HomeMy WebLinkAboutNCC203724_NOT Closeout Documents_20210903North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Dare Project: Old Wharf Estates Lot 1
Person financially responsible: Cedric C Jernigan
Address: 7 Redbay Lane, Southern Shores, NC 27949
1. Project Location: Old Wharf Road, Wanchese
Pictures: No
River basin: Pasquotank
Project #: DARE-2021-001
2. Weather and soil conditions: 95 degrees, sunny, dry Initial inspection: No
3.- - Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No contact was made. Title:
Inspection report: Sent Report Date given/sent: August 24, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. The project is in compliance and released under the SPCA.
10. Comments: The permittee must request termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) via a Notice of Termination (NOT). The NOT is available at
https://edocs.deq.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be
uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: August 11, 2021 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM
cc:
County: Dare Project: Old Wharf Estates Lot 1
Person financially responsible: Debra M Jernigan
Address: 7 Redbay Lane, Southern Shores, NC 27949
I. Project Location: Old Wharf Road, Wanchese
Pictures: No
2. Weather and soil conditions: 95 degrees, sunny, dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
River basin: Pasquotank
Project #: DARE-2021-001
Initial inspection: No
If no, check violations below:
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No contact was made. Title:
Inspection report: Sent Report Date given/sent: August 24, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring
or self -inspections are required. The project is in compliance and released under the SPCA. The permittee
must request termination of coverage under the NPDES General Stormwater Permit for Construction
10. Comments: Activities (NCGO1) via a Notice of Termination (NOT). The NOT is available at
https://edocs.deq.ne.gov/Forms/NCGOI-Termination. Please note that this correspondence must be
uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: August 11, 2021 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM
cc: