HomeMy WebLinkAbout20130784 Ver 1_401 Application_20130713William G. Daniel & Associates 2 0 1 3 0 7 8 4 Letter of
Engineering - Planning* Site Design Transmittal
TO: Karen Higgins
NC DENR -DWQ
WBSCP Unit
PROJECT: Autopark Honda (13 -SP -013)
Please find the following items
Transmitted by n Fax Fax Number:
DATE:
I
JUL 2 6 2013
D_. NR - -FAT —E UALITY
'Pages:
EMail Pick -Up Delivered Overnight 11
For your: 0 Approval []Information O Use 11 Records []Distribution
DReview & Comment O Signatures and approval
Copies Revision date I Description
1 - Site plan with buffer encroachment shown and labeled
3 - PCN Form (1 Original and 2 conies)
REMARKS: Karen,
The Town of Cary is requiring we remove the existing sidewalk along
MacKenan Drive and construct a 10' asphalt greenway trail in it's place. The attached
site plan shows and labels the impacts.
Would you please copy me on the acceptance of this impact.
Please let me know if you have any questions or need additional information.
Thanks
COPIES TO: BY: Bart J. McClain
1150 S.E. Maynard Road, Suite 260, Cary, N.C. 27511 - (919) 467 -9708 - Fax (919) 460 -7585
WA tFA
O�
O Y
201 30784
�pF
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the Corps:
❑ Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps?
❑ Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
❑ 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification - Express ®,Riparian Buffer Authorization;
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑ No
For the record only for Corps Permit:
❑ Yes ❑ No
1f. `Is payment into a mitigation bank or in -lieu fee program proposed for+
(mitigation of impacts? If so, attach the acceptance letter from mitigation bank
;or in -lieu fee program.,
Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1hj
below.) - - -- - --
❑'Yes ®,No
,1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)' �
❑rYes, ®fNo
2. 'Project Information`,
'2a. Name of projecta
Autopark Honda
,2b. County:/
Wake
2c. Nearest municipality / town:'
Cary
2d. Subdivision name:-
MacGregor Park
2e. NCDOT only, T.I.P. or state project no:
flif T M fin I
3. Owner Information UU
3a. Name(s) on Recorded Deed:
MLC Automotive, LLC L s 12013
3b. Deed Book and Page No.
DB 11526 PG 1443 p -
;3c. Responsible Party (for LLC if;'
applicable):'
Keith Elks n s SZ ""ate'&anch
3d. Street address:
5601 Capital Boulevard
3e. City, state, zip:
Raleigh, NC 27616
3f. Telephone no.:
919 8760 -5432
3g. Fax no.:
919 876 -3258
3h. Email address:
kelks @Leithlnc.com
Page 1 of 10
PCN Form - Version 1.4 January 2009
4., Applicant Information (if different from owner)
4a. ,Applicant is:,
❑ Agent ❑Other, specify:'
4b. Name
,.4c. Business name
(if applicable):,
,4d. Street address:
'4e. City, state, zip
4f. Telephone no.:
'4g. Fax no.:,
4h. Email address:'
5.' 'Agent/Consultant Information (if applicable),
5a. -,Name:',
Bill Daniel
5b. Business name
(if applicable):,
William G. Daniel & Associates, PA
5c. Street address:,
1150 SE Maynard Road, Suite 260
,5d. City, state, zip:
Cary, NC 27511
5e. Telephone no..
919 467 -9708
r5f. Fax no.:
919 460 -7585
5g. Email address:
Bdaniel @WmGDA.com
Page 2 of 10
�B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID)
075215630137
1b. Site coordinates (in decimal degrees):
I Latitude: 35.4415 Longitude: -78.4839
1c. Property size:
16.3 acres
2. Surface Waters
2a. Name of nearest body of water to proposed project:
Swift Creek
2b. Water Quality Classification of nearest receiving water:
C;Sw,NSW
2c. River basin:
lNeuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing developed property including buildings and parking for automotive dealership inventory and overflow parking. The area of the impact is an
existing roadway (MacKenan Drive) with sidewalk
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,190
3d. Explain the purpose of the proposed project:
The Town of Cary is requiring the developer to remove a portion of existing sidewalk along MacKenan Drive and replace it with a 10' asphalt greenway
D
3e. Describe the overall project in detail, including the type of equipment to be used:
The greenway trail will be constructed with small dozer, stone compaction equipment, and small asphalt paving machine
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
❑ Yes ❑ No ® Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency /Consultant Company:
I Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑Yes ❑ No ® Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
❑ Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
Wetlands Streams — tributaries
❑ ❑ ®;Buffers ❑Open Waters El Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes /No
W2 -
Choose one
Choose one
Yes/No
W3 -
Choose one
Choose one
Yes/No
W4 -
Choose one
Choose one
Yes/No
W5 -
Choose one
Choose one
Yes/No
-
W6 -
Choose one
Choose one
Yes/No
-
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1
Choose one
S2
Choose one
S3 -
Choose one
-
S4 -
Choose one
-
-
S5
Choose one
S6
Choose one
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If Pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
;6. Buffer Impacts (for DWO),
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.\Project is in which protected basin ?,
® Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number —
Permanent (P) or
Temporary T
6c.
