Loading...
HomeMy WebLinkAboutNCC215099_Site Plan or Location Map_20210910DEVELOPER HOPPER COMMUNITIES, INC. 1616 CLEVELAND AVE. CHARLOTTE, NC 28203 CIVIL ENGINEER BLUE RIDGE ENGINEERING PLLC W. J ESSE HAN LI N, PE 924 MAIN STREET, SUITE 200 NORTH WILKESBORO, NC 28659 (336) 838-2500 SURVEYOR BLUE RIDGE ENGINEERING PLLC C. NEIL SHEPHERD, PE, PLS 924 MAIN STREET, SUITE 200 NORTH WILKESBORO, NC 28659 (336) 838-2500 PLANNING TOWN OF TROUTMAN 400 N. EASTWAY DR. TROUTMAN, NC (704) 528-7600 EROSION CONTROL IREDELL COUNTY JONATHAN WILLIAMS 349 N. CENTER STREET STATESVI LLE, NC 28687 (704) 832-2352 EXT. 2352 NCDOT JOHN COOK DISTRICT SUPERVISOR 124 PRISON CAMP RD. STATESVI LLE, NC 28625 (704-380-6040) SITEWORK PLANS FOR FALLS COVE AT LAKE NORMAN PHASES 3&4 TOWN OF TROUTMAN IREDELL COUNTY, NORTH CAROLINA Perth PARCE L I D: 4740044735 PROJECT SUMMARY FALLS COVE AT LAKE NORMAN - PHASE 3&4 THE PROPOSED FALLS COVE AT LAKE NORMAN PHASE 3 & 4 CONSISTS OF THE CONSTRUCTION OF 123 RESIDENTIAL BUILDING PADS AND ASSOCIATED STREETS, GRADING, AND UTILITY INFRASTRUCTURE IN TROUTMAN, NC. PHASE 3 & 4 IS PART OF THE OVERALL FALLS COVE AT LAKE NORMAN RESIDENTIAL SUBDIVISION. WATER AND SEWER SERVICES WILL BE PROVIDED BY THE TOWN OF TROUTMAN. GRAVITY SEWER WILL BE EXTENDED FROM THE FALLS COVE PHASE 7 THAT FLOWS TO THE TOWN LIFT STATION. NEW WATER MAINS WILL SERVE THE DEVELOPMENT VIA EXTENDING THE 8" WATER MAIN LOCATED AT THE END EXISTING STREET E IN PHASE 7, SEE CIVIL DESIGN PLANS BY BLUE RIDGE ENGINEERING, PLLC. WATER WILL BE PROVIDED TO EACH PROPOSED LOT VIA %" INDIVIDUAL SERVICES, TERMINATED IN A NEW METER BOX FOR FUTURE METER INSTALLATION. SEWER SERVICE LATERALS WILL BE PROVIDED TO EACH LOT FOR FUTURE CONNECTION DURING BUILDING CONSTRUCTION. ACCESS TO THE SITE WILL BE VIA HAMPTONS COVE ROAD (NCDOT SR 2741) AND CONNECTION TO STREET E FROM FALL COVE PHASE 7, SEE DESIGN PLANS BY BLUE RIDGE ENGINEERING, PLLC. EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN DESIGNED WITH SKIMMER SEDIMENT BASINS AS THE PRIMARY SEDIMENT CONTROL DEVICE. THE PRIMARY CONSTRUCTION ENTRANCE FOR THE PROJECT WILL BE ON HAMPTONS COVE ROAD. PHASES 3&4 WILL DISCHARGE TO LAKE NORMAN AND TO AN UNNAMED TRIBUTARY TO LAKE NORMAN (JUST UPSTREAM FROM ITS CONFLUENCE WITH LAKE NORMAN) WHICH HAS A DESIGNATION OF WS-IV, CA. THE PROJECT IS LOCATED IN THE CATAWBA RIVER BASIN. OVERALL LAND USE DESIGN SUMMARY (ALL PHASES) Falls Cove at Lake Norman Project Area: 373.72 AC. Maximum Lots Allowed: 710 (1.9 Units/Acre) Final Proposed Lots: 653 (1.75 Units/Acre) Open Space Required: Total: 149.48 Acres (40% of Project Area) Active: 7.47 Acres (5% of Open Space) Passive: 52.32 Acres (35% of Open Space) Open Space Provided: Total: 171.18 Acres Active: 9.23 Acres Passive: 161.95 Acres *See Sheet C-1.1 for Phase 3&4 specific density DRAWING INDEX CHAPTER 1 C-1.0 COVER SHEET C-1.1-1.2 GENERAL NOTES C-1.3 EXISTING CONDITIONS CHAPTER 2 - EROSION & SEDIMENT CONTROL C-2.0 OVERALL ESC PLAN C-2.1-2.2 ESC, PHASE 1 C-2.3-2.4 ESC, PHASE 2 C-2.5-2.6 ESC, PHASE 3 CHAPTER 3 - SITE PLAN C-3.0 OVERALL SITE PLAN C-3.1-3.2 SITE PLAN CHAPTER 4 -GRADING PLAN C-4.0 OVERALL GRADING PLAN C-4.1-4.6 GRADING PLAN C-4.7 STREAM CROSSING PLAN CHAPTER 5 - ROADWAY PLAN & PROFILE C-5.0 OVERALL ROADWAY PLAN AND PROFILE C-5.1-5.5 ROADWAY PLAN AND PROFILE CHAPTER 6 - SANITARY SEWER PLANS C-6.0 OVERALL SANITARY SEWER PLAN C-6.1-6.5 SANITARY SEWER PLAN AND PROFILE CHAPTER 7 -WATER DISTRIBUTION PLANS C-7.0 OVERALL WATER PLAN C-7.1-7.5 WATER PLAN AND PROFILE CHAPTER 8 -STORM DRAINAGE PLANS C-8.0 OVERALL STORM PLAN C-8.1-8.5 STORM DRAINAGE PLAN AND PROFILE CHAPTER D -DETAILS D-1.1-1.4 TOWN OF TROUTMAN DETAILS D-1.5 MISC. DETAILS D-1.6 STREET CROSS-SECTION DETAILS D-1.7-1.8 ESC DETAILS D-1.9-1.10 STREAM CROSSING DETAILS (BY CONTECH) © COPYRIGHT 2021 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUTTHE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. m Z2 z Q� LU 0 U LU V) N O w o Q °0 z W a z � 0 0 U U z z w � � Q o 0 W N E) O ci ci N N N N N00 0 0 zJ ci N \ \ 0 U r, 00 > O O o W as `�"tX11,CA 1,,,J." %0P�F ss o9l�'L,�: 1,9 SEAL WO / NGINE� %�ligM � 'NPR,. LU LU cn 0 U SHEET C L �l O a) 00 N • cn z yL A' W � o L o 0Ln oLn ci a, ao — N bnO 00 ro m rn L m L z 3:E 1 MM w 0 �U cn J J Q L.L z a 0 z w a J a z a �C O z LU a H a LJJ U z O06z U M < JL� J QO a== LL 13- 1-- C-1.0 z 0 U D z 0 U 0 LL 0 z J z 0 0 z C� G oc w a- 0 LL