SUBJECT: Authorization to Construct
A to C No. 033111A03
Carolina Water Service, Inc.
Fairfield Harbor Subdivision WWTP
Ctaven County
Dear Mr. Hough:
A letter of request for Authorization to Construct was received September 28, 2006, by
the Division, and final plans and specifications for the subject project have been reviewed and
found to be satisfactory. Authorization is hereby granted for the construction of modifications to
the existing 0.6 MGD Wastewater Treatment Plant, with discharge of treated wastewater into the
Neuse River in the Neuse River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
replacement of a gas chlorine disinfection system with a liquid sodium
hypochlorite disinfection system to be utilized as backup to the existing UV
disinfection system, installation of a double walled 200 gallon storage tank, and a
60 GPD chlorine feed pump, in conformity with the project plans, specifications,
and other supporting data subsequently filed and approved by the Department of
Environment and Natural Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0033111 issued November 13, 2003, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0033111.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily,including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities. rl°i" Carolina
Naturally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service
Internet:www newaterouatitv.orq 512 N.Salisbury St. Raleigh,NC 27604 FAX (919)733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper
Ia
Arthur L. Hough, II
Carolina Water Service, Inc.
February 5, 2007
Page 2
The Washington Regional Office, telephone number(252) 946-6481, shall be notified at
least forty-eight (48)hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E.,
Construction Grants &Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-
i 1633.
Upon classification of the facility by the Certification Commission,the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the'project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s)for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
•
Arthur L. Hough, II
Carolina Water Service, Inc.
February 5, 2007
Page 3
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at
telephone number (919) 715-6203.
Sincerely,
a
Alan W. Klimek, P.E.
MM:cgm
cc: Linwood E. Stroud, P.E., Stroud Engineering, P.A.
Craven County Health Department
DWQ Washington Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
Point Source Branch, NPDES Program
Cecil G. Madden, Jr., P.E.
Michelle McKay, E.I.
ATC File
CWS Systems Inc.
•
• 575 Broad Creek Road
•
New Bern NC.28560
•
•
CWS Systems Inc.
December 19,2006
Attention:Gil Vinzani
N.C.Division of Water Quality
1617 Mail Service Center
Raleigh N.C.27699-1617
Dear Sir:
This letter is to request a change to permit:NC0033111. The requested change is to discontinue
pulling chlorine samples to ensure the chlorine levels do not exceed 28 micrograms per liter.
We have switched from chlorine and dechlorination to Ultraviolet disinfection. This was put in use
starting August 2,2006. Since using U.V.disinfection we have not noted a chlorine residual above
the required limit.
We are currently requesting chlorine and dechlorination as a back-up system,however we will notify
the regional prior to putting this system in use. We are requesting the permit reflect this and only
require chlorine samples when the chlorine system is in use.
I can be reached at 1-800-348-2383 or cell phone(252)659-0514 if you have any questions. My E-
mail is al.hough@uiwater.com
Thank you,for your time.
Sincerely,
Arthur L Hough
Operating Manager •
Fairfield Harbour
[Click here and type slogan]
l 1
t. V
Carolina Water Service, Inc.
A To C No. 033111A01
Issued December 9, 2005
Engineer's Certification
I, /4 n wood E. 5*froze d , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Fairfield Harbor WWTP, located
on State Road 1600 in Craven County for Carolina Water Service, Inc., hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the following
construction:
Installation of an ultraviolet disinfection system, in conformity with the project
plan, specifications, and other supporting data subsequently filed and approved by
the Department of Environment and Natural Resources.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance and intent of the approved plans and specifications.
•
Signature /' ��r�,�/ Registration No. SZ � �I
g /_
Date 8 - OZ- oh ``,,,�»��eeh.,,,.
