Loading...
HomeMy WebLinkAbout20210927 Ver 1_More Info Received_20210829 Staff Review Form • NORFH CA.,i0:INA En vironmenfrr!QvoGry Updated September 4,2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* 6* Yes r No ID#* Version* 1 20210927 Is this project a public transportation project?* (' Yes r No Is this a DOT r Yes ( No project?* Reviewer List:* Garcy Ward:eads\gpward Select Reviewing Office:* Washington Regional Office-(252)946-6481 Does this project require a request for payment to be sent?* C' Yes r No Project Submittal Form Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r For the Record Only(Courtesy Copy) r New Project r Modification/New Project with Existing ID ✓ More Information Response ✓ Other Agency Comments r Pre-Application Submittal ✓ Re-Issuance\Renewal Request ✓ Stream or Buffer Appeal Is this supplemental information that needs to be sent to the Corps?* Yes r No Project Contact Information Name: Jason Hartshorn who is submitting the information? Email Address: jason.hartshorn@kimley-horn.com Project Information Existing ID#: Existing Version: 20210927 1 20170001(no dashes) 1 Project Name: Project P134 Perimeter Security Compliance, Slocum Road Entry Control Facility Is this a public transportation project? (' Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown TIP#: WBS#: (Applies to DOT projects only) County(ies) Craven Please upload all files that need to be submited. Oick the upload button or drag and drop files here to attach docurrent P134_Slocum USACE_RFI_Response_Package_2... 136.71MB Only pdf or Ivre files are accepted. Describe the attachments or comments: Attached is the Additional Information Package in response to the USACE Incomplete Application Notification, and includes a narrative addressing additional comments provided by NCDWR during review of the USACE comments. In addition to the narrative response to comment document serving as the cover letter for this package,the PDF also includes the following supporting documentation: • Revised Permit Drawings with Cross Sections •Treatment Swale Exhibits • Revised Adjacent Property Owner Figure and Table •Stormwater Permit Approvals and Stormwater Design Narrative Excerpt •Bridge Plans(partial set) •Copy of US Coast Guard Advance Approval Exemption Request Package Sign and Submit ....................................................................................................................................................................................................................................................................................................................................................................................................... 17 By checking the box and signing box below, I certify that: • I,the project proponent, hereby certifies that all information contained herein is true,accurate, and complete to the best of my knowledge and belief. • I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature: 77f� [ a&dOA! �r�t.4drietie Submittal Date: Is filled in autorretically. 6 NAVY TRANSPORTATION PARTNERS JV August 4, 2021 Ms. Emily Thompson U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West Fifth Street Washington, NC 27889 Mr. Garcy Ward NC Division of Water Resources Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 RE: SAW-2021-00067—Incomplete Application Response and Additional Information Project P134 Perimeter Security Compliance, Slocum Road Entry Control Facility MCAS Cherry Point, Craven County, North Carolina Dear Ms. Thompson and Mr. Ward, On behalf of our client, the United States Marine Corps Air Station (MCAS) Cherry Point, Navy Transportation Partners, JV (NTPJV) is submitting the attached additional information for the above referenced Project per the US Army Corps of Engineers (USACE) Incomplete Application Notification received via email on June 24, 2021. On July 8, 2021, the USACE, NCDWR, MCAS Cherry Point, and NTPJV discussed the Incomplete Application Notification via conference call to review potential responses, and to review any other outstanding comments from USACE and/or NCDWR as a result of the Incomplete Application Notification. Below is an outline of the USACE comments with a brief narrative addressing each item, followed by the additional comments received from USACE and/or NCDWR during the conference call. The USACE comments with NTPJV response and explanation are as follows: 1. The plans you furnished are inadequate for our processing. Specifically: a. The drawings are the basis for U.S. Army Corps of Engineers (Corps), agency, and public review, and as submitted with the supporting documentation, are difficult to read and understand. You must clearly indicate the limits of filling and drainage impacts to jurisdictional features on the plans entitled, Grading and Drainage Plans and Site Plan Subset Plans. This can be done with color shading, crosshatching, or similar graphic symbols. NTPJV response: NTPJV has prepared an updated set of permit drawings based on this feedback that will more clearly show proposed impacts in plan view for USACE and NCDWR use. The updated permit drawings have been based on the grading and drainage plans and will Navy Transportation 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 1. 919 677 2000 Partners, JV .. '� : NAVY V LT TRANSPORTATION PARTNERS JV Page 2 include colored hatching that will be clearly defined in a legend and will utilize callouts that detail the proposed impacts at each impact site. Based on feedback from the USACE and NCDWR, the revised permit drawings will adjust sheet cuts to avoid bisecting impact sites. b. You must submit typical cross section drawings at the locations where the project impacts jurisdictional features, indicating on the drawings the limits of filling and drainage impacts to the jurisdictional areas. NTPJV response: The updated permit drawings now include cross sections focusing on jurisdictional areas and impacts to help demonstrate limits of the proposed impacts in relation to jurisdictional resources. The cross sections also will better demonstrate the relationship of proposed stormwater conveyances, ditches, and swales in relation to cut and fill slopes. Cross sections are visible on the updated permit drawings by a straight line bisecting the project limits and labeled with a station identifier(ex. 130+25.00). The station identifier corresponds with the cross section label on permit drawing sheets WTL309 and WTL310. c. Please be aware that you provided no indication that you will be coordinating with the U.S. Coast Guard regarding its jurisdiction pursuant to Section 9 of the Rivers and Harbors Act of 1899 for construction of the proposed bridge across the navigable waters of Slocum Creek. In order for the Corps to evaluate your proposal pursuant to Section 10 of the Rivers and Harbors Act of 1899, you must submit detailed plan and cross section drawings of the proposed bridge and pedestrian lane, including ancillary features that will be attached to the bridge, and any filling associated with approaches, abutments, etc. NTPJV response: As part of the permit application process for this Project, NTPJV is submitting an Advance Approval Permit Exemption to the US Coast Guard along with a Bright Lighting Exemption request. To help facilitate the USACE review of the Section 404 permit application, included with this additional information package is a copy of the Advance Approval Permit Exemption Application as will be submitted to the US Coast Guard, along with detailed proposed bridge plan sheets. Based on discussion with the USACE and NCDWR during the July 8 conference call, the bridge plans submitted include bridge drainage plans and the closed drainage system designed within the bridge itself. 2. Review of your application revealed that the project includes the construction of"treatment swales"within and adjacent to jurisdictional features. Please describe the methodology used for evaluating the potential drainage effects of the subject swales. If you did not consider the effect of drainage associated with this work on jurisdictional areas, this must be undertaken to capture all potential project impacts. NTPJV response: Based on the USACE request, NTPJV has evaluated the proposed treatment swales as well as proposed diversion ditches in the vicinity of jurisdictional areas. We identified three areas where treatment swales or ditches have potential to have drainage or dewatering effects on adjacent wetlands. To better document the location and elevations relative to the adjacent Navy Transportation 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 Partners,JV Arit NAVY TRANSPORTATION V PARTNERS JV Page 3 wetlands, included with this response package is an additional figure set titled "Treatment Swale Exhibit". Below is a brief narrative explaining each of the three treatment swale/ditch locations and our evaluation of their potential to affect the adjacent wetlands. • As shown on figure SWALE 1, the proposed treatment swale on the east side of the proposed Slocum Road is located in the vicinity of wetland W1. However, the treatment swale is located within a larger area of fill above the jurisdictional area, so the invert of the proposed treatment swale is 26.85', while the elevation of the adjacent wetland W1 is 26.25'. Based on these elevations, the proposed treatment swale is not anticipated to have any additional drainage effect or impact to W1. • As shown on figure SWALE 2 (and in the associated updated permit drawing sheet WTL302), we have removed the proposed diversion ditch that was previously proposed along the western side of impact Site 3. The diversion ditch was originally designed to direct surface flow within W2 around the proposed fill slope, however based on the proposed elevations we determined there was no way to ensure the diversion ditch did not unnecessarily drain additional hydrology from the adjacent wetland areas. As such, we have revised the plans to remove this diversion ditch. Surface flows will still maintain hydrologic connectivity to downstream waters, they just will not utilize a specific diversion ditch to do so and will flow naturally through wetland W2. The proposed treatment swale will remain within the interior of the Project. The proposed invert of the treatment swale is 26.80'while the adjacent wetland is 28.90'. However, the proposed treatment swale is located approximately 75' inside an area of fill, and there is a large berm between the treatment swale and the jurisdictional resource that will be further compacted and help prevent any potential for additional dewatering impacts to the adjacent wetland W2. • As shown on figure SWALE 3, the proposed treatment swale on the north side of the proposed realigned Slocum Road is located in the vicinity of wetland W6. The invert of the proposed treatment swale is 26.43', while the elevation of the adjacent wetland W6 is 28.83'. While the treatment swale is proposed lower than the adjacent wetland, this section of the proposed Project is located within a fill section with the proposed treatment swale cut back into the fill and located approximately 50' inside the limits of disturbance. The proposed treatment swale will be separated from the adjacent wetland by a berm, which will be further compacted and will help prevent any potential for additional dewater impacts to the adjacent wetland W6. 3. Pursuant to 33 CFR 325.1 (d), the names and addresses of adjacent property owners must be included in your application. Please contact me to discuss the limits of this requirement. NTPJV response: During the July 8, 2021 conference call, the limits of the adjacent property owner search was discussed in detail. As a result of that discussion, included with this response package is a revised and updated Adjacent Property Owners map and corresponding table. The additional items that were discussed on the July 8, 2021 conference call but not otherwise addressed in the above comments and responses are included here (number continues from above for clarity): Navy Transportation 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 Partners, JV Arit NAVY TRANSPORTATION V PARTNERS JV Page 4 4. USACE and NCDWR requested additional detail on the proposed bridge, including plans and drainage features. Included with this response package are the relevant bridge plans for USACE and NCDWR review. The full package of bridge plans includes in-depth structural plans and sheets which can be provided to USACE and NCDWR upon request. 5. NCDWR requested additional detail on the proposed stream crossing of stream S1, specifically focusing on burial depth, limits of fill, and other information. The updated permit drawing sheet WTL306, which includes the stream impact (Site 7), has been updated to include the culvert crossing details in profile view. 6. NCDWR requested additional information on the proposed bridge's stormwater drainage system and requested the drainage system be shown on the updated permit drawings. The permit drawings have been revised accordingly, and sheet WTL307 and WTL308 show the outlet of the proposed bridge's closed drainage system. Both outlets are well outside of protected riparian buffer zones and include a riprap dissipator pad to ensure non-erosive velocities. 