Sorry it has taken me a few days to get back to you but I have been in meetings most of the week. After walking the site
with you on Monday (7/22/13) and talking it over I hope that we have come to a resolution that works. As we walked
the alignment we moved the center line to areas that are currently void of SAVs. On several locations when we tried to
find a route to return the breakwater back into land we encountered areas that had SAV present (patches and 100%
coverage). In order for DMF to be OK with the project's SAV impacts that we could not avoid, we would require several
conditions. The first condition would be that the alignment follows what we marked on site on July 22, 2013. The second
condition would include the removal of the entire breakwater from the northern most point new proposed breakwater
(marked B1 on attached map) extending south to and past the ramp, removing the entire breakwater within this area.
Removing this section of the breakwater will minimize the impacts from this project. After visiting the site again there is
SAV present and there is minimal erosion in the dock /ramp area due to the protected nature of the bay. Boat wake
impacts should also be minimal in this area due to the marina location. In addition to the removal of this portion of the
breakwater, the NCDMF also proposes that the applicant connects the southernmost breakwater and the breakwater
just to the north east (ED on attached map). This will minimize the footprint of the project while avoiding some SAV
habitat.
If these conditions are met along with the openings as described in the earlier conversations, the NCDMF can remove its
objections. If you have any questions please let me know.
Also just to let you know, I will be out of the office for a week starting next Tuesday.
Kevin
From: Ted Sampson [ mailto :sampsonandco @roadrunner.com]
Sent: Saturday, July 20, 2013 1:59 PM
To: Hart, Kevin; Scheller, Roberto
Cc: 'Ron'; Howell, Jonathan
Subject: RE: Andron Properties /drummond Pt
Kevin, Roberto,
I was at the site on Friday, and able to get the alignments staked so they will be ready for you on Monday. Please let me
know when you expect to be at the site.
With best regards,
Ted Sampson
- - - -- Original Message---- -
From: Hart, Kevin [mailto:kevin.hartCd)ncdenr.aov]
Sent: Thursday, July 18, 2013 1:38 PM
To: Ted Sampson; Howell, Jonathan
Cc: 'Ron'; Deaton, Anne
Subject: RE: Andron Properties /drummond Pt
Ted,
I had spoken to Roberto earlier this week and had scheduled next Monday (July 22) to go to this site. This is the
only day in the next few weeks that we both have free. We will be using the alignments on the plat that we had
when we met in Washington.
Kevin
From: Ted Sampson [ mailto :sampsonandco(a)roadrunner.com]
Sent: Wednesday, July 17, 2013 11:20 AM
To: Hart, Kevin; Howell, Jonathan
Cc: 'Ron'
Subject: RE: Andron Properties /drummond Pt
Kevin,
I apologize for the length delay in providing you a response. I was able to confirm with the owner yesterday
evening an agreement to go forward with staking the alignments of the proposed riprap sills. I plan to try to get out
there this week to stake the GPS points we have for what is on the drawings. I believe that I will be able to have
this done at least by Wednesday next week. If you proceed with scheduling your site visit for after next
Wednesday, the alignments should be all staked.
We look forward to working with you to identify acceptable alignments that have sufficient minimization of impacts.
With best regards,
Ted Sampson
- - - -- Original Message---- -
From: Hart, Kevin [mailto:kevin.hartCd)ncdenr.aov]
Sent: Wednesday, July 03, 2013 12:46 PM
To: Howell, Jonathan; Ted Sampson
Subject: RE: Andron Properties /drummond Pt
Ted,
Please let me know if you will be staking the alignment out. Once it's done can you let me know? I'm
trying to schedule with others to find a day that works out.
Thanks,
Kevin
From: Howell, Jonathan
Sent: Tuesday, July 02, 2013 3:32 PM
To: Ted Sampson; Hart, Kevin
Subject: RE: Andron Properties /drummond Pt
was that as I--- — was no SAV found in the alignment of the �ir000sed breakwater the wo
them in the loop as to the dates to get all this accomplished. Thanks everyone, you and Kevin, for
helping move this along.
From: Ted Sampson [ mailto :sampsonandcoCa)roadrunner.com]
Sent: Tuesday, July 02, 2013 3:29 PM
To: Howell, Jonathan
Cc: 'Ron'
Subject: RE: Andron Properties /drummond Pt
Jonathan,
Thanks for forwarding the email. If the agencies would like the alignments staked according to our GIPS
points, I will probably need the 8th and /or 9th to get that done. I am still awaiting a green light from Mr.
Andronowitz to go ahead with staking the GIPS points. I will get back to you as soon as I know when this
can be done.
With best regards,
Ted Sampson
- - - -- Original Message---- -
From: Howell, Jonathan [ mailto :jonathan.howellCa)ncdenr.gov]
Sent: Tuesday, July 02, 2013 2:30 PM
To: Ted Sampson
Subject: FW: Andron Properties /drummond Pt
Ted, as we discussed.
From: Hart, Kevin
Sent: Friday, June 28, 2013 9:10 AM
To: Mathis, Lynn; Scheller, Roberto
Cc: Deaton, Anne; Rawls, Kathy; Howell, Jonathan
Subject: Andron Properties /drummond Pt
Hi All,
I'm trying to set up a day that we can all go together to look at the Drummond point breakwater
alignment and SAV. I was thinking either July 8 or 9. Does this work for everyone?
If so, Kathy do you think one of your staff would be available to join us? We wouldn't
necessarily need the boat.
Thanks,
Kevin
Kevin Hart
Marine Biologist
Habitat Section
North Carolina Division of Marine Fisheries
943 Washington Square Mall
Washington, NC 27889
252- 948 -3878
Email correspondence to and from this address is subject to the North Carolina Public Records
Law and may be disclosed to third parties unless the content is exempt by statute or other
regulation.