.e� 0PR0Lj4 i,
Z.'4>. :49Str.q
Send to: Construction Grants & Loans
2
DENR/DWQ a r'2 P19
1633 Mail Service Center r
Raleigh, NC 27699-1633 ��••.FNG�N��'����
1 I
OF\NATF,9 Michael F.Easley,Governor
P
0 G William G.Ross Jr.,Secretary
North Carolina Department of Environment and Natural Resources
DWa,
p _ Alan W.Klimek,P.E.Director
Division of Water Quality
December 9, 2005
Mr. Jim Highley, Regional Manager
Carolina Water Service, Inc.
P.O. Box 240908
Charlotte, North Carolina 28224
SUBJECT: Authorization to Construct
A to C No. 033111A01
Carolina Water Service, Inc.
Fairfield Harbor WWTP
Craven County
Dear Mr. Highly:
A letter of request for Authorization to Construct was received September 13, 2005, by
the Division, and final plans and specifications for the subject project have been reviewed and
found to be satisfactory. Authorization is hereby granted for the construction of modifications to
the existing 0.6 MGD Fairfield harbor Wastewater Treatment Plant, with discharge of treated
wastewater into the Neuse River in the Neuse River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of an ultraviolet disinfection system, in conformity with the project
plan, specifications, and other supporting data subsequently filed and approved by
the Department of Environment and Natural Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0033111 issued November 13, 2003, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0033111.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Washington Regional Office, telephone number(252) 946-6481, shall be notified at
least forty-eight(48)hours in advance of operation of the installed facilities so that an on site N°nc Carolina
, aturally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service
Internet: h2o.enr.state.nc.us 512 N.Salisbury St. Raleigh,NC 27604 FAX (919)733-2496 I-877-623-6748
An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper
Mr. Jim Highley
December 9, 2005
Page 2
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E.,
Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-
1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal)which have jurisdiction.
Mr. Jim Highley
December 9, 2005
Page 3
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at
telephone number(919) 715-6203.
Sincerely,
an W. Klime , E. �--
MH:cgm
cc: Linwood Stroud, P.E—Stroud Engineering, P.A.
Craven County Health Department
DWQ Washington Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
Point Source Branch, NPDES Program
Cecil G. Madden,Jr., P.E.
Mark Hubbard, P.E.
A to C File
Carolina Water Service, Inc.
A to C No. 033111A01
Issued June 13, 2005
Engineer's Certification
,‘ St E ; ) l uti,3,as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Fairfield Harbor Subdivision
WWTP, located on Broad Creek Road in Craven County for Carolina Water Service, Inc.,
hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the following construction:
Installation of a liquid sodium bisulfite dechlorination system, pursuant to the fast
track application received on May 26, 2005, and in conformity with the Minimum
Design Criteria for Dechlorination Facilities.
I certify that the construction of the above referenced project was observed to be built
within sub tantial compliance and intent of the approvedplans and specifications. Atrial.
Va f s'A 1%o' S �,•v� p 1A L �• I�"S 1eci b.e 1 ow.
Signature Registration No. / c-z 7
Date 6-2- d(-OC
Send to: Construction Grants & Loans .�•0.' °.FR0L,,�,ee•,_„r
DENR/DWQ
1633 Mail Service Center c` 9<
Raleigh, NC 27699-1633 _ 70
• J
'e t,'t, •c�
ee.,�° •ODe.;�o'
Secbhd cl, erc
hk dS6a ns
fed
SPave Dh , Lo
,euLAe
ced
- (de.cs elih- ,
((
1 , 1 HccovEr
! J U L 1 2 2005 �
JUL 2105
DENR - WATER QUALITY
POINT SOURCE BRANCH NSI7t^mot"t,'',t,h f
(
•
�QF wATFRP Michael F.Easley,Governor
•
v 0 G William G.Ross Jr.,Secretary
7 North Carolina Department of Environment and Natural Resources
H
0 .. Alan W.Klimek,P.E.Director
Division of Water Quality
June 13, 2005
Mr. Art Hough
Carolina Water Service, Inc.
575 Broad Creek Road
New Bern, North Carolina 28560
SUBJECT: Authorization to Construct
A to C No. 033111A01
Carolina Water Service, Inc.
