Loading...
HomeMy WebLinkAboutWQ0024756_Additional Information Request_20210903ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director FRED M.BUNN FMB AT THE GROVE, LLC 2231 NASH STREET NW, SUITE D WILSON, NORTH CAROLINA 27896 Dear Mr. Bunn: NORTH CAROLINA Environmental Quality September 3, 2021 Subject: Application No. WQ0024756 Additional Information Request The Grove WWTP High -Rate Infiltration System Carteret County Division of Water Resources' Central and Regional staff has reviewed the application package received June 7, 2021. However, additional information is required before the review may be completed. Please address the items on the attached pages no later than the close of business on October 4, 2021. Please be aware that you are responsible for meeting all requirements set forth in North Carolina rules and regulations. Any oversights that occurred in the review of the subject application package are still the Applicant's responsibility. In addition, any omissions made in responding to the outstanding items in Sections A through E, or failure to provide the additional information on or before the above requested date may result in your application being returned as incomplete. Please reference the subject application number when providing the requested information. All revised and/or additional documentation shall be signed, sealed and dated (where needed), with two paper copies and one electronic copy submitted to my attention at the address below. If you have any questions regarding this request, please do not hesitate to contact me at (919) 707- 3659 or erickson.saunders@ncdenr.gov. Thank you for your cooperation. Sincerely, 1-4C 11 Ca4 6Z",2 Erick Saunders, Engineer Division of Water Resources cc: Wilmington Regional Office, Water Quality Regional Operations Section (Electronic Copy) Ronald D. Cullipher, PE — The Cullipher Group, P.A. (Electronic Copy) Permit Application File WQ0024756 E Q�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA - oeparoaeat ai emiroamemai Quality 919.707.9000 Mr. Fred M. Bunn September 3, 2021 Page 2 of 3 A. Water Balance/Geotechnical Report: 1. Limited information was provided on the proposed structure's foundation and the potential impact the foundation may have to the existing subsurface conditions. Please provide a copy of the geotechnical report for this structure, including information regarding the depth to the groundwater table, depth to the confining later (if encountered), and any potential impacts/interactions between the proposed structure and the existing infiltration field. 2. Has the structure been designed with tolerance to potential varying groundwater conditions that could be experienced from operation of this facility. For instance, if infiltration were to discontinue at the site, would the different pore pressure impact the foundation and integrity of the parking garage? B. Engineering Plans: 1. Sheet 1 of 2 shows the Architect Rendering Plan and Elevation views. However, these schematics appear to be conceptual and they are low resolution. Please provide engineering plan and profile views for the parking deck and their relation to the existing conditions of the infiltration field and its associated components. These plans shall provide existing conditions along with details of all new work to be completed during construction. 2. The Vertical Clearance does not show the full extent of the piles or the dimensions of the pile caps. These dimensions shall be included in the engineering drawings that are included as a response to Item B.1. 3. As mentioned in the cover letter, fluorescent lighting is proposed throughout the ceiling of the first level of the parking deck, which will continue over the drip field for illumination. Please provide a detail of these lights. 4. As mentioned in the cover letter, stormwater on the proposed parking deck will experience sheet flow down the ramp and away from the drip field. However, a detail of the drainage plans from the parking deck is not shown on the engineering plans. Please include a detail showing these drainage plans in relation to the siting of the infiltration field. 5. Please provide a brief construction sequence plan to detail how the parking deck will be constructed while also allowing for adequate disposal of the wastewater generated under this permit. This plan shall account for any anticipated interruptions to the disposal area that may be required during construction. 6. The regional office staff have noted that there have been security issues at the facility, even with signage posted as mentioned in the cover letter. Due to the potential increase in public traffic in the area please provide a detail for fencing and access to the infiltration area. C. Specifications: 1. Please provide a specifications package to describe the methods of construction, material to be used, and means for ensuring the quality and integrity of the infiltration field and its associated components during the construction of the parking deck. These specifications shall include, at a minimum, a detailed construction schedule as required in Item 13.5. and a plan of recourse in the event that construction causes damage to the infiltration activities in the basin. Mr. Fred M. Bunn September 3, 2021 Page 3 of 3 D. Operation & Maintenance Plan: Please provide a discrete Operation and Maintenance (O&M) Plan as required by permit Condition I11.2. that fulfills the requirements in 15A NCAC 02T .0707(a) which addresses any O&M changes incurred due to the proposed construction of this parking deck. This plan shall address potential issues that may arise due to the limited vertical clearance that may impede O&M activities. It shall also clarify where and how perimeter access to the fields will be provided for maintenance equipment, as well as detailing how public access will be restricted to the infiltration fields. E. Groundwater Monitoring: 1. The regional office noted that monitoring well MW-1 was damaged and will need to be replaced. Please provide a plan for the replacement of this well. This plan shall be approved by the Wilmington Regional Office, and the location of the well shall be included on the plans as required in Section B.