Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20211353 Ver 1_Shoreline Stabilization_20210913
Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: Pre -Submittal Meeting Request Form.pdf 1.61 MB Pre -fling Meeting or Request Date 8/11/2021 ID# Version I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * rogerajeffs@gmail.com Rease provide an email address for payrrent and requests for pure information here. Owner Information: Name: * Roger Jeffs Email: * rogerajeffs@gmail.com Phone Number:* (919)667-7949 (xxx)xxx-xxxx Mailing Address:* Street Address 149 South Longfellow Lane Address Line 2 City State / Frovince / Region Mooresville NC Fbstal / Zip Code Country 28117 US Is there an agent working on the project? * Agent/Consultant Information ................................................................................................................. Name: Company Affiliation:* Email: Phone Number:* Mailing Address:* F Yes r No Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecychng.com (704)660-5111 (XXX)XXX-XXXX Address 638 Oakridge Farm Hwy Address Line 2 City Mooresville Fbstal / Zip Code 28115 Asigned and dated copyof the Agent Authorization letter:* Auth. Form.pdf 1.86MB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Jeffs Dredge State / Province / Fdegion NC Country United States If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Property Address Lookup:* Street Address 227 Mayfair Road Address Line 2 City Mooresville Fbstal / Zip Code 28117 Latitude:* 35.537594 State / Province / Region NC Country US Longitude:*-80.909530 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 2.52MB Buffer Form.pdf 2.52MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Dredge Area Pic s.pdf 24.2MB 4. Location of the property (where work is to be conducted) Nearest Town:* Mooresville County:* Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* The Point on Norman Lot 35 Include phase/lot nunber Directions to site:* 610 E Center Ave Mooresville, NC 28115 Head south on Evergreen St toward E Center Ave 13 s (197 ft) Take NC- 1100/Brawley School Rd to Chatham Rd 19 min (9.5 mi) Turn right onto E Center Ave 0.5 mi Turn left onto S Church St 0.4 mi Turn right onto E Wilson Ave 1.5 mi Continue onto NC- 1100/Brawley School Rd 1.0 mi Continue straight to stay on NC- 1100/Brawley School Rd 6.2 mi Drive to Mayfair Rd 2 min (0.7 mi) Turn left onto Chatham Rd 0.2 mi Turn left onto Mayfair Rd 0.5 mi 227 Mayfair Rd Mooresville, NC 28117 Rease include road nacres and nunbers, landn aft etc. 5. Describe the existing land use or condition of the site at the time of this application:* New Residential Construction Pesidential, undeveloped, etc. 6. Property Size 1.84 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredge a 60' x 60' area for new dock. Dredge by barge, haul material off by land. 8. How will the work be done? * I7 From Land V From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 466.66 cubic yards below square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0' above dredge 10' x 50' access corridor (500 sf temp. impact) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) Grass buffer, no trees removed, minimal disturbance to buffer Sketch: Dredge Application.pdf 23.49MB Dredge Spoils Info.pdf 18.44MB Sketch.pdf 1.75MB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* JaniceFstep Signature: Submittal Date: 9/13/2021 Initial Review Is this accepted into the review process?* Project Number:* 20211353 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. 35 PLAN NO. PARCEL ID: STREET ADDRESS: 3\a`1 J�a,r PoresQiIke 14f, asI1`1 Please print: Property Owner: Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Janice E51� of C13C' ayone E piPc�''► n►l Lr� (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): iLi 4 5. 1 na 11© n. Telephone: q I q - Lo ( e-1 — "1 q y We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. O " Authorized Signature Authorized Signature Date: : , 0 `2, f Date: x. 1. ro� x w w x �E r rc _ z i va y a :E t c n . r x ■ m I I � m 8/11 /2021 Submission Completed DWR Pre -Filing Meeting Request Form Contact Name* Contact Email Address * Project Owner* Project Name* Project County* Owner Address: Is this a transportation project? * Janice Estep info@cbcstoneandrecyling.com Roger Jeffs Jeffs Dredge Iredell Street Address 227 Mayfair Rd. Address Line 2 City Mooresville Postal / Zip Code 28117 Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Individual Permit Shoreline Stabilization Does this project have an existing project ID#? Yes No NOR'. CARD NA Ee.