Fairfield Harbor Subdivision WWTP
Craven County
Dear Mr. Hough:
A fast track application for Authorization to Construct dechlorination facilities was
received on May 26, 2005,by the Division. Authorization is hereby granted for the construction
of modifications to the existing Fairfield Harbor Subdivision WWTP, with discharge of treated
wastewater into the Neuse River in the Neuse River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of a liquid sodium bisulfite dechlorination system, pursuant to the fast
track application received on May 26, 2005, and in conformity with the Minimum
Design Criteria for Dechlorination Facilities.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0033111 issued November 13, 2003, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0033111.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Washington Regional Office, telephone number(252) 946-6481, shall be notified at
least forty-eight(48) hours in advance of operation of the installed facilities so that an on site
0ne
NhCarolina
aturally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service
Internet: h2o.enr.state.nc.us 512 N.Salisbury St. Raleigh,NC 27604 FAX (919)733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer—50%Recycled/t 0°'°Post Consumer Paper
Mr. Art Hough
June 13, 2005
Page 2
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Pursuant to 15A NCAC 2H .0140, upon completion of construction and prior to operation of
these permitted facilities, the completed Engineering Certification form attached to this permit shall be
submitted to the address provided on the form.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
Mr. Art Hough
June 13, 2005
Page 3
If you have any questions or need additional information, please do not hesitate to contact
Cecil G. Madden,Jr., P.E. at telephone number(919) 715-6203.
Sincerely,
Ian W. Klim , P.E.
MH/cgm
cc: Linwood Stroud, P.E. - Stroud Engineering, P.A.
Craven County Health Department
Washington Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
Point Source Branch,NPDES Program
Cecil G. Madden, Jr., P.E.
Mark Hubbard, E.I.
A to C File
i
mow+/
State of North Carolina
Department of Environment, Health and Natural Resources
Division of Environmental Management
512 North Salisbury Street• Raleigh,North Carolina 27611
James G.Martin,Governor George T.Everett,Ph.D
William W.Cobey
,Jr.,Secretary Director
April 29, 1992
Mr. Carl Daniel
Northeast Craven Utility Company
750 Broad Creek Road
New Bern, North Carolina 28560
Subject: Permit No. NC0033111
Authorization to Construct
Northeast Craven Utility Company
Wastewater Treatment Facility
Craven County
Dear Mr.Daniel:
A letter of request for an Authorization to Construct was received November 15, 1991 by the
Division and final plans and specifications for the subject project have been reviewed and found to be
satisfactory. Authorization is hereby granted for the construction of a 300,000 GPD circular, extended
aeration sewage treatment plant with a clarifier, a digester, a 150,000 gallon surge tank, and alum feed for
phosphorus removal to operate in parallel with the existing 300,000 GPD extended aeration treatment plant
with discharge of treated wastewater into the Neuse River which is classified as "SB-Swamp Nutrient
Sensitive" in the Neuse River Basin.
This Authorization to Construct is issued in accordance with Part III paragraph B of NPDES
Permit No. NC0033111 issued September 1, 1988, and shall be subject to revocation unless the
wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in
Permit No. NC0033111.
The sludge generated from these treatment facilities must be disposed of in accordance with G.S.
143-215.1 and in a manner approved by the North Carolina Division of Environmental Management.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by this
Division, such as the construction of additional or replacement wastewater treatment or disposal facilities.
Regional Offices
Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem
704/251-6208 919/486-1541 704/663-1699 919/733-2314 919/946-6481 919/395-3900 919/896-7007
Pollution Prevention Pays
P.O.Box 29535,Raleigh,North Carolina 27626-0535 Telephone 919-733-7015
An Equal Opportunity Affirmative Action Employer
The Washington Regional Office,phone no. (919) 946-6481, shall be notified at least forty-eight
(48) hours in advance of operation of the installed facilities so that an in-place inspection can be made.
Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m.
until 5:00 p.m. on Monday through Friday, excluding State Holidays.
