Loading...
HomeMy WebLinkAbout20210656 Ver 1_Buffer Approval Letter_20210913 September 13, 2021 DWR #20210656v1 Wake County This letter replaces one dated April 22, 2021 Emily Crawford and Chad Cygan 113 Goldenthal Court Cary, NC 27519 (via email at emily.crawford@gmail.com) Subject: AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B .0714) WITH ADDITIONAL CONDITIONS 113 Goldenthal Court Ms. Crawford, You have our approval for the impacts listed below for the purpose described in your application received by the Division of Water Resources (Division) on March 26, 2021. This letter shall act as your Authorization Certificate Approval as described within 15A NCAC 02B .0611(b). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This Authorization Certificate shall expire five (5) years from the date of this letter. This approval requires you to comply with the following conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Buffer Rules are met. No other impacts are approved, including incidental impacts [15A NCAC 02B. 0714]. Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers – Zone 2 B1: patios, fireplace 321 (square feet) 0 (square feet) 2. Compensatory Mitigation Using a Private Mitigation Bank Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received a Statement of Availability letter from Environmental Banc and Exchange, LLC and the EBX-Neuse I, LLC Neuse Riparian Buffer Umbrella Mitigation Bank or EBX Upper Neuse Riparian Umbrella Mitigation Bank to meet this mitigation requirement. The specific bank site to be debited is either Buffalo Branch, Bucher, Selma Mill, Cedar Grove, Ezell, Polecat, Stone Creek, Hannah Bridge, Meadow Spring, Poplar Creek, Uzzle, or Hatley located in HUC 03020201. Until RES, LLC receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to Resource Environmental Solutions, LLC to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Compensatory Mitigation Required Bank Sponsor River & Sub-basin Number Buffer- Zone 2 481.5 (square feet) EBX-Neuse I, LLC, Environmental Banc and Exchange, LLC Neuse: 03020201-Not in Falls Lake Watershed Total: 481.5 (square feet) 3. Dispersed Flow All stormwater must be directed and maintained as dispersed flow, as defined in 15A NCAC 02H .0100, at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream. [15A NCAC 02B .0714 (9)] 4. No Additional Zone 1 Impacts No impacts (except for "Deemed Allowable" uses as identified within 15A NCAC 02B .0714 (11) shall occur to Zone 1 of the protected riparian buffers unless otherwise approved by the DWR. No impervious surfaces shall be added to Zone 1, unless otherwise approved by the DWR. [15A NCAC 02B .0714 (8)(a)] 5. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case-by-case basis. 6. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur [15A NCAC 02H .0501 and .0502]. 7. Protective Fencing All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (example- orange fabric fencing) prior to any land disturbing activities and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] This Authorization neither grants nor affirms any property right, license, or privilege in any waters, or any right of use in any waters. This Authorization does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and this Authorization does not create any prescriptive right or any right of priority regarding any usage of water. This Authorization shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Authorization to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0714. Please contact Rick Trone at rick.trone@ncdenr.gov if you have any questions or concerns. Sincerely, Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: DWR 401 & Buffer Permitting Unit Filename:20210656 Ver 1_Crawford Cygan Backyard Patio_Wake_NRB DocuSign Envelope ID: 6BEBF6E9-9353-4A3B-B3DD-583887BBC6E5