Loading...
HomeMy WebLinkAbout20201358 Ver 1_33-21 Bayshore Nine LLC._20210330Permit Class Permit Number NEW 33-21 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Bayshore Nine LLC., 104 Poplar Ridge. Rd., Goldsboro, NC 27534 Authorizing development in Carteret County at adj. to Bogue Sound, at 304 Bayshore Dr., in Cape Carteret , as requested in the permittee’s application dated 12/8/20, including attached workplan drawings (1), Sheet 1 of 1 dated “Revised 12/2/20”. This permit, issued on March 25, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Docking Facility 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No portion of the authorized docking facility shall extend more than one quarter of the width of the water body associated with the basin. Measurements to determine width of the water body shall be made from the normal high water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. (See attached sheets for Additional Conditions) Bayshore Nine LLC. Permit No. 33-21 Page 2 of 3 ADDITIONAL CONDITIONS 3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 4) This permit authorizes a maximum of five (5) boat slips. 5) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction and/or operation of the authorized facilities. Should dredging of these areas be proposed in the future, the permittee is further advised that the Rules of the Coastal Resources Commission prohibit new dredging within SAV beds. 6) In order to ensure compliance with condition No. 5, no cleats, tie piles or other formal mooring structures shall be constructed on any portion of the docking facility outside of the formalized slip area indicated on the attached workplan drawings. 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 8) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. General 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) All debris associated with the removal or construction of the permitted docking facility shall be contained within the authorized project area and removed to an appropriate upland location. 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit 56 (Action ID SAW-2020-01671). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2020-1358. Bayshore Nine LLC. Permit No. 33-21 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: An application processing fee of $250 was received by DCM for this project.