Upon completion of construction and prior to operation of this permitted facility, a certification
must be received from a professional engineer certifying that the permitted facility has been installed in
accordance with the NPDES Permit, this Authorization to Construct and the approved plans and
specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC
27626-0535.
Upon classification of the facility by the Certification Commission, the Permittee shall employ a
certified wastewater treatment plant operator to be in responsible charge (ORC)of the wastewater treatment
facilities. The operator must hold a certificate of thetype and equivalentgreater than the
grade at least to or
classification assigned to the wastewater treatment facilities bythe Certification Commission.
ssion
Permittee must also employ a certified back-upoperator of the appropriate • The
Ptype and grade to comply with
the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at
least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and
must properly manage and document daily operation and maintenance of the facility and must comply with
all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Perminee must
submit a letter to the Certification Commission which designates the operator in responsible charge within
thirty days after the wastewater treatment facilities are 50%complete.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for the
life of the facility.
Failure to abide by the requirements contained in this Authorization to Construct may subject the
Permittee to an enforcement action by the Division of Environmental Management in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from complying
with any and all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have any
questions or need additional information, please contacftlqs Angela Y. Griffin, telephone number
919/733-5083.
erely,
0
eorge - r
1
cc: Craven County Health Department .
Washington Regional Office,Water Quality
Training and Certification Unit
( ccti-wx
State of North Carolina
Department of Natural Resources and Community Development
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Governor May 14, 1985 S. Thomas Rhodes, Secretary
Mr. Mike Nicodeme, President
Northeast Creaven Utility Company
754 Broad Creek Road
New Bern, North Carolina 28560
SUBJECT: Permit No. NC0033111
Amendement to.Authroization to Construct
Northeast Craven Utility Company
New Replacement Wastewater Treatment
Facilities (Expansion)
Fairfield Harbour, North Carolina
Craven County
Dear Mr. Nicodeme:
A letter of request for Authorization to Construct was received April 4,
1985, by the Division and final plans and specifications for the subject project
have been reviewed and found to be satisfactory. Authorization is hereby granted
for the construction of a 0.30 MGD dual path wastewater treatment facility consisting
of two (2) 150,000 gallon aeration tanks, a 26,180 gallon sludge holding tank,
three (3) 550 CFM blowers, two (2) 27,635 gallon clarifiers, two (2) 3,150 gallon
chlorine contact tanks, gaseous chlorine as a source of disinfection and a 205
KW generator as a source of stand-by power.
This Authorization to Construct is issued in accordance with Part III para-
graph C of NPDES Permit No. NC0033111 issued March 27, 1985, and shall be subject
to revocation unless the wastewater treatment facilities are constructed in accor—
dance with the conditions and limitations specified in Permit No. NC0033111.
The Permittee must employ a certified wastewater operator in acccordance
with Part III paragraph D of the referenced permit.
The sludge generated from these treatment facilities must be disposed of
in accordance with General Statutes 143-215.1 and in a manner approvable by the
North Carolina Division of Environmental Management.
The Washington Regional Office, telephone number 919/946-6481 shall be notified
at least twenty-four (24) hours in advance of backfilling of the installed subsurface
filter system so that an in-place inspection can be made of said system prior
to backfilling. Such notification to the Regional Supervisor shall be made during
the normal office hours from 8:00 A.M. until 5:00 P.M. on Monday through Friday,
excluding State Holidays:
Contd.
P.O.Box 27687,Raleigh,North Carolina 27611-7687 Telephone 919-733-4984
An Equal Opportunity/Affirmative Action Employer
Permit No. NC0033111
Page Two
In event the facilities fail to perform satisfactorily in meeting its's NPDES
permit effluent limits, the Permittee shall take such immediate corrective action
as may be required by this Division, inclusing the construction of additional wastewater
treatment and disposal facilities.
This Division will require dual path treatment, therefore; each treatment
path shall operate independently of each other.
