Loading...
HomeMy WebLinkAbout20201838 Ver 1_Y-5500JC_Permit_Drawing_Package_20210913(Version 2.08; Released April 2018)45533.1.18TIP No.:Y-5500JCCounty(ies):UnionPage 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2045Existing:Year:Aquatic T&E Species?NoComments:NoN/AN/AWetlands within Project Limits?Supplemental Classification: Wooded and residential UT to Twelvemile Creek0.80.753 milesProject DescriptionProposed ProjectCatawbaRiver Basin(s): City/Town:3.0Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Nobegackstetter@ncdot.govRaleigh, NC 27603Address:6/23/2021UnionWaxhaw, NCBrian Gackstetter862 Capital Blvd.WBS Element:New LocationWBS Element:Eleni M. Riggs, PE / W. Herbert Turner, Jr, PENCDOT Contact:(919) 707-41317621 Purfoy Road, Suite 115Fuquay Varina, NC 27526Contractor / Designer:(919) 679-9379Mott MacDonaldNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:Engineering Coordination and Safety BranchAddress:General Project InformationY-5500JC45533.1.18Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The North Carolina Department of Transportation (NCDOT) has proposed to extend Tory Path Rd (SR 1432) in Waxhaw, NC in Union County and close the railroad crossing to Waxhaw Hwy (SR 2100). The proposed road is a two lane road with sidewalk and curb and gutter on the left shoulder and a grassy shoulder for most of the length of the right side of the project with a few sections of paved shoulder. This new road has been designed to have as little environmental and surface water impacts as possible. There are no buffers present in this project, however there are various wetlands located within the project limits. Storm water impacts to the stream have been minimized by utilizing ditches, cross pipes, junction boxes, and rip rap outlet pads to dissipate energy to provide non erosive flow into the streams. A cross pipe that discharges into the wetland is location at station -L- 35+52 LT and has an outlet velocity of 2.0 ft/s to prevent erosion. At station -L- 42+37 LT, there is a cross pipe that discharges into a JS and Class II rip rap has been placed at the outlet of the pipe and on the banks. Class B toe protection is utilized to stabilize the toe of proposed fill slopes, as the existing slopes are currently severely eroded. Due to the nature of low impact new road construction, the increases in stormwater discharges (post v. pre condition) are significant, however minimization techniques will be used to reduce surface water impacts. Therefore additional stormwater measures are not required. N/ABuffer Rules in Effect:None200Tory Path Rd (SR 1432): 2 paved lanes (total 22' wide), LT Side: 2' curb and gutter section, 5' sidewalk with handrail and unpaved section (total 10'); RT Side: 5' unpaved shoulderWaterbody Information2019NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Bodyac.Tory Path Rd (SR 1432): 2 paved lanes (total 18' wide, unpainted), grassy shoulder on each side400eleni.riggs@mottmac.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) ENGLISH WETLAND AND SURFACE WATER IMPACTS PERMIT R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_tsh.dgnMAR0899506/23/2021SITE 1 SITE 2 SITE 3 SHEET 1 OF 16 PERMIT DRAWING 1520253010152025303510 15 20 1010 152025 303540 455055105' CONC. SIDEWALK 5' CONC. SIDEWALK 5' CONC. SIDEWALKCR CR HANDRAILPROPOSED HANDRAI LPROPOSED (75 (75 (16 Sassafrass Trl Sandberry DrFo res t Oaks Ln Red Oaks Trl Red Oaks Trl Pr ovi d e nc e Rd SCreekview Dr Peyton Ct Waxhaw Hwy S Jackson AveMill St Helms Rd Waxhaw Hwy Rene Cir Teresa CirLockly n RdSh a r o n Dr Trails End Dr Waxhaw Pop. 4,157 Pine Oak Rd Maplewood Ln Kensington Dr Sandberry Dr Pinetuck Ln Waxhaw-Marvin Rd Bucke ye Ct Pine Oak RdMcCall Rd Waxhaw-Marvin RdEutaw DrGlenola DrEutaw Dr Helms RdW axhaw-M ar vi n RdRutledge Ct Rehobeth RdFerguson Cir Rockwood Dr Trails End Dr Rehobeth RdSchmitz Rd Ellis Rd Rehobeth Rd Richardson King Rd Rockwood Dr Bancroft Pl Dr Cassidy StonecrestDr 1300 1469 1468 1301 1228 1175 1432 1301 1107 1107 1241 1240 1108 1304 1301 2536 25001304 2560 2613 1270 1268 1269 1268 2551 1305 2868 2646 1304 1298 1299 3369 3370 Roc kwood Dr1268 Manor Way Ashton Trail Rd Cherokee Grove Center Will Free Church BaptistNut CtHickory D T V = = = = = = % % MPH ADT ADT % * DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN TYPE OF WORK:09/08/990 00 CONTRACT:TIP PROJECT:See Sheet 1A For Index of Sheets PLANS PREPARED FOR THE NCDOT BY: Fuquay-Varina, NC 27526 (919) 552-2253 (919) 552-2254 (Fax) www.mottmac.com/americas LICENSE NO. F-0669 VICINITY MAP 25 50 10050 25 50 10050 5 10 2010 REGIONAL TIER 2018 STANDARD SPECIFICATIONS LOCATION: PROJECT BEGIN NC DEPARTMENT OF TRANSPORTATION CN N CNORTH CAROLINA (919) 707-4154 (FAX) (919) 707 4110 RALEIGH, NC 27699-1556 1556 MAIL SERVICE CENTER PROJECT END END CONSTRUCTION 2019 2045 200 +DUAL 8%)* (TTST 1% 9 55 10 LOCAL FUNC CLASS = THIS PROJECT IS PARTIALLY WITHIN THE MUNICIPAL LIMITS OF WAXHAW, NC. UNION COUNTY 64 5 HELMS ROAD CONNECTORTORY PATH ROAD / -L- END CONSTRUCTION BEGIN TIP PROJECT Y-5500JC END TIP PROJECT Y-5500JC -L- POT STA 53+00.00 TORY PATH ROADSR 1432-Y1- TO WAXHAW -Y2- POT STA 11+40.00 -Y1- POT STA 18+55.54 TO SOUTH CAROLINA -L- POT STA 13+25.00 Y-5500JC 7Y-5500JCTO WAXHAWNORTH CAROLINASOUTH CAROLINAWAXHAW TOWN LIMITS WAXHAW TOWN LIMITS RAIL DIVISION STATE OF NORTH CAROLINA 75 75 CSX TRANSPORTATION WA X HA W T OWN LI MIT S TO SR 1300 (HELMS ROAD) IN WAXHAW CROSSING CLOSURE AT CSX TRANSPORTATION, AND EXTENSION SR 1432 (TORY PATH ROAD)(CROSSING NUMBER 638 898H, MP 319.97) MP 319.97 638 898H (TORY PATH RD.) CROSSING CLOSURE: PE WAXHAW HIGHWAYNC 75-Y3- HELMS ROADSR 1300-L- ROW PLANS PROJECT ENGINEER NCDOT DIVISION PEF ENGINEER PROJECT ENGINEER PEF ENGINEER PROJECT DESIGN ENGINEER BRYON PALMER, PE JEFFREY COOKE BRIAN GACKSTETTER, EITOTAL PROJECT LENGTH BASED ON -L- STATIONS. TOTAL LENGTH OF TIP PROJECT Y-5500JC = 0.753 MILES 45533.1.18 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. GRADING, PAVING, DRAINAGE, AND RAIL CROSSING CLOSURE 45533.2.18 R/W 1200 40 MAR 15, 2022 7621 Purfoy Rd Suite 115 LENGTH ROADWAY TIP PROJECT Y-5500JC = 0.753 MILES APRIL 26, 2021 END C&G -L- STA. 49+24.96 LTBEG . SIDEWALK -L- STA. 13+25.00 RT END S IDEWALK -L - STA. 17+21.16 RT BEG. SIDEWALK -L- STA. 17+17.88 LT BEG. C&G -L - STA. 13+25.00 RT BEG . C&G -L- STA. 13+25.00 LT BEG. HANDRAI L -L- STA. 4 1 +50.00 LTEND HANDRAI L -L- STA. 4 4 +00.00 LTEND HANDRAIL -L- STA. 37+00.00 LT BEG. HANDRAIL -L- STA. 24+50.00 LT END C&G -Y1 - STA . 10+48.11 RT END SI DEWALK -L- STA. 49 +00.00 LTNA 2011NAD 83/ SHEET 2 OF 16 PERMIT DRAWING R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_details.dgnMAR0899506/23/2021Office of: Prepared in the PO Box 700 Fuquay-Varina, NC 27526 www.mottmac.com/americas DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS Y-5500JC -L- STA. 42+00 TO STA. 44+00 RT -L- STA. 42+40 TO STA. 43+15 LT -L- STA. 35+38 TO STA. 36+06 LT Fill Slope2:1 or Flatter b= 5 Ft. d= 2 Ft. Type of Liner= CL B Rip-Rap b DETAIL J Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile ( Not to Scale) 2:12:1D B b LATERAL BASE DITCH 1"/Ft. -L- STA. 33+00 TO STA. 34+00 RT DETAIL N b= 5 Ft. B= 2 Ft. Min. D= 1 Ft. Ground Natural Slope Fill ( Not to Scale) SPECIAL LATERAL 'V' DITCH 2:1D -L- STA. 25+50 TO STA. 26+50 RT -L- STA. 24+25 TO STA. 25+50 RT Min. D= 1 Ft. DETAIL A Ground Natural Flatter4:1 or Slope Fill ( Not to Scale) BERM BASE DITCH 2: 1 2:1 D2:1B b -L- STA. 23+30 TO STA. 24+00 RT DETAIL L b= 5 Ft. B= 2 Ft. Min. D= 1 Ft. Ground Natural RDWY d 2:1B D ( Not to Scale) Flatter4:1 or SPECIAL LATERAL BASE DITCH -L- STA. 23+50 TO STA. 24+25 LT Slope Fill DETAIL D B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. Type of Liner= Class I Rip Rap Ground Natural Geotextile d 2:1B D ( Not to Scale) SPECIAL CUT BASE DITCH Flatter4:1 or -L- STA. 22+50 TO STA. 23+50 RT DETAIL G B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. Type of Liner=Class I Rip Rap Ground Natural Ditch Slope Front Geotextile2:1D Flatter4:1 or d ( Not to Scale) SPECIAL CUT DITCH -L- STA. 28+79 TO STA. 30+00 RT, CL B RIP RAP DETAIL F Max. d= 1 Ft. Min. D= 1 Ft. Type of Liner= SEE BELOW Slope Ditch Front Ground Natural Geotextile 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d BEGIN EL.=603.55, END EL.=597.75 -L- STA. 34+25 RT, CL I RIP RAP BEGIN EL.=581.00, END EL.=577.00 -L- STA. 26+15 RT, CL I RIP RAP BEGIN EL.=563.00, END EL.=560.00 -L- STA. 24+55 LT, CL II RIP RAP DETAIL H B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= SEE BELOW Geotextile LATERAL 'V' DITCH ( Not to Scale) D2:12:1 b 1"/Ft. b= 1 Ft. Min. D= 1 Ft. DETAIL C Ground Natural Slope Fill ( Not to Scale) LATERAL BASE DITCH 2:1D B b d 2:1 1"/Ft. -L- STA. 35+50 TO STA. 36+50 RT, CL B RIP RAP -L- STA. 34+00 TO STA. 35+50 RT, CL I RIP RAP -L- STA. 31+00 TO STA. 33+00 RT, CL B RIP RAP -L- STA. 22+85 TO STA. 24+55 LT, CL B RIP RAP DETAIL M b= 5 Ft. B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. *When B is < 6.0' Type of Liner= SEE BELOW Ground Natural Slope Fill GEOTEXTILE Flatter4:1 or D2:1( Not to Scale) SPECIAL CUT DITCH -L- STA. 41+00 TO STA. 41+50 RT -L- STA. 36+50 TO STA. 38+50 RT -L- STA. 30+00 TO STA. 31+00 RT -L- STA. 26+50 TO STA. 28+79 RT DETAIL B Min. D= 1 Ft. Ground Natural Slope Ditch Front -Y1- STA. 17+00 TO STA. 18+76 RT 2D-1 d 2:1B D ( Not to Scale) TYPICAL 2' BASE DITCH Flatter4:1 or -L- STA. 17+81 TO 22+50 RT DETAIL AA B= 2 Ft. Max. d= 1.5 Ft. Min. D= 1 Ft. Type of Liner= PSRM Ground Natural Slope Ditch Front 2:1 DETAIL 1 1.0' Max0.5' Min.S=Ditch Slope 2: 1 Outside Ditch L S etc. GI ( Not to Scale) FALSE SUMP 2.0' C Proposed Ditch -L- STA. 16+45.50 LT -L- STA. 44+38 RT -L- STA. 41+50 RT EIP EIP EIP EIP EIP EIP EIP EIP EIP TOP=593.26' DI DITOP=586.20' S60" WW 15" RCP 15" RCP BY2-34 BY2-35 BY2-36BY2-37BY2-38BM #411.7' G R GATECONCB Y2- 3 9 SS1SFDSWALL2 4" ROCKWALL24" ROCKWALL2 4" WDCONCW ALL36" BLK48" WW48" WD WALL 48" WW48" WWGRWALL 4" WD 12" HDPEGATE48" WW 48" WW 1SBKD 8.7' BST 54" BKBK GRILL 12.3' BST 12" BK WALL EI PEIP NGS-RODGERS CONC WG2 S F D60" WW U/C CONC CONCWOODS WOODS WOODS WOODS WOODS WOODS WOODS W OODSW OODSW OODSW OODSW OODSWOODS W OODSWOODS W OODSW OODSBK WSLD MILLBRIDGE VI LLC DB 7172 PG 304 MB B PG 7-B JOSEPH D. SELLS NO DEED LISTED DB 3383 PG 702 DB 396 PG 863 MB O PG 637 TREE SAVE EASEMENT (MB 0 PG 637)TREE SAVE EASEMENT (MB 0 PG 637)7' UE (MB 0 PG 637) 20' SDE EASEMENT (MB 0 PG 637) 20' SDE EASEMENT (MB 0 PG 637) 7' UE (MB 0 PG 637) L E N N A R C A R O LI N A S L L CMB O P G 637 N O D E E D LIS T E D DEBORAH H. RUSCIOLELLI WILLIAM J. RUSCIOLELLI & JUDITH H. WOOD JAMES W. WOOD & 20' PR IVA T E DR IVE (MB B PG 7-B )(TO 2" PVC OVERFLOW)ONLYDIRECTION4" PVC8" PVC8 " PVCBAG W ALL12" CONCW OODSW/LTLP WELL SWITCH WSLD MILLBRIDGE VI LLC DB 5377 PG 23 MB O PG 637 DB 3383 PG 702 DEBORAH H. RUSCIOLELLI WILLIAM J. RUSCIOLELLI & CYNTHIA S. HELMS ALBERT THOMAS HELMS & DB 6476 PG 204 WSLD MILLBRIDGE VI LLC DB 5377 PG 23 WSLD MILLBRIDGE VI LLC DB 5377 PG 23 DB 396 PG 863 JUDITH H. WOOD JAMES W. WOOD & POND JB w/MHREMOVE 24" RCP-III TAIL DITCH 2' BASE w/ CL 2 RIPRPAP 25 LF @ 10% EST 35 CY DDE EST 54 TONS SEE DITCH DETAIL H JB w/MHEST 73 SY GEOTEXTILE SEE DITCH DETAIL H EST 14 TONS, EST 30 SY GEOTEXTILE 30 LF @ 13%, EST 8 CY DDE, 2' BASE w/ CL I RIP RAP HEAD DITCH EST 25 CY DDE 6 6 8 7 8 9 9 10 10 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 5 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$Y-5500JC -L- STA. 39+00.00 MATCHLINE SEE SHEET 6 -L- STA. 2 1 +5 0. 0 0MATCHLINE SEE SHEET 4 FOR DITCH DETAILS SEE SHEET 2D-1 -L- SEE PROFILE SHEETS 8 & 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER 3 6" RCP-III 24" RCP- III 24" RCP-IVINV. OUT=566.0' INV. OUT=575.0' INV. IN=585.5' INV. OUT=570.5' INV. OUT=544.9' INV. OUT=603.9' 1 8 " RCP-III 24" W/2 ELBOWS HW INV. IN =577.0' INV. IN=576.0' SPECIAL CUT DITCH W/CLASS B RIP RAP SEE DETAIL F INV. IN=596.5' HEAD DITCH 2' BASE w/ CL I RIPRPAP 40 LF @ 14.5% EST 10 CY DDE EST 17 TONS SEE DITCH DETAIL H JB w/MH LATERAL 2' BASE DITCH W/CLASS B RIP RAP SEE DETAIL M INV. OUT=598.9' CLASS B RIP RAP EST. 2 TONS 7 SY GEOTEXTILE TB 2GI BDO24" W/ 2ELBOWSTB 2GI 15" W/ 2 ELBOWS 15" W/ 2 ELBOWS TB 2GI LATERAL 2' BASE DITCH W/CLASS B RIP RAP SEE DETAIL M INV. IN =582.1' 38 SY GEOTEXTILE EST. 25 TONS CLASS II RIP RAP 30 SY GEOTEXTILE EST. 17 TONS CLASS I RIP RAP 10 SY GEOTEXTILE EST. 3 TONS CLASS B RIP RAP 30 SY GEOTEXTILE EST. 17 TONS CLASS I RIP RAP SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL J TOE PROTECTION BEG SBG +95 SEE DETAIL A SPECIAL LATERAL 'V' DITCH SEE DETAIL N LATERAL 2' BASE DITCH SEE DETAIL M W/CLASS I RIP RAP LATERAL 2' BASE DITCH SEE DETAIL A SPECIAL LATERAL 'V' DITCH SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL G W/CLASS I RIP RAP SPECIAL CUT BASE DITCH SEE DETAIL M W/CLASS B RIP RAP LATERAL 2' BASE DITCH SEE DETAIL L W/ TOP OF BERM EL=591.0 STD BERM 2' BASE DITCH SEE DETAIL D W/CLASS I RIP RAP BASE DITCH SPECIAL LATERAL 2' INV. OUT=592.7' SEE DETAIL A SPECIAL LATERAL 'V' DITCH SEE DETAIL M W/CLASS B RIP RAP LATERAL 2' BASE DITCH 15" RCP-IV ELBOWS 18" w/2 10 SY GEOTEXTILE EST. 3 TONS CLASS B RIP RAP =574.0' INV. OUT INV OUT =562.5' EST 35 SY GEOTEXTILE SEE DETAIL AA TYPICAL 2' BASE DITCH W/ PSRM 36" 18" 15" EST 180 CY DDE EST 140 CY DDE EST 410 CY DDE EST 2390 CY DDE -L- PC Sta. 21+69.11 -L- PT Sta. 38+46.17 25 3035 0 1 0 2 04 0 3 04 03 02 01 0002 02 0 2 -L--L-TYP.18'+93 TYP. 1 8'+23 11'11'GR E U T L-2 8:1 GUARDRAIL PROPOSED 5' CONC. SIDEWALK 11'11' 5' PS5' PS8 :1 GREU TL-2 11'11'2 0 ' 20' 20' 20' 20' HANDRAIL PROPOSED ENGLISH LEGEND 0 10050 100 SCALE: 1"= 100' HORIZ.R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh05.dgnMAR0899506/23/2021SITE 1 SITE 2 SITE 1 & SITE 2 PLAN VIEW F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING SHEET 3 OF 16 PERMIT DRAWINGNAD 83/ 2011E E IN WETLAND DENOTES EXCAVATION SHEET 5 AND 6 ON PERMIT DRAWING SEE ENLARGED AREA SHEET 7 AND 8 ON PERMIT DRAWING SEE ENLARGED AREA BEGINNING OF JS CB CB END HANDRAIL -L- STA. 37+00.00 LT BEG. HANDRAIL -L- STA. 24+50.00 LT C C F F F F F F F F F F C C C C C C C F F C F C F C F E E F F F E (NON-EROSIVE) V = 1.3 fps Q = 1.9 cfs10 10 EIP EIP EIP EIP EIP EIP EIP EIP EIP TOP=593.26' DI DITOP=586.20' S60" WW 15" RCP 15" RCP BY2-34 BY2-35 BY2-36BY2-37BY2-38BM #411.7' G R GATECONCB Y2- 3 9 SS1SFDSWALL2 4" ROCKWALL24" ROCKWALL2 4" WDCONCW ALL36" BLK48" WW48" WD WALL 48" WW48" WWGRWALL 4" WD 12" HDPEGATE48" WW 48" WW 1SBKD 8.7' BST 54" BKBK GRILL 12.3' BST 12" BK WALL EI PEIP NGS-RODGERS CONC WG2 S F D60" WW U/C CONC CONCWOODS WOODS WOODS WOODS WOODS WOODS WOODS W OODSW OODSW OODSW OODSW OODSWOODS W OODSWOODS W OODSW OODSBK WSLD MILLBRIDGE VI LLC DB 7172 PG 304 MB B PG 7-B JOSEPH D. SELLS NO DEED LISTED DB 3383 PG 702 DB 396 PG 863 MB O PG 637 TREE SAVE EASEMENT (MB 0 PG 637)TREE SAVE EASEMENT (MB 0 PG 637)7' UE (MB 0 PG 637) 20' SDE EASEMENT (MB 0 PG 637) 20' SDE EASEMENT (MB 0 PG 637) 7' UE (MB 0 PG 637) L E N N A R C A R O LI N A S L L CMB O P G 637 N O D E E D LIS T E D DEBORAH H. RUSCIOLELLI WILLIAM J. RUSCIOLELLI & JUDITH H. WOOD JAMES W. WOOD & 20' PR IVA T E DR IVE (MB B PG 7-B )(TO 2" PVC OVERFLOW)ONLYDIRECTION4" PVC8" PVC8 " PVCBAG W ALL12" CONCW OODSW/LTLP WELL SWITCH WSLD MILLBRIDGE VI LLC DB 5377 PG 23 MB O PG 637 DB 3383 PG 702 DEBORAH H. RUSCIOLELLI WILLIAM J. RUSCIOLELLI & CYNTHIA S. HELMS ALBERT THOMAS HELMS & DB 6476 PG 204 WSLD MILLBRIDGE VI LLC DB 5377 PG 23 WSLD MILLBRIDGE VI LLC DB 5377 PG 23 DB 396 PG 863 JUDITH H. WOOD JAMES W. WOOD & POND JB w/MHREMOVE 24" RCP-III TAIL DITCH 2' BASE w/ CL 2 RIPRPAP 25 LF @ 10% EST 35 CY DDE EST 54 TONS SEE DITCH DETAIL H JB w/MHEST 73 SY GEOTEXTILE SEE DITCH DETAIL H EST 14 TONS, EST 30 SY GEOTEXTILE 30 LF @ 13%, EST 8 CY DDE, 2' BASE w/ CL I RIP RAP HEAD DITCH EST 25 CY DDE 6 6 8 7 8 9 9 10 105405405 4 0 540 540545 5455455455455455455455455 4 5 5 45545 550550550550550550550 5505505555555555555555555555 5 5 5555555555555 5 5 5 5 5 560 560560 560560560560560560560560 560560560560560560565565565 565565565565565565565565565 565565565565570 570 570 570 570570570570570570570570570570570570 570570575 575 5 7 5 575 575575575 575575575575575575575575575575575575575 575580 580 580 580580580580580580580580580580580580580580580580580585585 585 585585585585585585585585585585585585585585585585585590 590 5 9 0 590590590590590590590590590590590590590590590590 595595595595595595595595595595595595595595595 595595595 600600600600600600600600600600600600600600600 600 6056056056056056056056056 0 5 605605605605605610610610610610610610610610610610610615615615615615615615615615615615620620620620620620620620620620620620625625625625625625625625625625630630630630630630630630630630635 635635635635635635635635635635640640640640640640640640640640640 640 6 4 0645645645645 645645 6 4 5645 650650650650650655655 660DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 5 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$Y-5500JC -L- STA. 39+00.00 MATCHLINE SEE SHEET 6 -L- STA. 2 1 +5 0. 0 0MATCHLINE SEE SHEET 4 FOR DITCH DETAILS SEE SHEET 2D-1 -L- SEE PROFILE SHEETS 8 & 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 5 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$Y-5500JC -L- STA. 39+00.00 MATCHLINE SEE SHEET 6 -L- STA. 2 1 +5 0. 