HomeMy WebLinkAbout20211077 Ver 1_WRC Comments_202108189 North Carolina Wildlife Resources Commission 9
Cameron Ingram, Executive Director
August 18, 2021
Ms. Amanda Fuemmeler
U.S. Army Corps of Engineers, Regulatory Branch
151 Patton Avenue, Room 208
Asheville, North Carolina 28801-5006
SUBJECT: 20 South Bear Creek
UT to Hominy Creek, Buncombe County
Dear Ms. Fuemmeler:
Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed an
application to culvert 60 ft of an unnamed tributary (UT) to Hominy Creek, fill 0.018 acre of
wetland, and temporarily impact 30 ft of stream and 0.004 acre of wetland in Buncombe County.
Our comments on this application are offered for your consideration under provisions of the
Clean Water Act of 1977 (33 U.S.C. 466 et. seq.) and Fish and Wildlife Coordination Act (48
Stat. 401, as amended; 16 U.S.C. 661-667d).
Wild trout reproduction should not be impacted by the project, and a trout moratorium is not
needed. However, Blotched Chub (Erimystax insignis, NC Significantly Rare) is found
downstream of the project, and effective erosion and sediment control on site is important to
conserve habitat for this species.
The project application proposes to culvert the stream with two 72-inch culverts. Double
culverts set at the same elevation often result in one culvert carrying most or all of the flows over
time; this can cause channel instability and problems with aquatic organism passage. We
recommend replacing the double culverts with a spanning structure such as a bridge or
bottomless arch instead. If a culvert must be used, we recommend using a single larger squash
(or elliptical) pipe capable of carrying base and stormflows, possibly with a floodplain culvert
placed at a higher elevation to pass flood flows. In addition, culvert material is not specified.
We recommend against slick -walled high -density polyethylene (HDPE) and reinforced concrete,
as these materials are smooth and are less likely to retain substrate and allow passage of aquatic
organisms like salamanders and crayfish.
Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721
Telephone: (919) 707-0220 • Fax: (919) 707-0028
20 South Bear Creek Page 2 August 18, 2021
UT to Hominy Creek, Buncombe Co
It also appears that part of the development will be in the 100-year floodplain. The NCWRC
does not support commercial or residential development within the 100-year floodplain. The
filling of floodplains increases the potential for flooding and degrades in -stream habitats for fish
and other aquatic organisms.
We offer the following recommendations to minimize impacts to fish and wildlife:
1. In -channel work should be accomplished as quickly as possible and vigilance used in
sediment and erosion control during site preparation, construction, and clean up. Disturbed
areas should be seeded, mulched and/or matted as soon as possible, preferably at the end of
each workday.
2. Any erosion control matting used should be free of plastic or nylon mesh, as this type of
mesh frequently entangles wildlife and is slow to degrade, resulting in a hazard that may last
for years.
3. We recommend that the stream running through the property be planted with a riparian buffer
at least 30 ft in width comprised of native trees, shrubs, and herbaceous vegetation. In
addition, we recommend widening the buffer on Hominy Creek to at as wide as possible and
using this area as green space. A wide forested buffer can ensure greater bank stability, filter
overland pollutants, and provide habitat for birds and other wildlife.
4. We strongly recommend using a spanning structure such as a bridge or arch pipe; if a culvert
must be used, we recommend a single corrugated squash/elliptical pipe, possibly with an
additional floodplain culvert set at a higher elevation. In addition, smooth -walled culvert
material should not be used.
5. If temporary wetland impacts involve heavy equipment access, then equipment should work
from mud mats to lessen wetland soil compaction.
6. Effective stormwater management is essential in minimizing impacts to downstream waters.
Stormwater control measures should mimic the hydrograph consistent with an impervious
coverage of less than 10%. We recommend the use of Low Impact Design techniques, such
as grassed swales and pervious pavement; curb and gutter, catch basins, and underground
piping of stormwater should be avoided. As stormwater runoff from pavement can cause
short-term temperature spikes in downstream waters, mechanisms to lower stormwater
temperature should be incorporated into the stormwater management design.
Thank you for the opportunity to review and comment on this project. Please contact me at
(828) 400-4223 if you have any questions about these comments.
Sincerely,
Andrea Leslie
Mountain Region Coordinator, Habitat Conservation Program
ec: Jon Swaim, McGill Associates
Andrew Moore, NC Division of Water Resources
NOTES
SEE GRADING, EROSION CONTROL, AND STORM DRAINAGE DETAIL
SHEETS FOR ALL GENERAL NOTES. CONTRACTOR RESPONSIBLE
FOR INCLUSION OF DETAILS SHEETS WITH ALL PLANS.
