Loading...
HomeMy WebLinkAboutSW3210601_Supplemental Info Review_20210908Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/8/2021 3:13:15 PM (Supplemental Submittal) Submit by McCoy, Suzanne 9/9/2021 7:02:08 AM (Supplemental Info Submittal) • The task was assigned to McCoy, Suzanne 9/8/2021 3:13 PM Submittal from 9/8/2021 Permit Information: Rease provide specific permt details below. ........ ......... ......... ......... What Type of Choose one: Permit?* r NPDES Industrial or MS4 Permit r State Stormwater (Post -Construction) Permit f Other Permit Number* SW3210601 Begins with "SW', "NCG", or "NOS' What DEQ Office is Reviewer: Rease correct if nisidentlfied, close this review forrn and reassign taskto the appropriate contact. the Primary r Central Office Contact?* r Washington Regional Office (Attn: Carl Dunn) f Wilmington Regional Office (Attn: Christine Hall) Project Name* Custom Plastics Phase I Building Expansion Owner/Operator* IOM Enterprises LLC County: Iredell Submitter Name:* Nicholas Parker Mo is subnitting this infornation? E-mail Address:* nrparker@amicuseng.com Phone Number* 7045731621 Additional E-mail for nrparker@amicuseng.com Submittal (Optional) Confirmation: State Stormwater (Post -Construction) Information Uploads Choose file type and upload attachment (Reviewer nay rerrove unnecessary subnittals) File Type* Plansheet - Existing Conditions/Survey File Upload aick the upload button, or drag and drop files to attach Existing Conditions - Custom Plastics Phase I 697.02KB Building Expansion (01-25-2021).pdf Only RDFfiles are accepted. File Type* Plansheet - Proposed Conditions/Site Plan File Upload Oickthe upload button, or drag and drop files to attach Site Plan - Custom Plastics Phase I Building 1.42MB Expansion (01-25-2021).pdf Only RDFfiles are accepted. File Type* Plansheet - Notes File Upload aickthe upload button, or drag and drop files to attach Utility Notes and Details - Custom Plastics Phase I 1.18MB Building Expansion (01-25-2021).pdf Only FDFfiles are accepted. File Type* Plansheet - Landscape/Planting Plan File Upload aickthe upload button, or drag and drop files to attach Landscaping Plan - Custom Plastics Phase I Building 502.03KB Expansion (01-25-2021).pdf Only FDF files are accepted. File Type* Plansheet - Other File Upload aickthe upload button, or drag and drop files to attach Phase I Erosion - Custom Plastics Phase I Building 929.12KB Expansion (01-25-2021).pdf Only FDF files are accepted. File Type* Plansheet - Grading/Drainage Plan File Upload aickthe upload button, or drag and drop files to attach Phase 11 Erosion - Custom Plastics Phase I Building 910.3KB Expansion (01-25-2021).pdf Only FDF files are accepted. File Type* Plansheet - Misc. Detail File Upload aickthe upload button, or drag and drop files to attach Erosion Details(1) - Custom Plastics Phase I Building 1.89MB Expansion (01-25-2021).pdf Only FDFfiles are accepted. File Type* Plansheet - Misc. Detail File Upload aickthe upload button, or drag and drop files to attach Erosion Details (2) - Custom Plastics Phase I 1.75MB Building Expansion (01-25-2021).pdf Only FDF files are accepted. File Type* Plansheet - Proposed Drainage Area File Upload aickthe upload button, or drag and drop files to attach Storm Manangement Plan - Custom Plastics Phase I 978.02KB Building Expansion (01-25-2021).pdf Only FDF files are accepted. File Type* Plansheet - SCM Detail File Upload aickthe upload button, or drag and drop files to attach SCM Plan and Details - Custom Plastics Phase 1 514.01 KB Building Expansion (01-25-2021).pdf Only FDF files are accepted. File Type* File Upload File Type* File Upload File Type* File Upload File Type* File Upload File Type* File Upload File Type* File Upload File Type* File Upload Soils/Geotechnical Report Click the upload button, or drag and drop files to attach 11-20-043 - IOM Expansion SHWT Letter - Amicus - 47.35KB Revised.pdf Only FL7Ffiles are accepted. Property Deed dick the upload button, or drag and drop files to attach Property Deed.pdf 361.8KB Only PDF files are accepted. USGS Topographic Site Map Oick the upload button, or drag and drop files to attach USGS Map.pdf Only R7Ffiles are accepted. O&M Agreement/Plan Oick the upload button, or drag and drop files to attach O&M Agreement (05-10-2021).pdf Only R7Ffiles are accepted. Stormwater Narrative dick the upload button, or drag and drop files to attach Narrative Letter(05-10-2021).pdf Only PDF files are accepted. Application Form 146.77KB 258.3KB 319.65KB dick the upload button, or drag and drop files to attach NCDEQ Stormwater Management Permit Application 727.83KB Form (08-28-2020).pdf Only FDFfiles are accepted. Design Calculations Click the upload button, or drag and drop files to attach Custom Plastics Phase 1 Building Expansion Storm 3.96MB Water Calcs (12-01-2020).pdf Only R7Ffiles are accepted. Uploads contain r NO Confidential r YES Information * NOTE The following infornation cannot be clained as confidential: the narre and address of any pernit applicant or perrrittee, perrrit applications, pernits, effluent data, infornation required by MODES application forns provided by the Director inclusive of all forms and attachments [%f. 40 CFR 122.7(b) and (c)]. Notes about the attachments: 17 By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; • I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Nicholas Parker Signature: Date Submitted: 09/08/2021 Initial Review Verify Permit No.* I1\410RfANT. RE\/lRAE 2SHOLLDVMFY and revise here if necessary. SW3210601 Who needs a Reviewer selections will only be required for offices checked here. copy? * rJ Central Office Staff r Regional Office Stormwater Contact State Stormwater RO Staff r No Copy Needed Central Office Reviewer:* Notifies OD Staff with 5rail Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date * 09/09/2021