Loading...
HomeMy WebLinkAboutSW3210601_Plansheet - Grading/Drainage Plan_20210908NPDES Stormwater Discharge Permit for Construction Activities (NCG01) NCDENRfDiuision of Energy, Mineral and Land Resources STABILIZATION TIMEFRAMES (Effective Aulp. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS iw11 Perimeter dikes, swales, ditches, slopes 7 days None .. ." High Quality Water (HOW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50'in length. L------ All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HOW Zones. OVERALL CONSTRUCTION SEQUENCE: 1. SETUP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH NCDEQ EROSION CONTROL INSPECTOR AND/OR LOCAL MUNICIPAL REPRESENTATIVE TO DISCUSS CONSTRUCTION. FAILURE TO SCHEDULE SUCH CONFERENCE 48-HOURS PRIOR TO ANY LAND DISTURBING ACTIVITIES IS A VIOLATION OF LOCAL CODE AND MAY BE SUBJECT TO FINES OR OTHER PENALTIES. 2. SURVEY AND FLAG THE DENUDED LIMITS. 3. INSTALL CONSTRUCTION ENTRANCE. 4. INSTALL SILT FENCE, STONE OUTLETS, SKIMMER SEDIMENT BASIN (ST-2), AND OTHER MEASURES (AS SHOWN ON THIS SHEET); CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 5. SEDIMENT BASIN NEEDS TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION. 6. CALL FOR ON -SITE INSPECTION BY NCDEQ INSPECTOR. WHEN APPROVED, CONTRACTOR MAY THEN BEGIN CLEARING AND GRUBBING THE REMAINING PORTIONS OF AREA. 7. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY. 8. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISH GRADE. REFER TO DETAIL SHEET C-5.1 FOR SEEDING. 10. CONTRACTOR TO COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 11. ONCE SITE IS STABILIZED, SEDIMENT BASIN ST-2 MAY BE CONVERTED TO SAND FLITER SF-1 PER SHEET C-6.0. EROSION CONTROL NOTES: 1. ALL "REFERENCE" NUMBERS REFER TO NCDEQ MANUAL UNLESS OTHERWISE NOTED. 2. ON -SITE BURIAL PITS MAY REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE LOCAL ZONING ADMINISTRATOR. 3. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE STATE EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 4. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 5. GROUND STABILIZATION: SEE ADJACENT NEW STABILIZATION TIMEFRAME CHART. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN, COUNTY OR NCDEQ. 1\\ \ w" I NOTE: ',.:. `" APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL„ m ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN „ "" ` -g) "" REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES ""/ `* """ �.„ OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE ""{ " DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF m"'" �W' _, ,, >' v� N� WATER RESOURCES RULES AND REGULATIONS. [15A NCAC 4B .01101 "�_ ,_ )\ , \ ` a„ 4, �� // " ,r ,_,„.... „ fI11 \ x NOTE:N TW�,. r, , ?!'�,% ALL INLETS ARE TO BE EMBOSSED WITH FISH LOGO AND "DUMP NO WASTE, DRAINS TO STREAM" OR ��IW/ �', ;� � " � �` ' / rw„,r,, " „ „ jm 11 PROP. SILT FENC �°;,,, - `:`i:: 1, V " err r EQUIVALENT APPROVED LANGUAGE. ,'`/ � E I& I/ ,_, SEE DETAIL 1/5.1 �;, .. / 1 54 U II 11 �*," "� "" a v ILA IC " "". � ,�" ,,e �i� Il ,, ,, fJt/yf .