Loading...
HomeMy WebLinkAboutSW1210503_Plansheet - Grading/Drainage_20210903NOTES GROUND STABILIZATION 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: 1.a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 1.b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 2. CONDITIONS - IN MEETING THE STABILIZATION REQUIREMENTS ABOVE, THE FOLLOWING CONDITIONS OR EXEMPTIONS MAY SHALL APPLY: 2.a. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASE ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. 2.b. ALL SLOPES 50'IN LENGTH OR GREATER SHALL APPLY GROUND COVER WITHIN 7 DAYS EXCEPT WHEN THE SLOPE IS FLATTER THAN 4:1. SLOPES 6- LESS THAN 50'SHALL APPLY GROUND COVER WITHIN 14 DAYS EXCEPT WHEN SLOPES ARE STEEPER THAN 3:1, THE 7-DAY REQUIREMENT APPLIES. Ilk* 2.c. ANY SLOPED AREA FLATTER THAN 4:1 SHALL BE EXEMPT FROM THE 7-DAY GROUND COVER REQUIREMENT. 2.d. SLOPES 10'OR LESS IN LENGTH SHALL BE EXEMPT FROM THE 7-DAY GROUND COVER REQUIREMENT EXCEPT WHEN THE SLOPE IS STEEPER THAN 2:1. Sx- 2.e. ALTHOUGH STABILIZATION IS USUALLY SPECIFIED AS GROUND COVER, 14 SOUTH RN RAILWAY OTHER METHODS, SUCH AS CHEMICAL STABILIZATION, MAY BE ALLOWED ON 200'RAN( RP.B.3,PG.15) A CASE -BY -CASE BASIS. \81k 21. FOR PORTIONS OF PROJECTS WITHIN THE SEDIMENT CONTROL Nil RIPRAP OUTLET PROTECTION -4ko'l - I L/) COMM ISSION-DEFI NED "HIGH QUALITY WATER ZONE", STABILIZATION WITH Z& FOR SKIMMER BASIN GROUND COVER SHALL BE ACHIEVED AS SOON AS PRACTICABLE BUT IN (SEE SIZING SPECIFICATIONS SHEET C4.0) ANY EVENT ON ALL AREAS OF THE SITE WITHIN 7 CALENDAR DAYS FROM F \\\\\ - �, 1 1111, THE LAST LAND -DISTURBING ACT. SKIMMER BASIN 2.g. PORTIONS OF A SITE THAT ARE LOWER IN ELEVATION THAN ADJACENT PER 01/C5.1 DISCHARGE LOCATIONS AND ARE NOT EXPECTED TO DISCHARGE DURING CONSTRUCTION MAY BE EXEMPT FROM THE TEMPORARY GROUND COVER x (SEE SHEET C4.0) REQUIREMENTS IF IDENTIFIED ON THE APPROVED E&SC PLAN OR ADDED BY THE PERMITTING AUTHORITY. 3. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE STOCKPILE PER SHEET 4414111, ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE I EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT CO.1, SECTION F, EARTHEN STOCKPILE MANAGEIVIEN I EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF 116k, GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR 71 PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO cl� RESTRAIN EROSION. DIVERSION DITCH - 40 36 3:1 SIDE SLOPES 4. PROVISIONS FOR GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PER 05/C5.0 LIMITS OF CONSTRUCTION ACCOMPLISHED WITHIN1 5 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION DEVELOPMENT, WHICHEVER PERIOD IS SHORTER. EROSION CONTROL MATTING ROCK CHECK DAM, TYP. PER 08/C5.0 5. THE LAND DISTURBING ACTIVITY SHALL BE CONDUCTED IN ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. 1,50 SEEINSET SILT FENCE SEDIMENT I=_MkJ0IkJIN Ili I MkJL I IkJIN 1. THE PURPOSE OF SELF -INSPECTION IS TO MAKE SURE THAT THE APPROVED OUTLET PER 07/C5.0 EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED, WHICH INCLUDES THE INSTALLATION AND MAINTENANCE OF MEASURES, AND THE -(SEE SIZING SPECIFICATIONS SHEET C4.0) 2. ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING 50 CY SEbIMENT BASIN WITH 20 RIPRAP OUTLET PROTECTION THIS SHEET A�, A PROVISIONS OF GROUND COVER IN TIMELY MANNER. SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION TONS OF RIPRAP AND 10 TONS PONDS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, ALL FORMS OF INLET OF #57 STONE FILTRATION SYSTEM PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION METHODS OF OPEN CHANNELS MUST BE INSPECTED. 3. A "SELF- I NSPECTI ON REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED j DIVERSION DITCH 3 SILT FENCE SEDIMENT OUTLET PER 07/C5.0 OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS MUST BE COMPLETED. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY DRAINAGE AREA 2 ACRES DRAINAGE DELINEAT11 N 5 EK KEPT ON THE PROJECT SITE. 4. THE SELF -INSPECTION REPORT FOR LAND -DISTURBING ACTIVITY IS TO BE COMPLETED AFTER EACH PHASE OF THE APPROVED EROSION AND """""BETWEEN SPRING CRE RUNOF F COEFFICIENT 0.60 (BARE SOILS) AND FRENCH BROAD RIVER 10 CY SEDIMENT BASIN WITH 10 TONS OF RIPRAP AND 4 TONS OF #57 STONE FILTRATION SEDIMENTATION CONTROL PLAN IS COMPLETE. SYSTEM 5. THE RECORDS MUST BE MAE AVAILABLE TO THE EROSION CONTROL INSPECTOF 2 OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL DIVERSION DITCH - 3 DRAINAGE AREA AT THE SITE. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE 2:1 SIDE SLOPES AVAILABLE ON THE SITE. ANY INSPECTION REPORTS SHALL ALSO BE MADE PER 05/C5.0 AVAILABLE ON THE SITE. DELINEATION"',,,,, INSTALL TURF PROJECT LEGEND REINFORCEMENT ....... EXISTING PROPOSED MATTING, TYP. SILT FENCE SEDIMENT 44111p 'STRAW BALE DAM, TYP. TOP OF BANK PV EQUIPMENT PAD OUTLET PER 07/C5.0 ADJOINER LINE BATTERY CONTAINER INSTALL TL JRFF�*-�!%l A PROPERTY LINE INVERTER REINFORCEMENT 2 OVERHEAD POWER TRANSFORMER/AUX. PAD DIVERSION DITCH -3 . ... ... MATTING 0 DRAINAGE AREA = 6 ACRES CURB & GUTTER . ......................................................................... MV SWITCHGEAR UNOFF COEFFICIENT 0.60 (BARE SOILS) CONTROL ROOM LIMITS OF CONSTRUCTION RIGHT OF WAY EASEMENT LINE PV PANEL DR INAGE AREA DELINEATION 14jo %\ 1 14 11 (SEE NOTE THIS SHEET) Q) INSTALL TURF M_ REINFORCEMENT SANITARY SEWER VEGETATIVE SCREENING Ni MATTING LIMITS OF CONSTRUCTION DIVERSION DITCH - 1 STORM DRAINAGE _N '/ 1440 GAS LINE PERIMETER FENCE 3:1 SIDE SLOPES -0- PER 05/C5.0 WATER LINE SITE ACCESS ROAD _100- UNDERGROUND ELECTRIC MAJOR CONTOUR �441 00 COMPOST SOCKS S PER 04/C5.2 UNDERGROUND CABLE MINOR CONTOUR Ya ir WOODSLINE PROPOSED WOODS LINE L PIPE DAYLIGHT 4k RAILROAD TE"M`0ORARY DIVtRS'(0N 'A 'Full. BERM,TYP. LEASE LINE EL: 14� /I 4 ;1.5 PIPE DAYLIGHT CONCRETE lq,v ,,�,p ASPHALT EL: 1 CD FLOODWAY o 0 -0\, 4P�TRA-PIPE OR EQUAL 4,31 100-YR FLOOD 500-YR FLOOD RIPRAP OUTLET PROTECTION NOTE: (SEE SIZING SPECIFICATIONS SHEET C4.0) MAJOR CONTOUR 100 MINOR CONTOUR ALL EQUIPMENT PAD t EL: 1431.5 FOUNDATIONS SHALL BE A NOTE: GUY WIRE A MINIMUM OF 4" ABOVE GRADE PER 01/S1.1. UTILITY POLE /4 34 DRAINAGE AREAS OUTSIDE 319 -D EL: 1431.5 SURVEY SCOPE DELINEATED TREE S 114,35 1440 / \ "I'll","" " ", I- I FROM MADISON COUNTY GIS \ 11036 PROVIDED TOPOGRAPHY. 0- EROSION CONTROL INSTALL TURF 0 MATTING PER 08/C5.0 Z .5 REINFORCEMENT f MATTING DIVERSION DITCH - 2 520 3:1 SIDE SLOPES Z-1 PER 05/C5.0 PETRA-PIPE OR EQUAL 1,5 35 6 DIVERSION DITCH DI RSION DITCH - 2 Know what's below. DRA NAGE AREA = 0.76 ACRES DRAINAGE AREA = 6.72 ACRES 'FF COEFFICIENT 0. 18 (WOODED AREA, SLOPE > 7% 0 30' 60. RUNOFF COEFFICIENT = 0.18 (WOODED AREA, SLOPE > 7%) 1540 RUNO Call before you dig. 0 60' 120' CIVIL DESIGN SEI Engineering Ergineeriil a Worki li by SoLar Energy SEI PROFESSIONAL SERVICES 39845 MATHEWS LANE PAONIA, CO 81428 INFO@SEISOLARPROS.COM 970.527.3920 ENGINEER EPC CONTRACTOR wATZTSILA WARTSILA NORTH AMERICA, INC 11710 N. GESSNER ROAD, SUITE A HOUSTON, TX 77064 (571) 325-6481 DUKE PROJECT NUMBER 446-14 DUKE SHEET NUMBER HSPOO-GR-C-PL-01 Q 0 W Z CV-) W `T > 00 < C14 C) U) Z W - 0� W 0 QZ `ZD Z < U) U 0 U) U) 0 00 0 CLIENT '001111UNITED­ Ilk UNITED RENEWABLE ENERGY 5895 SHILOH RD STE 104 ALPHARETTA, GA 30005 LU < d- Ui Z 0 >_ < �E - > LU cl� 0 Uj a_ U) W 0 < Uj 0 _j LU Uj < 1L W (D (D 00 00 (D Lo (D (D (D 1-- (D W PHASE IFC REV3 DATE 2/10/21 DRAWING SCALE AS SHOWN NOTE Ifthis drawing is not 24x36" it has been revised from its original size the scales noted on drawing/details are no longer applicable. DRAWN BY DRAWN BY REB DRAWING NAME GRADING & DRAINAGE C3.1