Loading...
HomeMy WebLinkAboutSW1191201_Plan (SCM Detail)_20200518AQUATTIC BENCH ELEV: 1202.00 OUTSIDE EDGE OF AQUATIC BENCH IS 6-IN ABOVE PERMANENT POOL ELEV FOREBAY• 6' WIDE AQUATIC BENCH TOP OF WEIR - AROUND ENTIRE POND ELEV: 1201.50 (SEE SHEETS C4.1 & C6.1) AQUATIC BENCH ELEV: 1201.00 INSIDE EDGE OF AQUATIC BENCH IS 6-FT LENGTH 31 T SUBMERGED 6-IN BELOW PERMANENT POOL ELEV FOREBAY WEIR ELEV : 1200.00 1-PCKtMf1pLENT OL ELEV__fWX0 �7 �1 FOREBAY ENTRANCE ELEV: 1197 1 2 AEXIT _ EXIT ELEV:1198 42" RCP IN -LET- PIPE RIPRAP PAD FOREBAY ----------- EMBANKME TOP OF PERM. SED. STOR. FOREBAY ENTRANCE TOP OF PERM. SED. ELEV: 1197.00 FOREBA BOT. OF PERM. SED. STOR. ELEV: 1197.00 FOREBAY ENTRANCE 6" IMPERVIOUS FILL ELEV: 1196.00 LAYER UNDER ALL - BOT. OF PERM. SED. STOR. WATER SURFACES FOREBAY EXIT .. ELEV:1196.50 SEQUENCE OF CONVERSION FROM SEDIMENT BASIN TO STORMWATER CONTROL MEASURE 1. INSTALL POND BARREL, OUTLET STRUCTURE, EMBANKMENT AND ALL OTHER POND COMPONENTS. 2. CALL FOR SITE INSPECTION PRIOR TO BACKFILLING POND BARREL. 3, INSTALL TEMPORARY SKIMMER TO OUTLET STRUCTURE. 4. EXCAVATE POND TO TEMPORARY SKIMMER BASIN DIMENSIONS, SEE EROSION CONTROL PLAN. 5. INSTALL BAFFLES AND OTHER TEMPORARY SKIMMER BASIN COMPONENTS, SEE TEMPORARY SKIMMER BASIN DETAIL. 6. REFER TO TEMPORARY SEDIMENT SKIMMER BASIN DETAIL FOR ELEVATION OF SKIMMER CONNECTION. 7. SEE CONSTRUCTION SEQUENCE ON EROSION CONTROL PLAN FOR INFORMATION, 8. ONCE SITE IS APPROVED, REMOVE TEMPORARY SKIMMER, BAFFLES AND OTHER TEMPORARY COMPONENTS 9, FILL HOLE IN OUTLET STRUCTURE FROM SKIMMER WITH NON -SHRINK GROUT. PROVIDE PERMANENT WATERTIGHT SEAL. 10. EXCAVATE SEDIMENT AND GRADE TO FINAL CONTOURS, SEE GRADING PLAN. 11. CONSTRUCT WET POND STORMWATER CONTROL MEASURE AS SHOWN ON THE DRAWINGS. AS -BUILT SURVEY REQUIREMENTS NOTE: CONTRACTOR SHALL PROVIDE AS -BUILT TOPOGRAPHIC SURVEY PERFORMED BY A PROFESSIONAL LAND SURVEYOR CERTIFYING WET DETENTION POND AREA DIMENSIONS AND ELEVATIONS OF THE FOLLOWING: 1. TOPOGRAPHIC SURVEY OF THE WET POND AND EMBANKMENT 2. OUTLET STRUCTURE TOPS AND INVERTS 3. OUTLET STRUCTURE DIMENSIONS 4. ORIFICE DIAMETERS 5. BARREL PIPE SIZES AND INVERTS 6. EMERGENCY SPILLWAY ELEVATION AND DIMENSIONS. OUTLET STRUCTURE NOTES 1. CAST -IN -PLACE CONCRETE RISER IS REQUIRED WITHOUT EXCEPTION. 2. CLASS "A" (3,000 PSI) CONCRETE TO BE USED. 6. ALL MORTOR JOINTS ARE 1/2" f 1/8". 7. GROUT SHALL BE NON -SHRINK (ASTM-C1107) S. ALL STRUCTURES OVER 3'-6" IN DEPTH TO BE PROVIDED WITH STEPS 1'-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH STANDARD 840.66. 