0 0MATCHLINE SEE SHEET 4 FOR DITCH DETAILS SEE SHEET 2D-1 -L- SEE PROFILE SHEETS 8 & 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER 3 6" RCP-III 24" RCP- III 24" RCP-IV0501 0502 INV. OUT=566.0' INV. OUT=575.0' INV. IN=585.5' INV. OUT=570.5' INV. OUT=544.9' INV. OUT=603.9' 0503 1 8 " RCP-III 0504 0505 0506 0507 0516 24" W/2 ELBOWS HW INV. IN =577.0' INV. IN=576.0' SPECIAL CUT DITCH W/CLASS B RIP RAP SEE DETAIL F INV. IN=596.5' HEAD DITCH 2' BASE w/ CL I RIPRPAP 40 LF @ 14.5% EST 10 CY DDE EST 17 TONS SEE DITCH DETAIL H JB w/MH 0523 0522 LATERAL 2' BASE DITCH W/CLASS B RIP RAP SEE DETAIL M INV. OUT=598.9' CLASS B RIP RAP EST. 2 TONS 7 SY GEOTEXTILE 0515 TB 2GI 0514 BDO 0518 0519 24" W/ 2ELBOWS0512 TB 2GI 15" W/ 2 ELBOWS 15" W/ 2 ELBOWS 0513 TB 2GI 0517 LATERAL 2' BASE DITCH W/CLASS B RIP RAP SEE DETAIL M INV. IN =582.1' 38 SY GEOTEXTILE EST. 25 TONS CLASS II RIP RAP 30 SY GEOTEXTILE EST. 17 TONS CLASS I RIP RAP 10 SY GEOTEXTILE EST. 3 TONS CLASS B RIP RAP 30 SY GEOTEXTILE EST. 17 TONS CLASS I RIP RAP SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL J TOE PROTECTION BEG SBG +95 SEE DETAIL A SPECIAL LATERAL 'V' DITCH SEE DETAIL N LATERAL 2' BASE DITCH SEE DETAIL M W/CLASS I RIP RAP LATERAL 2' BASE DITCH SEE DETAIL A SPECIAL LATERAL 'V' DITCH SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL G W/CLASS I RIP RAP SPECIAL CUT BASE DITCH SEE DETAIL M W/CLASS B RIP RAP LATERAL 2' BASE DITCH SEE DETAIL L W/ TOP OF BERM EL=591.0 STD BERM 2' BASE DITCH SEE DETAIL D W/CLASS I RIP RAP BASE DITCH SPECIAL LATERAL 2' INV. OUT=592.7' SEE DETAIL A SPECIAL LATERAL 'V' DITCH 0527 SEE DETAIL M W/CLASS B RIP RAP LATERAL 2' BASE DITCH 15" RCP-IV 0524 0525 ELBOWS 18" w/2 10 SY GEOTEXTILE EST. 3 TONS CLASS B RIP RAP =574.0' INV. OUT 0526 INV OUT =562.5' EST 35 SY GEOTEXTILE SEE DETAIL AA TYPICAL 2' BASE DITCH W/ PSRM 36" 18" 15" EST 180 CY DDE EST 140 CY DDE EST 410 CY DDE EST 2390 CY DDE -L- PC Sta. 21+69.11 -L- PT Sta. 38+46.17 25 3035 0 1 0 2 04 0 3 04 03 02 01 0002 02 0 2 -L--L-TYP.18'+93 TYP. 1 8'+23 11'11'GR E U T L-2 8:1 GUARDRAIL PROPOSED 5' CONC. SIDEWALK 11'11' 5' PS5' PS8 :1 GREU TL-2 11'11'2 0 ' 20' 20' 20' 20' HANDRAIL PROPOSED ENGLISH LEGEND 0 10050 100 SCALE: 1"= 100' HORIZ.R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh05_con.dgnMAR0899506/23/2021SITE 1 SITE 2 SITE 1 & SITE 2 PLAN VIEW F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING SHEET 3 OF 16 PERMIT DRAWINGNAD 83/ 2011E E IN WETLAND DENOTES EXCAVATION SHEET 5 AND 6 ON PERMIT DRAWING SEE ENLARGED AREA SHEET 7 AND 8 ON PERMIT DRAWING SEE ENLARGED AREA BEGINNING OF JS SHEET 4 OF 16 PERMIT DRAWING CB CB END HANDRAIL -L- STA. 37+00.00 LT BEG. HANDRAIL -L- STA. 24+50.00 LT C C F F F F F F F F F F C C C C C C C F F C F C F C F E E F F F E (NON-EROSIVE) V = 1.3 fps Q = 1.9 cfs10 10 WOODS (TO 2" PVC OVERFLOW)ONLYDIRECTION4" PVCWSLD MILLBRIDGE VI LLC DB 5377 PG 23 MB O PG 637 POND REMOVEDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 5 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$Y-5500JC FOR DITCH DETAILS SEE SHEET 2D-1 -L- SEE PROFILE SHEETS 8 & 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER 3 6 " RCP-III 24" RCP- I I I HW JB w/MH ELBOWS 18" w/2 36" -L- BEGINNING OF JS ENGLISH R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh05A.dgnMAR0899506/23/20215A 25 LEGEND 0 3015 30 SCALE: 1"= 30' HORIZ. E E SHEET 5 OF 16 PERMIT DRAWINGNAD 83/ 2011SITE 1 DETAIL SHEET FOR IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED CB F C E E E BY2-34 WOODS (TO 2" PVC OVERFLOW)ONLYDIRECTION4" PVCWSLD MILLBRIDGE VI LLC DB 5377 PG 23 MB O PG 637 POND REMOVE560560565565565570570575575575 575 575580580585590DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 5 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$Y-5500JC FOR DITCH DETAILS SEE SHEET 2D-1 -L- SEE PROFILE SHEETS 8 & 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER 3 6 " RCP-III 24" RCP- I I I HW JB w/MH ELBOWS 18" w/2 36" -L- BEGINNING OF JS ENGLISH R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh05A_con.dgnMAR0899506/23/20215A 25 LEGEND 0 3015 30 SCALE: 1"= 30' HORIZ. E E SHEET 5 OF 16 PERMIT DRAWINGNAD 83/ 2011SITE 1 DETAIL SHEET FOR IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED SHEET 6 OF 16 PERMIT DRAWING CB F C E E E 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 PROJ. REFERENCE NO.SHEET NO.0 6/23/16570 570 580 580 590 590 600 600 610 610 560 560 24+50.00 X-7Y-5500JC -L- 5 10 ENGLISH SITE 1 SHEET 7 OF 16 PERMIT DRAWING R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_site1_xsect.dgnMAR0899506/23/2021WETLAND 573.73 0.0400.040 2:1 586.522:1 576.87 5 :1 2:12:1562.00 BY2-38BM #4JB w/MH 24" RCP-III 9 10 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 5 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$Y-5500JC FOR DITCH DETAILS SEE SHEET 2D-1 -L- SEE PROFILE SHEETS 8 & 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER 24" W/ 2 ELBOWS-L-20' ENGLISH R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh05B.dgnMAR0899506/23/2021LEGEND 0 3015 30 SCALE: 1"= 30' HORIZ. F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING 5B SITE 2 DETAIL SHEET FOR SHEET 8 OF 16 PERMIT DRAWING 35 NAD 83/ 2011F F F F F F (NON-EROSIVE) V = 1.3 fps Q = 1.9 cfs10 10 BY2-38BM #4JB w/MH 24" RCP-III 9 10545545 5455455 4 5 545 550550555555560560565565565570570 570575575575580580580585585585590590595595600605DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 5 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$Y-5500JC FOR DITCH DETAILS SEE SHEET 2D-1 -L- SEE PROFILE SHEETS 8 & 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER 24" W/ 2 ELBOWS-L-20' ENGLISH R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh05B_con.dgnMAR0899506/23/2021LEGEND 0 3015 30 SCALE: 1"= 30' HORIZ. F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING 5B SITE 2 DETAIL SHEET FOR SHEET 9 OF 16 PERMIT DRAWING 35 NAD 83/ 2011F F F F F F (NON-EROSIVE) V = 1.3 fps Q = 1.9 cfs10 10 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100 100100 110 110110 120 120120 130 130130 140 140140 150 150150 PROJ. REFERENCE NO.SHEET NO.0 6/23/16550 550 560 560 570 570 580 580 590 590 600 600 610 610 620 620 630 630 540 540 35+50.00 X-16Y-5500JC -L- 5 10 ENGLISH SITE 2 SHEET 10 OF 16 PERMIT DRAWING WETLAND 160170180190200 591.64 2:10.0400.040 2:1 613.162:1596.50 2:1 R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_site2_xsect.dgnMAR0899506/23/2021 EIPEIPBY2-42P5748 BL-21BY1-3018" RCP15" RCP15" RCP18" RCP P5748 BL-22EIP12" RCPBY1-3115" RCP15" CMP18" HDPEEIPBY2-40 BY2-41 3 6" C MP HWCONCHWCONCHWCONCNC 75 (WAXHAW HWY) 24.0' BSTNC 75 (WAXHAW HWY) 23.7' BST16.8' GR14.7' GR22.5' GR14.1' BST 14.3' GR 20.5' GR SR 1300 HELMS RD. 19.4' BSTRASPBERRY LN 7.5' GR RASPBERRY LN 12' GR 10.3' GREIPEIPSIGRRSIGRRSS1SBKDGWSGGHTRSSSGWW1SFDR/R CABINET48' WD SPLIT RAIL48' WD SPLIT RAILCONCHWCONCWD48" WW4' WD RAMPBKDKWD60.00 'EXISTING R/WEXISTING R/W60.00 'EXISTING R/WEXISTING R/WEXISTING R/W60.00'EXISTING R/WEXISTING R/WWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODS WOODSWOODSWOODS WOODS EXISTING R/W0.44'1.36'60' DUKE POWER R/W (DB 237 PG 480 & DB 4788 PG 116)60' DUKE POWER R/W (DB 237 PG 480 & DB 4788 PG 116)15" RCP100' SEABOARD COAST RAILROAD R/W100.00 '100' SEABOARD COAST RAILROAD R/WWELLOUTLETTTHHTHHTSMTRGUARDCROSSINGGUARDCROSSING72 STR50 PR72 STR50 PR150 PR 144 STR150 PR72 STR144 STRRETAINRETAIN RETAINRETAINFS SEE DETAIL 1 R E MO VE JB w/MH 18" RCP-IV 24" W/ 2ELBOWSRETAIN54" RCP-III F F FF S S S S S S F F F F F FFF F F F F F F F TS TS F S S S S FF TS F S S 10 11 10 12 25 30 25 30 -Y3--Y4--L- PC Sta. 42+75.22 -L- PT Sta. 50+05.91 -Y2- POT Sta. 10+00.00 -L- POC Sta. 47+00.00 = -Y4- POT Sta. 25+59.63 -Y2- POT Sta. 12+74.75 =4045 50 -L--L--L- POT Sta. 53+00.00 TYP.18'+31TYP.18'+14+82TYP.18'11'11'11'11' 12'12' R = 55' R = 48' -Y3- POT Sta. 23+60.24 -Y2- POT Sta. 13+66.79 = -Y2- POT Sta. 11+40.00 END CONSTRUCTION 20'20'N A D 83/ 201110-Y2 - +14TYP.19' -Y2- PC Sta. 10+35.72 -Y2- PRC Sta. 11+33.97 -Y2- PCC Sta. 11+86.03 -Y2- PC Sta. 13+21.77 -Y2- PT Sta. 12+88.92 -Y2- PT Sta. 13+60.55 5' CONC. SIDEWALK 5' CONC. SIDEWALK8:1 8 :1 END TIP PROJECT Y-5500JC 20'HANDRAIL PROPOSED DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 6 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$SEE SHEET 2B-1 FOR INTERSECTION DETAILSSEE SHEET 2B-5 THRU 2B-8 FOR ISLAND DETAILS Y-5500JC -L- STA. 39+00.00MATCHLI NE SEE SHEET 5EXISTING PAVEMENT REMOVAL FOR