Loading...
HomeMy WebLinkAbout20170974 Ver 3_More Info Requested_20210831 August 31, 2021 DWR # 20170974 Ver 3 New Hanover County Live Oak Banking Company Attn: Lee Williams 1741 Tiburon Drive Wilmington, NC 28403 (delivered via email to Lee.Williams@liveoak.bank) Subject: REQUEST FOR ADDITIONAL INFORMATION Live Oak Bank Campus Extension Mr. Lee, On July 20, 2021 (fee receipt date), the Division of Water Resources (Division) received your application requesting an Individual Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on-hold until all of the following information is received: 1. The application package may require an agent authorization letter from the applicant. A sample agent authorization letter can be found on the U.S. Army Corps of Engineers (USACE) website: (http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE_AGE NT_AUTHORIZATION_FORM.pdf). [15A NCAC 02H .0502(a)(11)] 2. Please provide a most recent bound and published county soil survey. Please cleanly draw or delineate the site boundaries on the soil survey. The most recent bound and published survey can be accessed at the following link: https://www.nrcs.usda.gov/Internet/FSE_MANUSCRIPTS/north_carolina/NC049/0/index.pdf [15A NCAC 02H .0502(a)(9)] 3. Please confirm the impact amount for RPW Ditch. Various amounts of impact are noted throughout the application (e.g., 0.05, 0.027, 0.08). [15A NCAC 02H .0502(c)] 4. You indicated that the USACE reevaluated the wetland delineation in April of 2021 reducing the wetlands in the vicinity of the proposed Building 6, parking areas, and stormwater pond. Please provide documentation from the USACE confirming this reevaluation. [15A NCAC 02H .0502(c)] DocuSign Envelope ID: 94272F95-52CF-4B83-A3B4-79CD82CC987F 5. Please provide an updated stormwater management plan that show drainage areas, inlets and discharge points. [15A NCAC 02H .0502(c)] 6. The plans included in the previous authorization from 2017 show two buildings (one is referred to as “Building 6” in the narrative, the other building number is unclear) on the north side of the property that were sited east of the wetland. The current plans show these building reconfigured or enlarged with Building 6 impacting the wetland. Please explain why this reconfiguration or size increase was necessary and why the two buildings cannot be sited without impacting the wetland as was shown in previous plans. [15A NCAC 02H .0502(c)] 7. It appears minimization can be accomplished by reducing surface parking and incorporating those spaces into the proposed parking decks, thereby freeing area to shift the building locations and/or enlarging the smaller, eastern stormwater management pond. Please demonstrate why incorporating some of the surface parking space into the decks is not feasible as a minimization strategy. [15A NCAC 02H .0502(c)] 8. You indicated the northern portion of the BR Tract is not available for use during this project (north of future Building 8) due to being zoned residential. A review of the New Hanover Interactive Web Map indicates this tract is part of the same tract owned by the Applicant and containing the rest of the Live Oak Bank Campus. Please explain if this part of the BR Tract has recently been split off from the rest of the tract. If the northeast “finger” of the BR Tract is part of the main tract housing the Live Oak Bank Campus, please further explain why this portion is zoned differently and unavailable for use for the proposed future buildings. [15A NCAC 02H .0502(c)] Pursuant to Title 15A NCAC 02H .0502(e)), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https://edocs.deq.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Rick Trone at rick.trone@ncdenr.gov if you have any questions or concerns. DocuSign Envelope ID: 94272F95-52CF-4B83-A3B4-79CD82CC987F Sincerely, Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: David A. Syster, Southern Environmental Group, Inc. (via email) Mickey Sugg, USACE Wilmington Regulatory Field Office (via email) DWR 401 & Buffer Permitting Branch file Filename: 20170974 Ver 3_Live Oak Bank Campus Extension_New Hanover_RFAI DocuSign Envelope ID: 94272F95-52CF-4B83-A3B4-79CD82CC987F