HomeMy WebLinkAboutNCG500617_Inspection_20210902United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 LI 3 I NCG500617 111 121 21/09/01 117
Type
18I O I
I111I1III
Inspector Fac Type
191 S I 201 „I
211I1I11 I11111III II1II1I11 I I IIIII
I1 P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 70 I3 I 711 1 72 I N I 73 _ I 74 71
I I
I I I I I I 180
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
O B I Linings
411 Patrick Ln
Chocowinity NC 27817
Entry Time/Date
10:OOAM 21/09/01
Permit Effective Date
21/01/04
Exit Time/Date
10:25AM 21/09/01
Permit Expiration Date
25/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Keith A Morris,PO Box 326 Chocowinity NC 27817/VP/252-946-6176/2529466104
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Other
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Robert E Bullock // DWR/WARO WQ/252-948-3843/ 9/2/2021
A.664.2.. 1/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES yr/mo/day
N CG500617 111 121 21/09/01
I17
Inspection Type
18 [j
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Robbie Bullock (Division of Water Resources) met with Mike Hunter (OBI) to inspect General Permit
NCG500617.
There has not been a discharge from this facility since the last inspection. On the day of inspection
there was a small amount of water on the floor in the boiler room. Mike stated that the boiler
blowdown goes to the floor and either evaporates over time or the water is pumped to a sump. Steam
from the autoclave is piped to the sump which causes the water in the sump to evaporate.
Mike was reminded that if the boiler blowdown is discharged sampling is required as listed in general
permit NCG500000. A copy of the Technical Bulletin and General Permit NCG500000 was given to
the facility.
Page# 2
Permit: NCG500617
Inspection Date: 09/01/2021
Owner - Facility: 0 B I Linings
Inspection Type: Compliance Evaluation
Other
Comment:
Yes No NA NE
Page# 3