Loading...
HomeMy WebLinkAbout20130784 Ver 1_401 Application_20130713William G. Daniel & Associates 2 0 1 3 0 7 8 4 Letter of Engineering - Planning* Site Design Transmittal TO: Karen Higgins NC DENR -DWQ WBSCP Unit PROJECT: Autopark Honda (13 -SP -013) Please find the following items Transmitted by n Fax Fax Number: DATE: I JUL 2 6 2013 D_. NR - -FAT —E UALITY 'Pages: EMail Pick -Up Delivered Overnight 11 For your: 0 Approval []Information O Use 11 Records []Distribution DReview & Comment O Signatures and approval Copies Revision date I Description 1 - Site plan with buffer encroachment shown and labeled 3 - PCN Form (1 Original and 2 conies) REMARKS: Karen, The Town of Cary is requiring we remove the existing sidewalk along MacKenan Drive and construct a 10' asphalt greenway trail in it's place. The attached site plan shows and labels the impacts. Would you please copy me on the acceptance of this impact. Please let me know if you have any questions or need additional information. Thanks COPIES TO: BY: Bart J. McClain 1150 S.E. Maynard Road, Suite 260, Cary, N.C. 27511 - (919) 467 -9708 - Fax (919) 460 -7585 WA tFA O� O Y 201 30784 �pF Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ®,Riparian Buffer Authorization; 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. `Is payment into a mitigation bank or in -lieu fee program proposed for+ (mitigation of impacts? If so, attach the acceptance letter from mitigation bank ;or in -lieu fee program., Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1hj below.) - - -- - -- ❑'Yes ®,No ,1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)' � ❑rYes, ®fNo 2. 'Project Information`, '2a. Name of projecta Autopark Honda ,2b. County:/ Wake 2c. Nearest municipality / town:' Cary 2d. Subdivision name:- MacGregor Park 2e. NCDOT only, T.I.P. or state project no: flif T M fin I 3. Owner Information UU 3a. Name(s) on Recorded Deed: MLC Automotive, LLC L s 12013 3b. Deed Book and Page No. DB 11526 PG 1443 p - ;3c. Responsible Party (for LLC if;' applicable):' Keith Elks n s SZ ""ate'&anch 3d. Street address: 5601 Capital Boulevard 3e. City, state, zip: Raleigh, NC 27616 3f. Telephone no.: 919 8760 -5432 3g. Fax no.: 919 876 -3258 3h. Email address: kelks @Leithlnc.com Page 1 of 10 PCN Form - Version 1.4 January 2009 4., Applicant Information (if different from owner) 4a. ,Applicant is:, ❑ Agent ❑Other, specify:' 4b. Name ,.4c. Business name (if applicable):, ,4d. Street address: '4e. City, state, zip 4f. Telephone no.: '4g. Fax no.:, 4h. Email address:' 5.' 'Agent/Consultant Information (if applicable), 5a. -,Name:', Bill Daniel 5b. Business name (if applicable):, William G. Daniel & Associates, PA 5c. Street address:, 1150 SE Maynard Road, Suite 260 ,5d. City, state, zip: Cary, NC 27511 5e. Telephone no.. 919 467 -9708 r5f. Fax no.: 919 460 -7585 5g. Email address: Bdaniel @WmGDA.com Page 2 of 10 �B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID) 075215630137 1b. Site coordinates (in decimal degrees): I Latitude: 35.4415 Longitude: -78.4839 1c. Property size: 16.3 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Swift Creek 2b. Water Quality Classification of nearest receiving water: C;Sw,NSW 2c. River basin: lNeuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing developed property including buildings and parking for automotive dealership inventory and overflow parking. The area of the impact is an existing roadway (MacKenan Drive) with sidewalk 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,190 3d. Explain the purpose of the proposed project: The Town of Cary is requiring the developer to remove a portion of existing sidewalk along MacKenan Drive and replace it with a 10' asphalt greenway D 3e. Describe the overall project in detail, including the type of equipment to be used: The greenway trail will be constructed with small dozer, stone compaction equipment, and small asphalt paving machine 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑ No ® Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: I Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ❑ No ® Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): Wetlands Streams — tributaries ❑ ❑ ®;Buffers ❑Open Waters El Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes /No W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 Choose one S2 Choose one S3 - Choose one - S4 - Choose one - - S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If Pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: ;6. Buffer Impacts (for DWO), If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a.\Project is in which protected basin ?, ® Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer,_ mitigation) require_ d ?, 6f. _ ,zone 1� impact ((square feet) 6g. (Zone 2� 'impact) ((square feet); 61 P Greenway Path Tributory of Swift Creek No 40 290 B2 Yes/No B3 - Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i: Comments: The above area values represent the surface of the proposed greenway trail located outside of the existing street RAY Page 5 of 10 D. Impact Justification and Mitigation 1. `Avoidance and Minimization 1a. 'Specifically describe measures taken to avoid or-minimize-the-proposed impacts in designing_ project } The required greenway path is parallel to the existing road and replacing an existing sidewalk No meandering of the path is proposed. 1 b`. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.; Construction will be by equipment within the existing rtw No further impact from construction will take place other than installation of the asphalt path Additionally, the proposed trail is designed such that all drainage from its surface flows to the street rather than to the buffer 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 41h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ, ,6a. Will the project result in an impact within a protected riparian buffer that requires, Yes ® No ,buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. ;6e. Zone Reason for impact Total impact' ;Multiplier ;Required mitigation ,(square feet); (square feet), Zone 1 3 (2 for Catawba) Zone 2 1.5 6f.,'Total buffer mitigation required 6g. (If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, ,permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. 'Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified � ®Yes) ❑ iNo; iwithin one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why;' All flow from proposed greenway path will be directed to the existing curb line No direct flow into the buffer ❑ Yes ® No will occur. