HomeMy WebLinkAbout20120659 Ver 1_Sta Inspection_20130730Wetland Inspection Report
-80°26'34''+36°15'22''
SW Plan Location:
Longitude:Latitude:
NCDOT- Bridge No. 15 on SR 1604 (B-4744)Location:
Issued Status:1 Version:
Replace bridge with bridge Project Type:NCDOT- Bridge No. 15 on SR 1604 (B-4744)Project Name:
NC DOT PDEA Site Owner Name:
Project Num:20120659
County:Forsyth Winston-Salem Region:
Inspection Date:07/30/2013
Reason for Inspection:
Inspection Type:Site Inspection (DOT)
Routine
Phone:Inspection Contact Person:Title:
On-Site Representative(s):
Facility compliance Status:Compliant Not Compliant
Amy C Euliss Primary Inspector:
Secondary Inspector(s):
Phone:
Unpermittable Activities
Program Area:Standards/Sediment
Question Areas:
Inspection Summary:
1 Page:
20120659 NC DOT PDEA
Site Inspection (DOT)07/30/2013 Routine Inspection Type:
Project Num:
Inspection Date:Reason for Visit:
Owner:
Yes No NA NE Unpermittable Activities
# Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands,
etc.).
Is stream(s) free of unpermittable impacts?
Is wetland(s) free of unpermittable impacts?
Is open water(s) free of unpermittable impacts?
Are other standards being met (turbidity, pH, etc.) in all surface waters onsite?
Are surface waters on the site free of illegal discharges?
Comment: Sediment deposition following heavy rain. Erosion control plan being
followed. Most of the sediment washed downstream. Wash stone and sediment plume
removed from edge of Little Yadkin.
2 Page: