Loading...
HomeMy WebLinkAboutSW6210703_Plansheet - Cover Sheet_20210820 (2)z 0 cam'Q SITE o� LEO t STREET VICINITY MAP NOT TO SCALE U� � SPELL ESTATES SUBDIVISION '44 NORTH EXISTING UTILITY OWNER WATER Robeson County Public Utilities 176 Legend Rd Lumberton, North Carolina 28358 910-671-3485 Contact: Myron Neville Know what's below. Call before you dig. CIVIL ENGINEER 4D SITE SOLUTIONS, INC. 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Scott Brown, PE email: sbrown@4dsitesolutions.com SITE DEVELOPMENT PLAN PARKTON TOWNSHIP TOWN OF PARKTON, NORTH CAROLINA ROBESON COUNTY INDEX OF DRAWINGS C1.0 - EXISTING CONDITIONS C2.0 - SITE PLAN C3.0 - GRADING AND EROSION CONTROL PLAN C4.0 - UTILITY PLAN C5.0 - 5.2 - PROFILES OWNER/DEVELOPER STOUT LAND DEVELOPMENT, LLC 409 Chicago Drive - Suite 103 Fayetteville, North Carolina 28306 910-779-0019 Contact: Ben Stout email: ben@benstoutconstruction.com C6.0 - SITE & EROSION CONTROL DETAILS C6.1 - 6.2 - EROSION CONTROL DETAILS C6.3 - WATER DETAILS SURVEYOR 4D SITE SOLUTIONS, INC. 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Jimmy Holland, PLS email: jholland@4dsitesolutions.com ����pQ`••FESS 1p `� ��i�i SEA _ 02 _ TT 0 - 0'7 -..21 ````C1ARO''//� Q� •'•.• •'•• ��i 2p: �OF�SS'�,�•'�y�� AL IA,r 7 '57 &i. -V R i►S�� ``� 4Dsite solutions 04 civil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com REVISIONS PROJECT NAME SPELL ESTATES SUBDIVISION TAX I D# 948225977000 CHASON ROAD PARKTON TOWNSHIP TOWN OF PARKTON ROBESON COUNTY NORTH CAROLINA CLIENT 51uLff M Construction 409 Chicago Drive - Suite 103 Fayetteville, North Carolina 28306 Phone: (910) 779-0019 PROJECT INFORMATION DESIGNED BY: SEAN/CALEB DRAWN BY: SEAN/CALEB CHECKED BY: SCOTT PROJECT NUMBER: 1753 DRAWING SCALE SEE SHEETS DATE RELEASED JUNE 7, 2021 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED