Loading...
HomeMy WebLinkAbout20211356 Ver 1_Grace Drive SMP_20210913(Version 2.08; Released April 2018)80075TIP No.:HE-0003County(ies):Halifax Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year: Existing:Year:Aquatic T&E Species?NoComments:NoN/AN/AWetlands within Project Limits?NoneSupplemental Classification: urban commercialUT to Roanoke River 23(26)0.434 MilesProject DescriptionProposed ProjectRoanokeRiver Basin(s): City/Town:Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Notccoggins@ncdot.govWilson NC 27895Address:8/31/2021HalifaxRoanoke RapidsChad Coggins509 Ward Blvd. WBS Element:Roadway WideningWBS Element:Dennis EthridgeNCDOT Contact:525-640-6400509 Ward Blvd Wilson NC 27895Contractor / Designer:252-640-6400NCDOTNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:NCDOTAddress:General Project InformationHE-000380075Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)Existing flow patterns are maintained to the max extent practical. We maximized the use of vegetative conveyances throughout the project A 1@66" aluminum pipe will be installed at new location at -L-32+52. The culvert will be embedded 1' below the stream bed to help ensure the culvert maintains a natural channel material post-construction.N/ABuffer Rules in Effect:S1NoneThe proposed roadway is 4 12' lanes with 2 ft paved shoulders with 6' grass shoulders and 3:1 ditches. Waterbody Information2022NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Bodyac. The existing roadway is 2 12' lanes with 1 foot paved shoulder with 6+ ft of grass shoulder and ditchesdrethridge@ncdot.govProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)