9. LOCATE MANHOLE OVER STEPS. 6-IN DUCTILE IRON DRAIN PIPE WITH GATE VALVE AND HAND WHEEL d° ° CONCRETE Y PIPE ANCHOR PVC PRIMARY SPILLWAY ]I- ORIFICE DIAMETER: 3.5-IN E=:) LL - jF - - - - -;-/- - - TEMPORARY SKIMMER TO BE \ / REMOVED (SEQUENCE OF �/ FILL SKIMMER CONVERSION FROM SEDIMENT HOLE WITH BASIN TO STORMWATER NON -SHRINK CONTROL MEASURE) GROUT FOR WATERTIGHT SEAL X r ° d° d °� ° ° a° d ° ° ° W d° ° ° d d , ° 4. ° ° 8-IN L CAST IN PLACE RISER IS REQUIRED WITHOUT EXCEPTION I OUTLET BARREL 142-LF 24-IN RCP 8-IN 4-FT ° ° ° ° a ° CONTRACTOR SHALL PROVIDE STEP IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. OUTLET STRUCTURE PLAN VIEW 3 1� 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC TOP OF EMBANKMENT ELEV: 1208.00 100-YR STORM ELEV 1206.60 10-YR STORM ELEV 1205.10 2-YR STORM ELEV 1204.02 1-YR STORM ELEV 1203.68 PROVIDE 6' X 6' DEPRESSED AREA 2-FT BELOW PRINCIPAL SPILLWAY WITHIN AQUATIC BENCH FOR ADEQUATE DRAINAGE PERMANENT POOL ELEV: 1201.50 MAIN POOL INV=1197.20 TOP OF PERM. SED. STOR. ELEV: 1197.00 - BOT. OF PERM. SED. STOR. ELEV: 1196.00 SEASONAL HIGH WATER TABLE BELOW ELEV: 1192.00 TOP ELEV: 1205.5 6-FT WIDE ACCESS PAD TO OUTLET STRUCTURE 6-IN BELOW WEIR 10-FT WEIR WIDTH 3 11 SPILLWAY CREST ELEV: 1206.50 'Il= o 0 0 0 ' 1 1 I -I 1 I -I 1 I -I 1 I-1 I I -III -I 11-III-III-III-III-T EMERGENCY SPILLWAY SECTION 10-FT 3 1F_ 24-IN THICK CLASS B RIPRAP OVER FILTER FABRIC 1��1~ EMERGENCY SPILLWAY CREST ELEV: 1206.50 1 PRINCIPAL SPILLWAY =- INV=1203.30 L /COMPACTED6-INCOMPACTED \ OUTLET STRUCTURE '• ••• � SELECT FILL 7 ., � SELECT FILL / � N / N \ INV=1201.50 I N - - - - - - - - - - - - - - @ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BARREL OUTLET BARREL: 142-LF 24" RCP 17.2% SLOPE ASTM C-76 CLASS III GASKETED JOINT PIPE MANUFACTUR SEED & MULCH EMBANKMENT SEE SEEDING SCHEDULE (INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6: 1) WV EXISTING DROP INLET =III,��III� CORE DRILL AND PROVIDE WATERTIGHT CONNECTION TO EXISTING DROP INLET SCHEDULE A PRE -INSTALLATION CONFERENCE PRIOR TO CONSTRUCTION OF THE STORMWATER CONTROL MEASURE ED WITHOUT LIFT HOLES. GASKETED I INV=1171.00 INV=1197.00 JOINT PIPE SHALL BE WRAPPED WITH A DOUBLE LAYER OF NON -WOVEN FILTER FABRIC ON THE OUTSIDE OF THE PIPE AT EACH JOINT. `---------------------------------------------- d d INV=1197.10 • . • � 6-�TH/CK���tu�_ • , • • N CONCRETE PIPE N N / I / 4 • ° 4 • ° COLLAR TO CONC. ANTI -SEEP COLLAR (6" WIDE) 6" DUCTILE IRON 's , DRAIN PIPE SPRINGLINE 3 TOTAL UNDER EMBANKMENT WITH \ \ i� , . POND AND EMBANKMENT SECTION IV ONE COLLAR UNDER CENTER OF \ \ - / N • ° ' ° ° DAM / \, CONCRETE \ 24" PIPE ° RCP A41COLLAR ---�I \ z a e• °• N ,° • • •• •• A ° \ 24„ 24„ / \ MIN MIN / \ ANTI -SEEP COLLAR \ \ ENLARGEMENT / WET DETENTION BASIN MAINTENANCE SCHEDULE DAM EMBANKMENT CONSTRUCTION STANDARDS 1. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF DESCRIPTION METHOD FREQUENCY SEASON EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. EMBANKMENT 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER INSPECT AND REPAIR VISUAL ONCE PER YEAR ALL CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. EROSION / ANIMAL NESTINGS 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO INSPECT AND RESEED VISUAL WHENEVER NEEDED ALL SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. - - - - - - GRASS COVERAGE 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. OUTLET STRUCTURE 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. \ \ DEBRIS / OBSTRUCTIONS BY HAND WHENEVER NEEDED ALL 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE END CAP WITH / DRILL OPENING \ PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS / DIAMETER: 3.5-IN \ OF THE FOUNDATION SOILS WITH CRUSHED STONE. / \ OPERATE POND DRAIN VALVE BY HAND ONCE PER YEAR ALL 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, / \ ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE GEOTECHNICAL ENGINEER. / ° d \ EROSION AT OUTLET DISCHARGE VISUAL ONCE PER YEAR ALL 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. / ° \ 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR ° ANCHOR \ MINIATURE SELF-PROPELLED ROLLERS. ° DRAWDOWN \ FOREBAY / MAIN POOL 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE PERMITTED. � d PIPE TO WALL ° ° ° 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. SEDIMENT / DEBRIS BY HAND ONCE PER YEAR ALL / 10 IN 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 2- TO 3-INCH LAYER OF TOPSOIL SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND MULCHED OR HYDROSEEDED. REMOVE TRASH BY HAND WHENEVER NEEDED ALL 4"PVC ° "° CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE UNTIL PROJECT CLOSE OUT TESTING, OBSERVATION, AND CERTIFICATION I ° 1 AT WHICH TIME OWNER WILL ASSUME MAINTENANCE RESPONSIBILITY. 