� NOTE:11 ' , `- . . °"" °"" r °��111, % z PHASE II OF THIS PLAN SHAL NOT COMMENCE UNTIL PHASE I IS COMPLETELY STABELIZED. f`"1P ­1 11 ,''" I, �""^ a """ " 1. � , I �_�Ief // f - 1 , ,' w / / w Z1,..,.� / ��„ � /� � �� N r ,�r� / OPOSED AINING , WALL BY OTHER. PLANS ail'°"'",..,....,. �f i F 'I- I / , , /�! .CS .. / ,, , ,. HAVE BEEN SUBMITTED ,,, `..,. ;`',,' , ` " % / �11, ` r " ""�° r, 11, SEPARATELY. �olouawm°°ha °"" ,, .., � '. , . " F " ,,, "I "" \ " �" , ,, � " I ., I i n mom ..a I" p '`, / I f y , ... ,,�y�,/ I „/r ,w 11 �. >w r u P 3 /' / , ;- r I f ! ; ,, ,, , I`'P,, J' `...,,J 1r CONSTRUCTION ENTRANCE u, "'` tx, / e"m I w r' SEE DETAIL 3 5.0 t o "' /,t t l I/ .., - ( / ) ,; ,; % J ter' ,,. JB3A w, . �",� " ', , „ ' , . ,,,, ,,,, ,,,,, ,' r I.,,Y,.r,1 r tI;, T "" °4, ��v �,�„m� .A ° ". .,„,� , i, „r,,,rT N. �, C. ,,. , ,! ' y%f , , / /,e,. <,, /r i:<. ox ,/ J P Y Y,.,d, ,I,T ....,,,,,, , 11 /,.; ti k" .' „ / 18.58 fff Ttr ,J,. p kwml ,,, " ,;II r l ,` " i` f / ,"", 1 / , ,,, ,, ;, gym✓ "Bill „„/ h r� r e ,' /7. /, ,,� , r �I ,;� / ;, INLET SEETDEOTAIL 6NE ...,.5 . /,. "� a „u l / a2 a ti "11 / / / I PH', II)..SKIMMER SDIMEN,. r /, , / - \ ¢ r E <r�'; "-819.76 sl " `'„ TRAP(SEE"bETAiL."1 5.,Q) w° , ..... ,.," r ., ,..,WER .„, /" III„ " a `"�. ' " �p��� a ,`` / ,' ,, , ,, , m „�� , i „` °`" ` ,, +,, a � .. .. ,,,,,.. ,, Irv' ^`"' �. % / /fit N � "'., " �,. �' ,, / �s NEE ¢�s /�/, i `" 7 '/� ',," OUTLET ZO ,.,. ... I (D. B. 7( .. /m> (SEE DETAIL 6/5.0� " ...� ." . N d ) / 4y �` / SEDIMENT e� % ( icy 411 �.,,,,,,.., SKIMMER " . J63B„ f I f'/ ''/ ", I � BASIN ST-2 " 1" > /' \ " o , ((, ,,r „> (SE DETAIL / „m IIIIIIII 1 5.0 w r �" °, � �` ' 2.5" SKIIvif�1ER •, / `," ///, „m / ) SEDI T "ORIFICE RADIU � '''+ �, / ddllo PHASE r /' ,,` r` BASIN FF 2 ORIFICE IAMETEfi" \ `" /� '' DISTURBED AREA /, ./ ` "// (SEE DETAI 6/5.0 (SEE DETAIL7/5.d) I (2.14 ACRES) / / / , /' �� "" �, N " a' 7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. ' & t / / //` ,a /(,/` , � " k ESZ 1 / \ ,. EMBANKMENT MATTING MAY BE REQUIRED FOR SLOPES STEEPER THAN 3:1 BASED ON MATERIAL. / % ' /`,/, "a // °"" ,. PROP. SILT FENC - rI �' _ r 8. A GRADING PLAN MUST BE SUBMITTED FOR ANY GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY „ , ( / ) "/ /�/' EX " DRAIN / °e a� ) �.�; , 1" SEE DETAIL 1 5.1 / APPROVED. / o �, m' f 9. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT SILT FENCE OUT�E / 150 // i ;,t„ " 7"„°' " t %' �� r IN� $O�: O' 11 ,,, SEE DETAIL 6 .1 ��11� / 1 f �/ tl / . PRE-CONNTRUCTION MEETING. (IF APPLICABLE) ( / ) �i /y � 5u IN / �- I /r w �� ,) / �� "> r, / .r MAINTENANCE PLAN: ` _ 1 � 1 / ���� '" /II�"I J ` THE FOLLOWING MAINTENANCE PLAN SHALL BE FOLLOWED FOR EROSION AND SEDIMENT CONTROL DEVICES UNTIL THE SITE IS / R, /:., "" F.FL OR i f� r 1 ff COMPLETELY STABILIZED AND AFTER CONSTRUCTION FOR STORM WATER MANAGEMENT DEVICES THROUGHOUT THE LIFECYCLE �/ �/1 ✓ . / r / / / y, „ " r OF THE DEVELOPMENT. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTION AND �� //I // N /� / ��=819.66 I',,, rl1�1,o<� �/ t MAINTENANCE OF ALL EROSION CONTROL FEATURES. FOLLOWING CONSTRUCTION, THE OWNER/RESPONSIBLE PARTY IS I I �� �S� r 1111111° �I ' `' . I , i'N 8 6.46 ,,�/ " RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF ALL STORM WATER MANAGEMENT FEATURES. �� �� �� y �gP � / /I � " I / _ �- " �' �� ��Fl ( INV.- 06.3 C� I� �" 1. ALL EROSION CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING ANY RAINFALL �, . r ��1�; �,,, CM P �" I ��, i �l� �Y� y " / f �� PRODUCING RUNOFF AT LEAST ONCE A WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY SO THAT ALL EROSION , °° I )/ �% so „ / f j J ��" CONTROL MEASURES ARE MAINTAINED AS DESIGNED. , / /��� / , f l ' / l / ��� ' �� l /°', ��z" I„ ti� �� 1 //, 2. THE SEDIMENT TRAPS WILL BE CLEANED OUT WHEN THE LEVEL OF SEDIMENT REACHES APPROXIMATELY ONE HALF OF � / / // �"m �.I'll , " \/ �/, I j THE TRAP OR BASIN VOLUME. �. � / / / i 3. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SEEDING f �// / ,,,/ (� �- SPECIFICATIONS AND THE REMEDIATION PLAN IN ORDER TO MAINTAIN A DENSE VEGETATIVE COVER. �� f I � „' _.a� - . ,, �. 4. ALL SEEDED AREAS WILL BE RE -FERTILIZED IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. GRASSED I ,i (' �'+ 1, ` I 0: �, G.._.,.I AREAS WILL BE MOWED AT LEAST ONCE A YEAR.11 "� . F.FLOOR-819.35' l . I �� , t, - .. vv " _'" NK U NOW �` SELF INSPECTIONS r°/ / , )]I , , , , , < \ " -$ 7• .1 i p r �.�• 11 EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND I ' J "v \""°w- S�� 2 �� 66 �� SELF -INSPECTION A O .,,• EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED //�r � I / '11 ....... , �� W �I SELOF�ON AND INSPECTIONDIREPORT,ON PLAN AS WELL IASBDING ETAILSLOF THDE SELF -INSPECTION PROGRAM CAN BEQFOUND ONSTHE LAND I / / F �� �, �� / ��', 1 /� �/ -- - � / 11 � I " /� I , � �// f QUALITY WEB SITE: ham: //dec.nc.gov/about/divisions energy -mineral land resources/erosion sediment -control / \ \ � ar d //� ,/ AS A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: � <<` I,` / " 1, J/ 1 111 w ...... . � �,I, 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. �/ / I �I a v y�O� �� //� /�/ .. 2. INSTALLATION OF SEDIMENT TRAPS BASINS. l �� �„ / �� / / �/ , / 3. CLEARING AND GRUBBING OF EXISTING GROUND COVER. �/ / / // ,� `. l i� 1 %� /�//Y/ 4. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. a � -._I-, � / ��1� � � � �// 5. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. / �'11""" \ a , ��°'�( //, / , 6. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. ", / s /' � `�`" t' " tiw �,% /// 7. INSTALLATION OF STORMWATER RETENTION MEASURES. / 1 : 5 / °" ,, �' yyyl` " 8. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. / / � / cv ? W /�. ; / �I 1,��/` 0 PLEASE NOTE THESE INSPECTION REQUIREMENTS ARE IN ADDITION TO NPDES INSPECTION REQUIREMENTS. IF YOU HAVE / / / � IE,1 � � „, "°�� � � al +" ^ f°" „.'✓���" ^' ' ' �°'° i ••..- QUESTIONS ABOUT THE SELF -INSPECTION PROGRAM, PLEASE CONTACT US AT 704 663-1699. / ) r "I " " I i1 \ �' �,I / a,' ° "� �. . / 4 ;9 J �. \ m"" " / I� � �I / / , , ,E, / i a. r �� "°u° a Ia. II M.. a.1u LEGEND.. ��, / r s �' • I PR OSED QNCRETE WASHOUT r��: " ✓' " SUBJECT PROPERTY BOUNDARY 3 / ),,,`",,1,,,'',�`,K�\,, "�,�-��','�_:�z.,\"�:I, , T. I IL /) /` E DETA 9 51 ( EXISTING SANITARY SEWER EASMENT I I �/' � - ,`".... ,. _,/ > EXISTING68' DUKE POWER R W / .