Loading...
HomeMy WebLinkAbout20210749 Ver 1_Revided Application_20210909ROY COOPER Governor MICHAEL S. RtEGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 —Water Quality Certification, Shoreline Stabilization Shoreline Stabilization Application Form FORM: SSGP 09-2020 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski ❑WR-401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c){5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request to this application. Date of Pre -filing Meeting Request: _9J`22J 2021 (required) DWR ID # 2021-0794 Version (if applicable) A. Applicant Information 15A NCAC 02H .0502(a)1 1. Owner Information Name: Caldwell Timber Partners LLC Mailing Address: 1400 16th Street, Suite 320 Denver, CO 80202 Telephone Number: (720) 723-2850_ Fax Number: E-mail Address: Aaron.Patsch@RLHoldings.com North Carolina Department of Environmental Qualiry i Division of Water Resources _ 512 North SaIiybury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 EQ� u.a.cr,.,;r asimr:renawea, a.ex� 919.707,9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: htt www.saw.usace.arrn .mil Portals 59 docs re ulato re docs Permits SAMPLE AGENT AUTHORIZ AT[ON FORM. df) Name: Chris Hu sman Company Affiliation: Wetland & Waters Inc. Mailing Address: 170 Dew Drop Road S arta NC 28675 Telephone Number: 336-406-0906 Fax Number- E-mail Address: Chris.Huysman@gmail.com_ B. Project Information [15A NCAC O2H .0502 a & b 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Caldwell Nearest Town: Granite Falls Lake/ river/ ocean adjacent to property: Lake Rhodhiss Property size (acres): 1.033 acres Subdivision name or site address (include phase/lot number): Waterfront Club Directions to site - please include road names and numbers, landmarks, etc.: _ From Asheville take I-40 E to Malcolm Blvd. in Rutherford College. Take exit 113 stay on Malcolm Blvd. and it will become Connelly Springs road. The entrance to Waterfront Club will be in 4. 2 miles and the code to get in is 5266#. Stay on Scenic Lane for 1 mile and take a left on Leeward Lane. Take a right at the first intersection on Coves ide Drive. The Clubhouse lot will be 1 2 mile on the left. FORM: SSGP 09-2020 Page 2 of 6 Latitude (in decimal degrees) 35.7820D0 Longitude (decimal degrees)-81.551o0 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Existing cleared area next to the water on a residential lot 4X4s 36 feet wide with sand behind it is shown on the attached picture 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Large boulders will be used to stabilize the shoreline per Duke' s enhanced rip -rap technique Native plantings will also be used for stabilization I 7. Will work be conducted from land? D From water? S. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet landward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Native grasses will 6e gro n between the boulder the 3 ft X>30 h area 11. Signature 8y signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time 202� FORM: SSGP 09-2020 Page 3 of 6 Owner/Agent's Signature" [15A NCAC 02H .0502(f)] Rate Agent's signature is valid only if an ❑uthorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level} Full Pond/ Normal Water Shoreline , aJ 5c�r 6Pfrec t10 GIBV i K frcj bz,-Z� Plan View' �{rzo JAB b4!p eePA 3-f- x ;%a-F4 FORM: SSGP 09-2020 Page 4 of 6 3 f�- be lam 4� II p0:j La ke u (Al Full Pared/ Normal Water Level) M N i6 C L L Q C Side View FORM: 55GP 09-2020 Page 5 of 6 3 ft, below full pond water level 4 ft. above full pond water level 2 ft. additionai clearing 'if necessary Existing bank 16 ft. hank a height 5� f MMPIL MR maim" N:6m- m PI. FORM: 55GP 09-2020 Page 6 of 6 ll Sd�i 11g ada ]3 ipai .1aia ,+g,ip"�©EEo F$ Ai „aE'b5,9t•e5f hIUZJLi10i :8iap R.ra4ew� - r ' als000 40. R "F._� �"".. - _fit • _ 'r. '•- ..,:y .• .i `- Y ,y a •'�-y 1."• �.-�� " - _ �H� �•.".=. - - _. ".. ;q¢`_.,'.. � - � _ • `'�`-,^_;ts�c .. - ,.�,�rF._:.: :— �.F�F.�- - ors �'�i.+V_ � •-r.. �,%_'� ..•8'�_ -: .. 'lam _ � =a: '3- �-s,-.-•- _ _y may„ - y ,,*". �_ • _ r: � "�n- :�4•'iT'- '.�'y, � �ISS� ,` •tw3 t.. =T _F^��r.ro••- �o-�.. -'.' :.1 ::...