1. TESTS OF THE DEGREE (%) OF COMPACTION OF THE PLACED FILL IN THE DAM SHALL BE PERFORMED AS A PART OF THE PERMITTEE'S NORMAL QUALITY CONTROL PROGRAM FOR THE d ° d PRIMARY CONSTRUCTION OF THE DAM. TESTS SHALL BE CONDUCTED CONCURRENT WITH THE INSTALLATION OF THE COMPACTED FILL AND THE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION I 4"PVC TEE ° SPILLWAY OF THE DAM SO THAT THE TESTING CAN BE COMPLETED. SHOULD THE RESULTS OF THE TESTS INDICATE THAT THE SPECIFIED DEGREE OF COMPACTION HAS NOT BEEN OBTAINED; THE INV=1201.50 PORTIONS OF THE DAM REPRESENTED BY SUCH TESTS SHALL BE REWORKED OR REBUILT. ALL PORTIONS OF THE DAM SHALL ACHIEVE THE SPECIFIED MINIMUM DEGREE OF COMPACTION. PERM. POOL ELEV: 1201.50 I 2. CONSTRUCTION OF CLASS A, B AND C DAM EMBANKMENTS SHALL BE DONE UNDER THE OBSERVATION OF A QUALIFIED GEOTECHNICAL ENGINEER, WHO IS REGISTERED AS A PROFESSIONAL I ENGINEER IN THE STATE OF NORTH CAROLINA. THE GEOTECHNICAL ENGINEER MUST HAVE EXPERIENCE IN THE DESIGN AND CONSTRUCTION MONITORING OF DAMS OF THE SIZE AND SCOPE ° ° COVERED BY THESE STANDARDS AND GUIDELINES. d 3. ON CLASS A, B, AND C DAMS (WITH THE EXCEPTION OF DETENTION ONLY CLASS C DAMS THAT COLLECT DRAINAGE FROM AN AREA OF 25-ACRES OR LESS), THE GEOTECHNICAL ENGINEER, ° 4"PVC WATERTIGHT NON -SHRINK I AS DEFINED ABOVE, SHALL OBSERVE ALL ASPECTS OF THE CONSTRUCTION OF THE DAM (I.E., PREPARATION OF THE FOUNDATION, INSTALLATION OF THE CUT-OFF TRENCH, INSTALLATION OF GROUT I THE PRINCIPAL SPILLWAY PIPE, INSTALLATION OF THE INTERNAL DRAINAGE, INSTALLATION OF COMPACTED FILL, ETC.). THE FREQUENCY OF OBSERVATION AND TESTING MUST BE 8-IN °d SUFFICIENT FOR THE GEOTECHNICAL ENGINEER (OR THE DESIGN ENGINEER ON CLASS D DAMS AND CLASS C, DETENTION ONLY, DAMS) TO STATE, IN HIS/HER PROFESSIONAL OPINION, THAT THE SPECIFIC ITEMS OBSERVED AND TESTED WERE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS. ANCHOR / DRAWDOWN / \ °° PIPE TO WALL / \ • / HEAVY DUTY VALVE STEM \ / WHEEL \ END CAP WITH / DRILL OPENING \ / DIAMETER: 3.5-IN CONCRETE SLAB 3" DIA. CONCRETE CORE 5-IN THICK MANHOLE RING AND COVER CONCRETE SLAB \ PRIMARY SPILLWAY / #4 BARS 8" O.C. E.W. \ / 24" 6-FT WIDE ACCESS #4 BARS ENLARGEMENT PAD TO OUTLET 8"O.C. E.W. 3"R �\ TOP SLAB ELEV: 1205.50 STRUCTURE 6-IN TOP SLAB ELEV: 1205.50 - \ o' BELOW WEIR o• - - - \ #4 REBAR 6" O.C. E.W. \ TRASH RACK TRASH RACK TRASH RACK (ALL \ •0 ' IS ON ALL FOUR SIDES 3" •0 ' IS ON ALL FOUR SIDES FOUR SIDES OF \ WEIR ELEV: 1203.30 e 1 RIM ELEV: 1203.30 e OUTLET STRUCTURE) _ I \ ��II�I�I� ANCHOR TRASH