One (1) set of approved plans and specifications is being forwarded to you.
If you have any questions or need additional information, please contact Mr. Donald
Safrit, telephone number 919/733-5083, ext. 120.
Sincerely yours,
ORIGINAL SIGNED BY
DENNIS R. RAMEY
R: Paul elms
Director
cc: Craven County Health Department
Thomas Engineering Consultants, P.A.
Washington Regional Supervisor
Mr. Dennis R. Ramsey
DS/cgc
•
•
• • DIVISION OF
o. ENVIRONMENTAL
aTE, •
7 ... North Carolina Department of Natural
4 MANAGEMENT
:
Robert F.Helms
4.�. Resources &Community Development
ct Direor
�•, � - �
.4-, James B. Hunt,Jr.,Governor James A.Summers,Secretary Telephone 919 733-7015
ne' el ( November 9, 1984
Mr. Dennis Wilkins, President
Northeast Craven Utility Company
754 Broad Creek Road
New Bern, North Carolina 28560
SUBJECT: Permit No. NC0033111
Authorization to Construct
Northeast Craven Utility Company
New Replacement Wastewater Treatment
Facilities (Expansion)
Fairfield Harbour, North Carolina
Craven County
Dear Mr. Wilkins:
A letter of request for Authorization to Construct was received April 26,
1984, by the Division and final plans and specifications for the subject project
have been reviewed and found to be satisfactory. Authorization is hereby granted
for the construction of a .300 MGD wastewater treatment facility to replace an
existing 100 MGD system and with the new facilities including an existing pump
station with dual upgraded 520 GPD pumps, approximately 6,500 lineal feet of 10-
inch diameter force main, a bar screen, a flow splitter, parallel grit chambers,
a parshall flume and flow measuring/recording device,a combination equalization
and treatment basin, a dual 208 GPM pump station, a .300 MGD aeration basin (24
hour detention) , dual clarifiers, an aerated sludge digestor, sand drying beds,
a chlorinator, a chlorine in-line mixing and contact system, a dual 520 GPM effluent
pump station, approximately 1,200 lineal feet of 8-inch force main including a
50 foot bottom diffuser, an emergency standby power system, piping, valves, fittings,
and appurtenances to serve the Fairfield Harbour development area around SR 1600.
This Authorization to Construct is issued in accordance with Part III paragraph
C of NPDES Permit No. NC0033111 issued June 30, 1983, and shall be subject to
revocation unless the wastewater treatment facilities are constructed in accordance
with the conditions and limitations specified in Permit No. NC0033111.
The Permittee must employ a certified wastewater operator in accordance with
Part III paragraph D of the referenced permit.
The sludge generated from these treatment facilities must be disposed of
in accordance with General Statutes 143-215.1 and in a manner approvable by the
North Carolina Division of Environmental Management.
The Washington Regional Office, telephone No. 919/946-6481 shall be notified
at least twenty-four (24) hours in advance of the initial operation of this system
so that an in-place inspection can be made of said system prior to its use. Such
notification to the Regional Supervisor shall be made during the normal office
hours from 8:00 A.M. until 5:00_P.M. on Monday through Friday, excluding State
Holidays. _.
Contd. P 0.Box 27687 Raleigh,N.C.27611-7687
An Equal Opportunity Affirmative Action Employer
Permit No. NC003311
Page Two
In event the facilities fail to perform satisfactorily in meeting its NPDES
permit effluent limits, Northeast Craven Utility Company shall take such immediate
corrective action as may be required by this Division, including the construction
of additional wastewater treatment and disposal facilities.
One (1) set of approved plans and specifications is being forwarded to you.
If you have any questions or need additional information, please contact Mr.A. R.
Hagstrom, telephone No. 919/733-5083, ext.103.
Sincerely yours,
Robert F. Helms
cc: Craven County Helath Departmnet
Thomas Engineering Consultants, P.A.
Washington Regional Supervisor
Mr. W. Lee Fleming, Jr. ✓
ARH/cgc