7. NCDWR requested additional documentation relating to the stormwater design narrative and any stormwater permits/approvals. The three approvals issued for the Project are attached, along with an excerpt of the Stormwater Management Plan. a. Note -- The full Storm water Management Plan package in its entirety is approximately 551 pages, so included with this response package is the first 31 pages which includes the narrative and pre/post-development drainage area maps. If USACE and/or NCDWR would like to see the full report with all calculations, the full report package can be provided upon request. To assist in your review of this Incomplete Application Response and Additional Information, the following additional and/or revised information has been included: • Revised Permit Drawings with Cross Sections • Treatment Swale Exhibits • Revised Adjacent Property Owner Figure and Table • Stormwater Permit Approvals and Stormwater Design Narrative Excerpt • Bridge Plans (partial set) • Copy of US Coast Guard Advance Approval Exemption Request Package If you need any additional information to assist in your review of this Incomplete Application Response package, feel free to contact me at 919-678-4155 or Jason.Hartshorn@Kimley-Horn.com. Sincerely, Navy Transportation Partners, JV Jason Hartshorn, PWS Cc: George Radford, MCAS Cherry Point William Wescott, MCAS Cherry Point Navy Transportation 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 Partners, JV REVISED PERMIT DRAWINGS 1 I 2I 3I 4 I 5 a a a w D D Z Site 1 ° E U w 0 s Site 2� ( .‹‹z,,, Will1111. - = -_� - �� _ _ IIIlilliiii..._ 91 iiiiklijim _ _ — Sri 100+00 I I I I I I I I I —_ ' - _ e=s�� �.1 ■■_■i- �e=ue= --_-=-� = j1�� _ � — - -- , =, ^- willrA _ems - �, _ �� �1.14_ a / �'�.._ 011111111/1,. \6. .11"Wii01111 • Wi4s‘• '•ii, �, . . . . . . . Site 3 / / I i y , • T4 I a SEAL — v a '�� O/28/202k :y,� � � „f /. .._.: . .. . Site 4 _ _ ,r _ z ,,� , ,C10611 :_- ;7. : F C ,, :...,...'..-11‘",\..,:r..1": �+ '(1,.: ; N 1... •: •.:': Site 8 -�. '; %, rr s N C Site 5 � ,i ,/44 , 44, i o. s. „�, �• \', ,_... ........ ..._,,, f✓'., s .• . "A* • • •� 1 � 4 if�.c µ ,�p Ao'k, • iiii/ \ SEAL �' lw : ' �► / \ mil►// 6, , ' 3' i i 8 fir , 1 _ ,�, • � �� �� �: �v l • • • . . . . ���� / ���- 1 Site I �� �A �1 � �Hy" •�.� �� °�° Ls) �� - . . ' A� ;� SHE _ (ice (��l I11 r t �'' i'°I li,Jr— � � .,e6 ( / / / i / 0 \ co\ 114 /: /i mow° • • • rc\A ♦, 3 ( s \„,....,,,,.1.,_,..... . .\2. y� � �;� ,y 4 �. � , 1111� 1 1 1\ \� \ \ i 1 / ( \ f �'j;�j / � QC);�4f;-.'A."- ,.\ :/") . 4 iiiii 8111 l 1 1, _-_-_-_-____L) 1 1 -\ \ A , 1... / N AVY cn ��. :!`� _ ! > j ----,....,-..,, ,,,...iv \� �s r \ / III k I ff. s ';' �" �`, % ( .o '�`) ii��„ /�/,/�� ..� _� � \ T J 7// t \\ r� 1 �� \ I / i r �n . �� TRANSPORTATION o siii r f9 !� /�'� W ;i; �_i�%Opp \ _r / � I I `�., f `� / PARTNERS JV— f^ /� //' ��_ A �/ 11 — �V ; j / A/E INFO '. APPROvED N. , \it ff�i� �����/ice"^�I �+.,V,�,/•c, 0► -'<�_ � / A'\� _ - - ��3� / ^� /' ��1�\kk �� �.Gf/ l/�� �� Li" O a ,'.� \ 1 \ lift.� t=.. C� Cppgfp2 ----�- .s r• - \\ — -� ) �J �` . fi' � •�� •,.,. �, �a -_ �� --- •qd�.• Q� OER NAVFAC 0,--7,47;._,:.7'.._,..----,- ' .410( ,. _ _______________ , ,..... . , __ _,.....-„,, 1 11 ,.. - ,, Alik c( <; > ! _ i mild� 'O/ ' �_ � �b�� �` /' '�\'\ �; to 9 �.�.��'w s�nsFwctoRr m owh MMIDDIYY o • � ► AII L+t,= - a "r.— �' (� ��� �� �� 141t ts. t� \ ��y� DES EAS I DRw TMG I cHK RMN W » .. ���` ` .)� •° %P! (T-'� ,w �, 44 1+ \ Site 1 O BRANCH MANAGER o I5 r.,__ .E. N C \: _ 3��. ,�o,_ .� o-i[� \ yrl �1 m�0\ , J p `� ^ \ r r- �s:yl� +lr"'t s r..o,y�,.,,, ,t�l �- _, ` • CHIEF ENG/ARCH •• � o i�.�� � v + ��,o �„ � "r // FIRE PROTECTION / , Z o i 0° z o z F I—• o _ Q W � 2J cc O � > Wz Z• z = W U Q f/1 LLJ w p J z L,J Ix � � m 03 w — ~ � J U 0 X 3 z >- D C_)o u) U C� W n1 1 0 ,n Z Q CD LLI J Qy 3 z V c/� _I zL1J O C1� w co w _ tu cn o > J z U Q CC I v w Q u) CO o _ F IL r o w O o z > o U cnpa_ z U W M F 0 z • H NORTH o 2 0 SCALE: GRAPHIC n o EPROJECT NO.: 1565548 j CONSTR.CONTR.NO >_ GRAPHIC SCALE IN FEET N40085-19-D-9008 m� 0 150 300 600 NAVFAC DRAWING NO. Y L;i 123456789 - SHEET 1 OF 387 J WTL300 . 3 4 I 2 I I I 5 DRAWFORM REVISION:25 AUGUST 2020 1 1 I 2 I 3I 4 5 c, °��/�ov/' /,/ /j/ // // ��/,, :://217/1/:i7/1/1/:' ,/ // ::/#//N/#1, /�// // //WETLAND IMPACTS LEGEND / / , / / /i - moo/ /�/ /��/ �/ �// � � / �/ /, / ,PERMANENT IMPACT WETLAND: / / / ��, / / �'//ice �/ /' /��' ' �08' ' � � /�' / /'PERMANENT IMPACT - DITCH: ��c. �, c ///' , /�/' / // �i �// ! ,�PERMANENT IMPACT - STREAM: / \,00 /''�/ /'�' /' ///' / ���/ / �/ ooI PERMANENT IMPACT - BZ 1 : 1i'////',/ //// / / /+ 7 ' �� ,// �/" /'/ �\ coPERMANENT IMPACT - BZ 2: `' cn oo �°�' '� B-0 /' / ' /' ' / / / /^ ' '' // /'' 1 �Iftge 1007 I ` �/ , // / //� ,/ / ,' �BD LINE /� // / / // a,' , / / / ! /'/ / a+ + + + + + + / / _ WI\.+ + + + + + + TEMPORARY IMPACT - BZ1 : + max / / //' / N / / ,� /// N-% / /' \+ + + + + + + XN, + �Oo / X/ '' X / / // /IP // / ' / �'� LOD LOD LOD\\ LOD / / ,, \t\or) z;z Z> zzi://zii:zz:///: \p4_, ,r, • • • I. milm mmmmm / TEMPORARY IMPACT / \ O C T� / / / / /:+ca/0°4111 o / // / / �l / \ \ �-"7____, , + / 4',4'�/ 0° 'z S° �',/ X //,� /, i\z\ ,/// , /j/ �\- X X X X X X X X XX X X �2pQ;o�tSS%�y,/Qi9C / j/f/ or) i ,/ ; / / ' \ _ SEAL • + �+// 00 /// / / / / / // / // // // , /' �� ;•�1/28/205.2�\ z (tim• ` / / / , / /V M •/z 4sv z z ;..\:"437- C•` / ,7, ,),- ,- z // - , N./ It , /, 7, / , . iti , FIII \ I SEAL + /. z / / , / '4111111111110v if kif .,....inm N / 6° / / \ z z z / / z z z y 411aUlaraNkiliMMMMMMMMMMMMMIIIMMT • • • • • • • • • • • olo I i, + ./// /z z z, z _ ,2./../z/...//../>."405/01111111 z zy—..:,,,,VIWPOr: zx ///////://zz:z:z:: 71 _ .\si IMPAFINNAI.Iv --1 7,:-...., —.... _V ai , k,v7v 7 itirmliiitr&I _ /7 zry y / C-D + /\' / / Z 7 /' ----. --- / / ,, 0 , , , • II Illittirb„ (,) .,_ , z , , , , NAVY / O / / / / - /��/ / z i o / ///, I TRANSPORTATION PARTNERS JV ,vE INFo / / ,/ 7 z / - / —125 , / // / ,- / -�— ,�� SITE 1 . N + / ,� ,,� �/ 2V-----; % j/ ,tti 7 v �a� filPERMANENT WETLAND W1 / °O '� ,' / /-'-/� %' /' /',/' °+°% ///'//' ' / / / NJ, fOR CUMYIWDER NAVFAC + IMPACT: 1 . 13 AC. Ac'M" o /cn %/ - / / /i / c5` \�/ lei / ,/ // III lifff III 1 II // I ifir I II SATISOCTDRY TO DATE MM/DD/YY o / / / / / / / / soiNik �\\ _________- „// /�0 z // 11111W,�� If , _ EAS TMG RMN 4,\Y-1 / / O / ��. DES DRW CHK ......,„ , / ' ' / / / / / /ArdilV , ,...„,_ ,,,,,....a_____......„--it EEMENIMPINIP 1 . BRANCH MANAGER �� /7/ / / / / / / ■�� ��imam_ � = CHIEF ENG/ARCH M // / /V z z / / ",....:� /,xi illiky' / / / / //, ���0��/111��������11 '11airmagorm iir _ m iiivariatair___�rjarnrimirvrr i r ink_Anw. -- - \ \; FIRE PROTECTION B / / / / / / /� , �o �� �„ ow r�r , Q Y / zz // / / ' ` / ////' i/ / �1��� - - ���►�M=��� ��������i��rr���i._nuorai -- �������������� r�-\ J/ / / / % /„ I ���l� rrrr■ rrrr —/ orffirMIMINIINIMEMEN=fillpfloardi iiiiii 1111111111111111117araillararalialarle=1,11=2=714=k,r co illitliiiir cr, ._ zz/o , , .,, , a.____ _,...,,,,,,, 0,-,,,,,.... \ 0....,,..,,./ , ... & _____,,,, lir" ���� 1111111� z z _ ;Ir001106E)"37-\ vit,igv# amilfilliall , I /,/ // / / / / V lj 5 CL // / �/ X ��OW / \ �' \` rrr�r rrrrrr�,•00000.01-0-1-776411:111 rrrrr�� _.co Iffiliki\ o O _ / 1— Cin / /' /' / / / �� Op \ \ \NIIIIMIIIMIIIIIIIMIIIINniiim �r� rr��r��m�rrr rr�lrr�rr �������ll��������FI�������M��L��MM�. _ U 0 X // / / / � � / / \ oo rrrl�rr rrr�rrr Q Q/ III y��y ��� M��mrrrrr��r �_��� W 7,-- 5 � � � Z Qo° v �\ ao� ao� o_\v\ oaoi ao D U��/ G�XP26 LJM / / ` \ \ v ��o��M�� r�a�o�r�r���r7�ir���7b�7�r= � z, / w -J 7 / I \\\\\, _ , A,. Nz / / / 't:. 0- o Li 1 -r: "alaa' ' .4444, x 0 0/ ...a , 01- ot- ok IBD LINE H J et T _ o ��� w` H Z ' w \ \\\\�o / / — \ \ \\ �� .�� a J Q �' \\ \\\\\\\\1 0- - O'' / / 7 /7 ---- -------- --, --, /� / / \ \\\�'\ SCALE: GRAPHIC Ot° \ \\\ \\\ OP / / F \ \\ EPROJECT NO.: 1565548 \\ \ �C, \\0- Ok \\ �l�' / / / \ \\ CONSTR.CONTR.NO. ''''' \ / / GRAPHIC SCALE IN FEET .5 01- \ 0- / \ N40085-19-D-9008 Q \ 0- \\ \\ \\\ / / / \ Q 2,5 2rj rj0 NAVFAC DRAWING NO. \ 0'- \\��:x\ / �/ - / 123456789 6i SHEET 1 OF 387 m Z WTL301 DRAWFORM REVISION 25 AUGUST 2020 L 1 I 7 I I 4 I 0 \ * O O 0/ / VI/ 4I NLOB' LOD -+LOD LOD LOD + LOD j / \ /, �'' il I (I W \ \ � _ � � � Lop ilitti 111 ittillri I 1:11:i Cal littltilltiA111- 1111,10_011r": w ibt ..._.....NC>4/-------;ltr All �^^ V/A 1# pop ♦ li A. oil, ima _____�� ssure. Ix %raw .........webissimmirir., u) * / _ 0,% 111,,,01011 Isiollicsavis , I %III_ , ____ r .... viii Iwo pswir irlolfkr D iitiVri Aer.,°WATISOltilli IL x -i- ; lio%I°40:1:IilltilStill atai � z I ���� ' 1111111011011111.... " ����aaaaaaaaa aaaw�-rn._i• / I \ aaaaaaaaaaaaaaaaaaaaaaaa�aa�► / o �, ��� aaaaaaaaaa��� !Ifsr G v �I�I � � �� �aaaaaaaaaaaaaaaaa� .a�aa_ sol0 A** 11011111.011111111111161111.rniERIKU_IIMMIIMMINOWSIMMIASAIMPWIRMSWKWILMTAV _,------ 2 140 IL U I ,� tIS0V 0 0W,0AW0. raN M *0% 01101o1 vim, ola��i wlkwL AavmII-INLI‘M riMmA Ia_.l--aRIKa► M al,iN M-ma1,uEmaM,•1M..Rianmai1ii m h IIE umans. ...,. //.1 Is f 0 V 61,° 01*It I It i 00. 1,401 fiarl*al I 141 I kliki I ialatilialatigal Waal I Mfti allikvrA/ - - \ < - ---3-::::::::- J IL_ _ v $ MI Ilk\ dik wo*° _,%. ...00kiwat_ - _ _ * •••0____ . . __ , ..,* ♦III Alp�_. .�♦�I#0,..o,ososAtirlast \� _ /I"P � /- - ♦ III .. ♦IIii,04,,,� �J��oo10# 010 ,III ,,I-I 100 , * 4,* -- lik� -\i / 1410„, ,,„ ��. ♦ � Ali �� !`firillitilIVY „wit MM . Mir 'ZPC1/4....*iTS../e.**./#%, 4t;$00$ .0*$$#0 A $* VA. la.„.„:4441011110_i_____ _II 2 : Oi `94A 9 * 0 fitittto#1,&t ilk ov ....4 sionT Ix I lorovr a 050975 I--) ; / • ,WA�tlipkiW gilt% A iiii, , ;• p1/28/202‘.. y: t ii. LAI C li, l 1 '1 t 11 cp :,4'1:1.°:::mie":1!"1-\•::/sE,,, c 4at_ 4 ‘h4 .., * -------------------________________TAII4M . iia.. /. _„ .....firicAl......._ 711k .\\ ---- i r 407"I I I I I.w'- I 5 I B -'- - - ---.114 1 ki et I "irk -77-1 FT 1 1,1*Lki-,"LS-7:wam:SuliaVANAA 11 t",:t r. -stir.a 1._ 1.,Iiiiimii_i w r• • --- , W / / �1 1 1 i;•e�� i���5�aaaa :�waraaaavaaaaaaaa��— Ilk NB `\ �-_ _ NAVY -________________ALLILL__ Tie_ X. '.14. i __ /� SD 18 RCP /�i'"7 ����������������___ ____ / SITE 3 . �`����.�- _ TRANSPORTATION PARTNERS JV W INFO ilkW I I .../10r ---- - - . . At_.katilleillitiall* .-"glt:\\ltit r I ai 41D - - - / �- „ RGP S� - \ APPROVED �j PERMANENT WETLAND W2 IMPACT: 1 . 90 AC. - itna� ° •• ,, , I So _ N ' 24 cNiui PERMANENT WETLAND W10 IMPACT: 0.42 AC. Rip ,//�•- - _ _ ��` —— , PERMANENT JURISDICTIONAL DITCH JD2 !- �° IMPACT: 0. 06 AC. �$ig // , //®— SATISFACTORY,� D � MM/oo NY oUhl /t�,. EAS TMG RMN u / \/ .O // �� PM/DM j �'� SITE 2 : j // i / / , BRANCH MANAGER cNiM • , CHIEF ENG/ARCH .---.) '.410r / ° ' • `�• SO '' /� �' • ' PERMANENT FIRE PROTECTION LIJ B a 0 ,0�, . / I z B . . , 0 =� / / WETLAND W2 0 . z / / IMPACT 0. 01 AC. E o GRAPHIC SCALE IN FEET Aft // •/ } ¢ -, ct LJJ N 0 12.5 25 50 ' I��// ` �' � J � U / // i / / N / �'/ i r / l ,A/ ' , /,l // / // l / 1 w t U Q m / , • � ,e •Al � / /// / z CL ° / / / / Z Q 1- 41" /// /// 4 LIJ �/ / r / / /// / / / ' J U U WETLAND IMPACTS LEGEND / ,� / / f � , 1 f � // � , / / / / /// / f Q � ¢ w • / ' -_ / / / / I/ /ii / / / Q w — O Cn PERMANENT IMPACT - WETLAND: 1 ~ CC CC ~ _ ° �— — co 1 //// ' �'��Sri — ♦ U N i - — o i / w cn O PERMANENT IMPACT - DITCH: °� / ��///// ,' i/ / •; �� = w J J z AI// //// 1 , , ,/ tb,t, /- 4.bt , (r) ,, z 0 \ e \ • Li PERMANENT IMPACT - STREAM: • _ — — — _ • ,, / / /i. / // VIII - w _ FL • AV // 'P . . ---.... HI I 2 ..7ct it /... -\ • • • • • • .--•- • • • • • • / PERMANENT IMPACT - BZ 1 : //� �' / /// / a T 5 A / % \ _�, �� /' / / / / w o _1 w p d_ A M le Z it PERMANENT IMPACT - BZ 2: I / , / // ‘NN. a ,?). O O X / / ' \ ‘‘‘‘ U SCALE: T / . , c. • +,-,+,-,+,-,+ 61 / X �.,��/ X �// / GRAPHIC ++++++++++++++ TEMPORARY IMPACT - BZ 1 : \ �� / / // - EPROJECT NO.: 1565548 % *+++*++++++++ • + \ O ,/ l // / CONSTR.CONTR.NO. m + + + + + + + \O� ,,, / // / / _ \ �` N40085-19-D-9008 \ /� / ���� / \ NAVFAC DRAWING NO. iij C-1 I \ C' 123456789 a o , /»>> TEMPORARY IMPACT BZ 2: / SHEET OF w / 387 1 / � 1 LIJ WTL302 U- DRAWFORM REVISION:25 AUGUST 2020 1 I 2 I 3 I 4 I 5 1 I 2 I 3I 4I 5 0 a a w F- 0 WETLAND IMPACTS LEGEND D / i / PERMANENT IMPACT - WETLAND: D / ,`\� / O F \� PERMANENT IMPACT - DITCH: F 0 o +_ , , LOD PERMANENT IMPACT - STREAM: r �OD LOD LOD � x � x � J inew X x x — PERMANENT IMPACT - BZ 1 : WAN. K X X X X X X - x imm. CD ___---- PERMANENT IMPACT - BZ 2: _i iii / . . . . . . . Np, ++++++++++++++__ TEMPORARY IMPACT - BZ 1 : � � -- - ..... . - / ++++++++++++++ ♦♦ ♦\ \\^A,III Fi 0 . ♦ lJ/1 I • ,:. Ito. •....... </ ,, MIIII=MINIMIIIIIIMMIIIIMIllallag - SS o . E / y z F o . TEMPORARY IMPACT BZ 2: 0 9 9 = • a SEAL ' 7. • • 050975 � �;� �1/28/202� � coC _ \ > !.! .'< Y 11111111 C 0 + ' / I. /.. " 1 (n I— — I — I — I — III / / - Oro ='o ro / L U N Et SITE 3 : o w '1 PERMANENT WETLAND W2 IMPACT: 1 . 90 AC. NAVY IN PERMANENT WETLAND W10 IMPACT: 0.42 AC. TRANSPORTATION 6 PARTNERS JV ,vE,N, N PERMANENT JURISDICTIONAL DITCH JD2 ,. APPROVED IMPACT: 0. 