Loading...
HomeMy WebLinkAboutWQCS00047_NOV-2021-DV-0337 Response_20210831DocuSign Envelope ID: 1 D798858-1111-4CA0-922E-498FFA4AC93D P. O. BOX 3729 FAX 919-774-8179 Public Works Department CITY OF SANFORD North Carolina 27331-3729 TELEPHONE 919-777-1118 or 919-777-1122 Paul M. Weeks, Jr., P.E. City Engineer August 31, 2021 Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ 3800 Barrett Drive Raleigh, NC 27609 RE: Notice of Violation NOV-2021-DV-0337 Permit No. WQCS00047 City of Sanford Collection System Lee County Dear Mr. Vinson: We are in receipt of the above referenced Notice of Violation, dated August 10, 2021, which involved overflows at eight locations occurring on July 8, 2021. Measurements at the Big Buffalo wastewater treatment plant do not show a spike in flows around the time period in question. Rain gauge data measured at the plant was 2.78 inches on that day. Below is a discussion of the history as well as the current and future actions being taken to address these occurrences. Little Buffalo Basin (Incident 202101535, 202101536, 202101537,202101538) These incidents took place in part of the same outfall where we have had previous overflows. Therefore, the City has this area identified as high priority for cleaning and R:\Engineering Files\MEMOS\FY 21-22\0004 pw - Response to NOV-2021-DV-0337.doc DocuSign Envelope ID: 1 D798858-1111-4CA0-922E-498FFA4AC93D inspections prior to anticipated storm events. In addition, the following long-term corrective actions, which have been previously reported, are underway: 1. East Sanford CDBG On February 21, 2020, the City received a $2 million CDBG-I grant to rehabilitate sections of sewer line in East Sanford that was originally installed prior to 1930. We submitted plans and specifications to the Division of Water Infrastructure on August 18th for review. Once permits are received, we can proceed to bidding. 2. Little Buffalo Rehabilitation — Upper Reach In January of 2020, design work started to increase the size of a portion of Little Buffalo outfall. Previously, studies were undertaken to determine our options for addressing the overflows in the Little Buffalo basin. On March 1, 2021 we received a Notice of Intent to Fund from the Division of Water Infrastructure for the construction of this project (see attached). Our designer has submitted the Engineering Report for their review. Big Buffalo Basin (Incident 202101539, 202101540, 202101541, 202101542) The remaining four incidents occurred in two separate areas in Big Buffalo Basin. 1. Dry Creek (202101539, 202101540) We have collected survey information on this area and modeled its flow. Smoke testing and rehabilitation of a portion of the upstream area is scheduled for next fiscal year, funds permitting. 2. Shoreline (202101541) The City has cleaned and televised the downstream area. We are looking into installing flow monitoring equipment to help determine the extent of the issue. 