Reason for impact
6d.
Stream name
6e.
Buffer,_
mitigation)
require_ d ?,
6f. _
,zone 1�
impact
((square
feet)
6g.
(Zone 2�
'impact)
((square
feet);
61 P
Greenway Path
Tributory of Swift Creek
No
40
290
B2
Yes/No
B3 -
Yes/No
B4
Yes/No
B5
Yes/No
B6
Yes/No
6h. Total Buffer Impacts:
6i: Comments: The above area values represent the surface of the proposed greenway trail located outside of the existing street RAY
Page 5 of 10
D. Impact Justification and Mitigation
1. `Avoidance and Minimization
1a. 'Specifically describe measures taken to avoid or-minimize-the-proposed impacts in designing_ project }
The required greenway path is parallel to the existing road and replacing an existing sidewalk No meandering of the path is proposed.
1 b`. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.;
Construction will be by equipment within the existing rtw No further impact from construction will take place other than installation of the asphalt path
Additionally, the proposed trail is designed such that all drainage from its surface flows to the street rather than to the buffer
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ❑ No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in-lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
41h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ,
,6a. Will the project result in an impact within a protected riparian buffer that requires,
Yes ® No
,buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
;6e.
Zone
Reason for impact
Total impact'
;Multiplier
;Required mitigation
,(square feet);
(square feet),
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f.,'Total buffer mitigation required
6g. (If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
,permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. 'Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified �
®Yes) ❑ iNo;
iwithin one of the NC Riparian Buffer Protection Rules?
1b. If yes, then is a diffuse flow plan included? If no, explain why;'
All flow from proposed greenway path will be directed to the existing curb line No direct flow into the
buffer
❑ Yes ® No
will occur.
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
2b. Does this project require a Stormwater Management Plan?
❑ Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
❑ Phase II
❑ NSW
3b. Which of the following locally- implemented stormwater management programs
USMP
apply (check all that apply):
® Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
❑Yes ❑ No
attached?
4. DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a. Which of the following state - implemented stormwater management programs apply
ORW
(check all that apply):
BSession Law 2006 -246
[]Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federal /state/local) funds or the
❑ Yes
❑ No
use of public (federal /state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes
❑ No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated,—
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,;
❑Yes
®No
or Riparian Buffer Rules (15A NCAC 2B .0200) ?r
2b. ,Is this an after -the -fact permit application?
❑Yes;
®,Nol
2c. If you answered "yes" to one or both of the above questions,iprovide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. ;Will this project (based on past and reasonably anticipated future impacts) result in,
❑Yes
®No
additional development, which could impact nearby downstream water-quality? 1
3b. If you answered "yes" to the above-
bove, submit a qualitative or quantitative cumulative impact analysis in accordance with t J
most recent DWQ policy. If you answered "no," provide a short narrative description.)
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat?
❑ Yes ❑ No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
El Yes ❑ No
5c. If yes, indicate the USFWS Field Office you have contacted.
-
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑ No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
❑ Yes ❑ No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
❑ Yes ❑ No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
L LA
ApplicantlAgent's Printed Name
C5-
M •- �s.Xte, �''�e cv.bew
;Appiicant/Agent's Signature`,_ _
(Agent' s signature is valid only if an authorization)
letter from the applicant is provided.) �
--)/R / t
-
Date'
Page 10 of 10
N
€I -- tit AUTC PARK
MLG AUTOMO'iVE. LLC,
PIN 0752 1r )5A
PAVEMENT SCHEDULE ON-SITE
Light Duty (parking spaces) - 3" S9.16; 6" CABC
Heavy Duty (drive aisles) - 3" S9.5B; 8" CABC
PAVEMENT SCHEDULE OLD RALEIGH ROAD
Standard - 3" S9.5B; 4" 1198; 10 " CABC
Full Depth (areas less than 6' wide - 3" S9.5B; 4 1196; 5'° B25. 0B
F777777777777777771
DESIGNATES L [GHT DUTY PAVEMENT
. . . . ......