06 AC. IONoER NAVFAC / 0 30"RCP _ X X x X —�S �'� X X SATISFACTORY TO DATEMMIDDIYY CB Illff 1 DES E4s DPW TMG CHK RMN -lc° / i PM/DM l ' � \ BRANCH MANAGER / M �_ Q CHIEF ENG/ARCH 3 ��\ �- — — / FIRE PROTECTION B — B — ‘ Z r \� �� 1— cozz O O+ 3 N Y -`'= —il__ M__________ �� \ .��kW 11 Li LISSSI EMS. \ \` \ �( / Q N \_WAL`MI•_V1—__'!_____INl�lQ\\` _�Cii�[illi : „�`4iiii;t IN \ �C / w U __IEMMIU �__�__________� ) ,/ Q W CL -C� �:INIL__`���______________I \� — m I I . I N i /)1,) LI_ < Lu t-----. • 1 4 * . 1111,1111 \ ---- __AlAteir iii iNt 0,0-\ \ '----,. , 00`1 z ›- r., CVaq--- -------- '6./ c., All ---*--._—__________Alk Id/ iti it / \ i 4 Iiii C cy \ / /_./____ \ N/ , , z Q 2 - - - - / / / ��, \ \ \ / Q ', /1/ Jct z5 a il w Q co A A w 2 z w H o z WZ' o_Q Q_1W =0 SCALE GRAPHIC Racm EPROJECT NO.: 1565548 El?) CONSTR.CONTR.NO. GRAPHIC SCALE IN FEET N40085-19-D-9008 Q 0 12.5 25 50 NAVFAC DRAWING NO. Y w 123456789 SHEET 1 OF 387 J WTL303 1 I 2 I 3 I 4 I 5 ,IIII \IIII Al I I\\`\\� AL 'III\ I I III II \\\\\ AL 111 I II II II I I III \� \ N.N 4t, Ili- III J AL AL 11\I \\I I II I III \\\\ /, o AL \\,/I I I I I II \\\\ / ,,�AU- AL ,\I III // I II \ / '�` \j I 1\IIII \,\\ // AIL '� 'm` I\\�\\`II�/>'m` r\\\\11 I\\ ��D '', '„` \III III\`�i \ D ' ` A, , 11,1 I\,,,, 1, L '�` A III\ I\\\\' ,0 I \1 Au , IIII I I Z ,�" AL III\ III k\I II II1SITE 4: —'1 ' 1 ' ° 1 ,', '\ Nt 1 ' I 1 II Ij I I'I I o PERMANENT WETLAND W6 IMPACT: 2 . 51 AC. 1 '1 010 I�� '`�- o I \ \ 1 III,1 II � o PERMANENT JURISDICTIONAL DITCH JD1 ' \ IIII "�I�\ �I 6,5 - • ♦ Co \ 1 II„ Irdr---4. _ �JI \ \ IIII, i, -- WIN :, ., r\ A, Lr) � _sci Au Au IMPACT. 0. 05 AC. asci AL aso \ \I I ,, a - ' \ 1 imp,illiNIVr x -N _1.4- Lr) .....4‘._ ---------:______________.______ in A, + ..0, AL co roc') ,t LrIL \ II \ I \\, 1 •�• ' �-4 '�" LOD LOD LOD 'm` OD LOD LOD \' II I'� �4,� LOD LOD 2'- Wa i 4 i&i.-441111111wAllintw% .0„,Iiiii,,„,, „.,;* CAR04',„,, * , IPP,,AmwzmrAmrA...,mr.Lww__A.w._..m...AgrAmr. m..wm• rAm. rwAimw..w-A...Amv. ior pr 7--40.74770,4r zerzir,...............w.....„...... ,-,,,A .15 h-,,c1/4...,aciiw,",,,,,..../...,,-% 4r. \� :: , 9 • . N •\ -,\ 4Ir�`�'�� I ripir ' �. gri rApr - 1.,...4;.5..,,5s.2.0:8m.A/9.:.,;°.5.t..,..e.::::‘,...3..)- c \ ` \ � '�. . .1.0..0*..,__Ap .� Allrvilip&H.10,7A,*4A\ _AI �� � 11 �' 1 4410.,....„,„,„.............................................. .p., , .„,,,,, ,,„...,.......................=----"Ammware----------- SEAL \ WAyaAA"Pi I I I AIM I illaarell I rib rili OrAPATOkialgrA rffrAi gri FarArAvArgarr.WAArrWA I I rA I II FA I.I FA..S II WAWA ir 2 li rAllirAci I rA ri 1 I 111 I i 1 i I 111 _1#rAl ___ I WA PAVATAP41 I Pa Wili ri I I rA I I pr41 I I I I n.41 WA LIM IPA 1 0.WA.FAA rA I WA I VA rA WAVA.rA I FATVA WA WA VA.FALWAN WA I WA ZWA ittrA Arilrff4rAMA ffr A WilffAtani --- j „,\ all°4116.-WAIWW4 derWP: ---:--'.4--7TF-.W_ AdIEWAVAIFAWAWAIMVAllrrAMFAIWAIIWAIWMWAEA=WAA1=r r'IAI IMIMMI. 11 .11 :, _ r -,....... r . 1� Agrrrff �i�i�`iri.��ri�4. �i���",A r �i am► - \ --/"1 c? ArAPP.M.A7 .. "AW —�--- �1�� 1104 D .D .D ��� SD SD SD aAltly, 1 4"_RAP ler 4 N AVY /l/ �- r z �_ � i!.1� TRANSPORTATION � /SD _I �� , \ ,�� PARTNERS JV „�,N�o i24 RCPgp4 aD�O4 i AaartovED\ Al A .picortworro. A . 4 '. • ,,. . 1�� 1 41Kr .- ifir,,, , -------------jldrajrArlyfrposrAwirriari.: • �r Q o a a o o a o FOR CDauatoat rrA�Ac • Aff: • 4 Al) • • . 4 ti,-4 . 4 _______AIIII IF . . ffAl FA IVA IgiOVffA grArMA r Mr A \ A \ , `_ 4pr___ SATISFACTORY TD DATE MM/DD/YY o \ 1 ' �- , , DES DS DPW TMG CHK RMN 7A7Alf, \, ��� PM/DM A,WA, /"�\ ■ , rBRANCH MANAGER L •� �� r I` 1v/ICHIEF ENG/ARCH \` , 1 �'� FIRE PROTECTION I a U r — 41 1 4 ill I B �� i: __lir \ •�►il�l 2 -, z B �� '1 ,i � ' j'®�\1-Air - 7 r. � ��!'i ir 4 z o 0r Air irrA r All 7 A • AFAIKA04,71( V�� , ,_ a } Ll A i \ I } a � WO 1111111" \ I Q w f Ar----•ff- 41P-K � � zz cnw W,0 WETLAND IMPACTS LEGEND f AA •, AlA 1 it ,' J0 "aI%111 k1111411 11V11%.111Ar11r4 fBVir _ ArAAAl1g„is rAaffranirrk7 ,M7wili4,7 ‘kI) 1IIjiA i kr ((< Qw o �,3 // PERMANENT IMPACT - WETLAND: dffi.r#7 tAi A#r II"ZAi r �/ ►" Z//— #,Atwi r A 4 N01111rff1 °,Ill ,,,, : A1r4..11,irP.r §w,< 0,.1/4el>DL<c-l-c-i, N1 / %'C—A —A —���111 / / / / / / ©/IIII/_%/ //� _ -_ _= CB = U 7 PERMANENT IMPACT - DITCH: ____ 'O ��� � '� ` r 18RC�P ® r w r PERMANENTIMPACT - SEAM: / / � w ...; , i U PERMANENT IMPACT - BZ 1 : ` _ - �! ,o a - -� - T A - _ _ � u) c ° awo � A \ -- - -� ! / Z Q o U M PERMANENT IMPACT - BZ 2: — Li j z a Q v,i / 1-‹ o 0 o + + + + + + + + + + + + + +• ` / SCALE: GRAPHIC ++++++++++++++i TEMPORARY IMPACT - BZ 1 : EPROJECT NO 1565548 i ++++++++++++++. lb_ CONSTR.CONTR.NO. �, N40085-19-D-9008 1 GRAPHIC SCALE IN FEET NAVFAC DRAWING NO. 0 12.5 25 50 TEMPORARY IMPACT BZ 2: 123456789 O C H co NT O R ......................................................... SHEET OF 11 1 387 J WTL304 L� 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 1 I 2 I 3 I 4 I 5 - - - /' /',� WETLAND IMPACTS LEGEND �,.--.� ---- - - -r S __. — / / / • 1/ // __— _ _ I � _� \ \ i / / / \ -\\ - 7/ /' /' / / PERMANENT IMPACT - WETLAND: _ _ _ �`` \ � \. / - _ ,,� • / / / - O.S. \\ \ - - - � 7 i / /' / - - - - _ _ � - - - - _ _ _ _ - - _ �� ��, BLUFLINF gym` // // / // // // / — _ - - — _ — _ _ _ — _ '— - - - _ — _ — —\ , �� STREAM - / / / PERMANENT IMPACT - DITCH: ';;;__ _ _ ___ — — _ __ — — _ — _ - . \ 'u 1 R / / / /j ,i _ - \ - _ - _ _ _ c= - - �� _ - \ �\ \ \ \\ - / / D - //// //% ,,� PERMANENT IMPACT - STREAM: _ v � —_� _- _ - _- _ _ _ .„--- \\ \ \\ / / %�.s . y/ �// / IIINLii �'/ \ - - - - �" / // / ///c/ : ' lam c\I+ / ��� +- + /OD \ - �- PERMANENT IMPACT - BZ 1 : - _ _ - - - - \ y •//� —� l N- /), / / / y',;' ' ' 44 44/Ii 'll 'InE'lltuilimmensw-_ , ...-- s -7 PERMANENT IMPACT - BZ 2: N\ \ `L '' - - - - - ; - - �' _ \ \ \ / / ,. / • �Oe -j/ P. �� - > -al‘ro Dc ill / / 611112! Gam•' + + + + + + + _ 17=r / ti/ / �mm' - _f------;--- // / / / �'— ++++++++++++++_ - ..............................................................................................................., \NN/ \ \ \ l / / l !!�� V — — / '/- - - - - - /4, --- ____ -- ----- — —IMIWAIRI — - / — — — .I kam. - ___ �Z�I i _ _ _____, I L / 1 ...„,......... AL X t� TEMPORARY IMPA T BZ 2: ��t / O C / I' IIMP N N I / .011111111_11"41111111.1_ .. . MNEMMIliiM 711,EPPANI....._ =IN ---- ---- ---- ---- -__. ____/ -----"—.1-----__________.___ •977-774 NI / \ ___ --- _ _ . • - - - - - - \ \ SITE 6 . — / ' / i• ' / , , / / / / / ' ,'/�/ / / // / / / as / / / / ```,, �iiii ,iii,i PERMANENT WETLAND W3 IMPACT: 0. 01 AC. , _►' SS N �— - ,��, Z��:OFF �O•''?'.� � k PERMANENT JURISDICTIONAL DITCH JD3 IMPACT: 0. 01 AC. /' /' /' / rf ' / w�' ► \ = :ate y9;':/ / SEAL • PERMANENT NEUSE RIVER BUFFER ZONE 1 IMPACT: 484 S . FT , / / , ` _/ / - ,050975�••: CX I ( /, �- .- I / / / I� / / // I co/ U).- N - - - - I- 0 0.•' •a• 0i i NO.�•r C • S. PERMANENT NEUSE RIVER BUFFER ZONE 2 IMPACT. 2 580 SQ. FTSEAL ..,,,,,, ,M,,,,,,,.., : °W x / / l /� I - _ --- --.- 11111!0.0*.... , -- / l I 1 '_':����� _ oro 1 SD II ----- ..---- --- „fgr/v.. ›:, -. .. % -- - _--_- ____ W._!; 1.... � It ff-/SAFill• I. - - \ r M� I / / j 3.7 F M- FM FM rM - ____ _ _ _Q., \ \ IQO N NAVY N _ � \- / � � F TRANSPORTATION \ _ ® \ PARTNERS JVV A/E INFO APPROMED 414 $ 16. -----/ : • \\/ \/ \ \\ X oounnoas ravFac >, � / \ PCiM1Y \ X 6� / / _ ' - 1 ( - _ i _ /--------------- SATISFACTORY TO DATEMMIDDIYY _ \ /\WV--Q) DES Eqs DRW TMG CHK RMN w \ ) 1 ;IEA _ --MM // M / nn� _ _ �.— — _ I _ PM/DM • / \ BRANCH MANAGER o SD • \ ` \ ( 100111V- , / \ // / CHIEF ENG/ARCH J wv (2) r [� I I '-'''' I I / -/ \✓/ // FIRE PROTECTION U X SD 3� � SDSD / / / B SD o + 15 OA �\ I \ / \ / -- 1 / ' BL E LIN� / \ ��N� _ - - - - - - Z z _ � I I �, / \ \ SO EA BUFFS, \ \\ - E �-� w z a_cp ! N \ \TR "'� ��� \ -RULE ON TQ� ar-'V 1 m� Q1 I I o1 •n / �� \ \\,`� STREA� � ,� co o ct w I \ \\ of r ml I �\ / 1` \ \ \�� \\ \ \� �� — o %� —%_ = U\ \ SITE 5 . \ v — _ -_- Z z z_ o / N 1 \ SMH #20 �� �, / - I ) I �\\ \ \\ \\ \\ \\ • co� / — w ? 0 Q I \RIM=27.28 pY • o " I ; \ \ \� +� %,�� - - T.O, Z J / INV=20.86 (E) ) � - , PERMANENT NEUSE RIVER , \ \ \\ �\ \\ wet _ — % zQ PLUGGED) / l/ / / / / ' -- • \ - W I INV. 2 ( /4- » Hp / ♦ / \ I I /\\\\\ \\ \\ \\\\\2^ „� - - - -__� - _ w m/ , 24 - , ,' \ I BUFFER ZONE 2 IMPACT. I �' / \ \ ,� - - - - � o S - Q � Q LLJ \ , L 1` _ / �S \� \ II 285 SQ. FT _ � _- _-__=_ - - - - -,�� - w Qw 1- 0 - - -- \ (.., jg ___ Araimminamummw.ftwvimmhift __ --..,.-....,......,„ < cf) c) 1 \ — 1 // / 1 / / / •ate 'sue__.= = ,_ — _�� --- s Tiii±I-Ii1 _ _ C D -I a_ `�'I + 12" OAK \ I ` - \ : I / /// / / / ��i��� ! - - _ _ - - - - - - z (L-Lj� U 1 INS \ 30" PIN�F' + / l I __ - I 30 + \ / / / 1 1 ii�/ 1 \ / / / \/ Ai 1 \ / \ w i= %J..), —. __ _ - = z p U 1- \ '1 co' c± 24» PINE / •• .• / / I I ~I / • • V /11 / / ' /1.--1---7-1 ,I-1-1 Z — a 6 15" OAK + / 1 k / / / /' / ` `e U Wpm —i N I / , / \ / / w z W A I 30" PINE + \ J' ' _ _ "i�� i U 1 o z o NpRTH / \N 15�- 00 2 SCALE: GRAPHIC / N EPROJECT NO.: 1565548 / N CONSTR.CONTR.NO. `; GRAPHIC SCALE IN FEET FM. M FM - FM \ N40085-19-D-9008 Q 0 12.5 25 50 — — — — _ / - - NAVFAC DRAWING NO. - \ _ 123456789 LLj -/ SHEET 1 OF 387 3 WTL305 J L� 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 1 I 2I 3I 4 I 5 1\ \\ `\\ • \ \ \ , \\ , -`�\ \ \\ \ \ \ \ / 1 t-f `�:4. 48 a 1 \-- - - \` \\\ \ 4114 � \ \\ \ \\ \ ue` \ / o SITE 7 : \ \\ \\\\ \ F \ WETLAND IMPACTS LEGEND \ \ \ �\ \ \ \ \ , PERMANENT WETLAND W3 IMPACT: 0. 01 AC. N - \ ': `\ `\ \ �\ o o PERMANENT STREAM S1 IMPACT: 242 SQ. FT. . '�so\ ` \\ o �N \ �� \ \ \ 1 \ . \\ \ \NI I \ p / PERMANENT IMPACT - WETLAND: + � + \ \ \ + + I + + °1 �� I PERMANENT NEUSE RIVER BUFFER ZONE 1 IMPACT: 16 ,228 SQ. FT 9�e � �. � \\ � \ \ \ \\ \� \\ PERMANENT NEUSE RIVER BUFFER ZONE 2 IMPACT. 9, 731 SQ. FT PERMANENT IMPACT - DITCH: D _ _ N I \ \ \ -c4 D \ \ \ \ \ �� ����\ �\ ` \\` ` ��� \ - - I ` °� \�cg PERMANENT IMPACT - STREAM: o _ I \ A ii„......jr,www N, --I ............ F r, NkmilliumVIIIIMIMM-WIUIM‘WW.1211 4 w-'1111..IIIMA'Aill4C.fliP 'Ila 1 skliritli‘alrommIIMIMT7r-111111076--_,w__`--- Aims,-IS --- -- ,jn.11111111111111111111111111111Mmiiiiii' 1... PERMANENT IMPACT - BZ 1 : ism. walssivacmwg. ---1 .,_, :lm„_. ,m_.. ---_-_____ t. 4., ___ e----- --- . 4 `;-1.-----______\_____ \ Mik MISINNIOWO WerM63§1W PIW. A \ C'e - --, DO.' kmm.TWO ►��►�'� , F -7______-------------- ���� �� �' PERMANENT IMPACT - BZ 2: �- Ak - \ ` _� - '��� ?'��'`�.4. _ _ \/ I / / / ,.+.,.+.,.+.,. \ - 4/4/ .: � I\ \ \ \ I 1 s ++++++++++++++ TEMPORARY IMPACT - BZ 1 : iiimpr \ \ -,_ s _._-- --- , _ _1.* _ _,4*), _ 1 _ \ \ i 17__ ____ , \ 1.._ _ _ _ _/1 \ 1,-! ( ok_ .3- / �► A:1r_ / + i. + i. + i. + . IIW 1 I I \ \ I N \ 2 TEMPORARY IMPACT BZ 2: / N S /v O C J 4,7i,,, ,, \\ \ _ �, will a \ \ \ I `ir�1 Y FJ ccF° 16 5+QOI\ / / / �`�� Ci Q/; ����'� r� / ' 1� FM \rw \ v / \l \\ I� ��� + ICJ - I I `� _ I411r.... ....___ + / ;.` Q`� ••SS•'O` �,;8"E. S4N. d � �y�/O/O \ r� _ u FM\\ ✓ � FM \F\M .M_ _ =1_ `.FM = ,M _ - _ FM F�1 ` FM _ FM - J FM ` 'P 1��� 2 �� Oy9t9FLOW O/ \ NIL / L1 ` \ • = ��Fl l .� - 1 i - i \ = SEAL = / ,Q / / / / / / / / .03 : 1/28/202 ® ® � \ :;-: i�_ �/ / / Ian / / � _ 0 ••,Y' . :::: V . III Kv 1, iv: • • 11 -mdilM I 12 V ;-r:,-•':-,c,./..// ,.._.,;'---;, ' cyC° I : / II \ / --______ IIMINMIIINWBNIMMMMIIrallra...."".. .......... mmmmm........_AllIlliailMil!lli--"MIMIIIIIMalk ---- -.11.114MilltaL N 4 / OHO 1 r -, _ ,ta -__ •am7,••_ -0.--=,,,mmrp .11.5p,„ _ eannaii_ i'azrii _--,---__ ______ ,,,---,--------- ._mmi--------- - -- , - - 1 2"Ei. w , ........- ii-mg........mm.,..m........V.... .=4"W,,;--.--__,..,-__.....AZAbr. 4_1_- ±7-4= 1'1 v. Afr4 ,, u, - NAVY _ _ I. „raw/ / / / r ����� _ ITRANSPORTATION \l ' RI �-� _ ■ ivi ----- ■� C = = y / Fy 111111. PA RT N E RS J V WE INFO ai Leh / / / // / 1 / //i. :�7/ )144, 11/,�r' _+ I / / / ';':1' \�\ APPROVED N / / l )�/ iii.„.41. \ \ \ r ' J \ \ I \ • �� ; RCP SD tri v / / / , , 07 / / - nC I OD ,y/h, �/- _` 1 I 7 (AMERFOR ravFAc / / / / ` / W / r acnHn / /l r ,. _ Al .��r� I �► l / l ♦ 1 / /'I'�'�7j �3 LOD LOD •Ir 0 Rd / r �_ _- , - rm ! r_�>•��iIt-ti �/ / / /� �/ / c:7707.Z6?1:jr,, Nv /// L1 �� V n 1 / -U ' J �� i �. v�r�-! � / 8"`O - 6 CLAY , � \ coSATISFACTORY TO DATE MM/DD/YY rd MAIW.�MEMII.� irv�r - ra / cp - '°Jlo A �//■� l_!A'/�IN/IlI1/N� -� � / \ - e► �f� O �,/r, DES E/q$ DPW TMG cHK RMN / / �/I� i FLOW y /*/ w ' -»MJEA/MIIMOIL�aMEAtMl1'�NIM=Eia►�/r / J2,, / S J I re PM/DM L 2 ?� 2�'' `,� // I R� LMIM/M�R1L/LI WMAKI ��,�r 411, / / �, -'60 (S. 1 / D O BRANCH MANAGER F�2)`n i / / , My_MEii i ti i�� / l°oi / , - oOO o r-N I I p I I / o co V CHIEF ENG/ARCH M / / / / w� / / / \ O _ / \ I FIRE PROTECTION -44 Z B ��� ' // / / / w,f-imim���/'� °D A l l6) /.Qii :,� / - „ 1 \\ I I I 1 2 U 2 C // / // / // / / / / �,flowo ._ �i / / / / � / l 11 11 l l / • � „ �/ 6 I \ I I II I ozo z _ ll�ii'' �/ / / / l �``= �:�J. l i / �/ / 11 - / \ I 1 I I / o ss� / // / //// /� / / / / / l 1 / / I l/ / /l/ l f l / ��. .