�kanmrntafCturAUy State / Province / Region NC Country us 401 Water Quality Certification - Express Modification Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information. Dredge a 60' x 60' area for new dock. Dredge by barge, haul material out by land. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. hftps://edocs.deq.nc.gov/Forms/Form/Submit 112 8111 /2021 Submission Completed 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature* Submittal Date 8/11/2021 https://edocs.deq.nc.gov/Forms/Form/Submit 2/2 Lake At P-H 0 3.5 Full Pand! ADO Normal'Watef' Level Sh�6r4lne Nc, --k-vee-s re-nqoQexA New +0 �0 �Ve-'C A C, Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as loft X looft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSG P 10-2013 Page 3 of 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: 01V Na4f#10 �bI �i t L% l ' I County: f Owner: Ty r kt cWhA G,4 -1 Print Contractor/agent: Print Sign tore The approval is for the purpose and design described in your application. impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification ___ ee...-x: , hereby state that I have been informed of the Catawba Riparri n4Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: �� �� Duke Eneray Excavation Permit Angfication Form FOR DUKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit $ Check # Date Recv'd Initials j Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections Date 1 U Zd Initials Date Final Protection/Avoidance Area Markings Field - Verified Initials Approved to Start Work By Date Completion Required _ Date Passed Closeout Inspection* (Print) (Sign) Date of Any Approved Extension Initials Initials Date Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ONo (If Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Part I. Applicant Information (Please Print) Name Roger Jeffs , Trustee Telephone 919-667-7949 Email address: rogerajeffs@gmail.com Lake Address Mailing Address (if different) 227 Mayfair Rd. 149 S. Longfellow Ln. Mooresville, NC 28117 Mooresville, NC 28117 Contractor Company CBC Stone & Recycling, LLC Contractor Contact Person Janice Estep Telephone 704-660-5111 Contractor Email Address: info@cbcstoneandrecycling.com LAKE LOT INFORMATION Lake Norman County Iredell City M000resville State NC Tax Map No. Subdivision The Point on Norman Lot / Section No. 35 Lot Size 1.84 Acres Duke Energy Page 4 of 13 rev 10l1/2019 Excavation Program Duke Enemy Excavation Permit Application Form Are there any Co -Applicants*? (check one) ❑Yes ®No (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional Information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection $ 1 Q ZI Initials (Duke Energy) J V-411 (applicant/contractor) 0 Duke Energy Page 5 of 13 rev 10i1/2019 Excavation Program Duke Enerey Excavation Permit Application Form Part II. Description of Project A. Basic Information 1. Type of excavation: (check one) 2. Purpose of excavation: (check one) ❑ Water Intake Channel ❑ Other (specify): new dock 3. Lake user category: (check one) ❑Commercial Marina []Other (specify): El New excavation ❑ Maintenance excavation ❑ Boat Access Channel ❑ Wastewater Discharge Channel E]Private ❑Residential Marina ❑Public 4. Max. Excavation Area Dimensions (ft): Length 60' Width 60' Depth 3 F (Note: include additional area dimensions if necessary so response to #S below equals max. area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): 466.66 6. Type of material removed (applicant determines by field sample if practical): Dirt/Silt Cubic yards 7. Excavation Site area: 0.289 Acre (s) Disposal Site area: 2.29 Acre(s) 8. Total Disturbed Area (including equipment staging area): 0.30 Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) ✓ des Jo 10. Do you claim title to the disposal area? (check one) ❑Yes ✓ No 11. Do you claim title to the