HomeMy WebLinkAboutNCG590036_Compliance Evaluation Inspection_20210903ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
September 3, 2021
Shawn Pennell
Public Utilities Director
City of Hickory
Post Office Box 398
Hickory, North Carolina 28603-0398
Subject: Compliance Evaluation Inspection
Hickory WTP
NPDES Permit No. NCG590036
Catawba County
Dear Mr. Pennell:
Enclosed is a copy of the Compliance Evaluation Inspection (CEI) Report for the inspection conducted at the subject
facility on August 31, 2021, by Mr. Wes Bell of this Office. Please advise the facility's Operator -in -Responsible Charge
(ORC) of our findings by forwarding a copy of the enclosed report.
Should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192,
or via email at wes.bell@ncdenr.gov.
Enclosure: Inspection Report
NORTH
Dep®rlmont of Environmental Onolit
Sincerely,
EDocuSigned by:
A14CC681AF27425...
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quality 1 Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 IL I
21IIIIII
NPDES yr/mo/day Inspection
3 I NCG590036 111 121 21/08/31 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
19I S I 2011
IIIIIIIIIII IIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
67I2.0 I 70I4 I 71IN I 72 I N I 73I 1 74 751
I I 1
I I I I I I I80
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES Dermit Number)
Hickory WTP
1560 Old Lenoir Rd
Hickory NC 28603
Entry Time/Date
09:15AM 21/08/31
Permit Effective Date
21/08/01
Exit Time/Date
10:40AM 21/08/31
Permit Expiration Date
24/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Mark E Haynes/ORC/828-323-7530/
Wesley K Boyd//828-323-7530 /
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Warren Wood,PO Box 398 Hickory NC 286010398//828-323-7412/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling DispoFacility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s)
Wes Bell
of Inspector(s) Agency/Office/Phone and Fax Numbers Date
�Docusigned by: DWR/MRO WQ/704-663-1699 Ext.2192/ 9/2/2021
"-A61696D90CC3437...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger DWR/Division of Water Quality/704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
9/3/2021
"-A14CC681AF27425...
Page# 1
NPDES yr/mo/day
31 NCG590036 111 121 21/08/31
I17
Inspection Type
18 [j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NCG590036
Inspection Date: 08/31/2021
Owner - Facility: Hickory WTP
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ •❑
application?
Is the facility as described in the permit? • ❑ ❑ ❑
# Are there any special conditions for the permit? ❑ ❑ • ❑
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment: The Division issued a Certificate of Coverage (CoC) for NCG590036 on 7/12/21 with
an effective date of 8/1/21. The facility had previously operated/discharged under the
authority of Permit No. NC0044121.
The last compliance evaluation inspection at this facility was performed by DWR staff
on 5/8/19.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • ❑ ❑ ❑
Is all required information readily available, complete and current? • ❑ ❑ ❑
Are all records maintained for 3 years (lab. reg. required 5 years)? • ❑ ❑ ❑
Are analytical results consistent with data reported on DMRs? • ❑ ❑ ❑
Is the chain -of -custody complete? • ❑ ❑ ❑
Dates, times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses •
Transported COCs ■
Are DMRs complete: do they include all permit parameters? • ❑ ❑ ❑
Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ • ❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ • ❑
operator on each shift?
Is the ORC visitation log available and current? • ❑ ❑ ❑
Is the ORC certified at grade equal to or higher than the facility classification? • ❑ ❑ ❑
Is the backup operator certified at one grade less or greater than the facility • ❑ ❑ ❑
classification?
Is a copy of the current NPDES permit available on site? • ❑ ❑ ❑
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ • ❑
Page# 3
Permit: NCG590036
Inspection Date: 08/31/2021
Owner - Facility: Hickory WTP
Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Comment: The records reviewed during the inspection were organized and well maintained.
Discharge monitoring reports (eDMRs) were reviewed for the period August 2020
through July 2021. No effluent limit violations were reported and all monitoring
frequencies were correct. All parameters/samples to determine total nitrogen values
were being properly collected and calculated/reported.
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
DOME
Comment: On -site effluent field analyses (pH and total residual chlorine) are performed under the
City of Hickory WTP's laboratory certification #5072. Pace Analytical Services and ETT
Environmental (chronic toxicity) have also been contracted to provide analytical
support.
The effluent pH and total residual chlorine sample collection/analysis times were being
performed within the 15-minute required holding times.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ • ❑
Is sample collected below all treatment units? • ❑ ❑ ❑
Is proper volume collected? • ❑ ❑ ❑
Is the tubing clean? El El • El
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 El El • El
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type • ❑ El El
representative)?
Comment: The subject permit requires effluent grab samples.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • El El El
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable El El El
Solids, pH, DO, Sludge Judge, and other that are applicable?
Page# 4
Permit: NCG590036
Inspection Date: 08/31/2021
Owner - Facility: Hickory WTP
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Comment: The wastewater generated from the water treatment process is conveyed to an
equalization tank where the solids are settled. The clarified wastewater is
dechlorinated (sulfur dioxide gas) prior to discharge into the receiving stream. The EQ
basin's sludge is pumped to the gravity thickener. All of the gravity thickener's
wastewater/sludge is pumped (via pump station) to the City's Northeast WWTP. The
sludge is ultimately disposed at the Regional Compost Facility for further
treatment/processing.
All NPDES facilities appeared to be properly operated and well maintained.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
▪ ❑ ❑ ❑
Comment: The flow meter is calibrated/verified twice per year and was last calibrated/verified on
4/19/21 by Diversified Integration.
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment: The effluent appeared clear with no floatable solids or foam.
Yes No NA NE
• ❑ ❑ ❑
• ❑ • ❑
Page# 5