� \ I I I / w < 1- a Ca LGW / / // / / / / / / j'� // // i I I l I I/jll 11 / l 11 // // o" I o \3,+ 58'�' \� II I I o >_ L.0 vi o� // a' / , / // I l I l l 1 ,� � , , y, o > W c, 2/ / �/ / s'M 4 / // o / // l •• �// // / / / / / / i /// �,l l l , // � 1 0 , e I / Z z = Z N p/N /� ��/// / �1yh, 2�F•w / / �E�/ / / // // s�/T / / / / //�/l /qh,/ / F X30 ' I I I I I 30 w Q U Q P�// /Nv '---,5)3� / / O F�J /l l ikF� c�/),� t / l l/1// / / / / / /// / REx '\ J / � / ° O / / O/c / / l OUTLET CONTROL STRUCTURE mw J ���/ S B to Nv ,� // J / \ 1 / / y 1 11 DUCT BANKwC� 7 / /�, 9 / /pSC/ �� / / / 3 / / / ° / � K2RIM::2.08 EL. 13.44 O O = �lS/,PF y' �i J / / ? / ,o° F / / �I'Of\ ll�j / lll �a / INV. IN:2.08I F9,� 1,� TS / /l� O�j OUTLET CONTROL STRUCTURE INV.OUT:2.08 o u) U < Wr' �FFF� rS�y // ,1 // � J / / /./// /'� ' o�� / / l l ' l l 20/3 DO RIM: 94.29 w 1 1 \ / l 1q/ P G I l7� l ,447 //I//i� 10 J, INV. IN 3.36 Q W (/) I / / // �' P J INV.OUT 3.36 K-1A > H 1 / I \ % / / // / / / / / / / .. ./*/*Aliiiii / / l l / l /4/k/ .08 Mr NCDOT 840.31 JUNCTION BOX z Cr) U 3 1 / // t / / / / / / 20_ W/.NCDOT840..54.MANHOLE -20 cn l 11 1 1 / �l / / l / lam/ /// / / / / / / l // l /tiv� /� 6 �� M o / / I / / / / / \ / / / l ' l : � �jy /00 r'SF RIM: 13.96 U / / \ /C ///�/ / / 11. / / 1 / / / / / /%/ / l l'o/" _ v� °�¢/tic 9 �SFJ °�'°.oJ / \ J INV. IN:2.01 Z LJ.J U `„ / I / / i I • "y / //� / / �O¢, zINV.OUT:2.01 QM / I A / , o/ I/ / `'j /I I l / , / � ', � ��5�: ° , �'qr a w J z / l \ / y I / // • 1 / I l �► r�l r' I /` \ F�J Ls \ z U 36'OF 60"RCP Z Q (/) ¢ y / I I / I 'I //1 / / �1 / / I I I �/ , �� �� , �/ / ` 12" \ N �� \ 2"CONDUIT @0.30% O U \ 1 / / / • / / / / / I I 1 I I / ' I / I h°� \ m EL. 15.83 I 1 w Z W / / / I y 3 y �� d / \ w Cl� �, � 1 / /\ I / I / / o / I I 1 I 11 1 o" _ /1 I / / / 1 •I I III III' ,t i/p/� om / o w 2 I / I�/� / / 1 l 1 1 18l, bs �� I i \ / 1- rn / I I 1 I t ❑ V / / / / 1 I 1 I 1 1 11 I o�c o./f I -•.r 's o I 10- U -->''� V , w W W -10 ~ Y z.oC '� EX. 12"WM 1 N > I- Q U ¢1 I I I /I / ��( I 1 / / I I I 1 I q 1 7 ' °or �. I / II 1 1 1 ❑ ❑ // ) / / I 1 I / /r ` v� I / EL. 10.24 M �# 1 I j_ CL •1 w ¢ M l I I I I I I sq,1,/ �\ / j ce l )J)I( / I II11 1117/11 I1E60RCP A 1 111 �, qB Tq / lI / II / 1 /NF / 12a'OF R A I I11 °�F/ \,�/�, 1 cP/ I / 100%31I p / I 1 1 I /� 1 1 1 I I I I 1 \ \ \ tol �. 1 FOR REFERENCE o Z II 1 6r I I I l� 1 // Tc \ 1 .1 1 1 I1 1 i 11 I 1 11 1 1 \ \ I\ ,,„ \ \1 1 d / / / 21 " 1 1 I o FOI 1 1 \ \ I\ „e: \ - SEA SHEET CG5049� < zo, ( _ \ / ,' 24'OF 60"RCP t\ rx , FOf�SIZING N�pT a�' \ \ { / / /.I / \ I I I "` I SSCALE: GRAPHIC O 1 \ I 1 / / I °q / I I I 1q1�4 \ \ \ I \ \ itrrrrrrr?M. @ 0.30%\ 1\ \ \ \ IIII / / 1. / _ _ �� 1 \vidito \ 1 I 2 ' I `1-/\ \1./�L, �, .. \\ 0 0 O O N CO Lo M EPROJECT NO.: 1565548 1 1 761 IV to 1 il CONSTR.CONTR.NO. \ \ 1 1 �I �o = / /// // / I 1 1 \ \ \ \ -1+00 0+00 1+00 2+00 3+00 4+00 5+00\ \ \ \ I 1 ��� / / I I I I \ \ /� « ,� LOB �- _ GRAPHIC SCALE IN FEET N40085-19-D-9008 \ \ 1 V / ^i ��., `� S� • - -- CO Q 2.5 25 50 NAVFAC DRAWING NO. Y \ I I 1 13 / I I 1 \ \ \ o ��; , ,•� CULVERT CROSSING: K-0 TO K-3 SHEET 123456789 L 1� '� \ i I III � / ta: // , / I \ 1x, _, „ c�, O, �-` \ 387 r _ / I i i N. , , , . , �. . , -1 +00.00 TO 5+00.00 WTL306 U- 1 w I /'. 1 I DRAWFORM REVISION:25 AUGUST 2020 1 2 3 4 5 ftesiftoI 1 / / / \ \\ I/ / / \ \ o ,/ 1/ j / /� 1 0%IBD LINE /� ® ' \\� \\ \ % / / / // _ — I I \\A /I / / / / / _ - - I I \\ I 1 . D /' , ' / ' � /' / - - _ ', ', ',\\ I SITE 8: D / I _ PERMANENT WETLAND W8 IMPACT. 0. 05 AC. Z / / / / , / / , , - - / / ' / / \ \ PERMANENT WETLAND W4 IMPACT: < 0. 01 AC. o / / / / o 1 / \\ \ I `\\ \ \ \ // / o.%// /' �// / // / �' t_oD � � , 1 \ \ I `` \ \ OD \ / / / / / / LOAD 1 / / 1 / / 0 / // /z/ /i —» \ WAN. MM. / / / COD /\ �_= O / / / LODmr / Lora -- — ���.= — LOD / l ni'�,—raw, LO / / �I \ / e --�—mot- -� -- r�•�• --- --- -- •- • / � i-- / - �_o� - - - -- T -- ice- -%` G= _ �0%1 i/4 f - / __ \ CAR . a SEAL / z \ SOD 050975 // // //// // / `- ' / / /\' / ' '/ / // / \ • 11/28/202C 1 ; y i • — — — v _ _ _ - - - - - - - - - T7�+00 - - - - - - - - - - - - - - - -' _ — _ - - - - - - - - — — — � • eD _ � r vv� WA WA — = — - - - - - _ _ 7 /IV GI; ) —iniT - - - W \\ NAVY TRANSPORTATION �� W PARTNERS JV „�INFO - - - _ —M - • - - - M —���M - s )1 —9, �� - - - - - - - - APPROVED / -�T — _ COM .1111.‘111511 SD - - - - f _ 111AMMIIMMISIMV �Q j�'� _ La:= r_ `"mo) - - - FOR COMMANDER NAVFAC 7w4 / _ -• / r+� Immw1. - —\ g�� SATISFACTORY TO DATE MMIDDIYY Sp _ova ` _ \ / :.1 1^- OS ` SO DES EAS DRW TMG CHK RMN \/ \ d `M " — \ 4D PM/DM pQ BRANCH MANAGER M _ - - - - �.,,r,�� J _ _\ \\Lu _ , — _ - - \ ao� o ® o�o�� \ CH WETLAND IMPACTS LEGEND FIRIEPROTECEF TON .//cX \� - - - - _ m - O\ - - ___- - - \�\\\ \ �Fo� �� E. UG. ELEC. \ / Y z B _ - _ \ \ � - , 41) _ PERMANENT IMPACT - WETLAND: Arnim Z / / \ \ \ PERMANENT IMPACT - DITCH: o I / z \\ pO '� — /' - \ �` \\\ �==�\\�\\\\\� � _ — � z I , , , , - \\ \ \ \\ \ \ \ _ 1 \ PERMANENT IMPACT - STREAM: Z a LuZ1 - \\\\� \�\\� N \ \ / w � m \\\ \`\\\ \�\\- - - - \\\\\�� l\ � , \ \\ \ _ O / �" \ \ \\\\\`\\`` _ Nx _ _ - - \\ \ \ \ \ \ / �- PERMANENT IMPACT - BZ 1 : O / \\ \ _- -=-N` \ � \ � \ r Qw \)/ • 0.8.__ /z > CC CC I— o�\ \ \ `� � \\\\\\ �\\ \ \ ( / / z6' PERMANENT IMPACT - BZ 2: c� W \ \ \ \ \\ \\\ \ \\ \ \ \ \-� ' / 06''� ++++++++++++++- TEMPORARY IMPACT - BZ 1 : z 0 w \ i r \ / \ / \ >< TEMPORARY IMPACTBZ2: CL \ � •0 O \ z Q 1 \ \ \ \ \ \ \ \ \ \ w Q cn CO / 1 / ` Z\ \ \\\ \ \ \ \\ \\\\ \ \ \ \ \\I \ \\ / o _ o � A / � \ . \.. \ \ \\ \ \ \ \ \ \ \ \ `s` \I ' zQ � A I \ \\ \ \\ \\\ \ \ \ \ \ \ \\\ \ \ \ SCALE: CT NO.: GRAPHIC R I 1 z\\ \ \ \ \ \\ \\ \\ \ \ \ \ \ I — — 1565548 \ \\ \ \ \ \\ \\ \ \ \ \ �\I /� coNSTR.CONTR.NO. N40085-19-D-9008 L J / \ \ \ \ \ \\ \ \ \ \\ , „ - GRAPrHIC SCALE IN FEET \\ / \ \ \ \ \ \ \\ \ \\\ \ \ \ \�` 0 12.5 25 50 NAVFAC DRAWING NO. \ \ \ \ \ \ 123456789 \ \ \ \ \\ \\\ \\ \ \ \ \\ SHEET 1 OF 387 \ \ WTL307 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 1 I2 I 3 4 5 0 a a w F- WETLAND IMPACTS LEGEND 0 /i/' ' PERMANENT IMPACT - WETLAND: PERMANENT IMPACT - DITCH: / PERMANENT IMPACT - STREAM: Z \ \\ \ Y o \\ \\ \\ PERMANENT IMPACT - BZ 1 : \\\��\ �- 1:— \ oi.Zm\\ \ -_ or \\\\\ /\ \ oa \\\ :\ 0 _71-71—alli. \\ \\ \. o \ \0- ) + PERMANENT IMPACT - BZ 2: �� \ ��o 1 — _ _ _/ ��, \ \\ \\ . . . . . . . \\\\\\�\��:\\��'� - - - - - &IF ,. . \ �\ ;+;+;+;+;+;+;+: TEMPORARY IMPACT - BZ 1 . \�` \� \ 1 � I s 1 \ ear - - \ 1 TEMP RARY IMPA T BZ 2: 0 O C ::/c/of,71::;/::::°9C)a BA 6, �_ OF . � - P T6I ,....................................................... Q B •ii M rig 6" C.l. (QL-B) TBM "C„ - \ II II\ I �\ \ \�\ 1 I I �' LOD O :OFESS/�y••Q9\ 1 'laa, 16..,a P �� •` . I I \\\ \ I II - ®M� 1' _ SEAL = FM. Et/AULMM ���� �P/�\�Cjj\ \ 0.�•c•i��c•• • I I I \ / �WATER� \\\ III%��► I 3� ( OMM MB = 050975 q :;., _�-•-I� '-V�I,�,,� `''�\\\ ,:•• •.!' `f• ':: / J \ / WATER \ \ \ I I ' •: IIrd0 COMM p� ) COMM 13 ,• 11/28/202� . y _,,�� ' , �.•�• ,! . / / CONC. \ I I �LOD LOD \; I •�' I . �``SP p ' % M�c L ' O ••• 101 m0. • `o C /�vQ • C __.-•___-' _� V'G- �GJ ♦,l ••1 ` C••.i•i f 1 • •. / LOD •.-�f. � O E .�V•. '� /� 1 • iI •••• ••• i— lAtie ,�l` /i • e• f• '•�I. • ,� f • Q 'f 1'� `.-.. �� iA/• , COLUMNS (�'P.� \\ I lL YY 12 D.I.D.l. FOR -''� 2 E.GY +� .c,; �•:�, ' `� ,`•µ = ' ' ••, .,�.• .• , : ,; p� 4" P RAINS 4 PVC DRAINS _ � � - - L 06 ,,��`'N �•``• -: � • . • • _ .„•if.,_ GUARDRAIL —__ ——- -- - ����►�iM�-. �♦ • .-iwi�..� _ . IG L'11�r" �� }• •i ce.� --= -�re.�rr �: .. ....�.._�.. - •._, � _. i SEAL '- -./. i- , , , , „ „ , il II v 1 I R LIE Mk' ° _- - -- -- 03 - i02____ - - ° C�7/d�C\ /Gl�l _ ° I \ \\ \ I Oro / . I I \ CONCRETE BRIDGE CONC. - / Q o REFLECTORS/ ASPHALT / W I fNd. hR,(Dp' I I \ 0 15 15 COLUMNS---„ ? \ \ 1 I II\1 .! ,. > - - - - 00Illl JERS BA RIER �,� _____ CON . �lE EY .A 1 `-� — - _ -— _ c� rr� s s= =' -- Mr BMA I r �. 0 CPN �EpEq AlTH ` s Ewa j i�� —*=r—o-- _ - J - - �� \ _. _ TF�yl II r - �®N • • ____ ____ _ 10\trs, 141_ . __ - ,. GUARDRAIL _ ,- -__ NAVY — + - - s — / / P '111 ' O I i L \ / PARTNERS J V A/E INFO I 1 — — — — _ J /j/ / ) 1 �0 C I it �„� �_ TRANSPORTATION — / , / / Q N �� \ SQL y 1,��'�� N N N ) 2c /i N _ co LA r 11 \ q/ I �tri // /� // / r — / — ,- / / \ / \ � s , � _ - - - � - - - \ _ \ F cOMYANOERNAVFAC `ram ( I / '_ > / / ,: � :: II ' , \ \ , _� _ — _ _� �I \ 1 vv � � ���' � III vv � _ _ � �vv vv \ ilk 1 / \ / / a� m \Gam. , _© �i —� — - �9�~ / / I I \ rtl� SD `�— D Q \ \ DESSATISFACTORY EAS DRonW�TMGMMI�� RMN PM/DM / I '�$1� / /® / >( k I I k / ' \ _ _ \---- BRANCH MANAGER S0 -�— / I I I / CHIEF ENG/ARCH ,) I" -� / / / .. : : :: k I GM k // .. ' / / / /\ k Ik 1 Q01 Q01 k k k /// 1 k �= FIRE PROTECTION / \ / 1 • oB \ \ k I —WATER 0 k 7i'/ , k =! B !/ \ \ \ \ k, I I O WATER > 1, A�� .is — 2 z o N 1 II I\ \ \ Ol \ \ a \\ \ \\ a0� \ / 11 1 \\ `� _!. __� } < r U oi- \ I\ \ I \ o 1 \ \ I \ \ \ Ds \ \ \ \ 1 \ I I I / / /a0� 3 z CL m 00 , I \\ 0 1 I \ \ \ \ \ \ \ \ \ 1 / I I 1 G\ OH_ u) ,.., \ \ \ \ \ \ \ 1 I �, c� U 0 x m 1 I I \ \ \ \ \ \ \ \\ \1 I till 1 1 \ / OD / Q cn Q ,� M �� \ / \ \ o \ \ 1 \ / / , 1 I I \\ �c. COS U CD U w J O SITE 9 : SITE 10 : z z 0 N PERMANENT NEUSE RIVER BUFFER ZONE 1 PERMANENT NEUSE RIVER BUFFER ZONE 1 . ,IMPACT 2127 SQ FT MPACT: 3 007 SQ. FT J 1 ,7) Q PERMANENT NEUSE RIVER BUFFER ZONE 2 PERMANENT NEUSE RIVER BUFFER ZONE 2 < u) T N '�` IMPACT.PACT: 3 249 SQ. FT o a o A IMPACT: 1428 SQ. FT Q v H z o z TEMPORARY NEUSE RIVER BUFFER ZONE 1 TEMPORARY NEUSE RIVER BUFFER ZONE 1 Now-�`A o IMPACT: 1 249 SQ. FT IMPACT: 1 ,653 SQ. FT SCALE GRAPHIC EPROJECT NO.: 1565548 TEMPORARY NEUSE RIVER BUFFER ZONE 2 GRAPHIC SCALE IN FEET CONSTR CONTR N-19-D-9008 924 NAVFAC DRAWING NO. Y IMPACT: 839 SQ. FT 123456789 Z 1 OF 387 �j SHEET WTL308 1 I 2I 3I 4 I 5 0 STA: 156+25 25 / o 20 -- - - , - � ��" �� 20 STA: 128+00 r D 35 15 / / GRAPHIC SCALE IN FEET D / i 0 25 50 100 20' BZ 2 IMPACTS 140' WETLAND 11 _ �- /' 11 IMPACTS / HORIZONTAL o F 30 30 STA: 137+50 10 / LIMITS F PERMANENT 10 Q u) 35 I I I BZ 2 IMPACTS 191' WETLAND / LIMITS OF PERMANENT - - - - IMPACTS _ BZ 2 IMPACTS 0 2.5 5 10 ' - -N LIMITS OF PERMANENT11 6111112! 25 LIMITS OF PERMANENT L- �� LIMITS OF PERMANENT WETLANDS IMPACTS 5 BZ 1 IMPACTS 5 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 VERTICAL WETLANDS IMPACTS WETLANDS IMPACTS 30 30 - - - - - - _ STA: 149+50 Wall&k. . 30 _ 30 67ilr LIMITS OF PERMANENT _ -�- — — WETLANDS IMPACTS- 20 20-140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 25 25 I 6' BZ 2 IMPACTS STA: 124+00 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 _ _ _ - _ , M 1111- - _ _ , . 35 71' WEI I TLAND 5 I A: 136+50 25 7 r IMPACTS y 35 44' WETLAND ��,,,'f""',�� / LIMITS OF PERMANENT �r ,NN��� CA 0��/i„ IMPACTS / BZ 2 IMPACTS .. - 1 r ■ �� A ��......� •AEI / LIMITS OF PERMANENT ` ZO Q ffFS S/n.••:y'� '% LIMITS OF PERMANENT / BZ 2 IMPACTS - ••Q` '�'; 30 30 WETLANDS IMPACTS 20 / 20 = a SEAL r / = 050975 = LIMITS OF PERMANENT 30 30i. • c7 - - - WETLANDS IMPA TS� _ - - - — - - - ' O•.• :'� C // ' � • . cIN� .� r — _ - _ _ _ — _ / A. ''••.....•• * C LIMITS OF PERMANENT/ LIMITS OF MANENT — — - 'r M 25 WETLANDS IMPACTS 25 WETLANDS I PACTS 15 / ,,,,���-i i i i i i i i i- �,`,` SEAL -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 / 25 � -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 / • STA: 122+50 oro ,, a 35 I I I STA: 134+00 ® 172' WETLAND ` I W . A L____.E.2 IMPACTS I I10 \ -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 30 21' WETLAND 30 IMPACTS -\ - - -- - - STA: 141 +50 ai 30 \foFPERT 30 35 NAVY / c�N -- _ _WETLANDS IMPACTS / 265> DITCH PARTNERS JV ,N� LIMITS OF PERMANENT _ A PROWD tri i _ _ WETLANDS IMPACTS 25 // IMPACTS , 1 025 25 LIMITS OF PERMANENT�� / 30 30 FOR COMMANDER rIAVFAC - -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 WETLANDS IMPACTS AcnHn STA: 122+00 DITCH IMPACTS�> — — UMIIT�STOF PERMANENT LIMITS OF PERMANENT — - 35 20I 20 mum ur PERMANENT DITCH IMPACTS I — — — _ — _ i SATISFIVCTORY TO DATE MM/DD/YY Z 18 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200$ 25 160-140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 DES E,qs DRW TMG CHK RMN 0 PM/DM 1= N STA: 131 +50 STA: 140+50 BRANCH MANAGER 0 30 r 30 I I 35 CHIEF ENG/ARCH g / 110' WETLAND _ FIRE PROTECTION \ 8 _ 259' WETLAND _ B \ 177' WETLAND IMPACTS IMPACTS U B / LIMITS OF PERMANENT Z \ IMPACTS DITCH IMPACTSQ / - LIMITS OF PERMANENT 28' WETLAND o U o Z LIMITS OF PERMANENT r/ �, — — — — — — — — — — — — — — — — — 30 WETLANDS IMPACTS IMPACTS 30 o o 25 \,// �uMITS OF PERMANEIYI LIMITS OF PERMANENT DITCH IMPACTS 30 30 co Z z d WETLANDS IMPACTS WETLANDS IMPACTS LIMITS OF PERMANENT o _ } 1-1-1,v 1 - - - - - - - } u' J Z WE ANDS IMPACTS \ / LIMITSMF�PE♦\MANENT — — — — L.J WEFLAidBS '� / ,i LIMITS OF PERMANENT LIMITS OF PERMANENT z ¢ = Z �w �, LIMITS IMPACTS U Q (n 25 WETLANDS IMPACTS w Z 20 20 24 / 24 "` 25 z Z O m -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 w U STA: 121 +00 STA: 130+25 STA: 139+50 o O 35 35 Q Q cn 70' WETLANDy _ 214' WETLAND - IMPACTS IMPACTS<> 7' DITCH L 277' WETLAND _� Lu O IMPACTS IMPACTS > I- CC C U 3 J z � D c ) 0 30 _ 30 rn LIMITS OF PERMANENT W 30 - - IMPACTS 30 30 Z //� U 'NI \ _ V J LIMITS OF PERMANENT — _ LIMITS OF PERMANENT /\ /-DITCH _ _ _ _ — _ _ _ _ _ w O v \ WETLANDS IMPACTS — — — _ WETLANDS IMPACTS �< - - - - - - - - - - - - _ - W J J ') LIMITS OF PERMANENT Z Q a) j _ WETLANDS IMPACTS N / \ / 3 Z U _ _ / LIMITS F PERMANENT LIMITS OF PERMANENT _ _ c \ / LIMITS OF WETLANDS PERMANENTMPACTS 25 \ — P.