2. SOME PORTION OF THIS PROJECT LIES WITHIN THE 100-YR FEMA
FLOODPLAIN.
3. SOIL TYPE: IoA, UhE, EwD, CsD, BkD2, BkC2, EvD2, Ew, EwE, TsA.
4. TO SCHEDULE THE REQUIRED INSPECTIONS ON ALL WORK, CALL
THE CIVIL DESIGN CONCEPTS INSPECTIONS HOTLINE AT
828-771-4755, OR EMAIL AT INSPECTIONSOCDCGO.COM.
FAILURE TO SCHEDULE INSPECTIONS MAY RESULT IN UNCOVERING
OR REDOING WORK
5. RETAINING WALLS:
ALL RETAINING WALL ELEVATIONS SHOWN ARE FROM TOP OF WALL
TO FINISH GRADE ELEVATION. CONTRACTOR TO ACCOUNT FOR
FOOTER/COVER OVER FOOTER. REFER TO WALL DESIGN FOR
FOOTER DESIGN. WALL DESIGN TO ALSO ACCOMMODATE STORM
PIPE PENETRATIONS PER PLANS.
WALL DESIGN TO INCLUDE FOOTING DRAIN AND MINIMUM WIDTH OF
12" OF #57 WASHED STONE BEHIND WALL FROM BOTTOM TO TOP
OF WALL.
ALL RETAINING WALLS PROVIDING A CHANGE OF GRADE OF 30"
OR MORE SHALL BE PROTECTED WITH A GUARDRAIL. THE
GUARDRAIL SHALL BE 42" MINIMUM IN HEIGHT, AND PREVENT THE
PASSAGE OF A 21" SPHERE UNLESS ADJACENT TO A WALKING
SURFACE. COORDINATE BARRIER STYLE AND COLOR WITH
ARCHITECT AND ENGINEER. SEE SITE PLAN FOR APPROXIMATE
LOCATION OF FENCING/BARRIERS.
CONTRACTOR TO SUBMIT TO OWNER AND ENGINEER FOR REVIEW
PRIOR TO ORDERING MATERIALS. CONTRACTOR TO COORDINATE
WALL STYLE AND COLOR WITH ARCHITECT AND ENGINEER.
CONTRACTOR RESPONSIBLE FOR OBTAINING BUILDING PERMIT FOR
ALL RETAINING WALLS PRIOR TO ORDERING MATERIALS OR
CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR CONSTRUCTING
RETAINING WALLS IN ACCORDANCE WITH ALL WALL
MANUFACTURERS STANDARDS AND SPECIFICATIONS.
ALL RETAINING WALLS 4' OR GREATER TO BE SUBMITTED TO
BUNCOMBE COUNTY BUILDING SAFETY DIVISION FOR REVIEW AND
APPROVAL AND CERTIFIED BY THE WALL ENGINEER UPON
COMPLETION. RETAINING WALLS SUBJECT TO ADDITIONAL
LANDSCAPING DEPENDING ON HEIGHT AND MATERIAL.
� I I
F4 \ \
I
y `� °w oo A
DS
D9I I I II �ll 11 I
\ V A \V \ D7
PROPERTY LINE (TYP)
PROPOSED DOUBLE 48" PERMANENT HDPE PIPE ®� 1 I l I j 6 00
CULVERT WETLAND CROSSING. PIPE INVERT TO \ I I ( I
BE BURIED 12" BELOW STREAM BED LESSER \ I I
OF, ONE FOOT OR 2OX PIPE DIAMETER).
