Loading...
HomeMy WebLinkAbout20210209 Ver 1_ePCN Application_20210910 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20210209 1 Is a payment required for this project?* ✓ No payment required 6' Fee received Reviewing Office* ✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review la.Name of project: Haywood Bridge 237 Replacement 1a.Who is the Primary Contact?* Dave McHenry 1b.Primary Contact Email:* 1c.Primary Contact Phone:* dgmchenry@ncdot.gov (828)586-2141 Date Submitted 9/10/2021 Nearest Body of Water Sorrell Creek Basin French Broad Water Classification WS-III Tr Site Coordinates Latitude: Longitude: 35.400767 -82.897838 A. Processing Information L) County(or Counties)where the project is located: Haywood Is this a NCDMS Project ✓ Yes 6' No Is this project a public transportation project?* ( Yes r No Is this a NCDOT Project?* ( Yes r No (NCDOT only)T.I.P.or state project number: 17BP.14.R.177 WBS#(?) 17BP.15.R.177 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version Pre-fling Meeting or Request Date 9/10/2021 Attach documentation of Pre-Filing Meeting Request here: Click the upbad button or drag and drcp files here to attach docurrent Haywood 237_No-pre Meeting w DWR.pdf 108.45KB Pie type must be FCF 1a.Type(s)of approval sought from the Corps: I7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) n Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No Please provide the date of the previous submission.* 2/3/2021 lb.What type(s)of permit(s)do you wish to seek authorization? n Nationwide Permit(NWP) I7 Regional General Permit(RGP) I—Standard(IP) lc.Has the NWP or GP number been verified by the Corps? ✓ Yes !' No Regional General Permit(RGP)Number: 198200031-NCDOT Bridges,Widening Projects 2015 RGP Numbers(for multiple RGPS): ld.Type(s)of approval sought from the DWR: I7 401 Water Quality Certification-Regular n 401 Water Quality Certification-Express n Non-404 Jurisdictional General Permit r Riparian Buffer Authorization n Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes s No For the record only for Corps Permit: r Yes s No If.Is this an after-the-fact permit application?* ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Ih.Is the project located in any of NC's twenty coastal counties? ✓ Yes f No 1j.Is the project located in a designated trout watershed? ✓ Yes r No B. Applicant Information Id.Who is applying for the permit? n Owner 17 Applicant(other than owner) le.Is there an Agent/Consultant for this project?* • Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT Division 14 2b.Deed book and page no.: 2c.Contact Person: Dave McHenry 2d.Address Street Address 253 Webster Road Address Line 2 aity State/Province/Region Sylva NC Postal/ZZp Code Country 28779 USA 2e.Telephone Number: 2f.Fax Number: (828)586-2141 2g.Email Address:* dgmchenry@ncdot.gov 3.Applicant Information(if different from owner) 3a.Name: NCDOT Division 14 3b.Business Name: 3c.Address Street Address 253 Webster Road Address Line 2 Oty Slate/Ftovince/Region Sylva NC Fbstal/Zip Code Country 28779 USA 3d.Telephone Number: 3e.Fax Number: (828)586-2141 3f.Email Address:* dgmchenry@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Bethel 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 City State/Province/Region Fbstal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Sorrell Creek 3b.Water Resources Classification of nearest receiving water:* WS-III Tr 3c. What river basin(s)is your project located in?* French Broad 3d.Please provide the 12-digit HUC in which the project is located. 06010106010020 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project involves replacing an existing timber bridge on location with a concrete structure.The area around the bridge is residential with considerable forested watershed. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes C No r Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 600 4h.Explain the purpose of the proposed project:* The purpose of the project is to replace an obsolete and deteriorated timber bridge(430237)on SR 1129 in Haywood County. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The existing bridge will be cut in half and new bridge stage constructed with a traffic switch.There will be impacts to streams for temporary dewatering as needed to demolish the old bridge and permanent impacts at storm pipe outlets and under the bridge for rip rap.Also,an off-line pond will be filled because impacts to the dam for the bridge approach shift will compromise its integrity.This bridge approach shift will move the road away from Sorrell Creek and allow more room for a riparian buffer to volunteer.Track-hoes,dump trucks and other heavy equipment will be used. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6 Yes r No C Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown F N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Agency/Consultant Company: NCDOT Other: 6. Future Project Plans 6a.Is this a phased project?