DITCH DETAILS SEE SHEET 2D-1 -Y2- SEE PROFILE SHEET 9 -L- SEE PROFILE SHEET 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER HW 54" RCP-IV INV. OUT=569.3' (BURIED 1') INV. IN=576.1' (BURIED 1')REMOVE15"RETAIN RETAIN INV. IN =597.0' 18" RCP-IV SEE DETAIL B SPECIAL CUT DITCH (ON BANKS ONLY) 123 SY GEOTEXTILE EST. 94 TONS CLASS II RIP RAP SEE DETAIL J TOE PROTECTION SEE DETAIL J TOE PROTECTION 18" RCP-IV 15" RCP-I V CB CB 15" RCP-IV 15" RCP-IV 15 " RCP -IV DI CB CB CB CB SEE DETAIL 1 FS INV. IN=597.0' INV. IN=627.8'15"15" RCP- I V (NON-EROSIVE) V = 1.3 fps Q = 5.5 cfs10 10 MECHANIZED CLEARING ENGLISH LEGEND 0 10050 100 SCALE: 1"= 100' HORIZ.R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh06.dgnMAR0899506/23/2021SITE 3 F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING SITE 3 PLAN VIEW SHEET 11 OF 16 PERMIT DRAWING IN SURFACE WATER DENOTES PERMANENT IMPACTSSS SHEET 13 AND 14 ON PERMIT DRAWING SEE ENLARGED AREA TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY F C F C C C C C F F C F C F C C C C F F F F FC F F EIPEIPBY2-42P5748 BL-21BY1-3018" RCP15" RCP15" RCP18" RCP P5748 BL-22EIP12" RCPBY1-3115" RCP15" CMP18" HDPEEIPBY2-40 BY2-41 3 6" C MP HWCONCHWCONCHWCONCNC 75 (WAXHAW HWY) 24.0' BSTNC 75 (WAXHAW HWY) 23.7' BST16.8' GR14.7' GR22.5' GR14.1' BST 14.3' GR 20.5' GR SR 1300 HELMS RD. 19.4' BSTRASPBERRY LN 7.5' GR RASPBERRY LN 12' GR 10.3' GREIPEIPSIGRRSIGRRSS1SBKDGWSGGHTRSSSGWW1SFDR/R CABINET48' WD SPLIT RAIL48' WD SPLIT RAILCONCHWCONCWD48" WW4' WD RAMPBKDKWD60.00 'EXISTING R/WEXISTING R/W60.00 'EXISTING R/WEXISTING R/WEXISTING R/W60.00'EXISTING R/WEXISTING R/WWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODSWOODS WOODSWOODSWOODS WOODS EXISTING R/W317 PROPERTIES LLC DB 6363 PG 874 DB 4788 PG 116DB 291 PG 599WSLD MILLBRIDGE VI LLC DB 6359 PG 535 DB W18E PG 122 SHERRY FRANCES MCCLAIN DAVIE GENE MCCLAIN DB 1581 PG 657 0.44'1.36'60' DUKE POWER R/W (DB 237 PG 480 & DB 4788 PG 116)60' DUKE POWER R/W (DB 237 PG 480 & DB 4788 PG 116)TERESA C. SCHULTZ MICHAEL J. SCHULTZ &SEABOARD COAST LINE RAILROAD CO & CSX REAL ESTATE PROPERTY15" RCP100' SEABOARD COAST RAILROAD R/W100.00 '100' SEABOARD COAST RAILROAD R/WWELLOUTLETTTHHTHHTSMTRGUARDCROSSINGGUARDCROSSING72 STR50 PR72 STR50 PR150 PR 144 STR150 PR72 STR144 STRWSLD MILLBRIDGE VI LLC DB 5377 PG 23 WSLD MILLBRIDGE VI LLC DB 5377 PG 23 RETAINRETAIN RETAINRETAINFS SEE DETAIL 1 R E MO VE JB w/MH 18" RCP-IV 24" W/ 2ELBOWSRETAIN54" RCP-III F F FF S S S S S S F F F F F FFF F F F F F F F TS TS F S S S S FF TS F S S 10 11 10 12555560560560560560560560565565565565 565565565565565565565 5 6 5 5705705705705 7 0 5 7 0 570 5 7 0570570 5705705755755755755 7 5575575575 5 7 5 5 7 5575 5755755805805805805805805805 805 8 0 580580580580 580580580 5805855855855855855855855 8 5 5 8 5 585 5 8 5585 585585585585 585590590590590590590590 590590590590 590590590590590595595 595595595595 595 5955955 9 5 595595595595595595595 595600 600 6006 0 060 0 600600600600600 600600600600600600600600600605 6056 0 5 6056 0 5 6056056 05 605 605605605605605605605605605 605 605610610610610 610 610610610610610 6 10610610 6 1 0 610610610610610610615615615 6 1 5 615 615615 6 15 615615615615615615615 615615615615615615620620620620620620620620620620620620620620 620620 620620620620620620620620620625625625 625 6 2 5 6256256256256256256256256256256256256256256306306306 3 0 630630630 6 3 0 630630630630630 630635635635635635635 64025 30 25 30 -Y3--Y4--L- PC Sta. 42+75.22 -L- PT Sta. 50+05.91 -Y2- POT Sta. 10+00.00 -L- POC Sta. 47+00.00 = -Y4- POT Sta. 25+59.63 -Y2- POT Sta. 12+74.75 =4045 50 -L--L--L- POT Sta. 53+00.00 TYP.18'+31TYP.18'+14+82TYP.18'11'11'11'11' 12'12' R = 55' R = 48' -Y3- POT Sta. 23+60.24 -Y2- POT Sta. 13+66.79 = -Y2- POT Sta. 11+40.00 END CONSTRUCTION 20'20'N A D 83/ 201110-Y2 - +14TYP.19' -Y2- PC Sta. 10+35.72 -Y2- PRC Sta. 11+33.97 -Y2- PCC Sta. 11+86.03 -Y2- PC Sta. 13+21.77 -Y2- PT Sta. 12+88.92 -Y2- PT Sta. 13+60.55 5' CONC. SIDEWALK 5' CONC. SIDEWALK8:1 8 :1 END TIP PROJECT Y-5500JC 20'HANDRAIL PROPOSED DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 6 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$SEE SHEET 2B-1 FOR INTERSECTION DETAILS SEE SHEET 2B-5 THRU 2B-8 FOR ISLAND DETAILS Y-5500JC -L- STA. 39+00.00MATCHLI NE SEE SHEET 5EXISTING PAVEMENT REMOVAL FOR DITCH