(CONTRACTOR TO FOLLOW REQUIREMENTS OF \ I I I I
USACE & NCDEQ) (SEE DETAIL & SHEETS \ I II II I I ICD
C507-0509 FOR TABLE) I I I I II III I I I N I �� I II II I J1
PROPOSED STORM PIPE (TYP)
(SEE DETAIL & SHEETS 1
C507-0509 FOR TABLE) \ D10 I \ \ \ \
PROPOSED STORM STRUCTURE
\ \ TYP SEE DETAIL &SHEETS \
C507-0509 FOR TABLE)! \ V A \� o D6
0010%
T� PROPOSED CONTROL STRUCTURE 'D1' / N ZO D�VA�vv� vv vvv AV A v
SEE DETAIL /CD
to
PROPOSED BIO-RETENTION CELL 'G'�
(SEE SHEET C955)
W
LU
co
CIO)
0
o Z1
PROPOSED RIP RAP APRON 'J'
_ \ I f \
_ � A LENGTH: 10' '
D4 i� WIDTH AT START: 9' \
W -- - _ — — — � � �, I WIDTH AT END: 13
W - _
DEPTH: 18"
_ � I I STONE CLASS: B
I (SEE DETAIL)
� 1 I
o I -
--- --- 2008
W— \I,DO
--- D 1 N\ \ \
I \ a
2028-
1 I \ \
FLOODPLAIN (TYP)
<00
,. . . i t •tom t � J / � . \ � 0 l o �
/ i N
r i r i r i r i r i r i
B1 ' 1
o
B 0 100
i
EXISTING WETLAND - - PROPOSED DRY DETENTION PON
cn (SEE SHEET C952)
V) / PROPOSED CONTROL STRUCTURE 'B1'
/ (SEE DETAIL)
0
i r i r i r i r r r r r r r r r r r r r I
MATCHLINE (S`E SHEET C503)
7/'
/
F2
I
Fn
I I I
I� /
NI I
I I
IlloCD
I I IIIE V7 I N
N
II EXISTING STRE�(Typ)
I D
I II II \ \
FLOODPLAIN (TYP) I\ \ \
NI
00 STREAM BUFFER TYP
N
W � OD LO 0) to 0 Ln
DCCOCIDZ WnCOvv
SUBJECT
00 Cli0
W N N N C"
PROPERTY
Z z N N Z a -it��
c
m
O J W W W J as
W X W X
R°
o N�
a W ¢
z�WLLL
=LL
soN
L
�aa
\
ZQa
INTERSTATE
O INTERSTATE 240
cm
ID2 GLO
1
I
I I /
\\ I I 000
II �� II I I I I II
—
-- - I I — 2090 — W
_-- CD
2080
PROPOSED 2' — - _ -- -- W
CONTOURS (TYP) — — — --
- -, W
---- �
— — — 2070
PROPOSED PERMANENT
DRAINAGE DITCH "D" — — — — _ — �_ _
_
\ — — — — — `OO
BOTTOM WIDTH: 4'
SIDE SLOPE: 2:1 — —
� \� DEPTH: 1' -----_-- W
SLOPE: 2% MIN. 2060
\ CHANNEL LINER: C125BN - — — — — — —
\ \ (SEE SHEET C936)-
---- J
\ CONTRACTOR TO MAINTAIN 2050 , T
PREVIOUSLY INSTALLED CHECK _ ---
\ \ v DAM (TYP) (SEE DETAIL) --
\ PROPOSED PERMANENT
DRAINAGE DITCH "C"
BOTTOM WIDTH: 4'
SIDE SLOPE: 2:1
DEPTH: 1'
SLOPE: 2% MIN.
DEVELOPMENT DATA
OWNER/DEVELOPER:
CONTACT:
CIVIL ENGINEER:
CONTACT:
SURVEYOR:
CONTACT:
PROJECT DATA
m
BEAR
VICINITY MAP
(NOT TO SCALE)
CROSSROADS COMMUNITY VENTURE, LLC
330 FRANKLIN ROAD
BRENTWOOD, TN 37027
SEAN MCGUIRE
(615) 727-7949
CIVIL DESIGN CONCEPTS, P.A.
168 PATTON AVENUE
ASHEVILLE, NC 28801
WARREN SUGG, P.E.
(828) 252-5388
ED HOLMES & ASSOCIATES, P.A.
300 RIDGEFIELD COURT, SUITE 301
ASHEVILLE, NC 28806
JOSHUA E. HOLMES
(828) 225-6562
PIN:
9627-89-6780
ADDRESS:
20 S. BEAR CREEK ROAD
DEED BOOK/PAGE:
5453/963
SITE ACREAGE:
55.40 ACRES
ZONING:
PS - PUBLIC SERVICE
SETBACKS:
FRONT:
20'
SIDES:
10'
REAR:
20'
DISTURBED AREA:
35.74 AC
PROPOSED UNITS:
660 MULTI -FAMILY RESIDENTIAL UNITS
DENSITY SUMMARY:
ALLOWED:
12.0 UNITS/ACRE
PROPOSED:
11.9 UNITS/ACRE = 660 UNITS
EXISTING USE:
RESIDENTIAL/VACANT
PROPOSED USE:
MULTI -FAMILY RESIDENTIAL
PARKING CALCULATIONS:
1.75:1 MULTI -FAMILY RESIDENTIAL
1.10:1 SENIOR HOUSING RESIDENTIAL
PROJECT AREA IMPERVIOUS CALCULATIONS:
IMPERVIOUS PERVIOUS
PRE -DEVELOPMENT:
0.00 ACRES (0%) 35.74 ACRES (100%)
POST -DEVELOPMENT:
1.25 ACRES (3.5%) 34.49 ACRES (96.5%)
STORM LEGEND
EXISTING STORM
PIPE
PROPOSED
STORM PIPE
■ ■
PROPOSED
HEADWALL
PROPOSED
INLET STRUCTURE
CQ
PROPOSED
JUNCTION BOX
O
PROPOSED
DETENTION STRUCTURE
OO
PROPOSED
FLARED END SECTION
PROPOSED
RIP —RAP APRON
Know what's below.
