Loading...
HomeMy WebLinkAboutNCC204928_MODIFICATION Supporting Documents_20210901M. ROCKY MOUNT ENGINEERING THE CENTER OF IT ALL LETTER OF APPROVAL FOR SEDIMENTATION & EROSION CONTROL August 27, 2021 Rocky Mount Village, LLC PO Box 611 Durham, NC 27702 Re: Project Name: Permit Number Location: Rocky Mount Mills Assisted Living Additional Acreage 2020-01446 River Drive Submitted By: Summey Engineering Additional Acres Approved: 1.0 acre To whom it may concern: This office has reviewed the subject erosion and sedimentation control plan sealed by Mack Summey Jr, PE on June 17, 2021. We find the plan to be acceptable and hereby issue this letter of approval. This letter of approval shall be valid for a period not to exceed twenty-four months or the time required for the proposed construction activities, whichever comes first. Please be advised that Section 801, Sub -section E12 of the City of Rocky Mount's Land Development Code (hereinafter referred to as LDC) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter the notice required by the LDC, Section 802, Sub -section Q1 of our right of periodic inspection to ensure compliance with the approved plan. The City of Rocky Mount's Sedimentation Pollution Control Program is performance oriented, requiring protection of the natural resources and adjoining properties. If following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Soil Erosion and Sedimentation Control Ordinance of the City of Rocky Mount (Section 801 of the LDC, also NCGS 113A-51 through 66J this office will require revisions to the plan and implementation of the revisions to ensure compliance with the Ordinance. Performance Reservations for this plan are included as part of this approval. The (252) 972-1121 / 331 S. Franklin St., PO 8ox 1180, Racky Mount, NC 27802-118D 1 www.rockymauntnc.gov developer is responsible for thecontrol of sediment on -site. If. the .approved erosion and sedimentation control measures prove insufficient, the developer .must take additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected. after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity. Please: be aware that this approval is based in part. on the accuracy of the .information i1 the Financial Responsibility/Ownership Form, which you. have provided. You are required to file an amended form if`there.is. any change in the information included on the. form.. Also, please note that this approval. does not relieve the. permittee . of the responsibility to obtain any other Federal, State, or Local approvals or permits. The responsible party may need to contact the appropriate Federal, State, and Local agencies prior to beginning work. This approval does not permit the construction of any impervious. surface, nor does it allow for the placement of fill in any area for which a floodplain development.permit is required. In addition, LDC Section 801 -El 0 requires that you notify this office of the proposed starting date for this project. Your cooperation is appreciated, and we look forward to working with you on this proj ect. Also, this letter gives the notice required by G.S. I I3A-61. J (a) of our right of periodic inspection. to ensure compliance with the. approved plan. As of April 1., 2019, all new construction activities are. required. to complete and submit an electronic Notice of Intent (NDI) farm requesting a Certificate of Coverage (COC) under the NCG910000 Construction Stormwater General Permit.. This form MUST be submitted prior to the commencement of any land disturbing,activity on the above project. The NOI form maybe: accessed atdeq.nc.gov/NCGO 1. Please direct questions about the NQI form to Annette Lucas at Annette.lucas cdenr: gov.or Paul Clark. at Paul.clark c@ncdenr.gov. After you submit a complete and correct NGI Form, a CDC will be emailed to you within three business days. A $ WO fee will be charged annually. This fee must be sent to the DEMR. Stormwater Central G#Iice staff in Raleigh. Title 15A NC:A.0 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: I.The approved. E&SC planas well as. any.approved deviation. 2. The NCG0.1 permit and the CDC, office it..is received. 3. Records of inspections made during the previous 30 days. (252) 972-1325..1 331 S.. Pranklin St.; Pa Box 1180; Rocky Mount; NC 27802-1180 I www.rockymbuntnc.p2 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our, right of periodic inspection to. ensure .compliance with the approved plan. Please complete the e-NOI submittal process as soon as you receive this letter for the subject site. Please: visit: h9ps-//deq-nc.gov/NCGO-1 The General Contractor or delegated agent is required to set. up a Pre -construction. meetin before construction b ins with the Control Inspector. Sincerely, YttA.iles, P.E. Storrnwater .Engineer City of kooky Mount. 252-972,1340 (252).972=1325 1 331 S. Franklin St;, PO Box 1100, Rock Mount, NC 27602-11 B0 1 www.rockymountngo�3