HomeMy WebLinkAbout20211356 Ver 1_ePCN Application_20210913 DWR
Division of Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 1,2021 Ver4.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6' Yes
✓ No
Is this project a public transportation project?*
R Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20211356 1
Is a payment required for this project?*
✓ No payment required
6' Fee received Reviewing Office*
✓ Fee needed-send electronic notification Central Office-(919)707-9000
Select Project Reviewer*
Rob Ridings:eads\rgridings
Information for Initial Review
la.Name of project:
Grace Drive Widening
1a.Who is the Primary Contact?*
Byron G.Bateman
lb.Primary Contact Email:* 1c.Primary Contact Phone:*
bgbateman@ncdot.gov (252)714-9719
Date Submitted
9/13/2021
Nearest Body of Water
UT To Roanoke River
Basin
Roanoke
Water Classification
Roanoke River(C)
Site Coordinates
Latitude: Longitude:
36.43345 77.62172
A. Processing Information
County(or Counties)where the project is located:
Halifax
Is this a NCDMS Project
✓ Yes ( No
Is this project a public transportation project?*
( Yes r No
Is this a NCDOT Project?*
( Yes r No
(NCDOT only)T.I.P.or state project number:
HE-0003
WBS#(?)
80075
Pre-Filing Meeting Information
Is this a courtesy copy notification?*
✓ Yes G No
ID# Version
Pre-fling Meeting or Request Date
6/23/2021
Attach documentation of Pre-Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
Grace Drive Scoping meeting minutes.pdf 39.78KB
Pie type must be FCF
1a.Type(s)of approval sought from the Corps:
I7 Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
✓ No
lb.What type(s)of permit(s)do you wish to seek authorization?
fJ Nationwide Permit(NWP)
✓Regional General Permit(RGP)
✓Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
✓ Yes 6 No
Nationwide Permit(NWP)Number: 14-Linear transportation
NWP Numbers(for multiple NWPS):
Id.Type(s)of approval sought from the DWR:
17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
✓Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
✓ Individual 401 Water Quality Certification
le.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: r Yes 6' No
For the record only for Corps Permit: r Yes 6 No
If.Is this an after-the-fact permit application?*
✓ Yes t: No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
6 Yes rNo
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
lh.Is the project located in any of NC's twenty coastal counties?
✓ Yes 6 No
1j.Is the project located in a designated trout watershed?
✓ Yes f No
B. Applicant Information
1d.Who is applying for the permit?
17 Owner r Applicant(other than owner)
le.Is there an Agent/Consultant for this project?*
✓ Yes !' No
2.Owner Information
2a.Name(s)on recorded deed:
NCDOT
2b.Deed book and page no.:
2c.Contact Person:
2d.Address
Street Address
509 Ward Boulevard
Address Line 2
atY State/Bovine/legion
Wilson NC
Postal/Ztp Cork Country
27895-3165 USA
2e.Telephone Number: 2f.Fax Number:
(252)714-9719
2g.Email Address:*
bgbateman@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
1b.Subdivision name:
(if appropriate)
N/A
1c.Nearest municipality/town:
Weldon,NC
2. Project Identification
2a.Property Identification Number: 2b.Property size:
N/A
2c.Project Address
Street Address
Address Line 2
City Slate/Bovine/legion
Postal/Zip Code Country
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
UT To Roanoke River
3b.Water Resources Classification of nearest receiving water:*
Roanoke River(C)
3c. What river basin(s)is your project located in?*
Roanoke
3d.Please provide the 12-digit HUC in which the project is located.
030101070103
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Grace drive provides access to a number of existing Industrial facilities with an anticipated expansion of the industrial sector in the near future.Aside from commercial and industrial land
uses are forested areas in various levels and stages of silvicultural management.
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
C Yes G No C Unknown
4f.List the total estimated acreage of all existing wetlands on the property:
.21
4g.List the total estimated linear feet of all existing streams on the property:
50
4h.Explain the purpose of the proposed project:*
This project will widen Grace Drive(SR 1710),from a two-lane to a four-lane undivided roadway.The purpose of this project is to increase capacity to better accommodate existing
commercial traffic volumes as well as an anticipated increase in commercial traffic associated with a U.S.Forest products manufacturer slated to develop property along Grace Drive.
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
This project proposes to widen Grace Drive(SR 1710),from a two-lane to a four-lane undivided roadway.The purpose of this project is to increase capacity to better accommodate
both the existing commercial traffic volumes,as well as an anticipated increase in commercial traffic associated with a U.S.Forest products manufacturer slated to develop property
along Grace Drive.
Excavators and dump trucks will be utilized to engage in land clearing activities as needed within the right of way.Unsuitable materials will be removed and disposed of in an approved
site.Suitable materials will be brought in,placed,and graded to the designed width and elevation necessary to accommodate the widening of Grace Drive to a four-lane facility that
conforms with NCDOT Standards and Specifications.