\� Z O Q LIMITS OF PERMANENT WETLANDS IMPACTS WETLANDS IMPACTS LLl H DITCH IMPACTS 25 25 24 '4 25 25 Cl) < 2 _1 0 -20 0 20 40 60 80 100 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 STA: 119+50 STA: 129+00 STA: 138+50 Q - a U CO 0 35 I 35 _ 281' WETLAND 1 0_ T A 16 IMPACTS WETLAND _ 1851MPACTSND IMPACTS o j o p A N - LIMITS OF PERMANENT W < W * ---1 _ WETLANDS IMPACTS 2H o Z ci3O 3O LIMITS OF PERMANENT z Ct r 30 / A\ 30 30 0 , , GRAPHIC o ` \ LIMITS OF PERMANENT — _ — _ _ LIMITS OF PERMANENT — — — — — — — — — — — — — — — — EPROJECT No.: 1565548 °' / WETLANDS IMPACTS _ — WETLANDS IMPACTS — — — — — — - SCALE: — /L - - \ / \ LIMITS OF PERMANENT /7-\J\ / LIMITSOF FERMANENT� 25 WETLANDS IMPACTS �. 1— CONSTR.CONTR.NO. :b WETLANDS IMPACTS N40085-19-D-9008 m 25 25 24 24 25 25 NO.DRAWING-20 0 20 40 60 80 100 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 NAVFAC D 12NGNO. 9 uj SHEET 1 OF 387 J WTL309 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 1I 2I 3I 4 I 5 0 0_ w H STA: 161 +50 20 20 STA: 162+75 20 15 \ \ — / D D �� -::\ �\ 70' BZ 2 IMPACTS / 65' BZ 1 IMPACTS \\ 15 �/ 28' BZ 2 IMPACTS \ • \-/ \ \\ • 1 / 10 // \\ 1 0 \ LIMITS OF PERMANENT / O c_ STA: 190+08.11 51' WETLAND / N \_ \ 7 LIMITS OF PERMANENT D IMPACTS / �BZI2 I OF MPACTSMANENT N N --1--- _, �� '�\— v/w/ BZ 2 IMPACTS 1 o / LIMITS OFFZ PERMANENT MPACTS / 33' BZ 1 IMPACTS / BZ12 IMPACTS PERMANENT -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 /�\ 5 / LIMITS OF PERMANENT STA: 162+50 /~ --77' BZ 1 IMPACTS BZ 1 IMPACTS LIMITS OF PERMANENT - _ — 20 / \ - 1 O LIMITS OF PERMANENT WETLANDS IMPACTS /LIMITS Of PERMANENT \ _� WETLANDS IMPACTS 10' BZ 2 IMPACTS _ / BZ 1 IMPACTS / -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 \/\ l 73' BZ 1 IMPACTS �/ LIMITS 0 OF PERMANENT IMMPPACTS \ wilir STA: 161 +25 25' BZ 1 IMPACTS LIMITS OF PERMANENT - s v - 20 15 BZ 1 IMPACTS _� \� 28' BZ 2 IMPACTS — _ _ 31' BZ 2 IMPACTS i LIMITS OF TEMPORARY — —/ BZ 1 IMPACTS LLIMITS OF - TEMPORARY LIMITS OF PERMANENT • / BZ 1 IMPACTS BZ 2 IMPACTS \ /\ / LIMITS OF PERMANENT AI\ \ / BZ 2 IMPACTS 30' BZ 2 IMPACTS \ \ .�` ,',. 15 \ 10 \ / LIMITS OF PERMANENT / 10 0 `���``'��••�,a RQ��i,,i — �� 4 \ BZ 2 IMPACTS \ / -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 •, / \ / LIMITS OF PERMANENT Q GFS S •• Qi 39' BZ 1 IMPACTS \ LIMITS OF PERMANENT\ BZ 2 IMPACTS �+ / - Z : Q` Q ••• 9 / LIMITS OF PERMANENT LIMITS OF PERMANENT BZ 2 IMPACTS 1 ST! 83+30 ti 1. / BZ 2 IMPACTS \ BZ 2 IMPACTS I \ -it LIMI OF PERMANENT 4� '��•1 18' WETLAND - \\ LIMITS Of PERMANENT LuMln OF PERMANENT r BZ 2 IMPACTS 5 I • _ SEAL / \ ez 1 IMPACTS \ / LIMITS OF_ERMANEIh .71' BZ 2 IMPACTS -- - 42' BZ 2 IMPACTS _ • IMPACTS BZ 1 IMPACTS : 0 / LMITS OF PERMANENT \ 10 \ J\/ BZ 1 IMPACTS I ' 13•:• 050975 • •. .......- 1 / BZ 2 IMPACTS / 71' BZ 1 IMPACTS — -- — 42' BZ 1 IMPACTS O .•�jjj � ; c,� : cy C LIMITS OF PERMANENT j , •r c Nt WETLANDS IMPACTS \I _ i i� y •.. *� ,� _ _ LIMITS OF PERMANENT BZ ITS OFIMPACTSEPERMANENT 3 / I LIMITS OF ORARY 1 ,,,,''I I 151111 h 1�� `,`,` / 1 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 uMIT� OF PERMANENT Tar 0 �% SEAL BZ 1 IMPACTS / / BZ 2 IMPACTS / LIMITS OF PERMANENT STA: 162+25 / BZ 2 IMPACTS JbThANDS IMPACTS 20 ZU LIMITS OF PERMANENT -8Z 12IMPA OF TE TEMPORARY • I 4 4 - BZ 2 IMPACTS _3 01`0 120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 -140-120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 I- STA: 161 +0 SD 74+5 �\ 31' BZ 2 IMPACTS 1-\ E 20 20 15 \ -62' BZ 1 IMPACTS \ NAVY 6� \ LIMITS F PERM NENT 15 /� — — I --I- 1 IPACTSrN20' BZ 2IMPAOF PERMANENT OZ 2 IMPACTS \ 23 WETLAND \ [BZ 114 BZ 1 IMPACTS / \ / \ PARTNERS JVWE INFO tri _ - - -\CV ' �\ \\ IIMPACTS / 1// \r \ / \\ / \ *PROM >` 15 . — l/ i \� 10 LIMITS OF PERMANENT \ / LIMITS OF PERMANe T 1 0 , / \ / \ = / \ BZ a IMPACTS BZ 1 IMPACTS C 10 36 WETLAND cBZ1TS OF 21MPACTSMANENT N \ \ r IMPACTS H \ UNITS OF PERMANENT /� \/ \` FOR�MYANDER NAWAC / \, BZ 1 IMPACT \ / TLANDS IMPACTS NT \ LIMITS Off PERMANENT // / \ ACIMIY / LIMITS OF PERMANENT \ Z 1 IMPACTS / \ ��BZ 2 IMPACTS LIMITS OF PERMANENT\ / \ / 6 -r/ I WETLANDS IMPACTS Ni \ / \ \ 0 10 \ / \ /'LIMITS OF PERMANENT -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 \ _ / 5 / WETLANDS IMPACTS \ SATISFACTORY TO DATE MM/DD/YY N /T �' \ DES EAS DRW TMG CHK RMN zo J TA: 15 t00 �\ / LIMITS OF PERMANENT \ PM/DM w _ -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 WETLANDS IMPACTS \\ BRANCH MANAGER o - CHIEF ENG/ARCH — -_-- STA 62+0 1 FIRE PROTECTION 20 20 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 20 _ — — — �� 20 + Q Y 3 B f STA 74 2 2 d B 0 / 85' BZ 1 IMPACTS ° 1 o z ITS OF PERMANENT- - Z ? / BZ 2 IMPACTS 15 w zz 0_c' / LIMITS OF PERMANENT /- — — } BZ 2 IMPACTS \ 15 M OF PERMANENT / } a 1- N / 13' BZ 2 IMPACTS BZ 1 IMPACTS \ U Z 15 4 BZ 1 IMPACTS / o / `\ [39' BZ 2 IMPACTS / \ z z = Z N / 4' WETLAND \ \ \ �` 1 w U Q Cl) / \ - - \ / \ I \ W 0 -J z IMPACTS LIMITS OF PERMANENT r� 81' BZ 1 / z z 0_ BZ 2 IMPACTS \ 1 0 \ \ / \ a m LIMITS Of PERMANENT / z 1— X LIMITS OF PERMANENT / 21' BZ 2 IMPACTS \ BZ 2 IMPACTS / \\ IMPACTS 10 \ 23' WETLAND \J/ \ C� w WETLANDS IMPACTS i / \ IMPACTS \ LL, 0 W Q 1 Q LIMITS OF PERMANENT \ / H LIMITS OF PERMANENT / UNITS OF PERMANENT BZ 2 IMPACTS J LIMITS OF PERMANENT \ \ / U U 0 WETLANDS IMPACTS �BZ 2 IMPACTS \ / BZ 2 IMPACTS \ \ \ U Cr) LIMITS OF PERMANENT / UNITS OF PERMANENT \ \ ,� Q (/) ' r z / LIMITS OF PERMANENT BZ 1 IMPACTS \ BZ 1 IMPACTS \ \ W ~ O CD BZ 2 IMPACTS 52 . // \\ 5 \ \ Q �LIMITS OF PERMANENT LIMITS OF PERMANENT 5WETLAND - LIMITS OF PERMANENT \ LIMITS OF PERMANENT \ / LIMITS OF PERMANENT ` z (J o BZ 1 IMPACTS BZ 1 IMPACTS LIMITS OF PERMANENT \ BZ 1 IMPACTS N M 5 5 WETLANDS IMPACTS IMPACTS \ /LIMITS OF PERMANENT WETLANDS IMPACTS WETLANDS IMPACTS \\ u CD -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 3 I I WETLANDS IMPACTS \ \ Z U Q CNI -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 °C cL STA: 156+75 ' z Q OJ 28' BZ 2 IMPACTS STA: 161 +75 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 z _ 20 I - 20 SD 74+00 z 20 — — — — �_ r 20 81' BZ 1 IMPACTS _ w _ _1 o — \ W I- 15 \ ,L — < _ � CI- � / - - \ - z0 a 015' BZ 1 IMPACTS 20' BZ 2 IMPACTS 15 \ // \\ i Lai cL CO i \ ,� rY A J / LIMITS OF PERMANENT 49' WETLAND _ 72' - / \ o a u, O A 0 15 WETLANDS MPACTS IMPACTS -- — \ / \ GRAPHIC SCALE IN FEET Z ¢ o U N \ 26 WETLAND \ L_ -. 0 25 50 100 w z LU /�LIMIn OF PERMANENT 1 0 o Z M LIMITS OF PERMANENT / BZ 2 IMPACTS \ \ IMPACTS \ \ E WETLANDS I MPACTS \ z 5' WETLAND / UNITS OF PERMANENT \ \ / \J/ \ w o Q IMPACTS \\ / Bz 2 IMPACTS \ 1Q \ / \ HORIZONTAL o o LIMITS OF PERMANENT \ \ LIGIIIS Uh F'tKMANENT SCALE: rn ^ BZ 1 IMPACTS \ / BZ 1 IMPACTS \\ \ / \ EPROJECT NO.: GRAPHIC 48 R. 10 LIMITS-OF PERMANENT \ \ j LIMITS OF PERMANENT / \ BZ 2 IMPACTS \ 5 / \ CONSTR.CONTR.NO. BZ 1 IMPACTS \ \ \ N40085-19-D-9008 LIMITS OF PERMANENT LIMITS OF PERMANENT\ / LIMITS OF PERMANENT LIMITS OF PERMANENT \ \ ' LIMITS-OF PERMANENT a // 82 2 IMPACTS \ N / WETLA S IMPACTS \ NLIMITS OF PERMANENT / / WETLANDS I MPACTS BZ 2 IMPACTS \ WETLANDS IMPACTS \ 0 2.5 5 10 NAVFAC DRAWING NO. WETLANDS IMPACTS \. - �., 123456789 LIMITS OF PERMANENT LIMITS OF PERMANENT \-- — — BZ 1 IMPACTS BZ 2 IMPACTS 5 3 \I SHEET 1 OF 387 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 -120-100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 VERTICAL WTL310 J 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 TREATMENT SWALE EXHIBITS 1 2 3 4 5 a -#4 , s. a a w F- a J �% m o X � D X. • �/1/ X Woj 3 woo D 3f — � X � XX ` X X WOo WOo 3 — i — X X X + ` X X WOo 3 C�� X X X LOD 7' CLF W/ B.W. X woo W0o3 3 DD E. UG. COMM. (F.O.) coM - - '[OD — Alop„4/4,4 -- X __ X X D LOD D LOD -I' — —X W00o U ELEC. 3 OM — COM — — — _ _COMLOD — _ _ — — — — — — osD X LO �O 00 �- J C — �-X LOD W - - - - - - -�o�A- - - - - - - - SOD _ _ __ _ __ - - - - __ — X LOD dfc:;:7 \ CO LOD _ - — - - -- ---i.,,,- -s, _____ ___ , _cr-- - _ _ I- - __ _ ___--------------44.4* ii:_______ ,... __ _______ _ _____ -- 25- -- \ - - - ---=-11=--24-4----1 - - - - in\ - - -______J-- - - - ----I---- _ . e- _ — — — — i --- ---- ---- illEl I —woo woo _ - - - - _ — __- - - _ — - - - - - - - TOB _ - - - - - - - - - - - _ — - - - - - - - _ —\ \.z -- , - - - -26- - - - - _ - - - - , T.O.B. - - - _ - - _ _ - i \\‘ 4 / „- _______ ____ ____ ____ _,__________ _ ,5„,...;,,„, _ _ 7/1UFAC21:.„„„...:1,,„ - - - - - _ - - - - - - - - - - — - I:1--- � -- _\ - - _ - - - - - - - - : °' SEAL �: - - - - - - - - — - — — - - - jO.B. _ - - - - - - _ C F _ - - - - _— _ _ _ _ __— _ C 1 _ - - - 27- -- _ - - --`b- - - - ' 7 f — , - - — — - - — - - - —30-- - - -_— — - - _ _ _ _ - - - - - - 28- SWALE INVERT ELEVATION 26 .85 - - _ ____— _29— _ _ 28 - - - - _ - _/ �` :., 27- - - 32 _ - _ _ - / \- V , _ 2 \ . NAVY N �___�- — = . , - - _ - _ - _��� '�`27 — — 39- \� \' �1 _ TRANSPORTATION\\ \ ARTNERSJ — _ � ���i� - 26 i i7' \ �� © \ E INFO \ IovEo E. AM_PrAti � � 1 ,41111.;,1111111V 4114.4jkw 4 W (,) ------.... .C....-------=.--a--- -27 ,ILIFIJPPAIIIIWAII.w411111rglle"Ir'AIZVI .ip--.........Aow -....-zir 401* i'l W S •������ 4��; �* ��"til �- � �4, -3 Of-5044ITITA -- -Ar--- -- '.NOW . . t I i .iN ' COMMANDER NAVFAC I V N 4p3 d \ ) `�' � ' `�.41,4 � � '\ '0 .N\ \ \ \ <0snnsFncroRr ro onn MMIDDIYY Lc; /� / \ �� _ - `,R I , ''`fr•'��,, ► \. \ DES ERY DRw TMG cD RMN WETLAND ELEVATION 26 .25 , \ - ���Q � . ` � 1 \ \ PM/DM H // �� / �� Nil , „0,0 8♦* , �\ ` \ CHIEF BRANCH NGAR HER H I Alf ` ` \ FIRE PROTECTION W PROPOSED TREATMENT SWALE ' ` i4 4 ����d�� '��� . 440,*# �. °` Z- V 4# 411* o z �\ o• f��� e4,•♦♦4*�0•�► , 4,40t, �. , # ,1-0# i • who CL * i ' ‘ ., , ____ 06 1*_ . ___ z (>2 < i` f: I-1-1 \ , \\\\\ \, * 4°.• • ' i ## -04 tfr a, AIL -.! ALL . 410,Ns:r c7 / - 0 < Osr44, '\ - -1- Jo = .45-'. \I \\\\ r;Th % S * . y 1 WOODS \\ \ \ m,♦♦♦ ♦, *4. 10:44# le S4IIIILi,. 414611,1 `. 404 . N,N. ,. \ 71 O .lip ' 14,4,4„4*, ..,c ***Ait * i ' / ' 0 LLJ 0 I AL AL AL \ \\Al,\ % S v) .4- ‘ \ \ \ \ AL AL -Th N S V"41t, Al _ 4$* IL \\ ' . •N'2 Si, 4401p ' CD .' \ \\\\ '''' % * SS E U) ,..-., z 2 \ & N V \ -Th * Slr LLI SS•AL tN*__*SS0 s.vS V'S p 9S ..&4111 , 0=_0_ZI<WI<CoIc-Ite_I SITE 1 . o '"�♦ ♦ * ,sO♦♦♦ ..4 ArSN4.44 I..A-4AM\N 1A } C A AL AL AL AL AL AL AL AL AL \\ \,1\V.‘,\\ PERMANENT WETLAND W1 ♦♦�# % -v� ,►�� �� i _ d\\iN. AL O) 4,,,K ,'\,N. / 7_'D 6\- A o ♦ 4de 41e• eAN0 44\4 �. Xo0 Ezo z AL AL Alt AL Alt AL Alt ALAlt \A\L \\\A\AL\\\.\\.\\\\\\.\\A\\I.L,-,\\\ \\ / N\\L‘ ,NAL 4,4. AL I \\ \\\ \VN \ 8 ♦ ♦ S - NORTH W o ¢ ' \,'. \ \ ♦ , • ` ''AI SCALE: EPROJECT NO.: GRAP 65548 < \\\\\ ♦ ,♦ ♦ ` ` CONSTR.TNO.: NO. \ \\\\\ \ ` o> •�`` ♦` �\ ` GRAPHIC SCALE IN FEET N40 RNO. -D-9008 Si pt, \\ \\\ �Illt\ ` �Illt �Illt �lllt �lllt , ♦`,♦ ` �`. \ Q 2.5 25 50 NAVFAC DRAWING NO. \\\ � . \ ` 123456789 4j SHEET 1 OF 387 Z SWALE 1 A I G DRAWFORM REVISION:25 AUGUST 2020 \"\17,I %)**, •4 ,() AL AL AL AL AL AL AIL AL AL AL •\• 1► � ��!�► �IuL �IuL �IuL I I �IuL �IuL A 4110p /\/ ALALALD v �'� ����♦ I D -H CD re#,#,..,,ip,:„.0 ,ilk ,ilk ,ilk ,ilk ,ilk ,ilk �• � �. I� � �S *s."_ ,a4\ woods. ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL AL ]IIIL ]IIIG ]IIIL AILU t*APOS % ‘10 !WIPW AP .i �_ \. - ,oo/ AL �IIIL �IIIL AIL AIL AIL AIL AIL AIL AIL AIL AIL AIL AIL "` 41W \ \ \ '♦�► ,' s,�' ,40 , ♦ ` / AL ]IIIL ]IIIL AIL AIL AIL AIL a,� \ • • Lou SA** 0 \ ♦ �� ! ♦ ilELSITE 3 PERMANENT WETLAND AND###A&\(( i `gi,j)9* `��►,��• \„„„„.„,,„,, �� ♦ ♦ , JURISDICTIONAL DITCH IMPACTS �� ..• •R0; \ • \ s ♦ , C�I�L I ,ilk ,ilk ,ilk ,ilk ,ilk ,ilk = � =• 9 , = SEAL Oft,' _ 04 As '•746) '19 I X iv SafA eA \\*0* \\sts**##v**#1 6 \ v#v 1$\ %olio 4 • , k A cii),L AL N' s$#+#9 AV: S \ \ / \ , :♦ , ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL ]IIIL♦♦ ♦ NAVY o \ • 141111;, ,� � , ` , , TRANSPORTATION \�. 411114fril' , , ` , ` PARTNERS JVINfO `S � , \� � , APPROVED-(`1 `,.� ' ,, *A4r, Q Olt AL �Illt AL 'Ills �Illt �Ilt �Ilt �Ilt I �tllt \40 Viel.r . \ \ • • so Vrit VSi \Ass* \ \ FOR COMMONER NAVFPC /\ • ' 4,41A _ ' AL �Illt �Illt ,ilk ,ilk ,ilk \ �Illt �Illt \ �Illt N \\ \ ,\ %,\ 04; MOSFACTCRY M DATE MM/DDNY \ cn V#er ♦ , , \ \\ DES EAS DRW TMG CHK RMN • • \ \_ _ 1 Q 1 , \ \ \4•4 PM/DM c � ♦ N� 1 SOIL�� ` �tlIL �IIIL �IIIL \ ,IIIL ,IIIL �IIIL \ ,IIIL ,IIIL ,IIIL BRANCH MANAGER N � � /0A ° \ \ \ CHIEF ENG/ARCH \ N � \ FIRE PROTECTION B \ r •� • N 4444\CPC , \ ��`;� ' �Illt I .� Ill Ill ,Illt U O\ \ #,‘ I moo /ff./1#\ o N �. 0.0\ WETLAND ELEVATION 28 .90 w z z o ♦ , o a>_ *#04 40$*'`., `p �IIIL �IIIL �\ �� �IIIL �IIIL �IIIL �IIIL \ — ¢ W U a 4 #$$ z U Q :1111.�' 28 / , • A. 410\ .I O 0\ 00*��♦ Aft, \PRO,POSED TREATMENT SWALEUX�,� 4,411 � OTOASO.4400,\ , ♦ 1� \ INVERT ELEVATION 26 .8 Q � — y O \ • \ _ - � _ ���'' � \ \ ` ,. , <j �IIIL � �IIIL �IIIL �IIIL �IIIL z 4.4\741r: 7A\ ottliA 44tii, st. lioktootv *cp itoossiooe\ 1i 4PA114 8 - / 41100., VVE CD Lu -21 • LLJ 9 LI • -4111 �••' WAIA*` 1?�*4p.- . ,Ili ,itr *//tV tllt �Illt �Illt �Illt �Illt (/) oriA; """t1.....",011111P ♦ ♦ z Q w 0 10011 . •A 7, - 41** \IV 400.4r \ 7\L p \ 1 rovvir\7111. t .7% ` 1p �uIL ` Q J IrA,404 A414 oi _�, ,• , :AV:cf) z UwCt 5 A \. , IhNOFW ��' NORTH o Q� , �•4SZVA$ scALE: GRAPHIC �° I � �� < !� • �� �IIIL �IIIL �IIIL EPROJECT NO.: 1565548 > ! �\ ��,, -DO / _ __\ CONSTR.CONTR.NO. U.5 \ ��_�� GRAPHIC SCALE IN FEET `�`� `` \ \ �c�cJ 6, \� _ - �_==_ ::::: 9k7 . \ \ \!�♦ \ \ _ LL SWALE 2 1 I 2 I 3 I I 5 DRAWFORM REVISION:25 AUGUST 2020 1 I 2 I 3 I 4 I 5 a \\\\\ \'11\V \\\\\\`\ i ,,� III I I I'I II \\\`\ ,�,� '�` 11 I\'�II I III \\ \ J A, SITE 4 PERMANENT WETLAND AND ICI \1 ,1 \I� �\1 III `III' ` � ` , JURISDICTIONAL DITCH IMPACTS I;I \ \\ ,I " \�\ / III I II ; , AIL il \ j\�`\ PROPOSED TREATMENT SWALE AL r,,,I II\�\` ,��,D INVERT ELEVATION 26 .43 .z At, 7 II;, III `�. I D � � 11 , \rl1 I III `I / - ,,� '�" III II ��I \IIIIj1 1 1 1 Z ''� 1 111 III I,\I \I II `I WETLAND ELEVATION 28 .83 , //, 1 , , ;;;I, \I, 1,,,,� 1 I I , II1111\0\ \ 1 I N A, ,_ Att l Op,=11 V N ,,� I III I I I ik i jp---_„ ♦ �" ,,�AIL AIL 00 1 I11 / • NJ Wal liMik. \\\ \\ \ II IAu- Au- tiL AIL \ V \ \\ Ei FA tiirN.N ' , ., ',If .Ip I'l �"LAIL Au- \ I \ 1 1A III I A, ,� I I 1 ..�,yO N.. . , \• \ ,, , * 1►_ '�" LOD LOD LOD ',u` LOD LOD LOD `\I I I 1 ilait �' LOD LOD Ni'ii � 29 �" .,,,,,,,,,i,,,- --, '''--'''- ''''''-'------ ,. Apr Air 4 I!is m r A I I I rd al mil 0 PrA is ra ow migi WA FA im w A 3 0 ������miWw�����w MI wA rA * W 4477 7"4 A yr" 411111=317if . :\ , �� atrirjArAttrATIF A ( ��� _ r SEAL r X — 9 �32 X X = 050975 „, Aw Afid 4, ' � � '�� 30 ' ` �� �;1/28/202� : v, ,,.�� �� �. I 1 IN \ . • �'' --- .L4 jt,APFAPr2gAarA.jrrAfv,A,...... — � / '�`. !� V •,„„,...„00 SEAL 4r:dirfir ha/ �• �'�'� �� imr. tr.--��aw_--- -------- ---- mw 30 ��.� w�. �...,... r1 %.„. A.ice_ �Ai`iiii� WAWA Or.-WA � ��i�W� --- n:.�, oro �. i ����AWIV���..AW©�IVAIA��' .��� /AII - -Off` -- - �,C� ��� --- ��------i---- ce....ww .. .wi�4.--�z 28 _ ��.—A—wm,„�w 28 aviu— - _ . _�C r �' ` 29 . �--' ����i� i ice//ii�r� 29 ��i� , �A�i��5trif W.D • m -- w�-�7� Sp � SD SD AdrAr i(1) I,,, . NAVY / ., �A , 1:- PARTNERS' � TRANSPORTATION N \ /•\ \Sp �-Air 30 , �j, J V ,UE INFO W 24„ RGp Sp p �_ - ❑ \ �• I 30 APPROVED ACTIVRY _ - `. ---- jir A A:dirA - - 1 .. • 4A‘. a FA, frA �7aI an nanFOR COMMMIOER NAVFAC_ r-------Air ----ArAr _ rAlr Ar.4 ' ... . a VI g 1 Aar A 7,41"41,4101,1r: CI d AWA ' • A\ I • . � a. • • • a I3pDES r . Air A SATISf EASACTORY o DRW \ I fry7Z3Z7iii____. .. i.r.:-. .„- ‘4,-,-AP=- Afr Air a PM/DM,, c, • .. \ ' ■ , ' BRANCH MANAGER _,.2„).>, \ . ..‘ I/ INICHIEFEG/ARC\ . , ,. N F IRE PRTECT Nr 4110Pr a , ^o B �� _ I 1\ 1�� v oM �� I ,tj ,�4,--- �'j�r 29 w4N4 cz � oW \ ir (yam Va. J / i Allr Mrit H I- V -. ♦ Z LL `\ ` 'AV II � 0Q wU ArArtz —...ummOME 0,4 Alt I IL.1 IA 6. ' err, „.... ,,_. '�� N N zw . 0_ \ .......... . ��.Adr Aril %if, AfI - � ' " z � w \ 1 ,* w o fil;111:74rej I r < 0 XAr �� 28 _ _ _� � �I I�� J �U U0 x 4 c) ss c-,-) (,) a 411/ ' ,` ` , Atti 0 p 0 1 lirAr/4,rAr J W28 O W .� Apr, �� �� Z CD LLI \ V w_i rAtt. LA f /A i r//ffu//A Ifff �� 0 z u) o� ii• �7� � Arff �lr4' 18" R UIP w 75 -.V��� L,_1 s� W �i Hif _,.,411I AMY 411110 ' zigWA Air/, '1-1 -w-4-w-M°Adir / / at / / / \ `i W � _ W /./ \ 1 L � Itail —....0" -- - N / / l W Q O - - LU o _ d / / Q I — - / / d J Q / w _�� / SCALE: GRAPHIC 01 n 01 EPROJECT NO.: 1565548 CONSTR.CONTR.NO. N40085-19-D-9008 O(W GRA 5 IC SCALE IN FEET 50 NAVFAC DRAWING NO. 123456789 NORTH m 11 SHEET 1 OF 387 Z SWALE 3 1 I 5 I 2 I 3 I 4 DRAWFORM REVISION:25 AUGUST 2020 ADJACENT PROPERTY OWNERS AND ADDRESSES APPENDIX D ADJACENT PROPERTY OWNERS AND ADDRESSES imU r e m Vir A: ., 11 u s �vas� `���% - / GOVERNMENT IS �� 1111. \�- PROPERTY 'gig ■■ ' 6= an a Alligatoreri Arm mil MEI — - `.- 111111, �44� us • ��©©0. p:" .GOVERNMENT _ • PROPERTYJo i US; GOVERNMENT 41:41111 PROPERTY01(11111 a.) Oilk no _ Alft l%k,_ '141 U S 441144#40‘41P A, GOVERNMENT A �Q-ap ♦+A •*J PROPERTY Legend 0 ; Affected Property Parcels ��� � 4�r`� GCraven County Property Parcels 1: ��� ��,�{'.144,d � ``1 J Project Study Area Parcel �,,,��'�,� �'•i�• ���`��, el Project Study Area AS�,����!%�1'1� ,A�� •.� 0 0.2 0.4 .,f �� ' ♦ /ai1�►f,� '� f ,, . ' I (Miles it AM. Figure 6: Property Parcels Map a NAVY Project P134- Perimeter Security Compliance TRANSPORTATION Slocum Road Entry Control Facility y7 PARTNERS JV Marine Corps Air Station, Cherry Point, Craven County, NC 07/16/2021 PROJECT STUDY AREA PARCEL PARCEL NUMBER LEGAL DESCRIPTION OWNER NAME SOURCE REFERENCE MAILING ADDRESS CITY STATE ZIP CODE 6-060-065 U S NAVAL RESERVATION U S GOVERNMENT PROPERTY DEED BOOK 0336/PAGE 0061 141 E FISHER AVE NEW BERN NC 28560 AFFECTED PROPERTY PARCELS MAP ID PARCEL NUMBER OWNER NAME SOURCE REFERENCE MAILING ADDRESS CITY STATE ZIP CODE 0 6-034-1-001 LAMBERT,ERNIE L&GERALDINE E DEED BOOK 1845/PAGE 347 140 MACDONALD BLVD HAVELOCK NC 28532 1 6-034-1-002 GRANGE,GARY&STEPHANI MACCARRON DEED BOOK 3555/PAGE 1029 142 MACDONALD BLVD HAVELOCK NC 28532 2 6-034-1-003 BARRERAS,NORA A&GAMEZ,EUSEVIA DEED BOOK 2131/PAGE 397 144 MACDONALD BLVD HAVELOCK NC 28532 3 6-034-1-004 BRADLEY,MARION ANTONIO DEED BOOK 3536/PAGE 1750 146 MACDONALD BLVD HAVELOCK NC 28532 4 6-034-1-005 COLAW,ROBERT E DEED BOOK 2142/PAGE 37 148 MACDONALD BLVD HAVELOCK NC 28532 5 6-034-1-006 CORACRUZ,MARCIAL&LORETTA DEED BOOK 2693/PAGE 375 150 MACDONALD BLVD HAVELOCK NC 28532 6 6-034-1-007 HOLMAN,RANDY L&CINDY B DEED BOOK 2313/PAGE 599 152 MACDONALD BLVD HAVELOCK NC 28532 7 6-034-1-008 PAN,LAWRENCE E DEED BOOK 3515/PAGE 1022 11287 FEATHERHILL LN SAN DIEGO CA 92126 8 6-034-1-009 HAMILTON,JESSICA RENEE DEED BOOK 3508/PAGE 850 156 MACDONALD BLVD HAVELOCK NC 28532 9 6-034-1-OOD HAVELOCK-CITY OF DEED BOOK 1873/PAGE 572 PO BOX 368 HAVELOCK NC 28532 10 6-034-1-010 GLYSHAW,CHRISTOPHER&CARISSA DEED BOOK 3578/PAGE 1935 158 MACDONALD BLVD HAVELOCK NC 28532 11 6-034-1-5000 CHERRY BRANCH LTD DEED BOOK 1597/PAGE 802 803 E MAIN ST APT A HAVELOCK NC 28532 12 6-036 -004 FOUNTAIN OF LIFE MINISTRIES DEED BOOK 2765/PAGE 71 PO BOX 326 HAVELOCK NC 28532 13 6-036 -005 CHURCH-GREEN CHAPEL MISSIONARY DEED BOOK 1661/PAGE 710 PO BOX 281 HAVELOCK NC 28532 14 6-036 -007 WILSON,PATRINA F ET AL DEED BOOK 3617/PAGE 954 PO BOX 246 DALEVILLE VA 24083 15 6-216 -023 WAL-MART REAL ESTATE BUSINESS TRUST DEED BOOK 2731/PAGE 777 PO BOX 8050 BENTONVILLE AR 72712 16 6-216 -11000 PAWN PROPERTIES LLC DEED BOOK 3489/PAGE 1412 5967 WILLIAMSTOWN RD DALLAS TX 75230 17 6-216 -24000 WOODFIELD COVE LIMITED PARTNERSHIP DEED BOOK 3580/PAGE 1251 7204 W FRIENDLY AVE STE C GREENSBORO NC 27410 STORMWATER PERMIT APPROVALS AND STORMWATER DESIGN NARRATIVE ( EXCERPT) ,..., „r137);i:kti: ROY COOPER ,g rt "Pr Governor " I D{ONNE DELLI GATTI ;'.'` r. A, Secretary �u gar M vat ri' BRIAN WRENN NORTH CAROLINA Director- Environmental Quality May 7, 2021 MCAS Cherry Point Attn: Anthony Ference — Deputy Facilities Director PSC Box 8006 Cherry Point, NC 28533 Subject: Stormwater Permit No. SW7070714 Modification Nugent Cove, Sections 1, 2, 3A, 3B, 4 and 5 High Density Subdivision Project Craven County Dear Anthony Ference: The Washington Regional Office received a complete Stormwater Management Permit Modification Application for Nugent Cove, Sections 1, 2, 3A, 3B, 4 and 5 on April 2, 2021. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7070714 Modification, dated May 7, 2021, for the construction of the Nugent Cove, Sections1, 2, 3A, 3B, 4 and 5 project This permit shall be effective from the date of issuance until April 24, 2023, shall void Permit No. SW7070714 Modification issued August 24, 2015, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please me at (252) 946-6481. Sincerely, , 02--1-��� William Carl Dunn, PE Division of Energy, Mineral and Land Resources cc: Robyn Niss— Kimley Horn and Associates (robyn.niss@kimley-horn.com) Nathan Arnett— Environmental Affairs Department MCAS Cherry Point (nathan.arnett@usmc.mil) Craven County Inspections —Shelton Toler(stoler@cravencountync.gov) Washington Regional Office D E Q \\\\ North Carolina Department of Environmental Quality I Division of Energy..Mineral and Land Resources Washington Regional Office q%I Washington Square Mdl Washinytnn North Carolina 27889 a erLrn u[Er, nmenl w fi, /`� 252 946-i 481 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO MCAS Cherry Point Nugent Cove, Sections 1, 2, 3A, 3B, 4 and 5 Craven County FOR THE construction, operation and maintenance of 3 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until April 24, 2023 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. A maximum of 52.41 • acres of built-upon area is allowed on this 150.37 acres site. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The following design elements have been permitted for these wet detention ponds, and must be provided in the system at all times. a. Total Drainage Area, acres: 139.03 b. Total Impervious Surfaces, acres: 52.41 c. TSS removal efficiency: 90% d. Design Storm: 1" e. Receiving Stream / River Basin: Slocum Creek / Neuse River Basin f. Stream Index Number: SC; Sw; NSW g, Classification of Water Body: "27-112" Central Gates Chatham Vance Road Pond Road Pond Road Pond Drainage area: 71.79 ac 35.23 ac 32.01 ac Total Impervious allowed on site: 26.89 ac. 13.50 ac 12.02 ac Section 1, acres: 0.00 3.87 4.57 Section 2, acres: 4.83 Section 3A, acres: 5.81 Section 3B, acres: 4.43 Section 4, acres: 9.52 Section 5, acres: 0.46 4.41 Existing to remain, acres: 2.30 Future Sections, acres: 0.00 5.07 7.45 Wet Pond Depth: 6.5 ft 6.0 ac 6.0 ac Required Storage Volume: 99,914 cf 51,748 cf 49,732 cf Provided Storage Volume: 102,880 cf 51,748 cf 49,732 cf Required Surface Area: 50,453 sf 31,745 sf 30,955 sf Provided Surface Area: 51,588 sf 35,068 sf 31,506 sf Controlling Orifice: 4" @ el. 3.0 ft 3.5" @ el. 7.0 ft 3" @ el. 9.0 ft II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built-upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built-upon area. Once the lot transfer is complete, the built-upon area may not be revised without approval from the Division of Energy, Mineral, and Land Resources (DEMLR), and responsibility for meeting the built-upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built-upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size, b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and ,1 specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 16. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11 . Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior to transfer of the permit, the stormwater facilities will be inspected by DEMLR personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken 15. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS 1 . This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Energy, Mineral, and Land Resources accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DEMLR. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral, and Land Resources, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DEMLR to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. 10. This permit shall be effective from the date of issuance until April 24, 2023. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 7th day of May 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 6- For Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7070714 Modification Nugent Cove, Sections 1, 2, 3A, 3B, 4 and 5 Stormwater Permit No. SW7070714 Modification Craven County Designer's Certification i, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Regional Office Craven County Building Inspections ;4'.,d SiAfEr},R ROY COOPER - - � 'A j '— gI Governor § °� DIONNE DELLS-GATTI \ ,,' QNANt Yu'_:g- Secretary BRIANY;,;,::.•. BRIAN WRENN NORTH CAROLINA Director Environmental Quality May 7, 2021 MCAS Cherry Point Attn: Anthony Ference — Deputy Facilities Director PSC Box 8006 Cherry Point, NC 28533 Subject: Permit No. SW7210402 P-134 Physical Security — Slocum Road Linear Public Stormwater Project Craven County Dear Anthony Ference: The Washington Regional Office received a complete Stormwater Management Permit Application for P-134 Physical Security — Slocum Road project on April 2, 2021. Staff review of the plans and specifications has determined that he project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H .1000. We are forwarding Permit No. SW7210402 dated May 7, 2021, for the construction of the subject project. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please me at (252) 946-6481. Sincerely, kik- William Carl Dunn, PE Environmental Engineer CC: Robyn Niss— Kimley Horn and Associates (robyn•niss@kimley-horn.com) Nathan Arnett— Environmental Affairs Department MCAS Cherry Point (nathan.arnett@usmc.mil) Craven County Inspections—Shelton Toler(stoler@cravencountync.gov) Washington Regional Office D E��- North Carnlina Department of Environmental Quality Division of Energy.Mineral and Land Resources Washington Regional Office 9 l Washington Square Mall : Washington North Carolina 27889 .,n <,o2<rR.�..�rei4ri� /�� 2529.16.6481 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT STATE STORMWATER MANAGEMENT PERMIT OTHER PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO MCAS Cherry Point P-134 Physical Security— Slocum Road FOR THE construction of a Public Liner Project in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS 1. The runoff from the impervious surfaces has been directed away from surface waters as much as possible. 2. This permit covers the construction of 1,532,506 square feet of built-upon area allocated to the Security Road, 3. The amount of built-upon area has been minimized as much as possible. 4. Best Management Practices are employed to minimize water quality impacts. 6. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit and shall be kept on file by the permittee at all times. �I' 7. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 8. No piping is allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access. II. SCHEDULE OF COMPLIANCE 1. The permittee shall at all times provide adequate erosion control measures in conformance with the approved Erosion Control Plan. 2. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 3. The permittee shall submit ail information requested by the Director or his representative within the time frame specified in the written information request. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction for the following items: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further subdivision, acquisition, or sale of the project area in whole or in part. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. 5. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately 6. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b Sediment removal. c. Mowing, and re-vegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 7. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. 8. The Director may determine that other revisions to the project should require a modification to the permit. III. GENERAL CONDITIONS 1. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 2. The permit issued shall continue in force and effect until revoked or terminated. 3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Session Law 2008- 211 and Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. al. 5. The permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. The permittee is responsible for compliance with the terms and conditions of this permit until such time as the Director approves the transfer. 6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. 7. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 7th day of May 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION For Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7210402 P-134 Physical Security— Slocum Road Stormwater Permit No. SW7210402 Craven County Designer's Certification as a duly registered in 9 the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Regional Office Craven County Building Inspections ,fieSTATEry"stkt, .f . , 4 ROY COOPER _ A Governor DIONNE DELLI-GATTI Secretor y `§P vNsz BRIAN WRENN NORTH CAROLINA Director Environmental Quality May 7, 2021 MCAS Cherry Point Attn: Anthony Ference — Deputy Facilities Director PSC Box 8006 Cherry Point, NC 28533 Subject: State Stormwater Management Permit No. SW7210401 P-134 Physical Security—Slocum Road Visitor Center Low Density Project—Craven County Dear Anthony Ference: The Washington Regional Office received a complete, State Stormwater Management Permit Application for the subject project on April 2, 2021. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in 15A NCAC 2H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding Permit No. SW7210401 dated May 7, 2021, for the construction of the built-upon areas (BUA) and vegetated conveyances associated with the subject project. This permit shall be effective from the date of issuance until rescinded and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Carl Dunn in the Washington Regional Office, at (252) 948-3959 or carl.dunn@ncdenr.gov. Sincerely, 4,ni.4Z- a fr." L.<:--- William Carl Dunn, PE Division of Energy, Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Attachment B—Built-Upon Area Allocation Application Documents cc: Robyn Niss—Kimley Horn and Associates(robyn.niss@kimley-horn.com) Nathan Arnett—Environmental Affairs Department MCAS Cherry Point(nathan.arnett@usmc.mil) Craven County Inspections—Shelton Toler(stoler@cravencountync.gov) Washington Regional Office North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Washington Regional office 943 Washington Square Mall Washington,North Carolina 27889 Oepartmalloirmi,onmenr,iaanN // 252.946.6481 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO MCAS Cherry Point P-134 Physical Security- Slocum Road Visitor Center Craven County FOR THE construction, management, operation and maintenance of built-upon area (BUA) for a 24% low density project (the "low density area") discharging to Class SC, SW, NSW waters as outlined in the application, approved stormwater management plans, supplements, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved byte Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable parts of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 101,658 square feet. The BUA requirements and allocations for this project are as follows: a. LOW DENSITY AREA BUA LIMITS. The low density area, in the approved plans and specifications, must not exceed 24%joer the requirements of the stormwater rules. Within this low density area, this permit approves a percent BUA of 23% and the construction of a total of 101,658 square feet of BUA. 2. LOW DENSITY AREA REQUIREMENTS. The low density area requirements for this project are as follows: a. LOW DENSITY AND CONVEYANCE DESIGN. The low density area is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. This low density area and conveyances must be provided and maintained at the design condition. b. PIPING. Other than the piping shown on the approved plans, only minimal amounts of piping under driveways and roads is allowed within the low density area when it cannot be avoided. No additional piping is allowed. c. DISPERSED FLOW. The low density area has maximized dispersed flow of stormwater runoff through vegetated areas and minimized the channelization of flow. d. VEGETATED CONVEYANCES. Stormwater runoff that could not be released as dispersed flow may be transported by vegetated conveyances with minimum side slopes of 3:1 (H:V) designed to not erode during the peak flow from the 10-year storm event as defined in the stormwater rules and approved by the Division. 3. STORMWATER OUTLETS. This project should not propose any discharge points that will have the opportunity to cause erosion during the 10-year storm event. 4. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured orizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans or in the following instances where the BUA has been minimized and channelizing runoff from the BUA is avoided: i. Water dependent structures; and ii. Minimal footprint uses such as poles, signs, utility appurtenances, and security lights that cannot practically be located elsewhere. 5. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system and maintenance accesses must be located in public rights-of-way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded platsmust reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 6. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project that impact the certifications, a new or updated certification(s), as applicable,will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved stormwater collection system and/or vegetative conveyance shown on the approved plan' e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. a. PROJECT CONSTRUTION, OPERATION AND MAINTNEANCE. During construction, all operation and maintenance for the project and stormwater system shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are no longer needed. b. FINAL GRADING. The vegetated areas and vegetated conveyances shall be entirely constructed and vegetated. Once the final grading is completed and the site is stabilized, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. 8. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 9. DESIGNER'S CERTIFICATION. Upon completion of the project,the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the projector provide a plan of action,with a timeline,to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. In the event that the low density area fails to meet the requirements of low density, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part; ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; iii. Bankruptcy; iv. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 12. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplements, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 7th day of May 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION . Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7210401 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As-Built Permittee Certification • As-Built Designer's Certification for Low Density Projects A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed,for each SCM and/or as a partial certification to address a section or phase of the project. AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above,and I certify by my signature below,that the project meets the below listed Final Submittal Requirements found in NCAC 02111042(4) and the terms,conditions and provisions listed in the permit documents,plans and specifications on file with or provided to the Division. ❑ Check here if this is a partial certification. Section/phase/SCM #? ❑ Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Signature 1, ,a Notary Public in the State of County of ,do hereby certify that personally appeared before me this day of ,20 and acknowledge the due execution of this as-built certification. (SEAL) Witness my hand and official seal My commission expires Permittee's Certification NCAC.1042(4) Completed/ N/A Provided A. DEED RESTRICTIONS/BUA RECORDS 1. The deed restrictions and protective covenants have been Y or N recorded and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective Y or N covenants has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Y or N Note 1) B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection / conveyance system are located in recorded drainage easements. Y or N 2. A copy of the recorded plat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS- Plats for residential lots that y or N have an SCM include the following: 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set Y or N forth in NCGS 143 Article 21 if the SCM is removed, relocated or altered without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and y or N appears in the chain of title. F. OPERATION AND MAINTENANCE PLAN—maintenance records are being kept in a known set location for each SCM and are available for Y or N review. G. DESIGNER'S CERTIFICATION FORM - has been provided to the Y or N Division. Note 1-Acceptable records include ARC approvals,as-built surveys,and county tax records. Provide an explanation for every requirement that was not met, and for every"N/A" below. Attach additional sheets as needed. AS-BUILT DESIGNER'S CERTIFICATION FOR LOW DENSITY PROJECTS I hereby state that I am a licensed professional and I certify by my signature and seal below,that I have observed the construction of the project named above to the best of my abilities with all due care and diligence,and that the project meets all of the MDC found in 15A NCAC 02H.1003,in accordance with the permit documents,plans and specifications on file with or provided to the Division,except as noted on the "AS-BUILT"drawings,such that the intent of the stormwater rules and the general statutes has been preserved. ❑Check here if this is a partial certification. Section or phase ❑ Check here if this is part of a Fast-Track As-Built Package Submittal per 15A NCAC 02H.1044(3). ❑ Check here if the Designer did not observe the construction but is certifying the project. ❑ Check here if pictures of the project are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City: State: Zip: Phone:f ) Consultant's Email address: O Circle N if the as-built value differs from the Plan/permit. If N is circled,provide an explanation on page 3, O N/E = Not Evaluated(provide explanation on page 2). ON/A= Not Applicable to this project/plan. Consultant's Certification(MDC 15A NCAC 02H.1003) Project Density and Built-Upon Area @As-built ON/E ON/A 1. The project has areas of high density based on natural drainage y or N area boundaries,variations in land use or construction phasing. 2. The project's built-upon area does not exceed the maximum limit y or N specified in the permit. Dispersed Flow ®As-built OO N/E ©N/A 1. The project maximizes dispersed flow through vegetated areas y or N and minimizes channelized flow. Vegetated Conveyances OO As-built OWE ON/A 1. Stormwater that is not released as dispersed flow is transported Y or N by vegetated conveyances. 2. The project has a minimal amount of non-vegetated conveyances y or N to reduce erosion. 3. Other than minimal piping under driveways and roads,no piping Y or N has been added beyond what is shown on the approved plans. 4. Side slopes are no steeper than 3H:1V. Y or N 5. The conveyance does not erode in response to the peak flow from the y or N 10-year storm. Curb outlet systems(if applicable) OO As-built OO N/E OO N/A 1. The swale or vegetated area can carry the peak flow from the y or N 10-year storm at a non-erosive velocity. 2. The longitudinal slope of the swale or vegetated areas does not exceel Y or N 5%. 