Call before you dig.
NORTH
PHASE I STORM DRAINAGE PLAN
GRAPHIC SCALE
40 0 20 40 80
( IN FEET )
1 inch = 40 ft.
m
J
Q
m
D
cn
U
w
U
m
0
U
Q y
Q.
a
C
0
N U
_ 2
(.) >
�Cn a U Z 4) 0 3
V�V 3
00
T
N
U
W
W
z
W
U
J
Cl)
J
W
m
0
z
rlm
z
0
k-
U
w
p
N
0
NLLJ
Q
N
p
_n
0
o
z
/v
Q
z
J
0
Q
0
0
z
z}
z
0
0
w
m
C)
5
0
G
0
O
z
D
m
U
U
J
� �/A/
J
OW U /
W
m
z
D
Q
F-
�
z
m
w
>
Q
<
�
z
It
z
Q
D
o
V,
o
0 U)♦^
O
Q
0
m
w
cn
cn
cn
Q
o
V
U
DRAWN BY: CDC
CDC PROJECT NO.: 11925
BC PERMIT NO. N/A
SHEET
i I C502
2030- 2030 2020— 020 2030 PROPOSED GRADE 2030
PROPOSED GRADE
PE ® 7.6% 24LF-15" HDPE @ 6.5%
PROPOSED GRADE 70LF-15" HDPE ® 0.5%
PROPOSED GRADE (CHURCH DRIVE)
2020 (ROAD A) 2020 201 010 2020 2020
46LF-15" HDPE 0 0.5%
92LF-48" HDPE ® 0.5% 84LF-48" DPE ® 0.5%
87LF-48" HDPE @0.5%
2010-
0
200 r
0 I
I
r ^ EXISTING GRADE
N -H 00
NOo (0r-
NI�0 +per
r O N} 7 0 0
Z
1990 0Q� �Q0
Qf�O> o ��z
a_ V)
1980
O O o
o O o
O N
STORM LINE Y
2010 200 2000 2010-- '� Q N Q ^ a Q - 2010
Q I Q N Q I I
O N \Qi ro Q v � vr10 v
HDPE PIPE Q N v
`. oLEXISTING
9 o ,�i o +I o
N EXISTING o rn ��O N00ro N "Oo `� o�oaMiN
~ / __ .. +10 +�N+3 ro ON It
GRADE N �o aooNzQo QN�N M� O O+�N �� p� O NZ p O
r 2000 199 °' -1990 2000- a o o '•a CL j j aoN I r�0 0) NZ �Q0HOZ Z 0 a» 0'HOI+er 0r,0) d CL(nHZ Z(nH— — 0 �Z Z a-0
N00M� ON0 Lp. N 0 0_ �?