equipment staging area? (check one) OYes vo 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) Yes 111,40 (If Yes, specify): 13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion control plan and disposal area design): Dredge by barge, haul material off by land and take to disposal site located at 638 Oakridge Farm Hwy. Mooresville, NC 28117. Duke Energy Page 6 of 13 rev 10n/2019 Excavation Program Duke Enerev Excavation Permit Agolication Form 14. Type(s) of excavation equipment to be used: Long Reach Excavator, Dump Trucks 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) IOYes ❑No (If yes, explain) By barge 16. Will return water re-enter the reservoir? (Check one) ❑Yes ONo ❑N/A (If Yes, specify point(s) of re-entry and show on Excavation Area Drawing) 17. Is there an existing facility (e.g. pier) that access is being maintained to by conducting the excavation? ❑Yes IONo (If Yes, provide th��,1te existing permit number. If No, include a scaled drawing of the proposed facility). Permit g Applied fo, New Dock Permit 18. Total planned duration of the work (Include first equipment mobilization, excavation through final mitigation measures complete): START 12 / 21 FINISH 12 / 21 (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev 10n/2019 Excavation Program R m x m 0) W M m Q w y z 0 `� o. T O O CDch N CD M 0 N R p D C (C) R a a a c C CD o � N c Z Z Z Z O p Z A A D D cr 'D v m n� s CL (Q (D C _ � o v � C CD M. fD o G C O w N � r.. b � CD CD CD n � CD CD o 0 Q ft CD CD $ CD w � b CD A O Q.• r c UQ W � o o ��q o CD � o 0 0 � 3 n O C�10 0 0. CD CAD C C) C:t. CD UQ e ' Q O D CD O CD FD O CD C*nCD CD CL C ',-n CD O~ O ftQ O„ qQQ O O � O C� CD � d ffQ (D d � C N n UQ O �a CD C 0 o m� tetra CD � o ORD NCDQ. W r • M O 00 A O �. �' .-� coo �• � A ItD O Z `D Z Z p, O d � EQ d C 0 ro I...1 h Duke Energy Excavation Permit Application Form C. Applicant's Signatures Comments: 1�ie�9hbor S : �O ► +(1-% OA nc . �icx�resv � 1 �� NC a811�t Ohomcxs i L-, ndo, M addox aG3 M4POLI%r �d. MOore5U) 0f- / NC a811`7 Applicant Name (print) Applicant Signature*! ' Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 10/1/2019 Excavation Program Excavation Project User's Agreement Letter (Please fill in the blanks. Please Print) Date TO: Duke Energy c/o Lake Services - EC12Q 526 S. Church Street Charlotte, NC 28202 RE: Excavation FoQ(Subdivision and Lot # 's or Other Project Name) �• ��..t '�s Vrr (Applicant's full name) :Rm2r IP(�s a�k)Sjee hereby agrees to comply with all recommendations, requiremeng and/or conditions of Duke Energy, General Permit(s) (if applicable) and other federal, state and local agency requirements pertaining to the application to excavate for the purpose of a rte.0 � d c r-K In addition, Uwe have read and agree to comply with Duke Energy's current Shoreline Management Plan (SMP) or other applicable guidelines, much of which is repeated herein, and understand that written authorization must be obtained from Duke Energy prior to beginning any activity within the Federal Energy Regulatory Commission (FERC) project boundary or on Duke Energy property associated with a reservoir, collectively referred to as Project Boundary. The excavation will be completed as described in the approved application and within eighteen (18) months from the date of written approval by Duke Energy, unless specifically noted otherwise in the application or unless I/we obtain approval for a single, time extension (maximum of one year) in writing from Duke Energy. I/we understand that if the SMP or other applicable guidelines or rules change during any extension period, I/we will be expected to comply with the new requirements to the maximum extent practicable. 1/we also recognize that failure to complete the excavation within this build -out period will require the filing of a new application within the then - current SNIP or other applicable guidelines and the new application must include any applicable fees and security deposits. 1/we attest to be the owner(s) or lease holder(s) of the land immediately adjoining the Project Boundary where the excavation activity is to take place, or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the proposal within the Project Boundary adjacent to their land. I/we attest to be the owner(s) or lease holder(s) of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the work on their land. Duke Energy Page 1 Rev: 4(6l2020 1/we understand that all excavation work must be done directly in front of my/our property and as specified in Duke Energy's approval. I/we also understand that access channels must run perpendicular to the shoreline while within the third of the cove area that is nearest my/our property. Ilwe understand that for proposed excavations, I/we must notify the appropriate local, state and federal agencies in advance of the activity by sending them a completed copy of Duke Energy's Excavation Permit Application Form and other required information. I/we understand that written authorization and/or other permits may be required by some of these agencies and such required authorizations must be obtained before I/we submit the final application to Duke Energy. At FERC-licensed reservoirs, Ewe understand that except for maintenance excavations, any excavation exceeding 2000 cubic yards of material removed or any excavation or shoreline stabilization work needed to support an application that requires FERC review does itself require specific review and approval by the FERC before Duke Energy can issue any approvals. I/we agree that unless specifically approved otherwise in the application, explosives will not be used as part of this excavation activity. 1/we understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife and other natural resources. I/we understand that applicants in South Carolina proposing excavations that are not covered under the General Permit, or are greater than 150 cubic yards, must receive prior written authorization from the South Carolina Department of Health and Environmental Control (SCDHEC) or the US Army Corps of Engineers (as applicable) before submitting the completed application to Duke Energy. Ilwe agree that excavation activities will not occur during the months of March, April, May and June because of the potential impacts to fish spawning areas. 1/we understand that trees and vegetation growing within or adjoining the lake play an important role in its overall environmental condition, and the ecological benefit the vegetation has on fish and wildlife habitat directly supports a sound and healthy lake environment. I/we also understand that unauthorized removal of shoreline vegetation (e.g. button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests, forfeiture of security deposits and require re-establishment of vegetation at my/our expense, particularly if the disturbance is found to be in violation of state or local ordinances or impacts FERC project buffers. I/we agree all excavated material will be placed in upland areas, landward of the Project Boundary, and confined to prevent erosion and sedimentation back into the lake or nearby streams. Duke Energy Page 2 Rev: 4/6/2020 Uwe agree to adequately stabilize all excavated material and all disturbed shoreline to prevent erosion and runoff into the lake. 1/we understand that the double handling of excavated material will not be allowed; therefore, all excavated material must be placed above the Project Boundary in one handling. I/we have designed the hydraulic excavation process (if any will be used) so that return water re- enters the lake in the same general vicinity and cove as the excavation, to the maximum extent practicable. Uwe agree that the proposed excavation will not be for the purpose of creating additional shoreline, will not alter the Project Boundary or the full pond contour, and will not impact threatened or endangered species, historic properties, or environmentally -important areas, unless special public entity provisions were made in the application. I/we recognize that it is myfour responsibility to clearly locate in the field and label on my/our work area drawings any areas that require specific protection or avoidance during this excavation work. Examples of these protection/avoidance areas include but are not limited to, any Environmental Areas, Natural Areas or Impact Minimization Zones as identified by Duke Energy; jurisdictional