HomeMy WebLinkAbout20210093 Ver 1_Design/Maps/Site Plans_20210706Legend:
Calico Court Subdivision
cpp - Corrugate Plastic Pipe M.B. 9, Pg, 48
D.B. - Deed Book ; a,
ex. - Existing
M.B. - Map Book
Pg. - Page _ — —
R/W - Right-of-way
81741 Sq.Ft.
-Wetlands area 404 Wetlands Fill
— — — -Wetlands Line (Total Impact)
6
Harrell Drive
60' Public R/ W
R/W
Calico Court Subdivision Evergreen Park Subdivision
M.B. 9, Pg. 48 M.B. 5, Pg. 40
PoIt Of
I 3 2: ' �. Part of I 4`ort'f 1)
I ^ \ \ I I
I / \ \ ex. 24"\cpp I I
1 e0.90
0 hl 0
' 337 Sq.Ft.
I: Wetlands to Remain
rotect with Silt Fence)
e
h x. inv.
1.07,
i
�- ex. 18" cop
,aptuuurgr ' i
ex. l8" cPP I I I
�N CAq�.rPOP
��400
P FESS�0404*66GO-y9i% North Morehead Extension Block H I
CC // M.B. 6. Pg. 83 ( _
? SEAL f, _\/ z; I a, a, x I
37928 271
_7I�IZI I North Morehead
'�y9 £ ®Q� ` ( MA3,Pg.139
L- R/W M° I
''ss,tttrttt,svv.v _J-----J.--'---I-------------J
Y
Emeline Place
tt
r
tt rt tt
ram
FEET
Prgect:
NORTH MOREHEAD EXTENSION
Map Book 6 I Page 83 Revision
Town of Peletier, Carteret County, North Carolina
Owner.
In & Em Properties LLC
5113•D Highway 70 West
M
orehead City, North Carolina 28557
Bloek
EX. canal •'��
404 Wetlands
(Non -Isolated
Open Waters)
31
LfiJ
I I
I I
Block A
I I
26 I
25 NO
60' Public R/ W
i3 South Yaupon Terrace
�w
la 60' Public R/W
: 17�
Section 3
.NWh Morehead
M.B. 3, Pg. 126
IN 19
IN 20
:21NI
Section 3
Nfih Morehead
Pg. 126
`22 r
-Ham
ilton Drive
60' Public R/ W
Harrell Drive
(Proposed Name)
Wetlands .Impact Map -Sheet 1 of 1
Rev. 07/06/2021 - revise impact per SW permit
Date: 02/15/2021
se.le: 1-=100•
Field book: n/a
File Name: NorthMoreheadExt-Impact.dwg
LOGO: n/a
Dr.wn: JJS
Jeb No-: C200407-7338
Vicinity Sketch
Not to Scale
Notes:
1. Wetlands Impact: initial disturbance of this area shall be limited to only
that area minimally needed to allow passage of construction equipment to
prepare for the installation of the fill and to execute upland
construction on the opposing side of the impact. Grubbing or land
disturbance of the subject area shall not be performed until the culverts,
backfi 11 material, erosion and sediment control materials or devices
sufficient to substantially complete the construction and stabilization of
the impact are staged or stockpiled at the location. Due consideration
shall be given to impending inclement weather conditions that may adversely
affect the completion of the impact in the minimum time necessary.
2. Drainage work shall be completed in the minimum time necessary.
construction of the fill for the wetland impact shall commence until all
materials needed for the impact are staged on site.
4. Establish clearing limits per approved plans. Clear and grub impact area as
needed. Temporary seed and mulch disturbed area. Do not clear or disturb
any unpermitted areas.
5. Install drainage piping and fill. Compact and finish grade area to be filled.
6. Install permanent ground cover (sod) on slopes. Install rip rap on portion
of submerged slope (open waters).
7. Install silt fence at toe of fill slope and as needed to prevent erosion.
8. See the construction plans for additional details.
9. See wetlands permit for additional requirements.
30. See Stormwater Permit 5W8 210412 for additional information.
Total
Project .................
5.69 Ac.
Tota1404
Wetlands .....
9,078 Sq.Ft.
(0.21 Ac. Non -Isolated Open Waters)
Total
Impact I ................
8,741 Sq.Ft.
(0.20 Ac.)
BELL AND PHILLIPS
Engineers - Surveyors - Planner
Cedar Point, North Carolina
604E Cedar Point Blvd.
Phone (252) 393=6101 - www.ParkerJac6onville.com
N.C. Firm License Number: F-0108