HomeMy WebLinkAbout20211334 Ver 1_Meeting Request Review_20210908 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20211334 Version* 1
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 9/8/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Amanda Johnson
Contact Email Address* amanda.johnson@wsp.com
Project Name* Intersection Improvements at SR 2320 and Shepard School Rd
Project Owner* Chris Ray,Town of Zebulon
Project County* Wake
Owner Address: Street Address
450 East Horton Street
Address Line 2
City State/Rovince/Region
Zebulon North Carolina
Fbstal/Zip Code Country
27597 United States
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
20210937
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below and include location information.*
The Town of Zebulon is seeking to improve vehicular and pedestrian
safety at the SR 2320(Old Bunn Road/Proctor Street)and Shepard
School Road intersection by adding turn lanes,sidewalks,and pedestrian
and traffic signals.To accommodate the sidewalks and additional lanes,
drainage improvements are also being proposed.The proposed project
limits extend approximately 0.17 mile along Shepard School Road and
0.22 mile along SR 2320.
The project study area is approximately 8.4 acres in size.Areas of
maintained road right-of-way, residential and commercial development,
pasture, agriculture fields, stormwater features,wetlands, streams, and
undeveloped forest occur within the study area.This project lies in the
Neuse River Basin and is subject to the Neuse River Buffer Rules.There
are three different locations where the project crosses an unnamed
tributary of Beaverdam Creek.
As this project is on NCDOT owned roadway,the project will be
administered through NCDOT and all design has been done to their
standards.The existing typical section allows for a two-lane section that
transitions to add a left turn lane at the Walmart Driveway.This existing
typical will be expanded to become a four-lane divided roadway with a
variable width raised median, bike lanes,sidewalks,and curb and gutter
throughout.
Within the project study area, Shepard School Road is being proposed to
be widened to include a variable turn and median lane and curb and
gutter will be installed on both sides. Catch basins are proposed along
the curb and gutter and tie into the existing 30"reinforced concrete pipe
(RCP)-III.The cross pipe would be collared and extended to proposed
roadway fill. By not replacing 30" RCP-III, impacts to the wetland(W1)will
be minimized to temporary fill impacts for roadway construction. Proposed
permanent stream impacts include pipe extension and channel
stabilization at this site.
Along SR 2320(Proctor Street),a proposed 48"RCP-III cross pipe would
replace the existing 30" RCP. Proposed permanent stream impacts
include rip rap at embankment at the outlet of a proposed lateral'v'ditch
and pipe inlet channel stabilization at the inlet of the proposed 48" RCP-
III.At the outlet of the proposed 48"RCP-III, rip rap at the embankment at
the outlet and pipe outlet channel stabilization are being proposed.A
roadside ditch that runs parallel to Shepard School Road north of the
intersection will be filled.
Please attach the documentation you would like to have the meeting about.
Shepard School Rd_DRAFT Buffer Permit
3.1MB
Drawings_Selected Pages.pdf
Shepard School Rd_DRAFT Wetland and
3.65MB
Stream Permit Drawings_Selected Pages.pdf
Zebulon Shepard Rd Features DWR.pdf 267.06KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 9/8/2021
Reviewer Meeting Request Decision
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Is a meeting required or is there more info needed?*
r Yes ( No
If rrore information is needed,please add corrrents for the errail notification below.