Loading...
HomeMy WebLinkAbout20051071 Ver 2_Approval Letter_20070706O~O~ WAT ~9QG ~ iy~ O 'r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality July 6, 2007 Mr. Patrick Franke, Director of Logistics BSH Home Appliances Corporation 5551 McFadden Avenue Huntington Beach, FL 92649 Re: BSH Home Appliances Logistic Center, Craven County DWQ #20051071, Ver. 2; USACE Action ID. No. SAW-2006-41372-125 APPROVAL of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions Dear Mr. Franke: Attached hereto is a copy of Certification No. 3670 issued to Mr. Patrick Franke and BSH Home Appliances Corporation, dated July 6, 2007. This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 1 SA NCAC 2B .0233. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. Sin rely, Coleen H. Sullins CHS/cbk/ijm Attachments: Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 U.S. Army Corps of Engineers, Washington Regulatory Field Office, Wilmington District, USACOE Kyle Barnes, DWQ, Washington Regional Office DLR Washington Regional Office File Copy Central Files Robert M. Chiles, P.O. Box 3496, New Bern, NC 28564 Filename: 051071 Ver2BSHHomeApplLogisticCtr(Craven)401_IC_NBR 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Winston-Salem, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Winston-Salem, North Carolina 27604 Phone: 919-733-17861 FAX919-733-689311ntemet: http://h2o.enr.state.nc.us/ncwetlands No e hCarolina ~atura!!y An Equal OpportunitylAffirmative Action Employer - 50% Recycledl10% Post Consumer Paper Mr. Patrick Franke and BSH Home Appliances Corporation Page 2 of 6 July 6, 2007 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to Mr. Patrick Franke and BSH Home Appliances Corporation, to fill or otherwise impact 1.02 acres of 404/wetland (0.45 acres of 404/wetland fill was previously authorized on September 2, 2005, by the DWQ), and 0.00 square feet of Zone 1 Neuse River basin protected riparian buffers and impact 0.00 square feet of Zone 2 Neuse River basin protected riparian buffers, to construct the proposed BSH Home Appliances Corporation plant expansion, which is located southeast of the intersection of Clarks Road and US 70, near Deep Branch, west of New Bern, in Craven County, North Carolina, pursuant to an application dated October 12, 2006 and received by the DW~ on January 4, 2007, and by Public Notice by the U.S. Army Corps of Engineers issued on the 3` day of January of 2007 (received by DWQ on January 4, 2007), and all additional information received by the DWQ on October 25, 2006, and October 31, 2006. This Certification shall also act as your approved No Practical Alternatives determination for impacts to the protected riparian buffers per 15A NCAC 2B .0233(2). The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other im acts area roved includin incidental im acts: Amount A roved (Units) Plan Location or Reference 404/Wetland 1.02 (acres A lication and Public Notice Buffer -Zone 1 0.00 (s uare feet A lication and Public Notice Buffer -Zone 2 0.00 (s uare feet) A lication and Public Notice Mr. Patrick Franke and BSH Home Appliances Corporation Page 3 of 6 July 6, 2007 Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233; Miti , ag_tion: 6. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the combined proposed impacts (1.02 acres 404/wetland) and previously approved impacts (0.45 acres of 404/wetland), as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. Additionally, your EEP acceptance letter dated February 28, 2006, has expired (as stated in the first sentence of paragraph two of your EEP letter, "This acceptance is valid for six months from the date of this letter"), and therefore you will need to provide documentation from the NCEEP indicating their Mr. Patrick Franke and BSH Home Appliances Corporation Page 4 of 6 July 6, 2007 willingness to accept your request to purchase 1.47 acres of 404/wetland, non-riparian, wetland mitigation credit to mitigate for the proposed 1.47 acres of tota1404/wetland impacts on the site. Once you have secured the acceptance letter from EEP, please submit it to the DWQ. However, until the EEP receives and clears your check (made payable to: DENR -Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733- 5205 if you have any questions concerning payment into a restoration fund. You have 60 calendar days from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: Type of Im act Compensatory Mitigation Re uired River and Sub-basin Number 404/Wetland 1.47 (acres) Neuse/03020202 Continuing Compliance: 7. Mr. Patrick Franke and BSH Home Appliances Corporation shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Patrick Franke and BSH Home Appliances Corporation, and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Patrick Franke and BSH Home Appliances Corporation in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; 8. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements Mr. Patrick Franke and BSH Home Appliances Corporation Page 5 of 6 July 6, 2007 are required. A copy of this permit and monitoring report forms may be found at http: //h2o. enr.state. nc. us/su/Forms Documents. htm; 9. Diffuse Flow (DWQ Review and Approval Required) All constructed stormwater conveyance outlets shall be directed and maintained to flow in a diffuse manner at non-erosive velocities through the entire protected stream buffers without re-concentrating. If this is not possible it may be necessary to provide stormwater facilities that are considered to remove nitrogen. Additionally, a stormwater management plan for this project shall be provided to this Office before any of the impacts approved herein are conducted. The plan shall specify all stormwater discharge points, plan details, and calculations to indicate that diffuse flow through the protected buffers or nitrogen removal as described above will be achieved. An Operation & Maintenance (O&M) agreement signed by the current landowner must be approved by the DWQ. This O&M agreement must transfer with the sale of the land or transfer of responsibility for the stormwater facilities and the DWQ must be notified of every transfer 10. Written Stormwater Management Plan (Final Plan Needed) A final, written stormwater management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604) and the stormwater management plans shall be approved in writing by this Office before the impacts specified in this Certification occur. You have the option of using the Express Review Program for expedited approval of these plans. If you propose to use the Express Review Program, remember to include the appropriate fee with the plan. The stormwater management plan must include plans, specifications, and worksheets for stormwater management facilities that are appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Additionally, in watersheds within one mile and draining to 303(d) listed waters, as well as watersheds that are classified as nutrient sensitive waters (NSW), water supply waters (WS), trout waters (Tr), high quality waters (HQW), and outstanding resource waters (ORW), the Division shall require that extended detention wetlands, bio-retention areas, and ponds followed by forested filter strips (designed according to latest version of the NCDENR stormwater Best Management Practices Manual) be constructed as part of the Mr. Patrick Franke and BSH Home Appliances Corporation Page 6 of 6 July 6, 2007 stormwater management plan when asite-specific stormwater management plan is required. Where a State Stormwater Permit (in accordance with 15 A NCAC 2H .1000) is required, this permit may be considered to meet this condition. 11. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 6`h day of July 2007 DIVISION OF W TE QUALITY Coleen H. Sullins 3670 CHS/cbk/ijm Certification of Campletian DWQ ProjectNo.: County: Applicant; Project Marne: Date of Issuance of Wetland Permit: Certificate of Completion Upon, completion of alI work approved within the • 401' Water Quality Certification and Buffer Rules, and auy subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express •Permitting Unit, North Carolina Division of Water Quaiity, 1650 Mai1• Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the .applicant's authorized agent, or the project engineer. It is nQt necessary to send certificates from all of these. • Applicant's Certification I ~ __ ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer 12ules, tlie•approved plans and spec cations, 2.nd other supporting materials. Signature: Agent's Certification Date; I, ~ ~ ,hereby state that, to'the best of my abilities, due care and diligence was used in the observation of the construction .such that the construction .was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and :Buffer Rules, the approved .plans and specifications, and other supporting materials. Signature: Data: If this project was designed by a Certi aed Professional I, as a duly registered Professional ~ ~ (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to.observe:(periodiaally; weekly,. full time) the construction of the project, for :the Permittee hereby state that, to the best of rriy abilities, due care 'and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality .Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.. ~ ~ Date