* C Yes 6 No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r Wetlands 17 Streams-tributaries r Buffers f7 Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Site 1,SA,bank protection Permanent Stabilization Sorrell Creek Perennial Both 15 60 Average(feet) (linear feet) S2 Site 1,SA,temp dewatering Temporary Dewatering Sorrell Creek Perennial Both 15 130 Average(feet) (linear feet) S3 Site 3,SB,road shift Permanent Fill UT Sorrell Creek Perennial Both 4 95 Average(feet) (linear feet) S4 Site 4,SA,pipe outlet Permanent Stabilization Sorrell Creek Perennial Both 15 5 Average(feet) (linear feet) S5 Site 5,SC,pipe outlet Permanent Stabilization Little East Fork Pigeon River Perennial Both 25 5 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 165 130 3i.Total stream and ditch impacts: 295 3j.Comments: Stream SB,impact site 3,is the return flow channel from the pond back to Sorrell Creek.This pond is proposed for filling. 4.Open Water Impacts 4a. Site# 4a1.Impact Reason 4b.Impact type 4c.Name of waterbody 4d.Activity type 4e.Waterbodytype 4f.Impact area l Site 2,PA off-line pond removal P none Fill Pond 0.15 4g.Total temporary open water Impacts: 4g.Total permanent open water impacts: 0.00 0.15 4g.Total open water impacts: 0.15 4h.Comments: This is an off-line pond with a surface water feed from a pipe in Sorrell Creek.It needs to be eliminated for a driveway and the bridge approach realignment and because the dam will be impacted,which will likely compromise its integrity.Stream SB,impact site 3,is the return flow channel from the pond back to Sorrell Creek. E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project will replace a bridge with another bridge,versus a culvert with more impact.The project is replacing the bridge near its original location, which will otherwise minimize impacts to streams and the buffers.Also,the bridge approaches will be moved further from the banks of Sorrell Creek. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Dewatering will be used as needed to avoid excavation in flowing water. 2.Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? rYes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: The permanent stream impacts and pond impact involve artificial features that have poor WQ and other stream functions.The remaining impacts are only for rip rap bank protection, which will not cause a loss or appreciable degradation of stream habitats. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes f No If no,explain why: This is not a riparian buffer protection area. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: Also an SMP is attached. G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* 6 Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ✓ Yes f• No Comments:* This project falls within NC minimum criteria parameters for exclusion from environmental documentation. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15ANCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes f•No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes t No 3b.If you answered"no,"provide a short narrative description. This is a maintenance project that is not increasing the amount of access to an area. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes (7Nor N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* 6 Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes f• No 5d.Is another Federal agency involved?* ✓ Yes 6' No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ✓ Yes r No 5g.Does this project involve bridge maintenance or removal? 6 Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? ✓ Yes r No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes G No r Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes rNo 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? 6 Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCDOT staff conducted field surveys and consulted IPAC and NHP data. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes r No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes (7 No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT conducted cultural resources evaluations to 106 standards. 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* ✓ Yes f No 8c.What source(s)did you use to make the floodplain determination?* NC Floodmaps FRIS Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. crick the upload button or drag and drop files here to attach document 17BP.14.R.177_Haywood 237_Permit Drawings_updated Sep 10 2021.pdf 3.06MB 17BP.14.R.177_Haywood 237_SHPO recheck for pond remove_2021.pdf 467.48KB Haywood 237 facing S from pond dam north of bridge.pdf 1.56MB Haywood 237 facing SE from north of bridge_tree clearing.pdf 1.59MB Haywood 237 GP Application Narrative and NRTR.pdf 372.5KB Haywood 237 Maps.pdf 816.01 KB Haywood 237 PJD appendices.pdf 279.71KB Haywood 237 soils.pdf 682.91 KB Haywood 237_NCSAM pond outflow channel_site 3.pdf 210.76KB Haywood County-6237-Architecture Screening.pdf 2.02MB Haywood County-B237-Hydro Report.pdf 5.85MB NCDOT_17BP.14.R.177_Haywood 237_Tribal 106 Coordination.pdf 1.05MB Structure 430237 RESUBMIT 2 Haywood No Archaeological Survey Required Form.pdf 1.51MB Fle must be FtF or ME Comments Signature * rJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Dave McHenry Signature Date 9/10/2021