HomeMy WebLinkAboutNCG030085_2021 DMR_20210811DAIMLER
Sean Quarry
Sr. Environmental Engineer
Daimler Trucks
1800 North Main Street
Mount Holly, NC 28120
704.822.7034 Phone
August 10, 2021
NCDEQ- Division of Water Resources
610 East Center Avenue
Suite 301
Mooresville, North Carolina 28115
To whom it may concern:
Please find the enclosed July Stormwater Discharge OutfalI (SDO) #001 and #002 forms for the
Daimler Trucks NA, LLC - Mount Holly Truck Manufacturing Plant (TMP). The July stormwater
samples were not collected during this month. According to rainfall data collected for the month,
there was no qualifying rain event (as defined by General Permit No. NCG030000). Shield
continues to monitor in August for an adequate sample.
Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue
to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling
frequency by Daimler.
Should you have any questions, please contact me at 704-822-7034 or
sean.guari-y@daimlei-.com.
Sincerely,
Daimler Trucks NA, LLC
'-z "::?�
Sean Quarry
Sr. Environmental Engineer
Enclosures - Shield Engineering, Inc. Cover Lefter and DTNA signed DMR forms
0iSHIELD
ENGINEERING
August 3, 2021
Mr. Scan Quarry
Daimler Trucks North America, LLC
1800 North Main Street
Mount I lolly, NC 28120
Subject: Monthly Sampling — July 2021
NPDES General Permit No. NCGO30000
Daimler Trucks of North America LLC - Mount Holly, North Carolina
Shield Project No. 1140109-08
Dear Mr. Quarry:
There were no qualifying rainfall events for the month of July 2021 as defined by General Permit No.
NCG030000. As a result, no monthly stormwater samples were collected for Stormwater Discharge Outfalls
(SDO) #001 and SDO 4002 at the Daimler Trucks — Mount Holly Facility in July. According to rainfall
data' collected for the month, four rain events or group events occurred on July 21d, July 8`s, July 121, and
July 25', producing 0.30 inches, 0.50 inches, 3.67 inches, and 1.32 inches of rain, respectively. However,
each of these events took place after normal business hours, within 72 hours of the rain event, or did not
produce enough rainfall to collect a sample. Shield will continue to monitor daily weather conditions and
attempt coordination of appropriate staff and resources to facilitate adequate sample collection. A partially
completed Discharge Monitoring Report farm is attached to this cover letter for signature of the appropriate
authorized permittec and submittal to the State.
Daimler remains in Tier 3 at SDO #001 and SDO 4002 for Zinc, Copper and TSS. Shield will continue to
perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by
Daimler. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks,
North America. If you have any questions in reference to this document or require further information,
please feel free to contact either of the undersigned at (704) 394-6913.
Respectfully,
SHIELD ENGINEERING, INC
3—
J
Magdaline Tzannis
Senior Project Manager
Melinda . Grcenc, EIT
Senior E *ineer
Robert L. Gnffin, PE
President/CEO
Attachment: Discharge Monitoring Report — July 2021
Rainfall data collected from w%v►v.wundevernund.cvin
4301 Taggart Creek Road www.shieldenpineering.com
Charlotte, NC 28208
Telephone 704394.6913
License No. F-0856
NCDEQ Division of Energy, Mineral and Land Resources
Stormwater Discharge Monitoring Report (DMR) Form for NCG030000
Metal Fabrication
Click here for instructions
Complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report (DMR] Upload form within
30 days of receiving sampling results. Mail the original, signed hard copy of the DMR to the a a pro priate OF MI R Regional Of fire.
Certificate of Coverage No. NCG03 0085
Person Collecting Samples: NA
Facility Name: Daimler Trucks - Mount Holly
Laboratory Name: NA
Facility County: Gaston
Laboratory Cert. No.. NA
Discharge during this period: ❑ Yes ❑� No {if no, skip to signature and dote)
Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? ❑J Yes ❑ No
If so, which Tier (1, 11, or Ill)? III
A copy of this DMR has been uploaded electronically via tittl)&:I/ed(xs.de(l.tic.gov/f-ortn5lSw-i)Mf( ❑d Yes ❑ No
Date Uploaded: k14V L r
Analytical Monitoring Requirements for OutfalIs with Industrial Activities - Benchmarks in (fled)
Parameter
Parameter
Outfall001
Outfall002
Outfall
Outfall
Outfall
Cade
N/A
Receiving Stream Class
WSW; CA
W5-IV; CA
N/A
Date Sample Coltected MM/DD/YYYY
NQE
NQE
46529
24-Hour Rainfall in inches
C0530
TSS in mg/L (100 or 50')
00400
pH in standard units (6.0-9.0)
Copper, total recoverable in mg/L
01119
0.010
Lead, total recoverable in mg/ L
01051
(o.075)
Zinc, total recoverable in mg/ L
01094
(0.126)
Total Toxic Organics (TTO) in mg/L(1)
78141
(if required)
00552
Non -Polar Oil & Grease in mg/L (15)
Additional parameters for outfalls in drainage areas that use >55 gallons per month of new hydraulic oil on average
Estimated New Motor/Hydraulic Oil
NCOIL
NA
Usage in al/month
NA
* autfafls to Outstanding Resource Waters (0RW), High Quality Waters (HQW),Trout Waters (Tr) and Primary Nursery Areas (PNA)
have a benchmark TS5 limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L
Notes (optional): NOE during this period.
"I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information
submitted is, a best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false infoce<atio6mcludIniz themossiWUty of fines and imprisonment far knowing violations."
Signature ofXerwkCee ar Delegated Authorized Individual
Email Address Gru ; q. 2 j(,j4gt e
����
Date
Phone Number 7uy( r Zr -77y]
Total Toxic Organics Certification:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring
requirement for total toxic organics (7170), 1 certify that to the best of my knowledge and belief, no leak, spill, or dumping of
concentrated toxic organics into the stormwater or onto areas which are exposed to rainfall or stormwater runoff has occurred since
filing the last ischarge moni�torh g report. 1 further certify that this facility is implementing all the provisions of the Solvent
Manage l a n include a Stormwater Pollution Prevention Plan."
Signature 90ermitteV—or Delegated Authorized Individual
Email Address Lr'�t 9, s �ti-- cc. In
PhoneNumber