wetlands; historic properties; rare or threatened species; and buried gas, water, sewer, electric or communications lines. Uwe agree to provide my/our contractor with a copy of these work area drawings showing these areas to stress the necessary protection measures. I/we agree that if any archaeological resources (e.g. pottery shards, Indian artifacts, etc.) are discovered during the excavation, work shall be halted immediately. I/we will then notify Duke Energy and the State Historic Preservation Office to determine what measures, if any, I/we must pursue to protect or salvage the archaeological resources. Uwe agree that any excavation from within the Project Boundary will not exceed the volume as outlined in the application and will remove and disturb only what is absolutely necessary to achieve the project's stated purpose. Uwe agree to be fully responsible for the permitted lake use and Uwe understand that this responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. I/we understand Duke Energy representatives may issue Stop Work Directives for violations of the SMP or other applicable guidelines and other consequences may result from such violations, including but not limited to suspension or cancellation of approved permits, increases in fees, modification or removal of non -complying structures and restoration of disturbed areas at my/our own expense or loss of any consideration for future lake use permits. I/we agree to immediately comply with any Stop Work Directives, to fully cooperate with Duke Energy and other agencies as necessary, and to perform the necessary remedial actions within the specified time frame. u.xe Energy Page 3 Rev: 4/6/2020 Ave agree to develop any required mitigation plansand to complete any required mitigation activities at my/our own expense within the specified time frames. 1/we recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements (if any) have been satisfactorily fulfilled. I/we agree to notify Duke Energy by phone when the excavation is initiated and to ensure that during the excavation period Uwe will post Duke Energy's approval letter in a clear waterproof bag at the lob site and visible from the water's edge I/we agree to notify Duke Energy in writinu when the excavation is completed (including any required mitigation measures) and that the excavation was completed per the approved application, so a close-out inspection can be performed. Uwe recognize security deposits will not be refunded if any violations of the SMP, other applicable guidelines, or this user's agreement occur. 1/we understand there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. I/we agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims, liability, loss or damage that may arise from this excavation project. Uwe understand that this user's agreement does not, in any way, constitute the transfer of any rights in real property and that my/our use and enjoyment of FERC project and Duke Energy lands and waters shall not hinder the general public's lawful use and enjoyment of the same. Sincerely, licant's Name (Print) Applicant's Si e Co -Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Signature Co -Applicant's Signature Co -Applicant's Signature Co -Applicant's Signature Duke Energy Page 4 Rev: 4/6!2020 Type: CONSOLIDATED REAL PROPERTY Recorded: 4/21/2021 2:07:09 PM Fee Amt: $3,326.00 Page 1 of 2 Revenue Tax: $3,300.00 fredell County, NC Maureen P. Purcell Register of Deeds BK 2805 PG 2041 - 2042 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $3,300.00 Parcel Identifier No. 4635169039 Verified by County on the day of , 20_ By: MailBox to: Thomas & Webber, PLLC, 514 Williamson Road, Suite 431, Mooresville, NC 28117 This instrument was prepared by: Thomas & Webber PLLC 514 Williamson Road Suite 431 Mooresville NC 28117 Title Insurance Company: Brief description for the Index: Lot 35 The Point on Norman THIS DEED made this day of , 20_, by and between Lee Alan Deskus and Archana Deskus Trustees of the Lee and Archana Revocable Trust dated October 17th 2018 161 W Breezy Way Unit 6C The Woodlands, TX 77380 GRANTEE Roger A. Jeffs, as trustee of the Peter Michael Jeffs 2016 Gift Trust 227 Mayfair Road