3. Crusaders (202101542) The City has cleaned and televised the downstream area. Just as with Shoreline, we are looking into installing flow monitoring equipment. Should you have any questions, please feel free to contact me at any time. R:\Engineering Files\MEMOS\FY 21-22\0004 pw - Response to NOV-2021-DV-0337.doc DocuSign Envelope ID: 1 D798858-1111-4CA0-922E-498FFA4AC93D Sincerely, DocuSigned by: paut, 6tiL. (fouls jr. f. "-BBC39E6667844B9... Paul M. Weeks Jr., P.E. City Engineer cc: Vic Czar, Public Works Director Gerald Cox, Distribution/Collection Administrator R:\Engineering Files\MEMOS\FY 21-22\0004 pw - Response to NOV-2021-DV-0337.doc DocuSign Envelope ID: 1 D798858-1111-4CA0-922E-498FFA4AC93D MONTHLY CLIMATOLOGICAL SUMMARY for JUL 2021 NAME BigBuffalo WWTP CITY. STATE ELEV 261 ft LAT. 35° 18' 00" N LONG. 79° 06' 00" W TEMPERATURE (°F), RAIN (in), WIND SPEED (mph) HEAT COOL AVG MEAN DEG DEG WIND DOM DAY TEMP HIGH TIME LOW TIME DAYS DAYS RAIN SPEED HIGH TIME DIR 1 81 0 90 6 5 OOp 71 6 11 OOp 0.0 16 0 0.19 2 8 23 0 9 30p N 2 72 6 78 1 7.00p 66 8 9.30a 0.0 7 6 1.32 0 9 16 0 8 00a SSE 3 71 0 81 6 5:30p 60 6 7 00a 0.5 6 5 0 03 1 0 12.0 10 30a SSE 4 72 6 85 4 5:OOp 58.6 6 30a 1 1 8 6 0.01 0 3 8 0 1.O0p NNE 5 77 3 91 6 6.00p 63.3 5-30a 0 2 12.4 0 00 0 4 8.0 1:OOp NNE 6 78 7 89 7 3.30p 65.6 6 30a 0.0 13.7 0.00 0 8 10.0 1:30p N 7 79 8 91 8 7 OOp 65.9 6 30a 0.0 14.8 0.00 1 2 12 0 8.30p N 8 74 6 78 8 12 30a 69.3 11 30a 0 0 9.6 2 78 2 3 19 0 12 30p E 9 77.5 91 3 4 OOp 71.6 6 00a 0 0 12 5 0 11 1 0 28 0 5 OOp ENE 10 78 8 91 0 5.30p 68 5 5.00a 0 0 13 8 0 00 0 3 8 0 11.00a ESE 11 80 0 90 3 3:OOp 71 1 5 00a 0 0 15 0 0 08 1 6 17 0 5 OOp NNW 12 80 9 89 0 2.30p 73.4 7.00a 0 0 15 9 0 00 1 7 13 0 10.00a N 13 79.2 90 6 6 OOp 71.1 12 00m 0 0 14 2 0.35 1 3 27 0 6 30p N 14 77.6 90 4 6 OOp 68 5 4.30a 0 0 12 6 0 44 1 0 17 0 7 OOp N 15 78 2 91 5 4 30p 69.1 6.30a 0 0 13.2 0 00 0 8 13 0 4 30p ENE 16 80 8 92.9 4.00p 71 6 6:00a 0 0 15 8 0.03 1 2 12.0 5 30p NNE 17 80 2 90 5 2.00p 70 8 6:30a 0.0 15 2 0.00 1 5 14 0 2-30p NNW 18 77 7 86 0 5:OOp 71 6 11:30p 0.0 12 7 0.13 1 0 16.0 7 30p NE 19 72 4 76 2 7:OOp 69 4 12.00m 0.0 7 4 0.52 1 0 13.0 4.00p SSW 20 74 7 83.6 5 30p 65 6 6.30a 0 0 9 7 0 01 0 2 8 0 10 30a SSW 21 79 5 88 8 4:30p 71 9 7 00a 0 0 14 5 0 00 0 8 11 0 11 30a NE 22 77 7 87 6 4.O0p 68 9 6 00a 0.0 12 7 0.00 0 6 8 0 9 30a SSE 23 76 6 87 5 6-OOp 65 7 6.30a 0 0 11 6 0 00 0 7 11 0 1 30p WSW 24 77 6 87 2 3 OOp 66 1 6 30a 0 0 12 6 0 00 0 9 11 0 6 OOp NNW 25 79 3 88 5 5.30p 70 0 7 00a 0 0 14 3 0 00 1 1 12 0 3 OOp N 26 81 1 92 2 4 00p 70 8 7 00a 0 0 16 1 0 00 0 6 10 0 12 30p NNW 27 82 5 94.8 6 OOp 72 9 5 00a 0 0 17.5 0 00 0 6 11 0 2.30a ENE 28 81 1 93 9 3 OOp 72 5 7.00a 0 0 16.1 0 00 0 8 14.0 5 OOp ENE 29 80 8 92 9 4.30p 67 6 5.30a 0 0 15.8 0.00 1 2 10 0 1 30p NNW 30 84 6 94 6 5:OOp 77 3 12 00m 0 0 19 6 0 00 1 0 11 0 2 OOp NE 31 81 2 90 8 4-30p 73 4 6:30a 0.0 16 2 0.00 0 9 11 0 9 00a SSW 78 3 94 8 27 58 6 4 1 8 414 2 6 00 1 0 28 0 9 NNW Max >= 90 0 17 Max <= 32 0 0 Min <= 32.0 0 Min <= 0 0 0 Max Rain 2 78 ON 07/08/21 Days of Rain 11 (> 01 in) 8 (> 1 in) 2 (>1 in) Heat Base 65 0 Cool Base 65 0 Method Integration DocuSign Envelope ID: 1 D798858-1111-4CA0-922E-498FFA4AC93D NPDES PERMIT NO NC0024147 FACILITY NAME Big Buffalo WWTP OWNER NAME City Of Sanford GRADE WW-4 eDMR PERIOD 06-2021 (June 2021) PERMIT VERSION 5 0 CLASS WW-4 ORC Scott A Siletzky ORC HAS CHANGED No VERSION 10 PERMIT STATUS Active COUNTY Lee ORC CERT NUMBER 24383 STATUS Submitted SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGE*: NO p Composite Sample Time Total Composite Time Operator Arrival Timo Operator Time On Site ORC On Site?" i GO e. a ,A° 50050 00010 00400 C0610 C0530 31616 00300 C0600 QM600 Continuous 5 X