O No +I o LO ~ Z o Q GRADE
N +pN r7 +0 a_ V)
>_ N 0 O
N Z N p
o- ....- 0_ •• 1990 1980-- 1980 1990-- - 1990
Qf� O j o Z
a_(nE-Z � �-
1980 1970- 1970 1980-- 1980
o O O O O 00
o) o O 00
+ + + + + + +
M M O O O
STORM LINE Z STORM LINE A
2030- 2030 2070 2070
PROPOSED GRADE
(ROAD A) _ V
PROPOSED GRADE EXISTING GRADE
(POND) 31LF-15" HDPE ® 0.5%
27LF-15" HDPE ®0.6%
2020 65LF-15" HDPE ® 0.5% 2020 2060— 2060
62LF-15" HDPE ®4.2% —
55LF-18" HDPE ®0.5% �
24LF-15" HDPE @ 0.6%
29LF-15" HDPE @ 0.6%
2010 2010 2050 / 2050
PROPOSED GRADE
\� N U
^
I � M U
ovUI � N
Lr7I �r, ocN
2000-- 000 2040 pN 0N o o-
v -2040
U U±O O N 0. I 014 n�
NIt CL �NZ M+MN UNO�
-H +Ip OQCL j U NZ O D_�N0 r +I(O �o
�00 OON CL V OZ O ..� 0Q0_ j-- -- +IrM rn� O -It O -� NN rnN--
ItU0 00 » 0=F-0 O t N N OHO N Lndo 000
O+pN +�H d F- Z 0_NHZ O+�O +'tN N+�N M+�N H ±OF-
Up0 Uo00 L��O
�NZ —Np L� O WO0 LL_ �..p �NZO �N�
NZ -NZ O Z p O 0
�HO> �HO> O' d 0QCLjj0<a— j afQpjj �Qpj
1990- o (n ? o (n ? 1990 2030- o' O> � 0 Z Z� O z z (n z z o r- -2030
0_ HZ 0_(nH——0_(nH— —
-- EXISTING GRADE -- - -
1980— 1980 2020 2020
O o O L o O u
O o O Un o O 00
O N N O
STORM LINE C STORM LINE F
?030
?020
2010
1990--
1980--
0
0
O
PROPOSED GRADE
95LF-15" HDPE ® 7.1%
PROPOSED GRADE
(POND)
50LF-15" HDPE ® 7.9%
t
r7
c�
v
^
O
�
-HO
LOAN
N
0±O
0
-H0
>
LO
X�O00
0_Z
C�
00ON
O
N
+I
N O
0
10 O
rM N 0
N
0✓ O >
Z
0 O O
a H
N Z
j
0= 0
N � Z
O
O
STORM LINE G
2030-
2020
2010
2000-
1990-
1980
O
O
O
STORM LINE B
2040- 2040
2030
rr--��25LF-105!"'
ED GRADE
2030
2020
HDPE @ 1.1
/ ^
2020--
-2020 c°
N-
c�
2010
^
^^LO\
I
co
m
0
o
v
I O p
OR
N
0
--
N
--
CD
�
--
`-� O
°'
N
o
+I
LO O N
(m�
O
NN�NNN
1
PO
NNN
0
0L0-
j
0C4
N
O
(0
oLO
2010--
010 No
�
Zz O
a_
a0
r,
x O
O
jj
o >
�� Z
(nHz
�OZ
EXISTING GRADE
EXISTING GRADE
2000-
2000
- 1990
1990-
1990
1980
O
o
't
m
o
+
+
+
+
O
O
cli
N
STORM LINE D (D10-D6)
2030
2020
2010
2000
1990
1980
u>
N
2030-
-2030
PROPOSED GRADE
2020
25LF-15" HDPE ® 0.6%
201
2010
� o
vo
O o 2000--
--2000
+I o
^N
N0O
N
+ 04
CL z 0
N�
W p > > > --
Z Z
--
O CL � • a-
0_ HZ
p>
C � Z
1990--
1990
EXISTING GRADE
STORM LINE D (D11-D4)
Know what's below.
Call before you dig.
PHASE I STORM DRAINAGE
PROFILE
0 20 40 80
"O!!!�
1 inch = 40 ft. (H)
0 4 8 16
"O!!!�
1 inch = 8 ft. (V)
m
Y
J
Q
H
m
N
U
W
U
m
W O OD Ln
Z W OD 0W
CDCD O Cn
00 Cn
Z 00 0 co N
~ W V U)
W
a LO
N
N
N U S
Z N
Z
O W N N
-1
W W N N
[o W
W J OD a
>wx
(LWz
2 W
(A
W
ao 0
coQa
W O
0.
z
a�
3
N
Cn
E
0
Q C
a
a
0
N U
.y
2)V >
.N r U
.� O O 3
vaU 3
00
N
0
W
W
z
w
0
J
W
J
W
m
IL)
z
9
Z
O
n
ry
U
Lj
0
N
0
N
Ln
0
Q
L0
o
z
00 0II
Poo Nb
X/'-
o
\ oo
o�y
Q
Y,o C�d 0 \( WO�
00000� �G
Q
z
J
O
Q
U
o'
0
z
Zr
Z
O
U
W
m
C)
O
U
O
z
D
m
U
O
L� //
J
W _^
/
_J
Li
0.
L�
O
F_
0
Z
W
Ld
W
0
Q
Z
cr
Z
Q
D
' w
O v J
r
O
♦
U
G_ v )
O
Q
(~ O
Q
O
o'
W
(n
(n
(n
Q ♦ ,
o
=
�
d V
U
DRAWN BY: CDC
CDC PROJECT NO.: 11925
BC PERMIT NO. N/A
SHEET
C507