Mooresville, NC 28117 Mailing address: 149 S Longfellow Lane 1 Mooresville NC 28117 Enter in appropriate block for each Grantor and Grantee: name, mailing address, and, if appropriate, character of entity, e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot, parcel of land or condominium unit situated in Iredell County, North Carolina and more particularly described as follows: Being Lot 35, Phase 1 B, of The Point Subdivision as shown on the map thereof recorded in Map Book 31 at Page 50 in the Office of the Register of Deeds for Iredell County, North Carolina. The property hereinabove described was acquired by Grantor by instrument recorded in Book 2747 page 2201. submitted electronically by "Matheson Law Firm, P.A." in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Iredell county Register of Deeds. NC Bar Association Form No. 3 C Revised 7/ 2013 North Carolina Bar Association - NC Bar Form No. 3 Printed by Agreement with the NC Bar Association North Carolina Association of Realtors, Inc. - Standard Form 3 All or a portion of the property herein conveyed includes or does not include the primary residence of a Grantor. Delinquent property taxes, if any, are to be paid by the closing attorney to the county Tax Collector upon disbursement of the closing proceeds. A map showing the above described property is recorded in Plat Book 31 page 49, TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: 1. Ad valorem taxes for the current year (prorated through the date of Settlement); 2. Utility easements and unviolated covenants, conditions or restrictions that do not materially affect the value of the Property. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. Lee Alan Deskus and Archana Deskus Trustees of the Lee and Lee Alan Deskus, Trusiee By: Archana Deskus, Turstee State of - County of 1, the undersigned Notary Public of the County and State aforesaid, certify that Lee Alan Deskus and Archana Deskus, Trustees personally appeared before me this day and acknowledged that they are the Trustees of Lee Alan Deskus and Archana Deskus Trustees of the Lee and Archana Revocable Trust dated October 17th 2018 and that by authority duly given and as the act of such entity, he signed the foregoing instrument in its name on its behalf as its act and deed. Witness my hand and Notarial stamp or sea], this _ +'`day of .,,; , 20_,)� k. My Commission Expires: % Notary Public r..e...R NOTARY PU9l1C STAltOF TDM MY COMM. EW. {lsl4&=3 [S NOTARY 012872294-6 NC Bar Association Form No. 3 0 1976, Revised C 11112010, 2013 This standard form has been approved by: Printed by Agreement with the NC Bar Association North Carolina Bar Association - NC Bar Form No. 3 Catawba Indian Nation Tribal Historic Preservation Office 1536 Tom Steven Road Rock Hill, South Carolina 29730 Office 803-32$ 2427 Fax 803.3284791 September 1, 2021 Attention: Janice Estep CBC Stone and Recycling Re. THPO # TCNS # Project Description 2021-566-24 Roger Jeffs — Trustee — 227 Mayfair Road, Mooresville, NC Dear Ms. Estep, The Catawba have no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project areas. However, the Catawba are to be notified if Native American artifacts and / or human remains are located during the ground disturbance phase of this project. If you have questions please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail Caitlin.Rogers@catawba.com. Sincerely, Wenonah G. Haire u Tribal Historic Preservation Officer 116, Parcel M. Disposal area required (sq ft and for acreage) _ 100, D . 1- o .r Actbwwjsdgement of AkWftcatfan t, -Ed fie l��sr is a �S . c. anti aware that the site must adhere to all state regulations and rotes re riling sedi eti nt and erosion control and water quality. And give permission %r Name of Indivldu and Company to dispose of their dredge material at the above stated location Owner. r % r r Print Date: - 10 - al Along with form, please provide; Aerial of parcel/lot (County GIS) Photo of proposed spoil site Identified proposed spoil site vives m O STATE OF NORTH CAROLINA 1REDELL COUNTY I cerWY €hat Yhis map was drawn frcrn on octuaf survey madeunder my Supervision The unedlusted roVa of precision as cdcufated is 1 to,Ooot 6aun11 . not