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
6 Yes r No C Unknown
Comments:
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
r Preliminary r Approved 6 Not Verified r Unknown r N/A
Corps AID Number:
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known): Byron Bateman
Agency/Consultant Company: NCDOT
Other:
6. Future Project Plans
6a.Is this a phased project?*
C Yes ( No
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
No
D. Proposed Impacts Inventory
1. Impacts Summary
1a.Where are the impacts associated with your project?(check all that apply):
17 Wetlands 17 Streams-tributaries r Buffers
r Open Waters r Pond Construction
2.Wetland Impacts
2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact
Jurisdicition*(?) area*
1 Fill P Pine Flat 1 Yes Both 0.120
(acres)
1 Excavation P Pine Flat 1 Yes Both 0.010
(acres)
1 Mechanized Clearing T Pine Flat 1 Yes Both 0.050
(acres)
1 Hand Clearing T Pine Flat 1 Yes Both 0.030
(acres)
2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact
0.080 0.130
2g.Total Wetland Impact
0.210
2i.Comments:
The site underwent a timber harvest within the past 5 years and is in the early stage of natural regeneration.
3.Stream Impacts
3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact
(?) Jurisdiction* length*
SI Roadway Widening Permanent Culvert UT To Roanoke River Perennial Both 3 4
Average(feet) (linear feet)
S2 Roadway Widening Temporary Dewatering UT To Roanoke River Perennial Both 3 46
Average(feet) (linear feet)
3i.Total jurisdictional ditch impact in square feet:
0
3i.Total permanent stream impacts: 3i.Total temporary stream impacts:
4 46
3i.Total stream and ditch impacts:
50
3j.Comments:
E. Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
During the design phase of this project the NCDOT Standards and Specifications for the construction of a four-land roadway were applied to ensure
that the final product was safe,stable,and functional.That design criteria best fits the anticipated traffic volumes for the roadway and ware not
intended to create a facility significantly beyond what was necessary to meet the anticipated needs.
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
To further meet the goal of minimization we are requesting approval for hand clearing in those areas where only temporary impacts are needed and
will refrain from any impacts that are deemed uneccessary during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
r Yes r No
2c.If yes,mitigation is required by(check all that apply):
r DWR r Corps
2d.If yes,which mitigation option(s)will be used for this project?
r Mitigation bank fJ Payment to in-lieu fee r Permittee Responsible
program Mitigation
4. Complete if Making a Payment to In-lieu Fee Program
4a.Approval letter from in-lieu fee program is attached.
6 Yes r No
4b.Stream mitigation requested:
(linear feet) 4c.If using stream mitigation,what is the stream temperature:
0
4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested:
(square feet) (acres)
0 0
4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested:
(acres) (acres)
0.130 0
4h.Comments
It is anticipated that these impacts will be mitigated at a 2:1 ratio.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes f: No
If no,explain why:
This project is within the Roanoke River Basin and is not subject to Basinwide Buffer Rules.
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
(7 Yes C No
Comments:
See attached Stormwater Management Plan.
LG. Supplementary Information
1. Environmental Documentation
1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
r Yes r' No
lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPNSEPA)?*
C Yes a No
Comments:*
MCDC is available upon request.
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)?*
C Yes ( No
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
C Yes a No
3b.If you answered"no,"provide a short narrative description.
See attached summary
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
C Yes C No G N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
CYes 6" No
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
( Yes r No
5c.If yes,indicate the USFWS Field Office you have contacted.
Raleigh
5d.Is another Federal agency involved?*
C Yes ( No C Unknown
5e.Is this a DOT project located within Division's 1-8?
G Yes C No
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
IPAC letter attached.
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
C Yes a No
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA EFH Mapper
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
C Yes ( No
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
See attached letters of finding from offices of State Architecture and Archaeology
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-year floodplain?*
r Yes ( No
8c.What source(s)did you use to make the floodplain determination?*
FIRM Panels:3720490800K
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one
file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach docunent
GraceDrive_IPAC_species_list.pdf 155.57KB
HE-0003 PERMIT DRAWING 08-24-2023.pdf 526.87KB
Grace Drive SMP.pdf 57.64KB
Grace Drive Topo Map(1).pdf 1.08MB
Grace Drive Project vicinity(1).pdf 1.55MB
Grace Drive Cumulative Impacts Summary.pdf 92.2KB
21-07-0003NoSurvey Historic Architecture.pdf 247.58KB
PA 21-07-0003 No Archaeological Survey Required Form Grace Drive widening Halifax(1).pdf 2.25MB
Fle crust be FIT or ffuE
Comments
Signature
*
17 By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Byron George Bateman
Signature
of tcw,:f oge /car
Date
9/13/2021