-." - ' '.. i i �"+ � .. V.:d".:LP' :'>;' .. - K'.rq ,.�h`:,'3Cyr • .'; 5';''h3 ���',. s' �Jw. }..":' .'.N-�: .. - "" 1 - :�rj i rt.^• 5: R .ai n, Tom,:"xr`•.'` L'_S - � "P`��{.� _ Y..,- ,j"j�'_/)- r,"%�-. :�•a�M..-ir :".=ti•�1-=� r R � A ,�"• ..:�, i .,�, �- 1!L':-�yg-., -"mot" �''C-�.v:;. Y. ,4 ;;%C•'T� _ iA•"it Z r:'.. �.. :+�' "4•L'.j^ , _ �-t: i <i• �ytYi. . •l■{-�.'� ^.: ., � X,"Wai r :::�'"� -�:; - •i' r. z- �r .,:J "� iS�. "� .L .2-F,-, .''.y - •i: , •��_y�t • •l'• L� � �_''N'- r •, �•:• P.fijy. �-. s'' i _ �'-1 i':: Jf= � i:t" ... • .;f]�. rid :'�.i y?.: . {'�`. � �•'0.. ".7!}� �s -.'yF J. k i �.. �.h �� .{ "��`^� r � 'S C ' i�� :... ' � i L '�� � F� � ' '�'.�r• T' t � � _ �; '� '�. �,K � �`' n�: �r,�' �r:�•.- :'fit:, ,M� �s......� �"_` _ _ g..�._.� ... _ : L�.1= �'��'s��_ !� .x�t' �'44`• i.�,a'��.F .�. •: c�4s-'�_.:asir'%•.3 -: �L,i�ii •�:f=F'� ::�� rt'�.7� '< � ��--��'�•�rb��,c ..r'.�t* ►.�'v�,3„�.="-k�. mar � f S .- ENHANCED RIP -RAP (WITH BOULDERS AND PLANTINGS) J_.61 " _ Figure 513-3 Shoreline Management Plan C atawha-11 ateree Project TFRC N1, 2332) 4. Cleari to SuI213ort Stabilization Pro-ect5 — Minimal Clearing within the proiect Boundaries is allowed to create corridors for equipment access Access corridors shouldfor stabilization projects. footpaths} where practical.1. incorporated into permanent pier/dock access corridors (i.e-, access for shoreline Native vegetation removed to accommodate construction Native shall be replaced in accordance with the Vegetation Management Requirementswith native vegetation of a similar species or type. 5. Water Willow Beds — Applicants are encouraged to avoid activities (including stabilization) that could have an adverse impact upon existing water willow beds_ Bioengineering is a preferred shoreline stabilization technique and is encouraged, especially in eroded areas associated with water willow beds. Shoreline stabilization activities are limited to the eroded bank and any unavoidable impacts to existing water willow beds, as a result of siabilizatifln installation, require repianting water willow in the impacted areas}. Rip -rap installed below the normal lake level elevation and associated with water willow beds must be limited to one layer deep to allover spaces between€ the stone for water willow recruitment. Removal of water willow for continued lake access may be allowed, but only for the specific and limited area necessary. Removal of water willow by means of chemical application can only be conducted in accordance with state and federal pesticide application regulations. 6. Ri -Ra Lse with Bulkheads — A layer of rip -rap (Class 11 or larger) extending six feet lakeward from Tull pond must be placed along the entire base of all bulkheads (except for loosely stacked, dry -stacked boulder walls). The six foot requirement for steep slopes is measured vertically. For more gradual slopes where the vertical measurement would prove impractical, a horizontal measure may be used (Figure 5B-2)_ 7 Bioen9ineerin_ Vegetation —The types of plar�tin� landscape -planting �s used in bioengineering and p p g projects should be native to North Carolina and South Carolina, and must be reviewed and approved by DE-LS prior to introduction. 8. Seawalls — Seawalls are not allowed in areas with an average eroded bank height of less than three feet. 9- Eiaeuts+ineerie — proposals for stabilization where the eroded bank height is less than two ft may use approved bioengineering technique and enhanced rip -rap technique Only (see Figure 5B-3 for example of acceptable enhanced rip -rap technique). 10. Length of Shoreline to be Stabilized — An individual permit from the SCDI EC far activities in South Carolina and the US Army Corps of Engineers far activities in North Carolina is required for stabilization that exceeds 500 linear ft of shoreline_ Multiple applications for less than 500 ft of stabilization activities on a parcel exceeding i will not he accepted within a five year thnefrarne. ng 500 linear October 3, 2015 C-55 Shoreline Management Guidelines Shoreline Management Plan Catawba-Wateree Project (FERC Na_ 2332)