surveyed if ari,Y, are noted. Deed desripUons are recarde ,u, Page. shown Xtness my hand and seal [his 4d'.day of , NE 2019.. yx111t i11111r� ,` �tytEr4rrtf : Pratessional fond Surveyor L-3743 NOTES; `x`t .,��~ * UL DISTANCES ARE E NOTED, HORIZONTAL MOUND DISTANCES 4 AREA BY COORDWATE COMPUTATION. - PROPERTY SUB.EGT TO ANY V'AUD & ENFORCEABLE trtll:trLlt3tiattk EASEMENTS,. RESTRICTIONS & R(CHTS OF WAY OF RECORD. • SURVEY IS BASED ON PHYSICAL EVIDENCE AND EXISTING MONUMENT FOUND DURING 7HE SURVEY.. - PROPEP.TY CORNER. PIPE SIZES AS SH9NN ARE NOMINAL INSIDE DIAMETER. LEGEND 3Ui3 �,,7 Lti C 4ci.:3.7 L� ��a'12"w st� a7o.T2 LINES SURVEYEE? - Li € S5�-'19 38"E 82.52 L414ES NOT SURVEYED-------- TIE LINES - -- - -- -- Ol?tE0 DtSTRfSUittP# U;±E -- • r `— PIN 4668-36-1353 f {OVERHEAD] OAICRiDGE STORAGE, ILC >' D.E..25z1 PG. 2033 /� -TES TRANSMISSION a NO MONUMENTATION UNLESS OTH€RMSE POSE POLE CENTERLINE NOTED f }! PROPERTY LINE ff (F) DENOTES "FOUND' r r (S) DENOTES °8ET" PIN 465d-20-$85 BRIDGES PROPERTIES, LLC NTS DENOTES 'NOT TO SCALE" D.E. 1602 PG. 1$12 ff l LOT },:-P.B. 36 PG. 150 f MONUMENT F F N. 679940.48 I' E 1462951.44:FT f � d � f `v f f f �k?.... PIN 44567-29-6642 ^? { BRIDGES f PROPERTIES, It,C IA D-e, 1602 PG. 1912 a PIN 4667-39-0Q00 USA6 GQS STAGING APXA N F. rf G 227 ACRE LIKE ENERGY TRANSMISSION LINE LINE ONLYf NAIL (F) AT BENT _ e $7 _P� 3 N 679337.77 FT 28 0.55 FT fREBAR {F) A ' --_ NA } GRAPHIC SCALE PIN 4697-29-5304 PCMF'OMESS HOLDINGS, W Q 45 x90 D.R. 2180 PG. 1029 LOT #2-P.B. 26 PG.. 73 LIVS FILE NO., Si9DSi DWG NO. Sl9Ci51 SURVEYED BY, N.D. 'AAHITU ( IN FEET) DRAWN BY: IY.II_ WHiTLI 1 inch = 154 ft. CHECKED BY: J.R. HOSE TAX PSSOURCE 667-29 FOR URGE OF TITLEITLE REFER TO D.BK. 1602 PG. 1412 PROPERTY OWNED BY -111vt- —5) BRIDGES PROPERTIES, LLC SURVEY AND A4AP PREPARED BY- SUR4'EY SHOWING LOCATION OF LAI(E NORMAN SURVEYING STAG NCr AM. & MAPPING PLL -0190 CODDLE CREEK TOWNSHIP fREDELL COUNTY, N.C_ 137 Jennings Pioad, Suite C Statesville. North Carolino 2862 SCALE: 1" — 150' DATE OF SURVEY: DUNE 3, 3019 (704) 875-4450 Fox (704) 876-445, BOOK_ NA DATE OF MAPPING: JUNE 3, 2019 1. 1KI IUM11 ReCDrddd: Ot08�3 t>o6 $ Tvt)*: OAP PN €ee Amt. $674>(# Page t of 3 Exclse Tare: US4.01 Iredell county. mc Brenda D. 5011 F40ISter ofDeeds sxUPG1912-1914 Excise Tax S654.00 Tax Lot No. Parcel Identifier No 4667-29-6642 and 4668-20-8185-4.34 Verified by ................. .......................... ...................... County on the day of ,........ , by......... ........ Mail after recording to- Grantee This instrumentprepared by. Lutzel, Gandy Broadway, PLLC Brief Description for the Index RTH CAROLINA GENERALWARRANTY GRANTOR Donald Ray Snyder and wife, Vittoria A. Snyder, awn Vicotim A. Snyder GRANTEE Bridges Properties, LLL,C 628 flak Ridge Fann Hwy Mooresville, NC 28115 Enter in appropriate block for each party; name, address, and, if appropriate, character of entity, c.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns and shall include singular, plural, masculine, feminine or neuter as required by context. ITNESSETH, that the Grantor, fora valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does„ ,grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or ,parcel of land situated iu the City of .. ......... ... . ... Township, Iredell County, North Carolina and more particularly described as follows: See Exhibit AA" attached hereto and made a part hereof The Property hereinalaove described was acquired by Granter by i Instrument recorded in Book . ....,,.., Page ........ A map slowing the above described property is recorded in plat Book ............... page....-- - TO HAVE AND TO HOLD the aforesaid lot or parcel ofland and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee supple, has the right to convey the same in fee simple, that title is marketable anal free and clear of all encumbrances, and that Grantor will warrant anti defend the title Against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property herein. above described is subject to the following execptio= All easement,, restrictions and rights of way of record. Ad valorem taxes for the year 2005 and subsequent years not yet due and payable. All matters revealed by and accurate survey ofthe property - IN (Corporate Name) . ! �.... I ....... ... _, .. -(,SAL) Do ,a' � ay Snyd By. Peesidettt... ......