DETAILS SEE SHEET 2D-1 -Y2- SEE PROFILE SHEET 9 -L- SEE PROFILE SHEET 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER HW 54" RCP-IV INV. OUT=569.3' (BURIED 1') INV. IN=576.1' (BURIED 1')REMOVE15"RETAIN RETAIN INV. IN =597.0' 18" RCP-IV SEE DETAIL B SPECIAL CUT DITCH (ON BANKS ONLY) 123 SY GEOTEXTILE EST. 94 TONS CLASS II RIP RAP SEE DETAIL J TOE PROTECTION SEE DETAIL J TOE PROTECTION 18" RCP-IV 15" RCP-I V CB CB 15" RCP-IV 15" RCP-IV 15 " RCP -IV DI CB CB CB CB SEE DETAIL 1 FS INV. IN=597.0' INV. IN=627.8'15"15" RCP- I V (NON-EROSIVE) V = 1.3 fps Q = 5.5 cfs10 10 MECHANIZED CLEARING ENGLISH LEGEND 0 10050 100 SCALE: 1"= 100' HORIZ.R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh06_con.dgnMAR0899506/23/2021SITE 3 F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING SITE 3 PLAN VIEW SHEET 11 OF 16 PERMIT DRAWING IN SURFACE WATER DENOTES PERMANENT IMPACTSSS SHEET 13 AND 14 ON PERMIT DRAWING SEE ENLARGED AREA TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET 12 OF 16 PERMIT DRAWING F C F C C C C C F F C F C F C C C C F F F F FC F F EIP3 6" C MP RASPBERRY LN 12' GR WOODS WOODSFS SEE DETAIL 1 R E MOVE JB w/MH 24" W/ 2ELBOWS54" RCP-III F F FF S S S S S S F F F F F FFF F F F F F F F TS TS F S S S S FF TS F S S 10 HANDRAIL PROPOSED HW 54" RCP-IV15" RCP-I V CB CB CB CB 15" RCP- I V (NON-EROSIVE) V = 1.3 fps Q = 5.5 cfs10 10 MECHANIZED CLEARING DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 6 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$SEE SHEET 2B-1 FOR INTERSECTION DETAILS SEE SHEET 2B-5 THRU 2B-8 FOR ISLAND DETAILS Y-5500JC EXISTING PAVEMENT REMOVAL FOR DITCH DETAILS SEE SHEET 2D-1 -Y2- SEE PROFILE SHEET 9 -L- SEE PROFILE SHEET 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER ENGLISH LEGEND 0 3015 30 SCALE: 1"= 30' HORIZ. F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh06A.dgnMAR0899506/24/2021SITE 3 DETAIL SHEET FOR SHEET 13 OF 16 PERMIT DRAWING42 S S IN SURFACE WATER DENOTES PERMANENT IMPACTS N A D 83/ 2011-L- 6A TS TS IN SURFACE WATER DENOTES TEMPORARY IMPACTS INVERT BURIED 1-FT INVERT BURIED 1-FTC F F F C F F EIP3 6" C MP RASPBERRY LN 12' GR WOODS WOODSFS SEE DETAIL 1 R E MOVE JB w/MH 24" W/ 2ELBOWS54" RCP-III F F FF S S S S S S F F F F F FFF F F F F F F F TS TS F S S S S FF TS F S S 10 5 7 0 575575580580580580580585585 585585590 590590590595 595595600600605605610HANDRAIL PROPOSED HW 54" RCP-IV15" RCP-I V CB CB CB CB 15" RCP- I V (NON-EROSIVE) V = 1.3 fps Q = 5.5 cfs10 10 MECHANIZED CLEARING DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Office of: Prepared in the Fuquay-Varina, NC 27526 www.mottmac.com/americas 6 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$SEE SHEET 2B-1 FOR INTERSECTION DETAILS SEE SHEET 2B-5 THRU 2B-8 FOR ISLAND DETAILS Y-5500JC EXISTING PAVEMENT REMOVAL FOR DITCH DETAILS SEE SHEET 2D-1 -Y2- SEE PROFILE SHEET 9 -L- SEE PROFILE SHEET 9 7621 Purfoy Rd Suite 115 PAVED SHOULDER ENGLISH 0 3015 30 SCALE: 1"= 30' HORIZ.R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_psh06A_con.dgnMAR0899506/24/2021SITE 3 DETAIL SHEET FOR SHEET 14 OF 16 PERMIT DRAWING42 N A D 83/ 2011-L- LEGEND F F DENOTES FILL IN WETLANDS DENOTES MECHANIZED CLEARING S S IN SURFACE WATER DENOTES PERMANENT IMPACTS TS TS IN SURFACE WATER DENOTES TEMPORARY IMPACTS INVERT BURIED 1-FT INVERT BURIED 1-FT 6A C F F F C F F 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 PROJ. REFERENCE NO.SHEET NO.0 6/23/16570 580 590 560 43+00.00 X-22Y-5500JC -L- 5 10 ENGLISH SITE 3 SHEET 15 OF 16 PERMIT DRAWING 600 570 580 590 560 600 WETLAND WETLAND WETLAND 580.05 2:10.0400.040 2:1 600.19R:\Hydraulics\PERMITS_Environmental\Drawings\F-14288_hyd_prm_wet_site3_xsect.dgnMAR0899506/23/2021 Hand Existing Existing Permanent Temp.Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) SITE 1 -L- 24+35 TO 24+65 LT 36" RCP-III < 0.01 0.02 SITE 2 -L- 35+40 TO 35+88 LT 24" CSP < 0.01 0.01 SITE 3 -L- 42+35 TO 43+05 LT 54" RCP-IV 0.03 0.05 < 0.01 < 0.01 91 12 SITE 3 -L- 42+55 TO 43+52 RT 54" RCP-IV 0.07 < 0.01 < 0.01 < 0.01 120 20 TOTALS*:0.10 < 0.01 0.08 < 0.01 < 0.01 211 32 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 16 OF 16 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS UNION COUNTY Y-5500JC NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS JUNE 23, 2021