HomeMy WebLinkAboutNC0021661_Inspection_20020822ATA
NCDENR
North Carolina Department of Environment and Natural Resources
Michael F. Easley, Governor
August 22, 2002
The Honorable Ann Slaughter
Mayor, City of Laurinburg
PO Box 249
Laurinburg, NC 28352
SUBJECT: Compliance Evaluation Inspection
Libby -Owens Ford
Wastewater Treatment Plant
NPDES Permit No. NC0021661
Scotland County
Dear Ms. Slaughter:
C,g3i tLlr, vvt)—Iiy1.J,LL t
f /ill l/O 2
11441
William G. Ross, Jr., Secretary
Alan Klimek, P.E., Director
Division of Water Quality
Enclosed is a copy of the Compliance Evaluation Inspection conducted August 20, 2002.
As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations
and recommendations are in Part D. Summary of Findings/Comments of this inspection report. The
cooperation of Mr. Ricky Odum, Grade IV ORC, was appreciated. During the inspection a copy of
the NPDES Compliance Reminders was reviewed and left with Mr. Odum. As a reminder
preservation of the Waters of the State can only be acquired through consistent NPDES permit
compliance.
Please review the attached report. If you or your staff have any questions do not hesitate
to contact me at 910-486-1541.
Sincerely,
I%n1� jlnD )
Belinda S. Henson
Environmental Chemist
BSH/bsh
Enclosures
cc: Ricky Odum, ORC, City of Laurinburg
Fayetteville Regional Office
225 Green Street — Suite 714, Fayetteville, North Carolina 28301-5043
Phone: 910-486-1541/FAX: 910-486-0707 \ Internet: www.enr.state.nc.us/ENR
An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper
NPDES COMPLIANCE INSPECTION REPORT
North Carolina Division of Water Quality
Fayetteville Regional Office
Section A. National Data System Coding
Transaction Code: N NPDES NO. NC0021661 Date: 020820 Inspection Type: C
Inspector: S Facility Type: 2 Reserved:
Facility Evaluation Rating: 4 BI: N QA: N Reserved:
Section B: Facility Data
Name and Location of Facility Inspected:
Libby Owens Ford WWTP
Entry Time/Date: 10:20am/020820 Permit Effective Date: 991201
Exit Time/Date: 2:30pm/020820 Permit Expiration Date: 040831
Name(s), Title(s) of On -Site Representative(s):
Ricky Odum-(Certified Grade IV)-"ORC"
Phone Number(s): (910) 276-3522
Name, Title and Address of Responsible Official
Ms. Ann Slaughter, Mayor
PO Box 249
Laurinburg, NC 28352
Contacted: no
Section C: Areas Evaluated During Inspection
(S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated, N/A = Not Applicable)
ernu
ecords/Reports:`
acility'Site ''Review:
:
ow -Measurement:`
aborattir
Pretreatment:
v/!
Effluent/Receiving Waters:
Compliance Sched
e _ N
Self -Monitoring Program:
udgeDisposal::
peration & Maintenance
Otlei
Slaughter
Page 3
August 22, 2002
Section D: Summary of Findings/Comments:
1. The facility is 100% domestic wastewater. The source of wastewater is from staff at the industry
(LOF). The City of Laurinburg operates this facility.
2. Influent flow travels through the aeration basins in a series. Diffused aeration is used in the treatment
of the wastewater. Two (2) blowers are used as the aeration source. The blowers are rotated
automatically by a timer.
3. The clarifier appeared to be operating adequately. There appeared to be a few paper products
floating on the water surface in the clarifier. Paper products and debris should be removed to
eliminate possible discharge to the receiving stream.
4. Chlorine gas is added to the effluent for disinfection. The chlorine contact tank appeared to be clean.
There appeared to be some leakage under the V-notch weir. The leakage should be repaired to
eliminate possible short circuiting. Please respond within 30 days of receipt of this report when
weir leakage is eliminated.
5. The effluent appeared to be free of solids.
6. The effluent flows from the chlorine contact tank into the ten (10) acre holding pond located on site.
From the holding pond, the effluent is discharged to an unnamed tributary to Shoe Heel Creek.
7. The sludge digester appeared to have water on the top of the surface. The sludge depth could not be
determined. A determination of the level of sludge should be made to assist with storage. From
records reviewed, it appeared the facility has been wasting every couple of months.
8. The effluent flow meter was calibrated March 20, 2002 by "Jim Haven Company". The flow meter
calibration document should contain the % error before and after calibration.
9. The "Backup Operator" for this facility is Robert Ellis, a Grade IV certified wastewater operator.
10. Maintenance records were reviewed during the inspection. A suggestion would be initial the entries
each day they are made.