RACK \ 8-IN 8-IN 6-IN - 8-IN (ALL CONTACT POINTS) 8-IN \ \ PRIMARY � - - �. VALVE STEM GUIDE. ATTACH ' , \ SPILLWAY / TO RISER WITH THREADED MID POINT OF / \ ROD FILLED WITH GROUT AQUATIC BENCH PRIMARY / • °, , INV=1201.50 . °, SPILLWAY INV=1201.50 • ° PERMANENT POOL ELEV: 1201.50 7 1 I HEAVY DUTY VALVE STEM `' I I��� • �� I I� I I� I I� ,e II•IIII TEMPORARY SKIMMER TO \ \ '� °• °• BE REMOVED ( SEE CONSTRUCTION \ \ � U SHAPED STEEL 3 1 � 3 1 F SEQUENCE) \ \ +• BRACKET ATTACHED TO _ _ _ _ _ _ FILL SKIMMER HOLE WITH \ \ BASE WITH THREADED NON -SHRINK GROUT. \ \ ROD FILLED WITH GROUT PROVIDE PERMANENT • ' \ ELEV: 1199.00 WATERTIGHT SEAL. 8-IN OUTLET EXTEND PIPE OUTSIDE _ _ _ -1�=1�1-' I J I I- ' '• • , INV=1197.00 BARREL 142-LF 24-IN RCP II I ' EMBANKMENT / I I- " INV=1197.10 DEWATERING • INV=1197.20 TOP PERMANENT SEDIMENT STORAGE ELEV: 1197.00 1 11 °° 6" DUCTILE IRON DEWATERING PIPE PIPE INV=1197.10 ° .1 • • If •° °, a °1 6-FT X 6-FT X 2.5-FT DEEP \ N / CONCRETE FILL • r` ° •. • ° • ° CONCRETE FILL • ° t • ° • DEPRESSION UNDER PRINCIPAL BOTTOM PERMANENT SEDIMENT STORAGE ELEV: 1196.00 / \ / , , ' TO EXCEED • • N TO EXCEED ° • ° N �. SPILLWAY FOR ADEQUATE / • BUOYANT FORCE ` ° • • q BUOYANT FORCE • ° a •, DRAINAGE. TIE BACK TO AQUATIC / CONCRETE ° °' °• ° .. , ,• °, • t • 4 BENCH AT 3:1 SLOPE. / PIPE ANCHOR ° ° z 1° co FLANGED, NRS, RESILIENT WEDGE GATE / \ VALVE WITH EXTENSION STEM, HAND WHEEL / \ AND STEM GUIDES AS MANUFACTURED BY / \ CLOW OR APPROVED EQUAL. / .. 24 IN OUTLET STRUCTURE OUTLET STRUCTURE \ SECTION Y-Y SECTION X-X ' •° a r• •' I I •n •' Y 6-IN DIP '°• I ` C °, 36-IN • . ° °• . • ' A. !° S •° S ° ° 1 / °. •• •° 12-IN ' °, • '° J / \ CONCRETE PIPE ANCHOR / \ ENLARGEMENT \ lO PERMANENT WET DETENTION POND STORMWATER CONTROL MEASURE (SCM) NTS pop M OV C N r` vi U v Q z M ++ X U-) rn i O N N U 00 06 �o oo r4 a Q O � o c w c 'c c +^r c_V i 3 v V Y Y t a� � N 0 O N O o U x Lu W o m 0_ U) O N Y • w a 0't CD - Q U) co O (fl Z O.S0N�lf) Lu 00 0 (n 0)z 0(0YUCF) Lo O a • o Z N E Z- 00 Lu co 6) 6 In _U oLL p)QjM c J E O '� �o UE= M.1-_xa H > z H Q Ln 0� D- Li to CON 0 oo ,,��'pN FQ`Q��• U W Z Z O U U Z W C) 0. Z W ::)U V V J U) W Z` z 0 LO OLr) U) 00 Q w 0 N z 0� U z Q J z Z Q Z O z J - O r O Vw n� U m�� CN I ` -O > I..L c,f) . 0 L O �, Z ran 0 Q) 1 z 0. 0 v) Ln �O �___LO 0 ` V/ C Lo Revisions No. Date 2 2020 FEB 12 3 2020 APR 07 FINAL 2020 MAY 18 Project Number: 1711-13 Date: 2020 JAN 20 Drawn by: FS SITE DETAILS Sheet Number: 0