HomeMy WebLinkAboutU-5204 (6)NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Thomas A. Reeder
Governor Acting Director
June 25, 2013
Mr. Michael Pettyjohn, P.E.
Division 11 Engineer
N.C. Department of Transportation
Post Office Box 250
North Wilkesboro, North Carolina 28659
Subject: Inspection
NCSR 1764 (New Farm Road)
TIP No. U -5204
Caldwell County
Dear Mr. Pettyjohn:
On June 19, 2013, I inspected the construction project on NCSR 1764 (New Farm Road), TIP No.
U -5204, in Caldwell County. Construction activities include heavy grading and bridge construction
John E. Skvarla, III
Secretary
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters. Also, please refer to the attached inspection report for
any specific items noted during the inspections.
If you have questions, please call me at 828 - 296 -4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: David Poindexter, PE
Heath Slaughter, Division 11, DEO
Neal Trivette, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
TIP No. U -5204 June 2013 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778 -8211
Phone, 828 - 296-45001 FAX. 828 - 299 -7043
Intemet: www.ncwaterouality mg
An Equal Opportunity k, Affirmative Action Employer
NorthCarohna
Naturallu
Site Inspection Report
Site Number: WT000423
Site Name: NCSR 1764 U -5204
Site Address:
County: Caldwell
Directions:
Latitude:
Site Owner Name: NCDOT Division 11
Inspection Date: 06/19/13
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
Facility compliance Status: ■ Compliant
Program Area: 401 (includes isolated /non -404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
Region: Asheville
Longitude:
0 Not Compliant
Phone:
Phone: 828 -296 -4500
Reviewed project and work continues throughout most of the project area. Work continues on the bridges and grading is also
underway.
Seeding and mulching had recently taken place throughout the project.
Several areas were noted that continue to need attention:such as rill areas on cut and fill slopes.
The contractor advised that they would be repaired when that area was dry enough to get equipment on the slopes.
Continue to maintain sediment and erosion control measures and seed and mulch all bare areas.
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Yes No NA NE
■nnn
■nnn
■nDn
Page: 1