11. The NPDES permit required parameters are analyzed by the certified municipal laboratory located
at the Laurinburg Leith Creek WWTP. The facility is utilizing the Hach 100 for Total Chlorine
Residual analyses. A recommendation would be to purchase a new meter to ensure better
accuracy.
12. A compliance evaluation analysis report for the period May 2001 through April 2002 did not reveal
any monthly violations. There were not any NOVs sent from this office for this period.
Slaughter
Page 4
August 22, 2002
13. Laboratory records were reviewed for the months November - December 2001 and January - February
2002 and compared to Discharge Monitoring Reports (DMRs). All records reviewed appeared to
be accurate.
Name and Signature of Inspector
Belinda S. Henson
LLB LCGzt�
Name and Signature of Reviewer
Paul E. Rawls
Action Taken
Agency/Office/Telephone Date
DENR/Fayetteville/(910)486-1541 � - ' �' _ 0
Agency/Office/Telephone Date
DENR/Fayetteville/(910)48 6-1541
Regulatory Office Use Only
Compliance Status
_Noncompliance
_Compliance
Date
co—
Section D: Summary of Findings/Comments
Brief Facility Description:
(). b St hvGQ- 1.) Tf cco,,±';arc. 0-cs 'bhe colicto��,�
fe-�lYlia(t)�c�� I-X$cr r'r,� ctle i'a# o pro j Gla(i : e },���c'{ Gh(�r;r '�� Lr11
i-iCct i IPJI'T AT'1U L;1 vyte'te 1 C{ .Vl rat Gt 'C role ( .5 I LA.L y ct
FACILITY SITE REVIEW
No N/A 1. Treatment units properly operated and maintained.
Yes No N/A 2. Standby power or other equivalent provision provided.
Yes No N/A 3. Adequate alarm system for power or equipment failure available.
4. Sludge disposal procedures appropriate:
Ye No N/A a. Disposal of sludge according to regulations
Yes No N/A b. State approval for sludge disposal received.
No N/A 5: Sufficient sludge disposed of to maintain treatment process equilibrium.
allo N/A 6. The ORC and Backup Operator are officially designated with
NCDENR/DWQ Training and Certification Unit.
i No N/A 7. Adequate spare parts and supplies inventory maintained.
No N/A 8. Plant has general safety structures such as rails around or covers over
tanks, pits, or wells.
No N/A 9. Plant is generally clean, free from open trash areas.
10. Screening:
Yes No a. Manual
Yes No N/A b. Mechanical
Yes. No N/A c. Buildup of debris
Yes No N/A d.. Screenings properly disposed of.
11. Grit Removal:
Yes No N/A a. Excessive organic content in the grit chamber
Yes No N/A b. Excessive odors
Yes No N/A c. Grit properly disposed of.
Page 2
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Now
No N/A
No N/A
No N/A
No N/A
No N/A
No . N/A
No N/A
No N/A No N/A
No%
No N/A
No; N/A
No N/A
No N/A
No N/A.
No N/A
No N/A
Yes M N/A
Yes . No /A
Yes CkP N/A
Yes N/A
Yes N/A
Yes N/A
Yes No N%`
Yes No TI
Yes No N/A
Yes No N/A
Yes No N/A
•
•
Primary clarifier;
a: Excessive gas bubbles
b. Black and odorous wastewater
c. Poor suspended solids removed
d. Excessive buildup of solids in center well of circular clarifier
e. Weirs level
f. Weir blockage
g. Evidence of short_ circuiting
h. ` Lack of adequate scum removal
i. Excessive floating sludge
j. Broken sludge scraper.
13. Trickling Filter
a:. Trickling filter ponding(indicating clogged media)
b. Leak at center column of trickling filter'sdistribution arms
c. Uneven distribution of flow on trickling filtersurface
d. Uneven or discolored growth
e.. Excessive sloughing of growth
f Odor
g. Clogging of trickling filter's distribution arm orifices
h. Filter flies worms or snails.
. 14... Activated Sludge Basins/Oxidation Ditches:,
a. Dead spots
b. Failure of surface aerators
c. Air rising in clumps ..
d. Dark foam or bad color
e. Thick billows of white, sudsy foam
f. Air rising unevenly
g: Excessive air leaks in compressed air.piping.
15.
Stabilization Ponds/Lagoons:. .
a. Excessiveweeds including duckweed in stabilization ponds
b. Dead fish or aquatic organisms
c.. Buildup of solids around influent pipe
d. Excessive scum on surface..
Page
16. Secondary Clarifier:
Yes CEO N/A a. Excessive gas bubbles on surface
Yes No N/A b. Level overflow. weirs.
Yes ( N/A c. Weir blockage
Yes 6 N/A d. Evidence of short circuiting •
Yes No N/A e. Excessive buildup of solids in center well of circular clarifier
Yes N/A f Pin floc in overflow ,
Yes No n g. Effective scum rake
Yes N/A h. Floating sludge on surface
Yes No N/A i. Excessive high sludge blanket
Yes No N/A j. Clogged sludge withdrawal ports on secondary clarifier.
