HomeMy WebLinkAbout20171041 Ver 1_MP Addendum_2021_20210907ID#* 20171041 Version* 1
Select Reviewer:*
Erin Davis
Initial Review Completed Date 09/07/2021
Mitigation Project Submittal - 9/7/2021
Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No
Type of Mitigation Project:*
V Stream r- Wetlands r` Buffer r` Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Paul Wiesner
Project Information
...................................................................................
ID#:* 20171041
Existing IDI#
Project Type:
Project Name:
County:
r DMS r Mitigation Bank
Little Sebastian Site
Surry
Document Information
Email Address:*
paul.Wesner@ncdenr.gov
Version:
*1
Existing Version
Mitigation Document Type:*
Mitigation Information
File Upload: Little Sebastian _100027_MP Addendum 2021.pdf 4.59MB
Rease upload only one RDFcf the conplete file that needs to be subnitted...
Signature
Print Name:* Paul Wiesner
Signature:*
�X/ I �;" -;-I 1
fires
August 27, 2021
Mitigation Plan Addendum
Little Sebastian Mitigation Site
DMS Project ID # 100027
Contract # 7187
RFP 16-006993 (Issued 9/16/2016)
USACE Action ID: SAW-2017-01507
DWR Project # 2017-1041
Dear NC IRT,
3600 Glenwood Avenue, Suite 100
Raleigh, NC 27612
Corporate Headquarters
6575 W Loop S #300
Bellaire, TX 77401
Main: 713.520.5400
Through stream restoration, enhancement, and preservation, the Little Sebastian Site now
presents 4,573.960 Cool Stream Mitigation Units (SMU) at As -Built. An additional 19.66 SMU
were generated from the addition of JN7 between Final Mitigation Plan approval and construction.
RES and DMS are requesting a mitigation plan addendum for this inclusion.
Mitigation Plan assets: 4,554.3 SMUs
As -Built assets: 4,573.960 SMUs
JN7 is located east of JN3-B and has a 30-acre drainage area. Historically, this pond drained
directly through the dam into JN3-B but due to the relocation of JN3-B, a channel was constructed
in order to connect the pond about 150 linear feet to JN3-B's new location. The restored JN7
includes 37 linear feet within the easement with graded banks, livestakes, new bed material, and
a grade control structure where its confluence on the left bank of JN3-B. The USACE non-
standard buffer width calculation was re -done for the entire project to include reach JN7.
Additionally, RES proposes to add a cross section during MY1 to track the vertical and lateral
stability of this reach.
Attached is the updated USACE non-standard buffer width calculation spreadsheet and map,
credit table and a photograph of the constructed JN7.
Sincerely,
Ryan Medric I Project Manager
e
-
O
-
O
-
O
lo
-
O
o
>
-
O
O
oo
>Ic
O
o
>
-
o
>
-
o
>
-
o
>
-
o
o
O
o
O
O
-
E
O
O
o_
O
o_
O
o
o_
=
O
O
_
_
_
_
o
-
U
o
o
o
o-
O
o
O
E
O
o
-oE
-oE
-oE
E
N
N
N
O
0
V
N
> O
o
V
N
N
O
>
O
>
O
>
lo O
lo o
O
>
O
o o
O
>
O
>
O
>
O
O
>
O
>
>
O
>
O
E
o
>
0
-E
o
>
O m
E o
o
E
-
-
-
-
-
-
-
o
O -o
_
O 6
O -o
-
-
O
O -o
_ o.
O
O -o
O_
o
-
-
-
-
-
-
-
-
-
-
-
-
-
O
-
-
-
-
-
-
-
-
-
-
O
a
o
>
-
w
m
-
w
m
-
w
m
d o
- in
C>
N
U N
d o
- yi
C>
N
U N
-
w
m
d o
- yi
C>
N
U N
d o
- yi
C>
N
U N
O
C
N-
U N
-
w
m
-
w
m
-
w
m
N o
N-
U d
-
w
m
-
w
m
_
C
m
-
w
m
N O
N-
U d
-
w
m
N O
N-N-
U d
-
m
_
N O
U N
N O
U N
my N
Q O ¢
O �
mU
a
81
o X
o� o
>
T
O
a`
¢
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
Z
-
-
-
¢
Z
¢
Z
¢
Z
-
¢
Z
¢
Z
¢
Z
¢
Z
-
¢
Z
-
Z
0
� J
o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
°o
-
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
0 o o
oo Q
0
¢
m
U
U
o
o
¢
m
m
¢
m
m
U
¢
m
U
o
¢
m
U
o
w
w
z
z
z
z
z
z
z
z
z
z
in
in
in
in
in
in
0
a`
g
g
g
g
g
g
g
g
m
m
m
m
m
m
\o
)
'o \ !}\\\a�;;;;;
r;�...E _.2EE-2 !!!!!
!=§�f| \ \?!!!!!4
!/>\!, ; I]]!!ƒ!!!!!3
I
Irk
r
t . S .:i4 �. '� � � ��yK�;Sp� ",'. � �� { - parr• 5�A �!.
_ r V �{��. r:�$•�/T'_5.� yF�,A., t .f � S :�iTyL (1
• � 6 i.,� T ..des �� - ,3� j p — /�
m
U
o a
m
in Q N U U
c c
co
T
1 L
APO -
k
w
• r:, -.�� `� � ,fir` .:�'{F. .
0
E W Y c
o ? VI VJ A a m
d-iNN o C a r
Nz U C7
� J � a®1 m 1111�1111
m
NPI