HomeMy WebLinkAbout20210459 Ver 1_Pre-Filing Meeting Information_20210904Contact Name* Wyatt L Brown
Contact Email Address* brownenvgrp@gmail.com
Project Owner* J S WEEKS SAND COMPANY INC (Joseph Weeks)
Project Name* Weeks Sand NcNeil Tract
Project County* Harnett
Owner Address:* Street Address
PO BOX 540
Address Line 2
aty
State / Province / Pegion
CAMERON
NC
Postal / Zip axle
Country
28326
United States
Is this a transportation project?* C Yes c: No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
F Individual Permit F Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
c: Yes C No
Please list all existing project ID's associated with this projects.*
SAW-2017-00956
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below.*
The project is an —294 acre tract of mostly cleared land located near
Cameron. The tract will be used as a sand and gravel mine by Weeks
Sand Company. The tract will touch the existing Weeks Mine.
There will be 3 stream crossings on the project. The engineer has
chosen to use bottomless culverts to avoid stream impact. There will
be wetland impacts associated with all 3 of the stream crossings. The
proposed wetland impacts will exceed the 0.10 threshold, so
mitigation is expected and I'll plan to obtain an SOA letter to submit
with the PCN.
I delineated the wetlands on this tract and I have attached the
Preliminary JD for the jurisdictional determination on this tract.
thanks
Wyatt Brown
919-524-5956
Please give a couple of dates you are available for a meeting.
3/17/2021
Please attach the documentation you would like to have the meeting about.
Weeks Sand Preliminary Set 2-26-21.pdf 6.9MB
eSAW-2017-00956 Weeks Mind PJD.pdf 2.24MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
Submittal Date 2/26/2021