HomeMy WebLinkAboutNCC214219_ESC Approval Submitted_20210901ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
October 15, 2020
LETTER OF APPROVAL
Express Option
JSJ Development Company, LLC
Attn: Jason S. Johnson, Managing Member
1135 Robeson Street
Fayetteville, NC 28305
RE: Project Name: Sheffield Farms -Section Five
Acres Approved: 7
Project ID: CUMBE-2021-046
County: Cumberland, City: Rockfish, Address: Scenic Pines Drive
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Larry King & Associates, R.L.S., P.A.
Date Received by LQS: October 15, 2020
Plan Type: Express
Dear Mr. Johnson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site.
This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been
undertaken, as required by Title 15A NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -
named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to
Annette Lucas at Annette.lucas&ncdenr. og_v or Paul Clark at Paul.clark&ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a
Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
0-0 E Q:> North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
t — _. �, - - - Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NORTH CAROUNA _�
^"w— —Z*� 910.433.3300
Letter of Approval
JSJ Development Company, LLC
October 15, 2020
Page 2 of 2
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land -disturbance, as called for on the application
plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would
require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of
the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
U -Qa
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
cc: Jeff Nobles, Larry King & Associates, R.L.S., P.A. (electronic copy)
Michael Naylor, Inspections Coordinator (electronic copy)
DEMLR - Fayetteville Regional Office File