week 5 X week 5 X week 2 X week 2 X month 5 X week Weekly Monthly Recorder Grab Grab Composite Composite Grab Grab Calculated Calculated FLOW TEMP-C pH N313-N-Cone TSS Conc FCOLI BR DO TOTALN TOTALN Qty 2400 dock Hrs 2400dodc Hrs YBIN mgd degc su mg/1 mg/1 mpnfl00ml mg/1 mg/t Ib/mon 1 240D 24 2400 24 Y 3294 22 67 014 30 77 31 2 2400 24 2400 24 Y 3 822 22 6 7 0 07 <25 7 7 3 2400 24 2400 24 Y 6.249 23 6 6 0 2 2 7 9 4 2400 24 2400 24 Y 4344 23 66 01 <25 79 5 2400 24 2400 24 N 3 499 6 2400 24 2400 24 N 3 34 7 2400 24 2400 24 Y 3 755 24 6 6 < 0 04 3 7 4 8 2400 24 2400 24 Y 3 776 23 6 5 < 0 04 7 3 2 71 9 2400 24 2400 24 Y 3 646 24 6 6 0 05 <25 2 7 6 10 2400 24 2400 24 Y 4 354 24 6 7 0 05 7 6 11 2400 24 2400 24 Y 4729 25 66 <004 <25 74 12 2400 24 2400 24 N 4 776 13 2400 24 2400 24 N 3 59 14 2400 24 2400 24 Y 3 575 24 6 5 < 0 04 27 7 4 15 2400 24 2400 24 Y 3 237 25 6 4 <0 04 7.5 2 79 16 2400 24 2400 24 Y 3 043 25 6 7 < 0 04 <2 5 7 8 17 2400 24 2400 24 N 3.2 24 66 004 15 76 18 2400 24 2400 24 N 3128 24 66 005 <25 8 19 2400 24 2400 24 N 3 086 20 2400 24 2400 24 N 5.289 21 2400 24 2400 24 Y 3 888 24 6 5 0 04 25 7 8 22 2400 24 2400 24 Y 3985 25 67 <004 76 266 23 2400 24 2400 24 Y 3 207 24 6 6 0 04 <2 5 < 1 7 7 24 2400 24 2400 24 Y 3 043 24 6 5 < 0 04 7 8 25 2400 24 2400 24 Y 2985 24 66 <004 <25 8 26 2400 24 2400 24 N 3 132 27 2400 24 2400 24 N 2 907 28 2400 24 2400 24 Y 3317 24 67 <004 3 74 29 2400 24 2400 24 Y 3 425 25 6 6 < 0 04 73 3 41 2708 75 30 2400 24 2400 24 Y 3218 25 67 04 <2.5 <1 74 Monthly Average Limit 12 1 30 200 Monthly Average. 3 694633 23 954545 0 053636 0 5 056871 7 627273 2 934 2708 75 Dairy Maximum 6249 25 6 7 0 4 0 30 8 3 41 2708 75 Doily NLnlmum 2 907 22 6 4 0 0 0 73 2 66 2708 75 **** No Reporting Reason ENFRUSE = No Flow-Reuse/Recycle ENVWTHR = No Visitation — Adverse Weather NOFLOW = No Flow, HOLIDAY No Visitation — Holiday Discharge Momtormg Report - Copy Of Record (COR NC0024147 Ver_10 6 2021 pdf) DocuSign Envelope ID: 1D798858-1111-4CA0-922E-498FFA4AC93D ROY COOPER. Governor MICHAEL S. REGAN Smeary Kim H. Colson Director Mr. Phillip "Hal" Hegwer, City Manager City of Sanford PO Box 3729 Sanford, NC 27331 Dear Mr. Hegwer: NORTH CAROLINA Environmental Quality March 1, 2021 ADMINISTRATION DEPARTMENT Subject: Letter of Intent to Fund Little Buffalo Creek Rehabilitation Fall 2020 Application Cycle Project No.: CS370432-06 The Division of Water Infrastructure has reviewed your application, and the State Water Infrastructure Authority has approved your project as eligible to receive a Clean Water State Revolving Fund (CWSRF) loan of $3,845,000. 25 percent of the loan (up to a maximum of $500,000) will be forgiven, and the remainder will be repayable at a maximum interest rate of 0.10%. A loan fee of 2% will be invoiced after bids have been received. Please note that this intent to fund is contingent on approval of the loan through the Local Government Commission and on meeting all of the following milestones: Milestone Date Engineering Report Submittal July 1, 2021 Engineering Report Approval December 1, 2021 Bid and Design Package Submittal June 1, 2022 Bid and Design Package Approval October 3, 2022 Advertise Project, Receive Bids, Submit Bid Information, and Receive Authority To Award February 1, 2023 Execute Construction Contract(s) March 1, 2023 The first milestone is