Loading...
HomeMy WebLinkAbout20171041 Ver 1_MP Addendum_2021_20210907ID#* 20171041 Version* 1 Select Reviewer:* Erin Davis Initial Review Completed Date 09/07/2021 Mitigation Project Submittal - 9/7/2021 Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No Type of Mitigation Project:* V Stream r- Wetlands r` Buffer r` Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Paul Wiesner Project Information ................................................................................... ID#:* 20171041 Existing IDI# Project Type: Project Name: County: r DMS r Mitigation Bank Little Sebastian Site Surry Document Information Email Address:* paul.Wesner@ncdenr.gov Version: *1 Existing Version Mitigation Document Type:* Mitigation Information File Upload: Little Sebastian _100027_MP Addendum 2021.pdf 4.59MB Rease upload only one RDFcf the conplete file that needs to be subnitted... Signature Print Name:* Paul Wiesner Signature:* �X/ I �;" -;-I 1 fires August 27, 2021 Mitigation Plan Addendum Little Sebastian Mitigation Site DMS Project ID # 100027 Contract # 7187 RFP 16-006993 (Issued 9/16/2016) USACE Action ID: SAW-2017-01507 DWR Project # 2017-1041 Dear NC IRT, 3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 W Loop S #300 Bellaire, TX 77401 Main: 713.520.5400 Through stream restoration, enhancement, and preservation, the Little Sebastian Site now presents 4,573.960 Cool Stream Mitigation Units (SMU) at As -Built. An additional 19.66 SMU were generated from the addition of JN7 between Final Mitigation Plan approval and construction. RES and DMS are requesting a mitigation plan addendum for this inclusion. Mitigation Plan assets: 4,554.3 SMUs As -Built assets: 4,573.960 SMUs JN7 is located east of JN3-B and has a 30-acre drainage area. Historically, this pond drained directly through the dam into JN3-B but due to the relocation of JN3-B, a channel was constructed in order to connect the pond about 150 linear feet to JN3-B's new location. The restored JN7 includes 37 linear feet within the easement with graded banks, livestakes, new bed material, and a grade control structure where its confluence on the left bank of JN3-B. The USACE non- standard buffer width calculation was re -done for the entire project to include reach JN7. Additionally, RES proposes to add a cross section during MY1 to track the vertical and lateral stability of this reach. Attached is the updated USACE non-standard buffer width calculation spreadsheet and map, credit table and a photograph of the constructed JN7. Sincerely, Ryan Medric I Project Manager e - O - O - O lo - O o > - O O oo >Ic O o > - o > - o > - o > - o o O o O O - E O O o_ O o_ O o o_ = O O _ _ _ _ o - U o o o o- O o O E O o -oE -oE -oE E N N N O 0 V N > O o V N N O > O > O > lo O lo o O > O o o O > O > O > O O > O > > O > O E o > 0 -E o > O m E o o E - - - - - - - o O -o _ O 6 O -o - - O O -o _ o. O O -o O_ o - - - - - - - - - - - - - O - - - - - - - - - - O a o > - w m - w m - w m d o - in C> N U N d o - yi C> N U N - w m d o - yi C> N U N d o - yi C> N U N O C N- U N - w m - w m - w m N o N- U d - w m - w m _ C m - w m N O N- U d - w m N O N-N- U d - m _ N O U N N O U N my N Q O ¢ O � mU a 81 o X o� o > T O a` ¢ Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ Z - - - ¢ Z ¢ Z ¢ Z - ¢ Z ¢ Z ¢ Z ¢ Z - ¢ Z - Z 0 � J o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o °o - U U U U U U U U U U U U U U U U U U U U U U U U U 0 o o oo Q 0 ¢ m U U o o ¢ m m ¢ m m U ¢ m U o ¢ m U o w w z z z z z z z z z z in in in in in in 0 a` g g g g g g g g m m m m m m \o ) 'o \ !}\\\a�;;;;; r;�...E _.2EE-2 !!!!! !=§�f| \ \?!!!!!4 !/>\!, ; I]]!!ƒ!!!!!3 I Irk r t . S .:i4 �. '� � � ��yK�;Sp� ",'. � �� { - parr• 5�A �!. _ r V �{��. r:�$•�/T'_5.� yF�,A., t .f � S :�iTyL (1 • � 6 i.,� T ..des �� - ,3� j p — /� m U o a m in Q N U U c c co T 1 L APO - k w • r:, -.�� `� � ,fir` .:�'{F. . 0 E W Y c o ? VI VJ A a m d-iNN o C a r Nz U C7 � J � a®1 m 1111�1111 m NPI