Act Section4.01 Certification Rule. • understand.by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. ▪ also understand that DWR is not required to respond or grant the Meeting request. Your project's thirty -day clock started upon receiptof this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Dat9 6/2/2021