17. Filtration:
Yes_ No .iSa. a. Filter surface clogging
Yes No N/A : b. Short filter run
Yes No N/A c. Gravel displacement of filter media
Yes No N/A d.. Loss of filter media during backwashing
Yes No N/A e. Recycled filter backwash water in excess of 5 percent
Yes No N/A f. Formation of mudballs in filter media.
18. Chlorination. Unit:
Yeses N/A a. Sludge buildup in contact chamber.
Yes I) N/A b. Gas bubbles
Yes CISa N/A c. Floating scum and/or solids
Cie No N/A d. Adequate ventilation of chlorine feeding room and storage area
Yes No N/A e. NIOSH-approved 30 minute air pack.
Yes No N/A f. All standing chlorine cylinders chained in place
Yes No N/A g. All personnel trained in the use of chlorine
& No N/A h. Proper chlorine feed, storage, and reserve supply.
Yes No .19. Ultraviolet radiation disinfection present and in use.
Yes No
Yes No N/A
Yes No N/A
Yes TO N/A
Yes o N/A
Yes No Mik
Yes No N/A
20. • Dechlorination: .
a: Proper storage of sulfur dioxide cylinders
b. Adequate ventilation of sulfur. dioxide feeding room
c. Automatic sulfur dioxide feed or feedback control operating
properly. •
21. • Aerobic Digester:
a. Excessive foaming in tank
b. Noxious odor
c. Mechanical aeration failure
d. Clogging of diffusers.
•
•
Yes () N/A
._6;/ No N/A
No N/A
Cr..e. No N/A
YeS (rSa N/A
• Yes (1') N/A
Yes No WA'
Yes go) N/A
Yes No N/A
Page 4
• 22. Anaerobic Digester:
Yes No OW a. Floating cover tilting
Yes No N/A b. Gas burner operative
Yes No
Yes No
Yes No
Yes No
• Yes No
Yes No
Yes NO
Yes No
•Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
• 23.. Sludge Drying and/or disposal: - Slaagj e_ 1-4 Ken-. II° +1/2
a. Poor sludge distribution on drying beds
N/A b. Vegetation in drying beds d'ispcsui
N/A c. Dry sludge remaining in drying beds
N/A d. Dry sludge stored on site
N/A e. Filtrate from sludge drying beds returned to front of plant
N/A f Sludge disposal through county landfill.
N/A g. Sludge land applied.
24. Filter Press:
• a. High level of solids in filtrate from filter presses or vacuum filters
N/A b. Thin filter cake caused by poor devvatering
N/A c. Sludge buildup on belts and/or rollers of filter press
N/A d. Excessive Moisture in belt filter press sludge cake.
25. Polishing Ponds or Tanks:
a. Objectionable odor, excessive foam, floating solids, or oil sheens .on
water surface
N/A b. Solids or scum accumulations in tank or at side of pond
N/A c. Evidence of bypassed polishing ponds or tanks because of low
capacity.
26. Plant Effluent:
Yes (g..0 N/A a. Excessive suspended solids, turbidity, foam, grease, scum, color, and
other macroscopic particulate matter present
b. Potential toxicity (dead fish, dead plant at discharge)
c. Outfall discharge line easily accessible.
27. • Flow Measurement:
a. Proper placement of flow measurement device
b. Flow meter calibrated
c. Buildup of SQlicts in flume or weir,
d. Broken or cracked flume or weir
e. Clogged or broken stilling wells
f. Weir plate edge corroded or damaged
g. Flow measurement error less than 10%.
r , •
• Page 5 •
28. Sampling:
• ENo N/A a. Sampling and analysis completed on parameters specified by permit
No N/A b. Composite sample temperatures maintained at 4 degrees Celsius or
less (but above freezing) during sampling
Yes No N/A c. Contract laboratory used for sample analysis
• Yes N/A • d. Effluent composite samples obtained are flow proportional.
RECORDKEEPING AND REPORTING
No N/A 1. Records and reports maintained as required by permit.
T_O No N/A • 2. All required information available, complete, and current.
Ta No N/A 3. Records maintained for 3 years and all sludge records maintained for 5
years.
No N/A •4. Analytical results consistent with data reported on DMRs.
5. Sampling and analyses data adequate ancl include:
No N/A a. Dates, times, and location of sampling
CI(_& No N/A b. Name of individual performing sampling
Cgi No N/A c. Results of analyses and calibration
Ye0No N/A d. Dates of analyses
Cirei) No N/A e. Name of person performing analyses.
6. Monitoring records adequate and include:
Yes No N/A a. Monitoring charts kept for 3 years
No N/A b. Flowmeter calibration records kept for 3 years.
