Loading...
HomeMy WebLinkAboutNCG500635_Ingenco Inspection September 2021_20210909ROY COOPER Gmv nnr ELIZABETH S. BISER Se( vrmry S. DANIEL SMITH Director Eric Troen Ingenco Wholesale Power LLC 7420 Old US 70 W Cove City, NC 28523 NORTH CAROUNA Environmental Qualify September 09, 2021 SUBJECT: Compliance Inspection Report INGENCO New Bern Plant NPDES WW Permit No. NCG500635 Craven County Dear Mr. Troen: The North Carolina Division of Water Resources conducted an inspection of the INGENCO New Bern Plant on 9/02/2021. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NCG500635. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact Paul Mays with the Water Quality Regional Operations Section in the Washington Regional Office at 252-948-3940 or via email at paul.mays@ncdenr.gov. Sincerely, Paul, AiLev?S Paul Mays, Environmental Specialist I Water Quality Regional Operations Section Washington Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Cc: Laserfiche United States Environmental Protection Agency Washington, D.C. 20460 E PA Water Compliance Inspection Report OMB Approved.. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 IN 1 2 I5 13 I NCG500635 111 121 21/09/02 117 Type 18 kin Inspector Fac Type 191 S 1 201 I 2111111111111111111111111111111111111111I111 r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 1 701 I 71 I I 72 1 N 1 731 1 174 751 1 1 1 1 I 1 I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) INGENCO New Bern Plant 7420 Old US Hwy 70 W New Bern NC 28562 Entry Time/Date 10:30AM 21/09/02 Permit Effective Date 21/01/04 Exit Time/Date 11:OOAM 21/09/02 Permit Expiration Date 25/11/30 Name(s) of Onsite Representative(s)/Tttles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Ttle/Phone and Fax Number Contacted Darren Herb,7420 Old US Hwy 70 W New Bern NC 28562//252-638-5147/2527222462 . No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit • Records/Reports Facility Site Review Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Paul M Mays DWR/WARO WQ/252-948-3940/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 31 NPDES NCG500635 yr/mo/day 21/09/02 I17 Inspection Type 18LJ (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On 09/02/2021 from 10:30am to 11:OOam Paul Mays with the Department of Environmental Quality: Division of Water Resources from the Washington Regional Office. INGENCO Wholesale Power was found to be compliant under general permit #NCG500635. The facility utilizes a non -contact cooling tower that uses groundwater from a well onsite. Upon investigation and discussions with staff onsite, it was found that no additional chemicals or chlorine were added to the groundwater utilized by the cooling tower. However, the groundwater is processed by a water softener before use by the facility. It is also important to note that the facility discharges to a drainage ditch at a rate of roughly 10 GPM and the ditch does not appear to connect to any streams. The facility and cooling tower both appeared to be well maintained and in overall good condition. Page# 2 Permit: NCG500635 Inspection Date: 09/02/2021 Owner - Facility: INGENCO New Bern Plant Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new MOOD application? Is the facility as described in the permit? •❑ ❑ ❑ # Are there any special conditions for the permit? DOED Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? •❑ ❑ ❑ Comment: General permit expires 11/30/2025 Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑ Is all required information readily available, complete and current? ■ ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? • ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? ❑ ❑ ❑ ■ Dates, times and location of sampling ❑ Name of individual performing the sampling ❑ Results of analysis and calibration ❑ Dates of analysis 0 Name of person performing analyses ❑ Transported COCs ❑ Are DMRs complete: do they include all permit parameters? 0.00 Has the facility submitted its annual compliance report to users and DWQ? 0 ❑ • 0 (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑•❑ operator on each shift? Is the ORC visitation log available and current? � ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? 0 0 0 • Is the backup operator certified at one grade less or greater than the facility ❑ ❑ ❑ ■ classification? Is a copy of the current NPDES permit available on site? ■ ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? DEED Comment: Upstream and Downstream Temperature measurements were not obtained due to the facility discharging to a drainage ditch that does not appear to lead to a stream. Total Residual Chlorine and Chemical Oxygen Demand parameters were not sampled due to chlorine and chemical additives not being added to the groundwater water being used by the facility's cooling tower. Page# 3 Permit: NCG500635 Inspection Date: 09/02/2021 Owner - Facility: INGENCO New Bern Plant Inspection Type: Compliance Evaluation Page# 4