SITE STRIPING NOTES:
1. ALL ON-SITE DIRECTIONAL ARROWS AND LETTERING TO BE WHITE PAINT.
2. ALL PARKING SPACE STRIPING TO BE 4" WHITE PAINT.
3. STOP BARS TO BE 2' WIDE WHITE PAINT
4. HC PARKING ACCESS AISLES AND STRIPED OUT AREA TO BE 4" WHITE PAINT.
5. ALL STREET SIGNS WILL CONFORM TO MUTCD GUIDELINES WITH RESPECT TO
HEIGHT, LETTER CASE, AND SIGN COLOR.
6. LANE STRIPING COLOR TO BE AS CALLED OUT ON PLAN.
ZONING: CROICU
I
C-
EX. PARKING
TIE TO
TIE TO E)(C&G
3'S9.
PROP, LIMITS�;
OFASPHALT
REMOVAL
J
TIE TO O(C&G
_EXt'S IN"G J
J
X
A
�4
N
y
h
7
/*
HC RAMP NOTE:
ALL PROPOSED RAMPS SHALL MEET THE CURRENT NC BUILDING
CODE AND /CC /ANSI A 117.1-2009 FCR SLOPE (MAX 1:12), LENGTH
(6 FEET WITHOUT HANDRAILS), WIDTH 4', AND A 4`x4' (MINIMUM)
LANDING NOT EXCEEDING 2% SLOPE AT THE TOP OF THE RAMP.
FIARAMP RAMP W11 LANDING
GRAPHIC SCALE
01
80, 120'
00. 0
(IN FEET)
It
WN oil as 1 Ell' 1 INCH = 40 FT
°LI =1TH 'AUTO PARK PROP. STEPS
N/F
EX. RETAINING WALL
PROP. DUMPS
'NO EMERGENC
ML,P AUTOMOTIVE. UPPER FFE 382.00:,, 1 FIRELANE
WISCREENWALLS PROP. STEPS
UPPERLEvEU OWER FFE 363.65
7 -4- 11-WIRETAINI
SEE AhQH PyNs WALL
"-PIN0752.15.53.6553 -------------------
'FOR
d..6
TRA DETAI�S)
-ZONING: ORD
J
TIE TO
8: CABC PROP. CONCRETE EXISTING
END RETAINING
RETAINING 3 S9.5B (6- 3000- PSI CONC. . . I I I I R
BEGIN RETAINING
WALL
WALL WITH 4"CABC PROP. P,
— — — BRIDGE I I. I I
FROF4.CONCRETE (LOWER LEVEL) I
TING RETAINING PSI COND • 11011 TOBE 'CAB ="6ABC' N/F
R�.WOVED FROM 3'S�5 PROP. PARTS J, PROPOSED TAiNI G
I ., ." wzt<VICEACCESS�
PUNT WHERE RECEIVINGISTA LLS TOPAZ MOON. LLG
;:`:�OPOSED WALL EX. ISLAND
AREA (LOWER
Tl)zs. ) I \", PROP. PARTS
EX. VEHICLE OP. PARTS GING
STORAGE
LEVEL) RECEIVING AREA D.B. 11587. PG. 835
H I
L (LOWER LEVEL)
0 PIN 0752.G3.GGG1
U
. "CABC 24"FLAT
ZONING: ORD
":S
V,
CONCRETE
BORDER
0'3600" PSI
6:CABC PROP. OPOSED
PROP.
