Loading...
HomeMy WebLinkAboutNCG170125_Carolina Mills Inc Plant 8 Inspection Letter_20210913ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Carolina Mills Incorporated Attention: Carson Copeland 618 Carolina Avenue Maiden, North Carolina 28650 NORTH CAROLINA Enrlronmental Quality September 13, 2021 Subject: Compliance Evaluation Inspection Carolina Mills Incorporated — Plant 8 NPDES Certificate of Coverage —NCG170125 Catawba County, North Carolina Dear Mr. Copeland, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Carolina Mills Incorporated — Plant 8 on September 1, 2021. Please note that in the stormwater inspection report summary we ask that a recission request be submitted for the facility. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Laserfiche Sincerely, es Moore Assistant Regional Engineer ,PTDEQ� fvm�v�- Ymlb\ /- North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Sutte 301 1 Mooresville, North Carohna 28115 704.663.1699 Compliance Inspection Report Permit: NCG170125 Effective: 08/01/19 Expiration: 05/31/24 Owner: Carolina Mills SOC: Effective: Expiration: Facility: Carolina Mills Incorporated -Plant 8 County: Catawba 618 Carolina Ave Region: Mooresville Maiden NC 28650 Contact Person: Carson Copeland Title: Phone: 704-428-9911 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/01/2021 Entry Time 02:10PM Primary Inspector: Jesse M McDonnell Secondary Inspector(s): Certification: Phone: Exit Time: 02:20PM Phone: 704-235-2139 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG170125 Owner - Facility: Carolina Mills Inspection Date: 09/01/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: This was a routine inspection. This facility is no longer in operation. A recission request needs to be submitted. If the permittee wishes to keep the permit, all permit requirements must be maintained at the facility. Contact the Mooresville Regional Office if there are any questions. Page 2 of 3 Permit: NCG170125 Owner -Facility: Carol ina Mills Inspection Date: 09/01/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Page 3of3