Loading...
HomeMy WebLinkAboutNCG080411_DMR_20201208Semi-annual Stormwater Uischarge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted 12 /08 /202o CERTIFICATE OF COVERAGE NO. NCG08 0 'A I FACILITY NAME RP��b l i_ c. �SPLV ices COUNTY (� clrPcw PERSON COLLECT] +NG� �SAMPLES -M� N� LABORATORY L.Nr`fJ Lab Cert. tt Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR 2 O 2 0 SAMPLE PERIOD ❑ Jan -June July -Dec or []Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA RECEIVE® Other DEC 14 2020 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 CENTRAL FILES ❑ No discharge this period' DWR SECTION Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark 50 or 100 see permit Within 6.0 — 9.0 15 1 l a •202b L- l -4. io 2.. --'kO 5O # 2 020 1 k o 2. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit 15 50 or 100 see permit 6.0 —9.0 k \ - V& •2020 2.-40 L- 1 -4.(o it 2 1t • t & •2o2-0 2.q0 10 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. S WU-250 last revised October 25, 2012 Page 1 of 2 STORM to ZAT CHARACTERISTICS: Date •20 (first event sampled) Total Event Precipitation (inches): 1 Date 11. o (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Wer 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one rnov of this DMR, including all "No Discharge" resorts, within 30 days of receipt of the lab results for at end of monitoring period in theme -of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significayrt penalties for subm, Ring false information, Including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) tI10812.020 (Date) Additional copies of this form may be downloaded at: http://Portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2