Loading...
HomeMy WebLinkAboutNCC203724_NOT Closeout Documents_20210903North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Dare Project: Old Wharf Estates Lot 1 Person financially responsible: Cedric C Jernigan Address: 7 Redbay Lane, Southern Shores, NC 27949 1. Project Location: Old Wharf Road, Wanchese Pictures: No River basin: Pasquotank Project #: DARE-2021-001 2. Weather and soil conditions: 95 degrees, sunny, dry Initial inspection: No 3.- - Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No contact was made. Title: Inspection report: Sent Report Date given/sent: August 24, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. The project is in compliance and released under the SPCA. 10. Comments: The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: August 11, 2021 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM cc: County: Dare Project: Old Wharf Estates Lot 1 Person financially responsible: Debra M Jernigan Address: 7 Redbay Lane, Southern Shores, NC 27949 I. Project Location: Old Wharf Road, Wanchese Pictures: No 2. Weather and soil conditions: 95 degrees, sunny, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes River basin: Pasquotank Project #: DARE-2021-001 Initial inspection: No If no, check violations below: Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No contact was made. Title: Inspection report: Sent Report Date given/sent: August 24, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. The project is in compliance and released under the SPCA. The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction 10. Comments: Activities (NCGO1) via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.ne.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: August 11, 2021 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM cc: