PROJECT INFORMATION
—
1 Project Name Gates Farm Subdivision
2 Project Area ac _ 16.75
3 Coastal Wetland Area (ac)
4 Surface Water Area (ac
5 1 Is this project High or Low Density? High
6 IDoes this project use an off -site SCM? No
COMPLIANCE WITH 02H ,1008 4
7
Width of vegetated setbacks provided (feet)
N/A
8
Will the vegetated setback remain ve etated?
NIA
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
No
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
77
—11 Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
1
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
22
_ _
Treatment Swale
0
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bayfilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Organization:
Matthew E. Lowder, PE
28
Triangle Site Design, PLLC _
29
Street address:
4004 Barrett Drive, Suite 101
30
City, State, Zip:
Raleigh. NC 27609
31
Phone number(s):
919-553-6570
32
Email:
mlowder@trianglesitedesign.com
Certification. Statement:
I certify, under penalty of law that this Supplement FZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the hest of my knowledge and relief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
F,,,��, trfllr11`'.,
4' J
0
SQr��S51a��P9
a SEAL i
2443
��
9 ENGINE ■■` `
.,r �,W
,P"fl,11rt6A�atff�
Signatu of Designer
Date
DRAINAGE AREAS
1
Is this a high densit l ro'ect?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
-
Infiltration Basin
5
Total drainage area (sq ft
759165 sf
689291
6
Onsite drainage area (sq ft
759165 sf
689291
7
Offsite drainage area (sq ft
8
Total BUA in project (sq ft
305418 sf
305418 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
10permitting)
New BUA not on subdivided lots (subject to
s
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
Parkinq (sq ft
Sidewalks ft
19503 sf
19503 sf
Roof (sq ft
203000 sf
203000 sf
Roadway s ft
82915 sf
82915 sf
Future (sq ft
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
Isubdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
44%
19
Desi n storm inches
1.0 in
20
Design volume of SCM cu ft
25778 cf
21
lCalculation method for design volume
Simple Method
ADDITIONAL_ INFORMATION
22
Please use this space to provide any additional information about the
1drainage area(s):
WET POND
1
Drainage area number
3
2
1 Minimum required treatment volume cu ft
25778 cf
GENERAL
MDC FROM 02H .1 0
31
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
en ineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for clewatering the SCM for maintenance?
Pump referred
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC 8 ?
Yes
12
Does the drainage easement comply with General MDC 9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC 12 ?
Yes
16
Does the SCM follow the devicespecific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM WM .1053
18
Sizing method used
SAIDA
19
Has a sta a/stora a table been provided in the calculations?
Yes
_
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
291.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
292.00
22
Elevation of the bottom of the vegetated shelf fmsl
294.90
23
Elevation of the permanent pool fmsl
295.40
24
Elevation of the top of the vegetated shelf fmsl
295.90
25
Elevation of the temporary pool fmsl
296.40
26
Surface area of the main permanent pool (square feet
17670
27
Volume of the main permanent pool cubic feet
49005 cf
28
Average depth of the main pool (feet)
3.08 ft
29
1 Average depth euation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
640.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 It
32
Volume of the foreba (cubic feet)
8947 cf
33
Is this 15-20% of the volume in the mainpool?
Yes
34
Clean -out depth for foreba inches
22.8 in
35
Design volume of SCM (cu ft)
25778 cf
36
Is the outlet an orifice or a weir?
Orifice
371
If orifice, orifice diameter inches
2.50 in
38
If weir, weir height (inches)
39
If weir, weir length (inches
40
Drawdown time for the tempospool (days)
2.47
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flowpath?
Yes
43
Depth of forebay at entrance (inches)
34.8 in
44
Depth of forebay at exit (inches)
28.8 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the ve etated shelf (feet)
6 It
47
Slope of vegetated shelf H:
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1
r 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Hybrid Bermuda
54
Hasa lanting plan been rovided for the ve etated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s);
Wet Pond 1 8:40 AM 8/23/2021