Loading...
HomeMy WebLinkAbout20100107 Ver 1_Inspection_20130725A.. NCDENR North Carolina Department of Environment and Division of Water Quality Pat McCrory Thomas A. Reeder Governor Acting Director July 12, 2013 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Natural ResouiT LJ 1 2 5 2013 �LANoSANns 0R QU L1 ' Skvarla, III R BRA -VCH Subject: Inspection- Bridge No. 81 TIP No. B -4122 DWQ Project No. 20100107V.2 NCSR 1117 (Moose Branch Road) Graham County Dear Mr. Setzer: On July 9, 2013, I inspected the construction work on Bridge No. 81 on NCSR 1117 (Moose Branch Road) in Graham County. The contractor was starting to work on drilled piles. Sediment and erosion control structures appeared to be working properly. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828 - 296 -4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: W. Trent Anderson Mark Davis, Division 14, DEO Ben DeWit, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Setzer) Bridge No. 81 TIP No B-4122 Inspection Letter July 2013 SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778 -8211 Phone: 828 - 296 -4500 \ FAX, 828 - 299 -7043 Internet. www.ncwatercivality.org An Equal Opportunity \ Affirmative Action Employer NorthCarolina Natural& Wetland Inspection Report Project Num: 20100107 Version: 3 Project Name: NCDOT- Bridge No. 81 on SR 1117 (B -4122) County: Graham Location: NCDOT- Bridge No. 81 on SR 1117 (B -4122) Latitude: +35 015'07" SW Plan Location: Site Owner Name: NC DOT.PDEA Inspection Date: 07/09/2013 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Facility compliance Status: 0 Compliant Program Area: 401 (includes isolated /non -404) Question Areas: 0 Permit (401 WQC) Title: Status: Issued Project Type: Replace bridge with bridge Region: Asheville Longitude: -83 °48'41" n Not Compliant Inspection Summary: Inspected site -with NCDOT inspector. Contractor was working on the east side of the stream so they could drive piles. Sediment and erosion control measures appeared to be working properly. Continue to maintain sediment and erosion control measures. Seed and mulch all bare areas as required. Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Phone: Phone: 828 -296 -4500 W__ Kl- AIA K- 0 0 0 ■nnn ■nnn Page: 1