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally- implemented stormwater management programs USMP apply (check all that apply): ® Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): BSession Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state/local) funds or the ❑ Yes ❑ No use of public (federal /state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated,— Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,; ❑Yes ®No or Riparian Buffer Rules (15A NCAC 2B .0200) ?r 2b. ,Is this an after -the -fact permit application? ❑Yes; ®,Nol 2c. If you answered "yes" to one or both of the above questions,iprovide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. ;Will this project (based on past and reasonably anticipated future impacts) result in, ❑Yes ®No additional development, which could impact nearby downstream water-quality? 1 3b. If you answered "yes" to the above- bove, submit a qualitative or quantitative cumulative impact analysis in accordance with t J most recent DWQ policy. If you answered "no," provide a short narrative description.) 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? El Yes ❑ No 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? L LA ApplicantlAgent's Printed Name C5- M •- �s.Xte, �''�e cv.bew ;Appiicant/Agent's Signature`,_ _ (Agent' s signature is valid only if an authorization) letter from the applicant is provided.) � --)/R / t - Date' Page 10 of 10 N €I -- tit AUTC PARK MLG AUTOMO'iVE. LLC, PIN 0752 1r )5A PAVEMENT SCHEDULE ON-SITE Light Duty (parking spaces) - 3" S9.16; 6" CABC Heavy Duty (drive aisles) - 3" S9.5B; 8" CABC PAVEMENT SCHEDULE OLD RALEIGH ROAD Standard - 3" S9.5B; 4" 1198; 10 " CABC Full Depth (areas less than 6' wide - 3" S9.5B; 4 1196; 5'° B25. 0B F777777777777777771 DESIGNATES L [GHT DUTY PAVEMENT . . . . ...... SITE STRIPING NOTES: 1. ALL ON-SITE DIRECTIONAL ARROWS AND LETTERING TO BE WHITE PAINT. 2. ALL PARKING SPACE STRIPING TO BE 4" WHITE PAINT. 3. STOP BARS TO BE 2' WIDE WHITE PAINT 4. HC PARKING ACCESS AISLES AND STRIPED OUT AREA TO BE 4" WHITE PAINT. 5. ALL STREET SIGNS WILL CONFORM TO MUTCD GUIDELINES WITH RESPECT TO HEIGHT, LETTER CASE, AND SIGN COLOR. 6. LANE STRIPING COLOR TO BE AS CALLED OUT ON PLAN. ZONING: CROICU I C- EX. PARKING TIE TO TIE TO E)(C&G 3'S9. PROP, LIMITS�; OFASPHALT REMOVAL J TIE TO O(C&G _EXt'S IN"G J J X A �4 N y h 7 /* HC RAMP NOTE: ALL PROPOSED RAMPS SHALL MEET THE CURRENT NC BUILDING CODE AND /CC /ANSI A 117.1-2009 FCR SLOPE (MAX 1:12), LENGTH (6 FEET WITHOUT HANDRAILS), WIDTH 4', AND A 4`x4' (MINIMUM) LANDING NOT EXCEEDING 2% SLOPE AT THE TOP OF THE RAMP. FIARAMP RAMP W11 LANDING GRAPHIC SCALE 01 80, 120' 00. 0 (IN FEET) It WN oil as 1 Ell' 1 INCH = 40 FT °LI =1TH 'AUTO PARK PROP. STEPS N/F EX. RETAINING WALL PROP. DUMPS 'NO EMERGENC ML,P AUTOMOTIVE. UPPER FFE 382.00:,, 1 FIRELANE WISCREENWALLS PROP. STEPS UPPERLEvEU OWER FFE 363.65 7 -4- 11-WIRETAINI SEE AhQH PyNs WALL "-PIN0752.15.53.6553 ------------------- 'FOR d..6 TRA DETAI�S) -ZONING: ORD J TIE TO 8: CABC PROP. CONCRETE EXISTING END RETAINING RETAINING 3 S9.5B (6- 3000- PSI CONC. . . I I I I R BEGIN RETAINING WALL WALL WITH 4"CABC PROP. P, — — — BRIDGE I I. I I FROF4.CONCRETE (LOWER LEVEL) I TING RETAINING PSI COND • 11011 TOBE 'CAB ="6ABC' N/F R�.WOVED FROM 3'S�5 PROP. PARTS J, PROPOSED TAiNI G I ., ." wzt<VICEACCESS� PUNT WHERE RECEIVINGISTA LLS TOPAZ MOON. LLG ;:`:�OPOSED WALL EX. ISLAND AREA (LOWER Tl)zs. ) I \", PROP. PARTS EX. VEHICLE OP. PARTS GING STORAGE LEVEL) RECEIVING AREA D.B. 11587. PG. 835 H I L (LOWER LEVEL) 0 PIN 0752.G3.GGG1 U . "CABC 24"FLAT ZONING: ORD ":S V, CONCRETE BORDER 0'3600" PSI 6:CABC PROP. OPOSED PROP. LIMITS-,, . ...... CONCRETE (ICABC 3 S9.5B OFASPHALT SERVICEACCESS dAAC (6- 3000' PSI CONC. 3"S�� WITH 4" EX15TING PRCP REMOVAL �RZ�iNING 'U( EX. 151-All- 5- CABC PI_ 13L 13L DING f�- 7 77.7.71 C yT6 BE CNVERTED 7- V, 10 SEORVICE)�,, W -�.