the submittal of an Engineering Report by close of business on July 1, 2021. The Engineering Report must be developed using the guidance found on our website (https://deq.nc.govlabout/divisions/water-infrastructureli-have-fundinglengineering- reportenvironmental-information). Failure to meet any milestone may result in the forfeiture of funding for the proposed project. DEQ� North Carolina Department of Environmental Quality : Division of Water Infrastructure 512 N. Salisbury Street : 1633 Mail Service Center I Raleigh North Carolina 27699-1633 919.7079160 DocuSign Envelope ID: 1D798858-1111-4CA0-922E-498FFA4AC93D Mr. Phillip "Hal" Hegwer, City Manager March 1, 2021 Page 2 of 3 Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding and the total funding amount may be reduced. Additionally, changes in the scope or priority points awarded x based on additional information that becomes apparent during project review — may also result in changes to the total funding amount and loan terms. Davis -Bacon Requirements and American Iron and Steel Provisions Projects funded through the State Revolving Fund (SRF) programs (including ASADRA) must comply with Davis -Bacon wage requirements and American Iron and Steel provisions. You can find standard specifications covering these requirements on our website. Joint Legislative Committee on Local Government Notification Requirements In accordance with G.S. 120-157.2, local government units with projects that require debt to be issued greater than $1,000,000 must submit a letter to Committee Chairs, Committee Assistant, and the Fiscal Research Division of the General Assembly at least 45 days prior to presentation before the Local Government Commission. You are responsible for submitting that letter and providing a copy to the Division. Brooks Act Compliance Projects funded through the CWSRF program (including ASADRA) must comply with the federal Brooks Act for the selection of architectural and engineering services. CWSRF projects cannot be exempted from qualification based selection of these services under N.C.G.S. 143- 64.32. Any services provided that were not selected in compliance with federal requirements will be ineligible for reimbursement. Extended Term Loan Projects that qualify for a targeted interest rate and demonstrate in the Engineering Report a weighted average design life for the major components of the project greater than 20 years are eligible for an extended loan term up to the calculated weighted average design life, but not to exceed 30 years. Request an extended term on the Engineering Report Submittal Checklist (https://deq.nc.gov/aboutldivisions/water-infrastructure/i-have-funding/engineering- reportenvironmental-information) and provide the necessary calculation. DocuSign Envelope ID: 1 D798858-1111-4CA0-922E-498FFA4AC93D Mr. Phillip "Hal" Hegwer, City Manager March 1, 2021 Page 3 of 3 If you have questions, please contact me at (919) 807-6458, by email at jon.risgaard@ncdenr.gov, or Logan M. Kluttz, El by phone at (919) 707-9157, by email at Logan.Kluttz@ncdenr.gov. Sincerely, Jon Risgaard, Chief State Revolving Fund Section CC: Glynn Fleming, P.E., WithersRavenel, Cary Catherine Renbarger, WithersRavenel, Raleigh Mark Hubbard, PE Project File (COM_LOIF) DocuSign Envelope ID: 1D798858-1111-4CA0-922E-498FFA4AC93D