-.-....1..1.X..1.I.-..I..I....I.1..I1...I.1..1I...-I..........1.1...1.1...-..........1,.1..,.1..,1..,.-..,...,..,...,..-.,..,....".........X........I..* ......,..,..,....,...,...,...,....I,..1...1....1'......................I.......,...,..,...,...,..X,...,...,..,...--,-.-..".....1.1....1.-........1.1....1.,.1,..,..-..1,.1..,...(,...1,)..1..,..1,.1..,"..-..�,..",.,'..,.�,..,'.1".1....1.1....-.........1 ..X........,.,.I.I.I.I.I.I.II.I."-...........I .,..,.,.,..,.,..,.X,.,..,.".I .M.....E.....,.E-,.,.,--1.,1.,1.-,.,.,.=1,.1,'11.--U4...101..1.1X.1.-..'%..I.1I1..II,.l,l1.,.1.,,. :.: ./. /-, .:/ : /,� /.1//- , .. / /., ., . . /: // ""I'll ... ..." , , I ",, 1"" I , 1��,�"�.,.I. 'll"'N �,7 " .b )) EXISTING 50' DUKE POWER EASMENT a /, " � `` I 4 � ,,. ,e' ADJACENT PROPERTY I ` `, , :` , �,.. X EXISTING FENCE " ' r I �� PROPOSED BUILDING EXPANSION I I I / / �. "" '` ''� /o' TOPOGRAPHY I r ,1r'` ..., ., PROPOSED FENCE -- ��-...„"""" ��r .... .n� � " r , "I r " "' ® ROCK CHECK DAM (DETAIL �; " •� �^� f , r SILT FENCE OUTLET (DETAIL 6/5.1) I �.�)�) ��" / <" , . �__ •._ . \ �� ,,, �^ II 1 `�✓ INLET PROTECTION (DETAIL 2/5.0) I J// Z/ TEMP. DIVERSION DITCH (DETAIL 3�5.1) 1" - 0% / / 1 ��`) l �' 11, r r ,,, - - - - - - - - DRAINAGE AREA __ --- -� .r. l " �""" 1 1jj .` •. ... _ . l 7, , �� _.�� ��/ 1 , ,�. 1 1 r�� . ;�" . -� � � ,r ', : " _ � ... "' / / ", I I I 1" �,... �. �. / GRAPHIC SCALE ' : J° �: I. O ,h h (xND I'rO(��al'{1'_D IN ... ;;: l/ 11 / / r 60 0 30 60 120 I 1 1 ", ,, ,,, " :, r 00_ ZQ)Q), l l -"" - - - / , - 11111,11 r � r-, ,. I COPYRIGHT © 2019, AMICUS PARTNERS, PLLC. r ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS REFERENCE: ALL PARCEL AND BOUNDARY INFORMATION FOR THIS PROPERTY AND OF THIS DOCUMENT, OR ADDITIONS OR DELETIONS TO THIS ADJACENT PROPERTIES REFERENCED FROM A SURVEY CONDUCTED BY CABARRUS COUNTY DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF AMICUS PARTNERS, IS STRICTLY PROHIBITED. ONLY GIs. PROPERTY DIMENSIONS AND COORIDINATES FOR PROPERTY REFERENCED FROM COPIES FROM THE ORIGINAL OF THIS DOCUMENT, AS APPROVED BY CABARRUS COUNTY GIS. THE ENGINEER SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. Firm License # P-1191 30 Union Street South Concord, NC 28025 Civil Site Design Low Impact Development Small -Scale Building Design Telephone: 704.573.1621 Facsimile: 704.248.7951 Sea Is: �% C 8� �� <� ��1`7�, ..o ESS10,* �9 ����11 ii SEAL t 032006 G 1:1�'•• , F Ems; ,z- 10 ,,,O 11* ,1AS I. ?�- #1,,,, ��811111/�SIS 08-28-2020 z 0 v J z v� J C�_ X a < o 51!� LL I -1 L v0 2c�°:� 0 =� E] °L z Z L� O _L �j L v J - Project Number: 17-18-092 Date: ,& 08/28/2020 Drawn By: EML Checked By:, NRI' Revisions: 07-2G-1 8 ORIGINAL SUBMITTAL 0 10-23-18 PER DEVELOPER 6 1 2- I G- 1 8 PER TOWN OF GRANITE QUARRY O 1 - 1 4- 1 9 PER TOWN OE GRANITE QUARRY 08-28-20 PER NCDEQ Sheet Title: 7PHASE 2� k EROSION CONTROL/ GRADING PLA Sheet No: