HomeMy WebLinkAboutWQ0014585_Permit (Issuance)_19971104State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
e��
LD EE f-I N Fi
November 4, 1997
Mr. Victor Ganjehsani, P.E.
Public Works Commission of the City of Fayetteville
P.O. Drawer 1089
Fayetteville, North Carolina 283h
Dear Mr. Ganjehsani:
r o'v 1 9 1998
FAYET TE=VILLE
REG. OFFICE
bject: Permit No. WQ0014585
Public Works Commission of the City of
Fayetteville
Round -A -Bout Skating Center
Wastewater Collection System
Cumberland County
In accordance with your application received October 23, 1997, attached is Permit No.
WQ0014585, dated November 4, 1997, to the Public Works Commission of the City of Fayetteville for
the construction and operation of the subject wastewater collection extension.
This permit shall be effective from the date of issuance until rescinded and you shall be subject to
the conditions and limitations as specified in the North Carolina Gravity Sewer Design Criteria adopted
February 12, 1996 and the attached permit.
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina
as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the
construction and operation of approximately 491 linear feet of 8 inch gravity sewer to serve 10 bathrooms
at Round -a -bout Skating Center, and the discharge of 2,500 GPD of collected domestic wastewater into
the Public Works Commission of the City of Fayetteville's existing sewerage system, pursuant to the
application received October 23, 1997, and in conformity with the North Carolina Gravity Sewer Design
Criteria.
The sewage and wastewater collected by this system shall be treated in the Public Works
Commission of the City of Fayetteville's Rockfish Wastewater Treatment Facility (NPDES Permit No.
NC0050105) prior to being discharged into the receiving stream.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of
this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North
Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447,
Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
The issuance of this permit does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local,
state, and federal) which have jurisdiction.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 FAX (919) 733-0719
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
If you need additional information concerning this matter, please contact Thelma Williams at (919)
733-5083 extension 524.
Sincer
IA. Preston Howard, Jr., P.E.
cc: Cumberland County Health Department
Fayetteville Regional Office, Water Quality Section
Moorman, Kizer, & Reitzel, Inc.
•
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES
RALEIGH
GRAVITY SEWER COLLECTION SYSTEMS PERMIT
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
following specified conditions and limitations:
1. This permit shall become voidable unless the facilities are constructed in accordance with the
conditions of the Division of Water Quality Gravity Sewer Design Criteria adopted February 12,
1996.
2. This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
3. The facilities must be properly maintained and operated at all times.
4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or
there is a name change of the Permittee, a formal permit request must be submitted to the Division of
Water Quality accompanied by an application fee, documentation from the parties involved, and other
supporting materials as may be appropriate. The approval of this request will be considered on its
merits and may or may not be approved.
5. Construction of the gravity sewers shall be scheduled so as not to interrupt service by the existing
utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State.
6. Upon completion of construction and prior to operation of this permitted facility, a certification
and a copy of the record drawings (i.e., as constructed plans) must be received from a professional
engineer certifying that the permitted facility has been installed in accordance with the Division of
Water Quality Gravity Sewer Design Criteria adopted February 12, 1996, and other supporting
materials. Mail the Certification and one (1) copy of the "Record Drawings" to the Non -Discharge
Permitting Unit, P.O. Box 29535, Raleigh, NC 27626-0535.
7. A copy of the Record Drawings shall be maintained on file by the Permittee for a minimum of five
years from the date of the completion of construction.
8. Failure to abide by the conditions and limitations contained in this general sewer permit or the North
Carolina Gravity Sewer Design Criteria may subject the Permittee to an enforcement action by the
Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-
215.6C.
9. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by
this Division, such as the construction of additional or replacement wastewater collection facilities.
1
10. Noncompliance Notification:
The Permittee shall report by telephone to the Fayetteville Regional Office, telephone number
(910) 486-1541, as soon as possible, but in no case more than 24 hours or on the next working day,
following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of
adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or
breakage, etc.; or
b. Any failure of a sewer line resulting in a by-pass directly to receiving waters without treatment of
all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter form within
five (5) days following first knowledge of the occurrence. This report must outline the actions taken
or proposed to be taken to ensure that the problem does not recur.
Permit issued this the 4th day of November, 1997.
NORTH CA&eSLINA ENVIRONMENTAL MANAGEMENT COMMISSION
A. Preston Howard, Jr., P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0014585
2
Permit No. WQ0014585
November 4, 1997
ENGINEER'S CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project, for the
Project Name Location
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the construction such that the construction was observed to be built within substantial compliance of this
permit, the certificate of coverage, the North Carolina Gravity Sewer Minimum Design Manual, and other
supporting materials.
Signature Registration No.
Date
The above Engineer's Certification must be completed and submitted to the address below with one (1)
copy of the "Record Drawings" (i.e., as -constructed plans) of the wastewater collection system This
project shall not be considered complete and allowed to operate until this Engineer's Certification and the
"Record Drawings" plans have been submitted. Any wastewater flow made tributary to the wastewater
collection system prior to completion of this Engineer's Certification shall be considered a violation of the
permit and shall subject the Permittee to appropriate enforcement actions.
NORTH CAROLINA DIVISION OF WATER QUALITY
WATER QUALITY SECTION
PERMITS AND ENGINEERING UNIT
POST OFFICE BOX 29535
RALEIGH, NORTH CAROLINA 27626-0535
3
State of North Carolina
Department of Environment, Health and Natural Resources \js0 0,1
Division of Environmental Management ECS T
NON -DISCHARGE PERMIT APPLICATION PRa' 71, \y��
GRAVITY SEWER COLLECTION SYSTEMS vec10 "
This form may be photocopied for use as an original. Pump Stations, force mains and lovislgure sewers
(including S.T.E.P. systems) are not to be included as part of this application panage.
Any changes made to the content of this form shall not be allowed and will result in the
application being returned.
This application will not be accepted by DEM unless all of the applicable items are included
with the submittal.
I. REQUIRED ITEMS CHECKLIST:
Please indicate that you have read the following list of application requirements by signing your initials in the space provided
next to each item.
1. One original and one copy of the completed and properly executed application form.
2. The appropriate permit processing fee, in accordance with 15A NCAC 2H .0205(c)(5). The fee for
sewer extensions is $400. The fee for sewer extensions by partially delegated municipalities
(applies only to those govemmental jurisdictions that have specific delegation review authority,
as granted by the Division of Environmental Management) is $200.
AppIint's Initials
3. If the owner/authority of the wastewater treatment facility (WWTF) and/or collection system that will be
accepting the wastewater flow from this project is different from the applicant of the project, then a letter(s)',
must be provided from the owner/authority of the WWTF and/or collection system specifying the
volume of flow that will be accepted. The letter(s) should be recent (within one [1] year) and should
refer to the project by the same name as that identified on the application and the plans/specificntions.
4. If the application is being submitted in the name of a privately owned public utility, written
documentation must be submitted from the Utilities Commission which demonstrates that the utility
is authorized to hold the franchise for the area to be served. In the case of contiguous service areas,
written documentation must be provided from the Utilities Commission acknowledging these areas
are covered under an existing franchise.
5. One original and two copies of a properly executed Operational Agreement must be submitted if the
sewer extension will be serving single family residences, condominiums, or town houses AND if the
subject sewer extension is owned by the individual residents, a homeowners association, or a developer.
II. PERMIT INFORMATION: SOC Project:
1. Application Number (will be completed by DEM):
2. Specify whether project is: X new modification.
3. If this application is being submitted as a result of a modification to an existing permit, please complete:
existing permit number and permit issue date
4. Specify whether the applicant is: X public private.
5. Application Date: October 1997 6. Fee Submitted: S 200.00
7. County(ies) where project is located: CUMBERLAND
8. Applicant's Name (Please specify the name of the municipality, corporation, individual, etc.):
Public Works Commission of The City of Fayetteville, NC
Yes
No.
FORM: GSPA 02/96 Page 1 of 4
1,400 copies of this document were printed at a cost of S1 17.32, or S0.084 per copy.
1
III. GENERAL INFORMATION:
1. Print Owners or Signing Official's name and tide (the person who is legally responsible for the facility and its compliance):
Victor Ganjehsani, PE - Chief Engineer Water Resources
2. Mailing address: PO Drawer 1089
City: Fayetteville State: NC Zip: 28302-1089
Telephone Number. (
910 ) 483-1382
3. Project Name (Please specify the name of the subdivision, facility, or establishment. The name should be consistent with
the project name on plans, specifications, leuers of flow acceptance, Operational Agreements, etc.):
Round -A -Bout Skating Center
IV. INFORMATION ON WASTEWATER:
1. Nature of Wastewater. 100 % Domestic/Commercial % Industrial
% Other (specify)
2. Volume of wastewater generated by this project.: 2500 gallons per day.
3. Explanation of how wastewater volume was determined: 10 Water closets and urinals at
250 gpd/ea. = 2500 gpd
4. Name of wastewater treatment facility receiving wastewater. Rockfish WWTP
Owner of wastewater treatment facility. Public Works Commission
Facility Permit Number NCO() 50105
or WQ
5. Indicate any parameters (and their concentrations) which will be greater than normal domestic levels:
NONE
6. If wastewater is not domestic in nature, what level of pretreatment has been provided to ensure protection of the : eceiv n€
wastewater treatment facility? N/A
7. If a pretreatment pemrit is required, has one been issued?
the pretreatment permit. If No, when will one be issued?
Yes No. If Yes, plcay. tttt�=h a cop of
FORM: GSPA 02/96 Page 2 of 4
V . DESIGN INFORMATION:
I. Summary of GRAVITY SEWER to be permitted, by diameter and length:
Diameter (inches)
. Length (linear feet)
491
2. Are there any sections of the Gravity Sewer Minimum Design Criteria or 15A NCAC 2H .0200 with which the subject
wastewater collection system will not be able to comply? Yes X No. If Yes, please identify and explain
IMPORTANT:
If you responded Yes to question V.2 above, the completed application package,
including two (2) copies of plans, specifications. supporting informa
pny other materials, should be submitted for an individual permit.
FORM: GSPA 02/96 Page 3 of 4
VI. CERTIFICATIONS:
Name and Complete Address of Engineering Firm: Moorman, Kizer & Re i tz e 1 , Inc.
115 Broadfoot Avenue, PO Box 53774
City: Fayetteville
State: NC Zip: 28305
Telephone Number. ( 910 ) 484-5191
Professional Engineer's Certification:
I James M. Kizer, Jr., PE , attest that this application for Round -A -Bout Skating
Center
has been reviewed by me and is accurate and complete. I further attest the proposed design has been prepared in accordance with the
applicable regulations and the North Carolina Gravity Sewer Minimum Design Criteria adopted February 12, 1996. Although certain
portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature
and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design.
North Carolina Professional Engineer's Seal, Signature, and Date: ��, o'tsie;eit••.,
Applicant's Certification:
i, Victor Ganjehsani, PE
Center
L Ao
208
ito
, attest that this application for Round -A -Bout Skating
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this
application are not completed and that if all requ' , • supporting ormation and attachments are not included, this application pkage
will be returned to me as iOcomplete. Upon a ;:royal and c• pleted construction, I will operate this system in accordance with the
North Carolina wastew4te5Corr e permit
Signature
Date 5-'91
THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS:
NORTH CAROLINA DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
PERMITS AND ENGINEERING 1JNIT
POST OFFICE BOX 29535
RALEIGH, NORTHH CAROLINA 27626-0535
TELEPHONE. NUMBER: (919) 733-5083
FORM: GSPA 02/96 Page 4 of 4
tames G. Marun. Governor
\ViiI:am W. Cobcy, Jr.. Secfetary
Memorandum
To: Delegated Municipalities
From: Steve W. Tedder. Chief(`
Water Quality Secdon
Subject: Delegated Munic: )a!:tics Ch2.c !!st for Revised Non -Discharge Pen1ut Appi cat i 1::
The Division of Environmental Management's Water Quality Section has revised th=
Gravity Sewer Non -Discharge Permit Application Form. The form now incorporates the basis
information that the Division feels is necessary in order for the delegated municipalities to perfoml
review on a gravity sewer project for the Division; therefore, the Division will no longer require th,t
the "Delegated Municipalities Gravity Sewer Design Checklist" be completed and submitted. We do.
however, require that the delegated municipality perform the same type of review as always reou:rto
and complete the bottom portion of this page and attach it as the last page of all gravity se'k e:
applications that are being submitted as a delegated municipalities project. If you have any questions
.on this matter, please contact Mr. Randy Jones at 919/733-5483.
DELEGATED MUNICIPALITY GRAVITY SEWER CERTIFICATION
(THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL)
Applicant: PUBLIC WORI7c-Cf MMI-SST(J (lW 'THF_CTTY (1F FAYFTTFVTI I.F NA_
Project Name: ROulflfa A `Blot i'� �J iY�'` ✓i� Oe eit—
Delegated Municipality Reviewer's Certification:
[, VICTOR CAN TEHSANT , attest that the subject plans and
specifications have been reviewed under my supervision and that those plans and specifications arc
consistent with the information that has been specified on the Non -Discharge Application and th.'
Division of Environmental Management's minimum design requirements for gravity sewer projects
Delegated Municipality R.evie•Aer's NC Prc essional Engineer's Registration N0. 14368
State of North Carolina
Department of Environment. Health, and Natural IZcsuurccs
Division of Environmental Management
512 North Salisbun Street • Raleigh. North Carolina:
Cr:o•_: T. Ever: u. `.'!i D
May 1, 1991
Seal and Signature (specify da:e):
FORM: DMGS 4/9.1.
PAGE 1 OF 1