Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Dear Mr. Setzer:
Division of Water Quality
Thomas A. Reeder
Acting Director
June 25, 2013
Subject: Inspection
Bridge No. 107
DWQ Project No. 20111063
TIP No. B -3861
Jackson County
John E. Skvarla, III
Secretary
On June 18, 2013, I inspected the construction work for the new bridge (Bridge No. 107) over the Tuckasegee
River on NCSR 1797 in Jackson County. The temporary bridge was almost complete and the contractor was
working paving the approaches. Sediment and erosion control structures appear to be maintained and working
properly.
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter.
If you have questions, please call me at 828 - 296 -4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Mitchell Bishop, PE
Mark Davis, Division 14, DEO
Ben DeWit, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Setzer) NCSR 1797 B -3861 20111063 Inspection Letter June 2013
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778 -8211
Phone: 828 - 296-45001 FAX: 828 - 299 -7043 One
Intemet. www.ncwatercluality.oro NorthCarohna
An Equal Opportunity 1 Affirmative Action Employer Naturally
Wetland Inspection Report
Project Num: 20111063 Version: 1
Project Name: NCDOT- Bridge No. 107 on SR 1797 (B -3861)
County: Jackson
Location: NCDOT- Bridge No. 107 on SR 1797 (B -3861)
Latitude: +35 °18'44"
SW Plan Location:
Site Owner Name: NC DOT PDEA
Inspection Date: 06/18/2013
Reason for Inspection: Routine
Inspection Type: Site Inspection. (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
Facility compliance Status: N Compliant
Program Area: 401 (includes isolated /non -404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
Title:
Status: Issued
Project Type: Replace bridge with bridge
Region: Asheville
Longitude: - 81°09'55"
n Not Compliant
Phone:
Phone: 828 -296 -4500
Contractor continues to work on temporary bridge and was getting ready the pave the approaches.
Sediment and erosion control measures appeared to be working properly.
Continue to maintain sediment and erosion control measures.
Seed and mulch all bare areas.
Permit 401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Yes; No NA NE
X000
■000
X000