_. .. . `S�, .,li... ,��,<.:�:4.. ci��. �, . (SEAL) Attest: Victoria A. Snyder ..{SEAL)............ SEAL) ........ ... (SEAL) sNky4p L� �' NORTH CAROLIN - . £C)UR�T ©� I, a Notary Public of the County and State aforesaid, ee >} >n Snyder and Victoria A. SNydes, Grantor, personally appeared before s d ae#mowledged a exeettti of the tU-8LtG S ca o foregoing Instrument. Witness my hand and O -al S I this 22nd. en7her 004, s �,r My Commission Expires: ... .-....... ,.....,.. hM! FtYiE:�Ny4R (SEAL) NORTH CAROLI A ,,...:_._ COUNTY, i, a Notary Public of the County and State aforesaid, certify that ..._.,.. I ...................... ..... _.... ,..,,................... .,.,.,...... ,..,.......Grantor, personally appeared before tnethis day and acknowledged that JWsheis ........ ............... ......of........_ corporation, and 'that he/she as ................ ..:_. ...,_._ ......... being authorized to do so, exe- cuted the foregoing instrument on behalf of the corporation Witness my hand and official stamp or seat this. .--------- _.. day of ...................... ......... 2004, myCommission Expires:. ---- ......... ......... ..... ....... ........ _Notary Public The foregoing CestificaUe S) of. Ware certified to be correct, This instrument and this certificate are duly . gistered at and time and in tlae hook and Page s iFrstp a €; ter Deeds for unty ..... ............... .. DgmtylAssis -_Register of Deeds EXHIBIT"RI TRACT 1: BEING all of that certain 6.49 =e tract located in Coddle Creek Township, fredell County, North Carolina on NC Hwy 150 By-pass; being more particularly described as follows - BEGINNING at a point in the centerline of the 100 ft. tight of way for NC Hwy 150 By-pass, said point being located Worth 36- t7-36 East 2,453.39 fL (Ground) from NCGS Monument "Ron To" N. 206,469.354 meters E: 445,290.693 meters Dated, 1991 NAD 83; thence continuing from said point of Beginning and along the centerline of the right of way for NC Hwy 150, North 36- 22-t6 East 561.58 it. to a point-, thence leaving said right of way and running with the line of Whitman property (now or formerly) South 64-06-48 East 49.90 ft. to an existing #4 rebar in the eastern margin of the right of way for NC Hwy t 50; thence South 64-06-48 East 246.91 it. to an existing 1/2" pipe; thence continuing with another fine of Whitman property North 40-19-43 East 305.92 ft. to an existing V pipe, thence North 71-18-07 East 121.51 ft, to an existing angle iron in the line of Evelyn Brown (See Deed Book 309, Page 337, Itedell County Registry); thence a new line of John W. Caffey, et al (see Deed Book 601, Page 538, Itedell County Registry) South 42- 31-26 West 221.12 ft. to an existing concrete monument; thence another new line of Caffey, et at South 15-00-41 West 614,81 fl. to an existing #2 rebar; thence with the northern line of Lot 2, Scott D. Burton Property (see Plat Book 26, Page 73, Ireclell County Registry) North 74-59-17 West 572..00 ft, to an existing 42 rebar in the eastern margin of the right of way for NC Hwy 150; thence North 74-59-17 West 5164 ft. to the point and place of Beginning. TRACT11. BEING all and the full contents of Lot No. I as shown on plat of minor Subdivision far William Wallace Whitman Estate and recorded in Plat Book 36, Page 150, Iredell County Registry, to which plat reference is made for a more full and complete description of said lot by metes and bounds. Property comer T -r m C o -n No -o m -Di N m m O U) 0 m D Z OO n n 90 m X CO -----------, � n , Ln to � N � f + m Q om @ < t0 ^' V V W 0 O 7 a 7' jCa 1 C Vi I C�J T G— C) 1 [1 \JWb\Ub-KIKUbWU- U—\Ub-Z -UUJ LL/ MAT H -\LL/ M—AIK KU.dwg vl�O ��zg w�>� - > zommi PA ® U m o D VA m m co AA rj16 i m ZA2 / z a 5 - 6 e y� na J I , �a0 Rim \ I I Aiu>i2> �o�g��5oo�$��c�yz �o�nyynA \ / J - ooy��c�om m<� v � aF�m dim 7m / ZO ymAa Ao mT �� Ng All Ag � o / picas C OD N IV r 0 z yy z 0 CD CL CD ............ . . . . . . . . 0 (D 0 _IQ *2 IDT s z m N z c c 8 � 3 0 i � p N CO o m c m o s ip a 0 d can � 0 N ' 0 'rA 4 5 J 3 ol w � i d Q n ► D C' c � co y n rf �x N a