�PROP. HC RAMP PROP 25LF EX FFE 360� 65 `a i C1 CABC WIDTH TO - , 1 \\ \ \ 0 PROP LIMITS DOUBLE OFASPHALT YELLOW PROP. FIFE 363.65 MATCH TRAIL REMOVAL CENTERLINE PROP. LIMITS (PAIN7) &_---PROP. HIGH FA 26 TY =IS, eCA. OE SPH_ 0 WALK z RE OVAff 3 °S9.58 (TYP) . .. .... ..... PROP. HC RAMP WIDTH TO ILI OP MATCH TRAIL RETAINING sj� C ------- n 11 WALL PR STJJP� 4'CONCRETE U U (6- 3000- PSI PROP. C WITH 4'CABC ISLAND PROP. LIMITS --------J PROP.24' 20' 14 PROP.24* STOP BAR& EX. ISLAND OF ASPHALT...... Li & '_7, STOP BAR EX. ISLAND \\ ®\ \ \. 3�9 \ \\ S.R1-I SIGNRI-1 Jv/ REMOVAL 30"X30" - - - - - - - - EX. I)--"- PROP. 40 LF Q DOUBLE BEIIE�M.VEDWREPLACED YELLOW WITH 10'ASPHALT GREENWAY OW �Lu ROD. STRIPED PROP. EX. VEHICLE CENTERLINE TRAIL PER TOWN OF CARY, 0. ISLAND >_ eCABC I W 3' S�� (PAIN7) STORAGE 0 RE7,WNING eCABC 88 v, -A N/F 3'S�� HUNTER INDU5TRIE5 LP 0 P IROP. 25 LF DOUBLE D.B. 8639. PG. 1897 v, YELLOW CENTERLINE PIN 0752.63.8420 PRO 1 LIMITS FAEPHALT EX. J(PAINO ISLAND NRB ZONE 1 IMRACT ZONING: ORD PROP-24" 40 SF RE 'A' ;N STOP BAR & SIGNRI-I PROP 10' PIRROP. STEPS ASPHALT 30"X30" M111111VALL PROP. 25 LF DRIVE-THRU NRBZONX'�MPACT\ GREENWAY DOUBLE PATH BYTOWN YELLOW AUTOMATIC .... ... . . . 290 SF OFCARY Q) CENTERLINE /�Zhlc CARWASH EX. GRASSED AREA E-2 PRO 4 Q\ PR STO BARB IG OT-1 EX. cNib._ SIDEWALK 30 — — — - - - - - - - Ike I T ro I 0f, 1 Y'S X. SIDEWALK (d" C;At$L; IJ — — — — — — — - - - - - - - - - - Ci ou- RP 10 P S Op�', A H GREENWA 7 PATH >41 EC FIRELANE . ... ... PROP. LIMITS OP. PROP. CONCRETE ONCRETE PR CONCRETE , ESXI!� I (6-3000-PSICONC. -30 O-PSICONC. OFASPHALT PROP H1_V1z 0, EX- DRIVE (6 0 REMOVAL CROSSWALK WITH 4'CABC EX. nRELANE WITH 4"CABC BY TOWN OF VOLKS-�WAGENJ, .. ..... ..... . ..... . CARY -PROP HC RA . .. .. ....... .. EX, ISLAND STORMWATER GOI`I EX. ISLAND ND \ WIDTH TO EX.15LAND . .. ... .. .... .. PROP. EDGE EX. ISLAND EX.15LAND • and AGGE55 MATCH TRAIL EX. 15LANTj . .... . ... ... OF POND PROP. LIMITS i'l �A - - - - - - - - - - - . . ..... ..... . ... OFASPHALT C15OM 2007 F (TYP) ILI REMOVAL ts! k4 . ... ..... .... .. EX. 15LAND AREA OF POND > Q, . . . . ....... EX. VEHICLE EXPANSION STORAGE EXISTING 7", Lw > i TREE5 STING L)s ED FR K V11 0 EX15TING POND (TO BE EXPANDED & V, PLEASE SEE CS-1 1, OF THIS SET, FOR MODIFIED) PROP. PROI EX, VEHICLE ISLA ISLAND ADDITIONS & MODIFICATIONS NO ISLA 00 STORAGE .. - N-EXISTING EDGE V IN SOUTHERN PARKING LOT. PROP. LIMITS OF POND CTYP) OFASPHALT REMOVAL (TYP) .... . . ..... Engineering Planning Site Design 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 Revisions v7 � \V1 w j nl Li N"i 13-SP-013 HTE #. 13-1070 Approved by the Town of Cary Development Review Committee Planner Date: OWNER: MLC Automotive, LLC 5601 Capital Blvd. Raleigh, NC 27616 (919) 876-5432 Project Autopark Honda 3630 Old Raleigh Roa4 I MMENIQ71W., Scale WEIM Sheet