HomeMy WebLinkAboutNCC204928_MODIFICATION Supporting Documents_20210901M.
ROCKY MOUNT
ENGINEERING
THE CENTER OF IT ALL
LETTER OF APPROVAL
FOR SEDIMENTATION & EROSION CONTROL
August 27, 2021
Rocky Mount Village, LLC
PO Box 611
Durham, NC 27702
Re: Project Name:
Permit Number
Location:
Rocky Mount Mills Assisted Living Additional Acreage
2020-01446
River Drive
Submitted By: Summey Engineering
Additional Acres Approved: 1.0 acre
To whom it may concern:
This office has reviewed the subject erosion and sedimentation control plan sealed by Mack
Summey Jr, PE on June 17, 2021. We find the plan to be acceptable and hereby issue this letter
of approval. This letter of approval shall be valid for a period not to exceed twenty-four months
or the time required for the proposed construction activities, whichever comes first.
Please be advised that Section 801, Sub -section E12 of the City of Rocky Mount's Land
Development Code (hereinafter referred to as LDC) requires that a copy of the approved erosion
control plan be on file at the job site. Also, you should consider this letter the notice required by
the LDC, Section 802, Sub -section Q1 of our right of periodic inspection to ensure compliance
with the approved plan.
The City of Rocky Mount's Sedimentation Pollution Control Program is performance oriented,
requiring protection of the natural resources and adjoining properties. If following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Soil Erosion and Sedimentation Control Ordinance of
the City of Rocky Mount (Section 801 of the LDC, also NCGS 113A-51 through 66J this office will
require revisions to the plan and implementation of the revisions to ensure compliance with the
Ordinance. Performance Reservations for this plan are included as part of this approval. The
(252) 972-1121 / 331 S. Franklin St., PO 8ox 1180, Racky Mount, NC 27802-118D 1 www.rockymauntnc.gov
developer is responsible for thecontrol of sediment on -site. If. the .approved erosion and
sedimentation control measures prove insufficient, the developer .must take additional steps
necessary to stop sediment from leaving this site. Each sediment storage device must be inspected.
after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50%
capacity.
Please: be aware that this approval is based in part. on the accuracy of the .information i1 the
Financial Responsibility/Ownership Form, which you. have provided. You are required to file an
amended form if`there.is. any change in the information included on the. form.. Also, please note
that this approval. does not relieve the. permittee . of the responsibility to obtain any other Federal,
State, or Local approvals or permits. The responsible party may need to contact the appropriate
Federal, State, and Local agencies prior to beginning work. This approval does not permit the
construction of any impervious. surface, nor does it allow for the placement of fill in any area for
which a floodplain development.permit is required.
In addition, LDC Section 801 -El 0 requires that you notify this office of the proposed starting date
for this project. Your cooperation is appreciated, and we look forward to working with you on this
proj ect.
Also, this letter gives the notice required by G.S. I I3A-61. J (a) of our right of periodic inspection.
to ensure compliance with the. approved plan.
As of April 1., 2019, all new construction activities are. required. to complete and submit an
electronic Notice of Intent (NDI) farm requesting a Certificate of Coverage (COC) under the
NCG910000 Construction Stormwater General Permit.. This form MUST be submitted prior to
the commencement of any land disturbing,activity on the above project. The NOI form maybe:
accessed atdeq.nc.gov/NCGO 1. Please direct questions about the NQI form to Annette Lucas at
Annette.lucas cdenr: gov.or Paul Clark. at Paul.clark c@ncdenr.gov.
After you submit a complete and correct NGI Form, a CDC will be emailed to you within three
business days. A $ WO fee will be charged annually. This fee must be sent to the DEMR.
Stormwater Central G#Iice staff in Raleigh.
Title 15A NC:A.0 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
I.The approved. E&SC planas well as. any.approved deviation.
2. The NCG0.1 permit and the CDC, office it..is received.
3. Records of inspections made during the previous 30 days.
(252) 972-1325..1 331 S.. Pranklin St.; Pa Box 1180; Rocky Mount; NC 27802-1180 I www.rockymbuntnc.p2
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our, right of periodic inspection
to. ensure .compliance with the approved plan.
Please complete the e-NOI submittal process as soon as you receive this letter for the
subject site. Please: visit: h9ps-//deq-nc.gov/NCGO-1
The General Contractor or delegated agent is required to set. up a Pre -construction.
meetin before construction b ins with the Control Inspector.
Sincerely,
YttA.iles, P.E.
Storrnwater .Engineer
City of kooky Mount.
252-972,1340