LIMITS-,, . ...... CONCRETE (ICABC
3 S9.5B OFASPHALT SERVICEACCESS
dAAC
(6- 3000' PSI CONC. 3"S��
WITH 4"
EX15TING
PRCP REMOVAL
�RZ�iNING
'U(
EX. 151-All-
5-
CABC
PI_ 13L 13L DING f�-
7
77.7.71 C yT6 BE CNVERTED 7-
V,
10 SEORVICE)�,,
W
-�.�PROP. HC RAMP
PROP 25LF
EX FFE 360� 65 `a i C1 CABC WIDTH TO
- , 1 \\ \ \ 0
PROP LIMITS DOUBLE
OFASPHALT YELLOW PROP. FIFE 363.65
MATCH TRAIL
REMOVAL CENTERLINE
PROP. LIMITS
(PAIN7) &_---PROP. HIGH
FA 26 TY
=IS,
eCA. OE SPH_ 0 WALK
z
RE OVAff
3 °S9.58
(TYP) . .. .... ..... PROP. HC RAMP
WIDTH TO
ILI OP MATCH TRAIL
RETAINING
sj� C -------
n 11 WALL
PR
STJJP� 4'CONCRETE U U
(6- 3000- PSI
PROP. C WITH 4'CABC
ISLAND
PROP. LIMITS --------J
PROP.24' 20' 14 PROP.24*
STOP BAR&
EX. ISLAND OF ASPHALT...... Li &
'_7, STOP BAR EX. ISLAND \\ ®\ \ \. 3�9 \ \\
S.R1-I SIGNRI-1 Jv/ REMOVAL
30"X30" - - - - - - - -
EX. I)--"-
PROP. 40 LF
Q DOUBLE BEIIE�M.VEDWREPLACED
YELLOW WITH 10'ASPHALT GREENWAY
OW
�Lu ROD. STRIPED
PROP. EX. VEHICLE CENTERLINE TRAIL PER TOWN OF CARY,
0. ISLAND >_ eCABC
I W 3' S�� (PAIN7)
STORAGE
0 RE7,WNING
eCABC
88
v, -A N/F
3'S��
HUNTER INDU5TRIE5 LP
0
P
IROP. 25 LF
DOUBLE D.B. 8639. PG. 1897
v, YELLOW
CENTERLINE PIN 0752.63.8420
PRO 1 LIMITS
FAEPHALT EX. J(PAINO
ISLAND NRB ZONE 1 IMRACT ZONING: ORD
PROP-24"
40 SF
RE 'A' ;N
STOP BAR &
SIGNRI-I
PROP 10'
PIRROP. STEPS ASPHALT
30"X30"
M111111VALL
PROP. 25 LF
DRIVE-THRU NRBZONX'�MPACT\ GREENWAY
DOUBLE PATH BYTOWN
YELLOW AUTOMATIC
.... ... . . . 290 SF OFCARY
Q) CENTERLINE /�Zhlc CARWASH EX. GRASSED AREA
E-2
PRO 4 Q\
PR
STO BARB
IG OT-1 EX. cNib._ SIDEWALK
30 — — — - - - - - - -
Ike I T ro I 0f,
1 Y'S
X. SIDEWALK (d" C;At$L; IJ
— — — — — — — - - - - - - - - - - Ci ou- RP 10
P S Op�',
A H
GREENWA
7 PATH
>41
EC FIRELANE . ... ... PROP. LIMITS
OP.
PROP. CONCRETE ONCRETE PR CONCRETE
, ESXI!� I (6-3000-PSICONC. -30 O-PSICONC. OFASPHALT PROP H1_V1z
0, EX- DRIVE (6 0 REMOVAL CROSSWALK
WITH 4'CABC EX. nRELANE WITH 4"CABC
BY TOWN OF
VOLKS-�WAGENJ, .. ..... .....
. ..... . CARY
-PROP HC RA
. .. .. ....... .. EX, ISLAND STORMWATER GOI`I
EX. ISLAND ND \ WIDTH TO
EX.15LAND . .. ... .. .... ..
PROP. EDGE
EX. ISLAND EX.15LAND
• and AGGE55 MATCH TRAIL
EX. 15LANTj . .... . ... ... OF POND
PROP. LIMITS i'l
�A
- - - - - - - - - - - . . ..... ..... . ...
OFASPHALT C15OM 2007 F
(TYP)
ILI
REMOVAL
ts!
k4
. ... ..... .... ..
EX. 15LAND
AREA OF POND
>
Q, . . . . .......
EX. VEHICLE
EXPANSION
STORAGE
EXISTING 7",
Lw > i TREE5
STING
L)s ED FR K V11
0
EX15TING POND
(TO BE EXPANDED &
V,
PLEASE SEE CS-1 1, OF THIS SET, FOR
MODIFIED)
PROP.
PROI
EX, VEHICLE ISLA
ISLAND ADDITIONS & MODIFICATIONS NO ISLA
00
STORAGE .. - N-EXISTING EDGE V
IN SOUTHERN PARKING LOT.
PROP. LIMITS
OF POND CTYP)
OFASPHALT
REMOVAL
(TYP)
.... . . .....
Engineering Planning
Site Design
1150 SE MAYNARD ROAD
SUITE 260
CARY, NC 27511
(919) 467-9708
C-0329
Revisions
v7
�
\V1 w
j nl
Li
N"i
13-SP-013
HTE #. 13-1070
Approved by the Town of Cary
Development Review Committee
Planner
Date:
OWNER:
MLC Automotive, LLC
5601 Capital Blvd.
Raleigh, NC 27616
(919) 876-5432
Project
Autopark Honda
3630 Old Raleigh Roa4
I
MMENIQ71W.,
Scale
WEIM
Sheet