Loading...
HomeMy WebLinkAboutNCC215110_Site Plan or Location Map_20210910PROJECT NO • : P1637-002 DRAWING NO.: =002 100 50 0 100 200 GRAPHIC SCALE: 1"-100' PLEASANT PLAIN, LLC DB 3761, PG 430 PN 22590 ZONE RA--20 r lO r �F a1 c7 a� W rnw r 6 "�a_ r$-- cz7� 44 COX BROTHERS I DB 052. PG 338 PN 21657 EP= 59.67 ZONE RA-20 E=59.54 I r j 1 � iJ f 1 _ _ y - V SAMUEL F. COX ❑B 2807, PG 306 PN 05006 ZONE RA-20 r SITE DATA TOTAL AREA.........................31.4620 AC NO. OF BUILDABLE LOTS...................................24 LOTS NOT SUITABLE FOR SEPTIC....................2 TOTAL NUMBER OF LOTS..................................26 ZONING ........................................... RA-20 SMALLEST LOT SIZE ...............22,495 SF ACRES IN PARKS, RECREATION .......... 0 PARCEL NUMBER...............22589 OPEN SPACE REQUIRED(765 SFf LOT)...18,341 SF OPEN SPACE PROVIDED ........... ......23,571 SF 1. CONSTRUCTION PLANS SHALL BE APPROVED BY TOWN OF AYDEN PRIOR TO THE CONSTRUCTION OF ANY SEWER OR STORM DRAINAGE. 2. ALL REQUIRED IMPROVEMENTS SHALL CONFORM TO THE TOWN OF AYDEN STANDARD FOR DESIGN AND DETAILS AND THE REQUIREMENTS FOR BELL ARTHUR WATER CORP. 3. ALL LOTS SHALL EQUAL OR EXCEED THE MINIMUM DEVELOPMENT STANDARDS OF THE TOWN OF AYDEN ZONING ORDINANCE. 4. EROSION CONTROL PLAN APPROVAL REQUIRED PRIOR TO CONSTRUCTION. 5. ALL UTILITIES SHALL BE UNDERGROUND. 6. ALL WATER SERVICES SHALL BE APPLIED FOR AND PAID TO BELL ARTHUR WATER CORP. BY INDIVIDUAL PROPERTY OWNER. 7. NCDOT DRIVEWAY PERMITS REQUIRED FOR INDIVIDUAL LOTS HAVE HAVE TO BE APPROVED By NCDOT. 8. HYDRAULIC ANALYSIS IS REQUIRED. 9. DRIVEWAY PERMITS TO BE APPROVED BY NCDOT PRIOR TO APPROVAL OF CONSTRUCTION PLANS BY THE TOWN OF AYDEN. 10. WATER SUPPLIED BY BELL ARTHUR WATER CORPORATION. 11. ELECTRIC SERVICE SUPPLIED BY TOWN OF AYDEN. 12. SEWER SERVICE BY INDIVIDUAL SEPTIC TANKS. 13. THIS PROPERTY IS LOCATED IN THE AYDEN FIRE DISTRICT. 14. THE CLOSEST FIRE HYDRANT TO PROPERTY IS LOCATED APRROXIMATELY 978 FEET FROM SOUTHERN MOST BOUNDARY OF PROPERTY. 15. THIS PROPERTY IS NOT LOCATED WITHIN THE 10D YEAR FLOOD PLAIN PER FIRM 3720465200K (REVISION 4/16/13) AND FIRM 3720465300J {REVISION 1/2/04.' 16. A HOME OWNERS ASSOCIATION IS REQUIRED PRIOR TOFINAL APPROVAL. 7. PLEASE BE ADVISED THAT A RULE TO PROTECT AND MAINTAIN EXISTING BUFFER ALONG WATERCOURSES IN THE NEUSE RIVER BASIN BECAME EFFECTIVE ON JULY 22. 1997. TIVITY BEFORE NOTIFYING THE CITY A TEMPORARY RULE TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG TURBING ACTIVITY WILL BEGIN. WATERCOURSES IN THE TAR RIVER BASIN BECAME EFFECTIVE ON JANUARY 1. 2000. THESE RULES ARE ENFORCED BY THE ❑IVISION OF WATER QUALITY (DWQ). DIRECT JIRED TO INSTALL APPROPRIATE ANY QUESTIONS ABOUT THE APPLICABILITY OF THESE RULES TO YOUR PROJECT TO TIL EROSION CONTROL MEASURES REGIONAL WATER QUALITY SUPERVISOR, WASHINGTON REGIONAL OFFICE. AT YDEN. (252)946-6481. WITH THE EROSION CONTROL S. ACCEPTANCE AND APPROVAL OF THIS PLAN IS CONDITIONED UPON YOUR AND DISTURBING ACTIVITIES. FOR COMPLIANCE WITH FEDERAL AND STATE WATER DUALITY LAWS. REGULATIONS. AND TICE 1S REQUIRED RULES. IN ADDITION. LOCAL CITY AND COUNTY ORDINANCES OR RULES MAY ALSO APPLY TO THIS LAND -DISTURBING ACTIVITY. APPROVAL BY THE CITY DOES NOT 'ES OR STRUCTURES SUFFICIENT TO SUPERCEDE ANY OTHER PERMIT OR APPROVAL. H 14 WORKING DAYS OF COMPLETION 9. DENUDED SLOPES MUST BE PROVIDED WITH A GROUNDCOVER WITHIN 21-30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PLACE OF DEVELOPMENT. EDED ALL EROSION CONTROL ❑EVICES ON T WITH RAINFAL GREATER THAN 0.5" OVER 10. WASTE FROM EXCAVATION WILL BE USED TO FILL EXISTING DITCHES AND FILL FOR LOTS. TROL DEVICES IN GOOD WORKING ORDER MAY PENALTY CIVIL PENALTY UP TO $500 PER DAY OF 11. ADD INLET PROTECTION OVER FINISHED CATCH BASINS ONCE CURBING IS INSTALLED. APS MUST ALSO SPECIFY A MAXIMUM DEPTH 12. ❑EWATERING OPERATIONS WILL BE FILTERED PRIOR TO LEAVING THE SITE. JIBE ADDITIONAL EROSION CONTROL 13. STREETS WILL BE SWEPT AS NECESSARY, BUT A MINIMUM OF ONCE A WEEK WHILE ION PROVE TO BE INADEQUATE GRAING ❑PERATIONS ARE UNDERWAY. 14. ONCE MUCKED OUT. SELECT BACKFILL TO BE UTILIZED IN EXISTING HITCH SECTIONS WHERE CROSSING THE RIGHT OF WAY. 95% COMPACTION REQUIRED. AYDEN USE ONLY 3 HAVE BEEN APPROVED FOR CONSTRUCTION BY THE TOWN OF AYDEN DATE :S ❑ATE:--_______- AID EROSION CONTROL DATE: -_----___- DATE:----_----- SEAL : q 36845 NE��. RICHARD A. BROWN, P.E. BEFORE YOU DIG! NC ONE CALL (TOLL FREE1 (OR 1-800-632-4949) IT'S THE LAW! R E V I S I O N S BIND. I DATE I DESCR IPTION CONSTRUCTION PLANS GENERAL GRADING, DRAINAGE, EROSION AND SEDIMENTATION CONTROL PLAN PLEASANT PLAIN FARM SURVEYOR'S CERTIFICATE I,JAMES L. EDWARDS CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK PAGE , OR FROM BOOKS REFERENED HEREON): OWNER: THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS DRAWN FROM INFORMATION FOUND IN BOOK .PAGE ; OR AS REFERENCED HEREON; THAT THE RATIO OF PRECISION ADDRESS: A CALCULATED IS_1_;10.000 THAT THIS TOPOGRAPHIC SURVEY WAS PERFORMED TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS AS APPLICABLE; THAT THE TOPOGRAPHIC DATA WAS OBTAINED ON ;THAT THE SURVEY WAS COMPLETED ON PHONE; THAT THE CONTOURS SHOWN AS BROKEN LINES MAY NOT MEET THE STATED STANDARD; THAT VERTICAL CONTROL WAS ESTABLISHED AT THE SITE TO THE CLASS "A" STANDARD, AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE"STANDARDS OF PRACTICE FOR LAND SURVEYI AYDEN TOWNSHIP PITT COUNTY BOBBY JOE TRIPP PO BOX 128 AYDEN. NC 28513 252-378-5284 IN NORTH CAROLINA" (21 NCAC 56,1600 k WITNESS MY ORIGINAL SIGNATURE AND SEAL THIS THE DAY OF , 20 AASTROUD ENGINEERING, P.A SIGNED 107-9 COMMERCE STREET cREENv1LLE, NORTH CAROLINA 27858 PROFESSIONAL LAND SURVEYOR PL5 I T (2521 756-9552 LICENK NO.C-owT SIGNED: NORTH CAROLINA RAB I DATE: 6/9/21 DRAWN: I SCALE: 1"=100' APPROVED: RAB SHEET Cl OF 5