Loading...
HomeMy WebLinkAbout20200047 Ver 2_Credit Release Task 1,2_20210910ROY COOPER. Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality September 10, 2021 Mike Hermann DWR Project #: 2020-0047v2 Watershed Investments NC, LLC Orange County 1630 Weatherford Circle Raleigh, NC 27604 (via electronic mail: mherrmann@watershedinvestmentsnc.net ) Re: Banished Bull Mitigation Banking Instrument (MBI) Banished Bull Bank Parcel Credit Release — Tasks 1,2 Dear Mr. Hermann: On November 11, 2020, the Division of Water Resources (DWR) approved a Bank Parcel Development Package (BPDP) for the above -referenced site under the terms and conditions of the Watershed Investments NC, LLC (WINC) Banished Bull Mitigation Banking Instrument (MBI) to establish a nutrient offset and buffer mitigation bank. On June 24, 2021, the DWR received a recorded conservation easement and corresponding plat for the subject site. Additionally, WINC provided confirmation that the conservation easement for the subject site has been successfully assigned to Unique Places to Save (UPS). UPS is a 501(c)(3) non-profit corporation and has been approved by DWR as a long-term steward for this mitigation bank On June 24, 2021, the DWR received an As -Built Report from WINC documenting that the subject site had been constructed in its entirety and monitoring plots had been installed. On August 12, 2021, Katie Merritt with DWR, with assistance from staff with WINC, inspected the site and confirmed that most the subject site had been completely planted, all monitoring plots were installed and cattle exclusion fencing had been erected. Additionally, conservation easement placards had been installed along the entire easement boundary. On August 16, 2021, Ms. Merritt requested additional information in order to confirm site completion had been fully implemented according to the approved BPDP. On August 19, 2021, Axiom Environmental provided Ms. Merritt with the information requested on behalf of WINC. According to the As -Built survey submitted with the As -Built Report, there are slight adjustments in the total amounts of buffer mitigation credits and nutrient offset credits as compared to the approved BPDP. Therefore, DWR will use the As -Built survey for this credit release. The subject site has generated 212,901 ft2 of buffer restoration credits and 142,384 ft2 (7,429.793 lbs-nitrogen, 478.536 lbs-phosphorus) of nutrient offset credits. The As -Built report and corresponding survey are still under review by DWR; therefore, credit amounts may be adjusted if the As -Built report is erroneous. In accordance with the MBI, signed on November 17, 2020, the following Project Milestones have been met and the corresponding credits shall be released: fD.E NORTH CARDONA ` oeperteent of Fa m...Mal OUN North Carolina Department of Environmental Quality j Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 Banished Bull Site Watershed Investments NC September 10, 2021 Task/Milestones Credit 1) MBI and BPDP approved by DWR, Conservation Easement Recorded & 25% Assigned to an approved land trust or stewardship, financial assurance posted 2) Site Earthwork, Planting and Installation of Monitoring 20% Devices Completed TOTAL: 45% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract and therefore, 45% of the Neuse buffer Restoration credits (0.45 x 212,901 ft2 = 95,805.45 ft2) and 45% of the Nitrogen nutrient offset credits (0.45 x 7,429.793 lb-N = 3,343.407 lb-N) and 45% of the Phosphorus nutrient offset credits (0.45 x 478.536 lb-P = 215.341 lb-P) are now available to sell. Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Upper and Lower Falls Watersheds within the Neuse River Basin pursuant to 15A NCAC 02B .0703 which became effective on April 1, 2020. Additionally, the riparian buffer credits must be used for authorized impacts in the Neuse River Basin according to guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B .0295, which became effective on November 1, 2015. Please use the Credit Ledger Templates provided in the approved MBI to track and report credit availability for the Banished Bull Mitigation Bank. Upon receiving this correspondence, please submit three (3) credit ledgers to DWR reflecting the available credits released for each mitigation type (Buffer Restoration, Nitrogen Nutrient Offset, Phosphorus Nutrient Offset). Please feel free to call me at (919) 707-3637 if you have any questions regarding this correspondence. cc:File Copy (Katie Merritt) Sincerely, DocuSigned by:_ - - : 1 \A � A43C72700BD543E... Katie Merritt 401 & Buffer Permitting Branch Page 2 of 2