TeD No N/A 7. The pH meter is calibrated daily with two buffers and checked with a
third buffer and properly documented.
No N/A
eii No N/A
8. Expiration dates of pH buffers adequate.
9. All thermometers used in NPDES permit reporting is calibrated
annually with an NIST certified thermometer or a traceable
thermometer annually and documented.
No N/A 10. The following NPDES permit required parameters are analyzed on site:
pH, Temperature, Dissolved Oxygen and Chlorine Residual.
Page 6, :
No N/A 11. The NPDES permit required parameter. Total Chlorine Residualis
analyzed by approved method:
ei) No N/A 12. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius,
and the temperature maintained in a log for every day of operation.
No N/A 13::. Fecal coliform incubator maintained at 44:5 +1- 0.2 Degree Celsius and
the temperature maintained in a log for every day of operation.
14.
Yes) No N/A
Yes No N/A
No N/A
Yes . No N/A
Plant records adequate and include:
a. O. & M Manual
b. "As -built" engineering drawings
c. Schedules and dates of equipment maintenance repairs
d. Equipment data cards:
Yes No N/A 15.. Permittee is meeting compliance schedule.
No N/A 16. DMRs complete and include all NPDES permit required parameters.
Yes No %j 17. The facility has a permitted flow greater. than 5 MGD and is required
to operate seven days per week 24 hours a day.
Ye No N/A 18. ORC visitation logs available and current.
%No N/A 19. ORC certified at a level equal to orgreater than the classification of
the wastewater facility.
es No N/A . 20. Backup Operator certified at one level less than the classification of
the wastewater facility or greater.
Yes No N/A 21. Current copy of the complete NPDES permit on site.
& No N/A . 22. Facility description verified as contained in NPDES permit.
es7 No N/A 23. Facility analyzes process control parameters for example: MLSS,
MCRT, Settleable Solids and others that are applicable.
Yes No (VS.-) 24. Industrial Waste Surveys (IWS) sent to all possible Significant
Industrial Users (SIUs) within the last five years (especially new
industries).
Revised 7/16/01
by Belinda Henson
Regional Field Inspectors Check List for Field Parameters
game of site to be Inspected: Ji b
=field certification # (if applicable):
Inspector:
gPDES#:.1VC, (O`21L(I Region: FaYe_fired,:!:)
Circle the parameter or parameters performed at this site:z
esidual Ch one Settleable Solids, Conductivity Temperature_
II. Instrumentation:
A. Does the facility have the equipment necessary to analyze field parameters as circled above?
1: A pH meter
2. A Residual Chlorine meter . ` ...
3. • DO meter 0-* No
4. . A Cone for settleable solids Yes No
5. A thermometer or rneter that measures temperature: No
. .. .. .
6. Conductivity meter Yes No
III. Calibration/Analysis:.
1. Is the pH meter calibrated with a 2 buffers and.
checked with a third buffer each day of use? es No
2. For Total Residual Chlorine, is a check standard
analyzed each day of use?
3. Is the air calibration of the DO meter performed
each day of use?
4. For Settleable Solids,is 1 liter of sample ..:
settled for 1 hour? ..
5. Is the temperature measuring device calibrated
annually against a certified thermometer? Yes
6. For Conductivity, is a calibration standard Yes
analyzed each day of use?
es
IV. Documentation:
1. Is the date and time that the sample was collected documented? e]
2. Is the sample site documented?
3. Is the sample .collector. documented?
4. Is the analysis date and time documented?.
5. Did the analyst sign the documentation?:
6. Is record of calibration documented?
7. For Settleable Solids;. isaample:volune:and._
. 1 hour time settling time documented?
8. For.Temperature; is the annual. calibration of
the measuring device documented?
Comments:
es
Yes
No
No
Please submit a copy of this completed form to the Laborato
DWQ Lab Certification
Chemistry Lab•
Courier # 52-01-0.1
FIELD INSPECTOR CHECKLIST REV. 04/23/2002
Certification Program.
Cauviouvg
OFFICE OF SUPERINTENDENT
WATER & WASTEWATER PLANT
October 21, 2002
Belinda S. Hinson
Environmental Chemist, NCDENR
225 Green Street, Suite 714
Fayetteville, North Carolina 28301-5043
Subject: Compliance Evaluation Inspection Report Pilkington Glass Plant
Dear Ms. Hinson:
I would like to inform you that the seepage flowingunder the weir at the wastewater
package plant at Pilkington Glass was repaired do October 14, 2002 byClark & Harris
Construction Company.
If you have any questions pleasecontact me` at 910-276 3522"or Robert- -Ellis at 910-277-
0214.
Sincerely,
Ricky Odom
603 LAUCHWOOD DRIVE • P.O. BOX 249 • LAURINBURG, N.C. 28352 •919/277-0214