Loading...
HomeMy WebLinkAbout20080915 Ver 1_Bridgewater Station Outage_20130719Burdette, Jennifer a From: Burdette, Jennifer a Sent: Thursday, August 01, 2013 1:48 PM To: 'Mark.Oakley @duke - energy.com' Cc: Higgins, Karen; ' chris.goudreau @ncwildlife.org'; Tarver, Fred; Dennison, Laurie Subject: RE: Catawba - Wateree Hydroelectric Project - Bridgewater Station Outage September 30 through October 11 Attachments: catawba -001. pdf Mark, Our response is attached and paper copy will be mailed. Thanks, Jennifer Jennifer A. Burdette Environmental Senior Specialist Wetlands, Buffers, Stormwater - Compliance and Permitting Unit (WeBSCaPe Unit) Wetlands and Stormwater Branch NC Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 -1650 (919) 807 -6364 phone (919) 807 -6494 fax *Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.* From: Higgins, Karen Sent: Friday, July 19, 2013 9:04 AM To: Burdette, Jennifer a Subject: FW: Catawba - Wateree Hydroelectric Project - Bridgewater Station Outage September 30 through October 11 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Oakley, Mark [ ma i Ito: Ma rk.Oa kley(a)d u ke-energy. com] Sent: Thursday, July 18, 2013 4:54 PM To: Goudreau, Chris J.; 'Mark Cantrell'; Tarver, Fred; Higgins, Karen; 'Dick Christie (christiedCd)dnr.sc.gov)'; 'prestohs @dhec.sc.gov'; Kevin(a)americanwhitewater.orq; 'MBLACKBURNI @CAROLINA.RR.COM' Cc: Galleher, George A Subject: Catawba - Wateree Hydroelectric Project - Bridgewater Station Outage September 30 through October 11 Duke Energy is planning an outage at Bridgewater Hydro in order to inspect and hopefully repair the Bridgewater Unit 2 Turbine Isolation Valve (TIV). The outage is planned to start on September 30th and run for 12 days ending on October 11th. Depending on the issues we find with the Unit 2 TIV this outage may be a shorter duration. During this time the penstock delivering water to the powerhouse will have to be drained and no water will be able to be released from any of the three units or the powerhouse ring jet valve. We will operate the ring jet valve at the Catawba Dam, so flows in the Catawba Bypass will not be affected. Flows below the Muddy Creek confluence downstream of the powerhouse will not be affected provided we operate the Catawba Dam ring Jet valve at its full capacity (approximately 75 cfs). Also, the reservoir level should remain within its normal range (assuming of course no extreme rainfall events). If we successfully meet our schedule, we will only impact one weekend of recreation flow releases. No impacts to flow releases or reservoir levels at Catawba - Wateree hydro stations in South Carolina are likely. I am making this notification and initiating consultation in accordance with the Catawba - Wateree Comprehensive Relicensing Agreement (CRA) Maintenance and Emergency Protocol (MEP). Per the MEP (see CRA Appendix D), this event is considered to be Condition A.1- Scheduled Hydro Unit Maintenance. Please respond at your earliest convenience. Thank you. z Division of Water Quality Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Acting Director Secretary August 1, 2013 DWQ # 2008 -0915 Burke County Mr. Mark Oakley Duke Energy Carolinas, LLC P. 0. Box 1006/EC12Y Charlotte, INC 28201 -1006 Subject: Bridgewater Station Outage Catawba - Wateree Hydroelectric Project, FERC Project No. 2232 Dear Mr. Oakley, On July 19, 2013, the North Carolina Division of Water Quality (Division) received your request for comments on Duke Energy's planned outage at Bridgewater Hydro to inspect and potentially repair the Bridgewater Unit 2 Turbine Isolation Valve (TIV) for the Catawba - Wateree Hydroelectric Project (FERC Project No. 2232). The outage is scheduled to begin September 30, 2013 and is anticipated to be completed October 11, 2013 or sooner if possible. During the outage, water will not be released from the Bridgewater powerhouse. Flows in the Catawba Bypass will not be affected. Flows below the Muddy Creek confluence downstream of the powerhouse will not be affected provided the Catawba Dam ring jet valve is operated at its full capacity (approximately 75 cfs). Provided there are no extreme rainfall events, the reservoir level should remain within its normal range. It is anticipated that one weekend of recreational flow releases would be impacted. Replacement recreational flow releases need to be scheduled for this calendar year after maintenance operations are completed. If it is determined that Critical Flow (75 cfs) within the tailrace would not be maintained, consult with Chris Goudreau of the NC Wildlife Resource Commission to determine whether monitoring of impacts to aquatic species within the tailrace is necessary. If the above recommendations are followed, the Division finds the proposed outage to be consistent with the terms of the 2006 Comprehensive Relicensing Agreement and the 401 Water Quality Certification issued on November 14, 2008. Wetlands, Buffers, Stormwater - Compliance and Permitting (Webscape) Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 T�TOne 1 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 1V orthCaroli11c`l Phone: 919 - 607 -6300 \ FAX: 919 - 807 -649.9 Internet: www.ncwaterguality.org Naturally An Fqual Opp - 'unity Affirmative P, ;lien ra ,!,ver Catawba - Wateree Hydroelectric Project FERC Project No. 2232 August 1, 2013 Page 2 of 2 Thank you for the opportunity to comment on this proposal. Please contact meat karen.higgins @ncdenr. ov or 919 - 807 -6360 or Jennifer Burdette at jennifer.burdette @ncdenr.ov or 919 - 807 -6364 if you have any questions or concerns. Sincerely, k" 0 Karen Higgins, Supervisor Wetlands, Buffers, Stormwater — Compliance & Permitting Unit cc: Chris Goudreau, NC Wildlife Resources Commission (via email) Mark Cantrell, U.S. Fish and Wildlife Service (via email) Fred Tarver, NC Division of Water Resources (via email) File Copy File name: 080915CatawbaWateree FIE RC2232( Catawba) BridgewaterStationOutage _Comments.docx