Loading...
HomeMy WebLinkAbout20211283 Ver 1_Meeting Request Review_20210830 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20211283 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 8/30/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* NCDOT-Kevin Hining Contact Email Address* kjhining@ncdot.gov Project Name* Alleghany bridge 5 replacement Project Owner* NCDOT Project County* Alleghany Owner Address: Street Address 801 Statesville HWY Address Line 2 City State/Rovince/Region North Wilkesboro NC Fbstal/Zip Code Country 28659 USA Is this a transportation project?* (' Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express • Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below and include location information.* replacing existing bridge with a new one, and replacing existing culvert below bridge with a new one. Draft permit drawings are attached. No meeting necessary unless Dave would like one. Please attach the documentation you would like to have the meeting about. 17BP.11.R.152_PERMITS_WETLAND_11 x17.... 3.01 MB pdI only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature reity Submittal Date 8/30/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes (' No If rrnre information is needed,please add convents for the errail notification below.