Loading...
HomeMy WebLinkAboutNCG070038_Compliance Inspection_20210913ROY COOPER¢' Governor . ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Piw&ww anW Quattty September 13, 2021 Bethlehem Manufacturing Company Attention: Latt Moretz 36 Bethlehem Manufacturing Lane Hickory, North Carolina 28601 Subject: Compliance Inspection NPDES Stormwater Certicate of Coverage- NCG070038 Alexander County, North Carolina Dear Mr. Moretz: Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspections we conducted at the Bethlehem Manufacturing facility September 8, 2021. The reports should be self-explanatory; however, should you have any questions concerning these reports, please do not hesitate to contact me atj*ames.moore@ncdenr.gov 704-235-2138 or Christopher Graybeal at christopher.graybeal@ncdenr.gov (704) 235-2147. Sincerely, aJ s Moore Assistant Regional Engineer Land Quality Section Enclosure c: Stormwater Laserfiche NCG070038 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704-663-1699 Compliance Inspection Report Permit: NCG070038 Effective: 06/01/18 Expiration: 05/31/23 Owner: Bethlehem Manufacturing Co Inc SOC: Effective: Expiration: Facility: Bethlehem Manufacturing Co Inc County: Alexander Bethlehem Manufacturing R Region: Mooresville Hickory NC 28601 Contact Person: Latt T Moretz Title: Phone: 828-495-7731 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/08/2021 Entry Time 09:30AM Primary Inspector: Christopher Graybeal Secondary Inspector(s): Certification: Phone: Exit Time: 10:40AM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: E Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG070038 Owner - Facility: Bethlehem Manufacturing Co Inc Inspection Date: 09/08/2021 • . Inspection Typo: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Update SWPPP annually with date and name of reviewer. Install markers that designate each outfall and perfrom maintenance as needed to access outfalls for sampling. Continue to operate site according to the approved stormwater permit. Page 2 of 3 Permit: NCG070038 Owner - Facility: Bethlehem Manufacturing Co Inc Inspection Date: 09/08/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: Review SWPPP note book annually and document date and name of reviewer on cover of notebook. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Qualitative monitoring reviewed and up to date. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? E ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? E ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Mark all designated outfalls with signage dispalying outfall numbers. Maintain access to outfalls as needed for sampling purposes. A copy of the permit was available in the notebook. Page 3 of 3