Loading...
HomeMy WebLinkAboutSWA000112_Application Form_20210910b1. Project area and density information: Total Property Area 2,254,230 sf Total Surface Water Area 10,290 sf Considered to include: • the normal pool of impounded structures; • the area between the banks of streams and rivers; and • the area below the Normal High Water (NHW) line or Mean High Water (MHW) line. Total Coastal Wetlands Area sf Considered to include: coastal wetlands landward from the NHW (or MHM tine. Total Project Area 2,243,940 sf Excludes the surface water area and coastal wetland area identified above. May or may not be the same as Property Area. Built -Upon Area (BUA) associated with Existing Development 2,200s . f "Existing development" means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 60,200 sf Includes proposed new BUA that is not associated with existing development. "BUA"is defined in N. C. G. S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1). Project Density w/Existing Development: Project Density = [New BUA]/[Total Project Area — Existing BUA]x 100 or 2.67 % w10 Existing Development- Project Density = [New BUA]/Total Project Area] x 100 6. Anticipated construction start date 08/15/2021 7. Is the project located within 5 miles of a public airport? ® No ❑ Yes lf'Yes,'see S.L. 2012-200, Part VI., httpalwww.ncleg.net/Sessions/2011IBillslSenatelPDFIS229v6.pdf and DEQ Stormwater Design Manual Chapter E-4 Airports. 8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B .0600. Stormwater Fast Track ATC Appflcation Form Page 4 of 9 Feb. 10, 2018