3. The swale has a trapezoidal cross-section and a minimum bottom wic y or N of two feet. 4. The minimum length of the swale or vegetated area is 100 feet. Y or N 5. Side slopes are no steeper than 3H:1V. Y or N 6. The project utilizes treatment swales designed per Section.1061 y or N in lieu of the curb outlet system requirements. Vegetated Setbacks(if applicable) OOAs-built ON/E ON/A 1. The width of the vegetated setback is at least 50'. Y or N 2. The width of the vegetated setback has been measured from the norrr pool of impounded waters,the MHW line of tidal waters, Y or N or the top of bank of each side of rivers or streams. 3. The vegetated setback is maintained in grass or other vegetation. Y or N 4. BUA that meets the requirements of NCGS 143-214.7(b2)(2)is locate y or N in the setback. 5. BUA that does NOT meet the requirements of NCGS 143-214.7(b2)(2) located within the setback and is limited to: • Publicly-funded linear projects (road,greenway,or sidewalk) y or N • Water dependent structures • Minimal footprint uses such as poles,signs,utility appurtenances,and security lights. 6. The amount of BUA within the setback is minimized,and Y or N channeling of the runoff from the BUA has been avoided. 7. Stormwater is not discharged(via swale or pipe) through a vegetated setback.Stormwater is released at the edge of the Y or N setback and allowed to flow through the setback as dispersed flow. Outlets ®As-built ON/E ON/A 1. Stormwater outlets do not cause erosion downslope of the y or N discharge point during the peak flow from the 10-year storm. Variations OAs-built ON/E . ON/A 1. The project has variations from the MDC that were not previously Y or N approved. (Modification may be required.) Deed restrictions(if applicable) ®As-built ON/E ON/A 1. Deed restrictions are recorded and ensure that the project and the BUA will be maintained in perpetuity consistent with the Y or N permit,approved plans,and specifications. For Subdivisions Only(Residential or Commercial) OO As-built ON/E ON/A 1. The number of platted lots is consistent with the approved plans. Y or N 2. The project area is consistent with the approved plans. Y or N 3. The layout of the lots and streets is consistent with the approved y or N plan. 4. The width/radius of streets,paved accesses,cul-de-sacs and sidewal Y or N is consistent with the approved plan. 5. No piping,other than those minimum amounts needed under a Y or N driveway or under a road,has been added. 6. The lot grading,road grading,vegetated conveyances,piping, y or N inverts,and elevations are consistent with the approved plans. Provide an explanation below for every MDC that was not met,and for every item marked"N/A"or "N/E."Attach additional pages as needed. 1 P-134 Physical Security, Slocum Road Marine Corps Air Station Cherry Point, North Carolina DESIGN DEVELOPMENT LID AND STORMWATER CALCULATIONS Prepared By: Kimley >>> Horn January 28, 2021 Contents Overview 3 Pre-Development Site Conditions 3 Post-Development Site Conditions 3 Site Design Criteria 3 Stormwater Modeling and Analysis 5 Stormwater Management Control Selection 6 Stormwater Management Compliance—By Point of Analysis 8 Closed Stormwater Conveyance System 12 Conclusion 12 APPENDIX A — DRAINAGE AREA SUMMARY AND DRAINAGE AREA MAPS APPENDIX B — PRECIPITATION DATA AND EISA STORM CALCULATION APPENDIX C — PEAK FLOW SUMMARY AND POND PACK RESULTS APPENDIX D — GEOTECHNICAL REPORT EXCERPTS APPENDIX E — SWALE CALCULATIONS APPENDIX F — STORM CAD CALCULATIONS APPENDIX G — SPREAD CALCULATIONS APPENDIX H — DOWNSTREAM ANALYSIS (POA 2B AND 3) Overview The P-134 Physical Security, Slocum Road project consists of realigning the existing Slocum Road in order to provide a complete Entry Control Facility for Marine Corps Air Station Cherry Point. This project disturbs 76 acres, and overall the impervious area increases from 15%to 40%.The increased runoff from this increase in impervious area must be managed per Section 438 of the Energy Independence and Security Act (EISA or Section 438) and North Carolina General Assembly Session Law 2008-211,which is enforced by North Carolina Department of Environmental Quality(NCDEQ) and North Carolina Department of Transportation (NCDOT). The stormwater management controls for this Project are designed to comply with the regulations set forth by EISA, NCDEQ, and the NCDOT. Pre-Development Site Conditions The Pre-Developed site consists of portions of existing Slocum Road and a heavy forested terrain that drain to seven (7) points of analysis. Pre-development watershed maps are located in Appendix A and identify the 7 points of analysis and delineate the areas discharging to each point. The project area is relatively flat resulting in wetland areas along the proposed road alignment. An effort is made to minimize impacts to the wetlands to the maximum extent practical without sacrificing design intent, however,there will be wetland impacts included in this project scope. Post-Development Site Conditions The project improvements include a roadway, two-lane bridge, several facilities including a visitor center and parking lot and supporting infrastructure. Based on the type of development,the project is classified in two ways, linear and site development.The site development portion of the project includes the visitor center and associated parking lot while the remainder of the improvements are considered linear. Pre-developed stormwater drainage patterns are mimicked in post-developed conditions where practical and utilize the same aforementioned site points of analysis as pre-development. Post- development watershed maps are located in Appendix A. The stormwater management for the project is developed to minimize the downstream effects of development at the Site. Stormwater management controls are proposed in order to control the stormwater runoff and maintain compliance with Federal and State regulations. The stormwater management for this Project is designed to comply with the regulations set forth by EISA, NCDEQ's Stormwater Design Manual, and the NCDOT's Stormwater Best Management Practices Toolbox. These design manuals are followed to the maximum extent practical for the design of the Site Development Plans and this Calculation package. Site Design Criteria EISA Regulations for Development "Section 438 of the Energy Independence and Security Act" (EISA or Section 438) requires site development to maintain or restore the predevelopment hydrology. In order to meet this regulation, low impact development is encouraged including stormwater runoff infiltration, harvesting and reuse. EISA recognizes the 95th percentile storm as a common storm event and therefore a practical design storm. The overall project, both linear and site development improvements, must satisfy EISA standards and requirements, including detention of the 95th percentile storm event (referred hereon as the EISA event) to the maximum extent practical. However, due to site constraints, full detainment of the EISA event is not feasible and the stormwater management system was designed to control post-development discharge rates to the extent possible. NCDOT Regulations for Linear Design The linear portion of the project is designed in accordance with NC DEQ administrative code 15A NCAC 02H .1001(1)(c). NC DEQ administrative code 15A NCAC 02H .1001(1)(c) states the following. (1) APPLICABILITY. This Section shall apply to development projects and major modifications of development projects for residential, commercial, industrial, or institutional use that are subject to one or more of the post-construction stormwater management programs listed in Item (2)of this Rule. This Section shall not apply to: (c)linear transportation projects undertaken by an entity other than the NCDOT when: (i) the project is constructed to NCDOT standards and is in accordance with the NCDOT Storm water Best Management Practices Toolbox(Version 2,April 2014 Edition)which is herein incorporated by reference, including any subsequent amendments and editions, and may be accessed at no cost at https://connect.ncdot.gov/resources/hydro/HSPDocuments/2014 BMP Toolbox.pdf; (ii) upon completion, the project will be conveyed either to the NCDOT or another public entity and will be regulated in accordance with that entity's NPDES MS4 stormwater permit;and (iii) the project is not part of a common plan of development. The project meets Item (1)(c), therefore, stormwater management for the linear improvements of the project shall be designed to meet the NCDOT Stormwater Best Management Practices Toolbox. Stormwater management for the linear improvements will use a combination of vegetated swales, a wet detention basin, and outlet control structures within the swales to meet the NCDOT requirements. The roadside swales are designed per the NCDOT's Stormwater BMP Toolbox and are used for conveyance and quantity control.The swales are designed to treat the volume of runoff from the 2-year storm and to safely convey the 10-year storm discharge with at least 6 inches of freeboard.The swales are designed to convey the 2-year and 10-year discharges at permissible velocities for the appropriate lining material. In certain portions of the roadside swales, rock check dams are utilized to provide additional storage volume and discharge control to the downstream portion of the swale. Outlet control structures are located at the discharge points of the swales to control post-development peak flow rates. Two detention basins provide additional storage volume and control of post-development discharges. The wet detention basins are sited south of the visitor center and east of the gate house canopy. NCDEQ Regulations for Site Development The visitor center and parking lot portion of the project classify as site development and are designed to comply with NCDEQ regulations. The total built-upon area (BUA) or impervious area of the visitor center and parking lot is less than 24%of the total permit area and qualifies as a Low-Density Project. The visitor center development must comply with NC DEQ administrative code 15A NCAC 02H .1003 and Part E-1 "Low Density Projects" of NCDEQ's Stormwater Design Manual. Part E-1 states that Low Density projects do not require stormwater control measures. The visitor center development satisfies the design requirements for low density projects as directed by NC DEQ administrative code 15A NCAC 02H .1003(2) because the design limits BUA, maximizes dispersed flow, and utilizes vegetated stormwater conveyances to help protect hydrology of the receiving stream and prevent erosion. Stormwater Modeling and Analysis Design Criteria In order to meet EISA, NCDEQ and NCDOT regulations, the site design must attenuate and treat stormwater runoff. Wet detention basins and detention treatment swales are proposed and discussed in further detail below. The following is the data used in the stormwater management analysis. The 24-hour rainfall depths for the site location were obtained from NOAA. A summary of the storm depths is below. A full copy of the NOAA precipitation information is included in Appendix B. To satisfy the stormwater requirements of "Section 438 of the Energy Independence and Security Act" (EISA or Section 438),the 95th percentile storm event was calculated at Cherry Point, NC utilizing historical data. Refer to Appendix B for the calculation of the EISA storm. The 95th percentile rainfall depth is included in the table below. Storm Event 24 Hour Rainfall Depth(inches) 95th% (EISA) 2.18 1-year 3.57 2-year 4.35 10-year 6.70 100-year 11.20 The stormwater runoff calculations are completed using the SCS TR-55 runoff curve number method in Bentley's PondPack modeling software. Refer to Appendix C for a summary of the drainage area data, curve number and time of concentration, and the modeling results.Assumptions for the input values that are used in the PondPack model are described below. Curve number is calculated based on land cover and hydrologic soil characterization. Land cover in the existing condition is based on topographical survey and aerial imagery and varies between impervious, turf and forest. The proposed land cover is based on improvements associated with the project. Hydrologic soil groups are determined based on soil boring data collected by the geotechnical engineer. The top stratum of soil is mostly sand with a mix of silt and clay so, a HSG B is used for the calculations. Excerpts from the geotechnical report are included in Appendix D. Land Type Hydrologic Soil Group Curve Number Woods B 55 Open Space (Good Condition) B 61 Impervious B 98 Time of concentration values are calculated for each drainage area. A minimum value of 0.10 hours or 6.0 minutes was used, per TR-55. The following Manning's roughness coefficients were used in the analysis. Surface Description Manning's n Concrete 0.013 Grass swales 0.03 PVC 0.01 H DP E 0.012 Stormwater Management Control Selection In order to meet EISA, NCDOT and NCDEQ regulations, several BMPs are utilized including treatment swales and wet detention ponds. The BMPs collect, treat and detain the stormwater runoff from the proposed improvements. The linear portion of the project is collected in treatment swales and/or a wet detention pond.The swales are sized to provide conveyance and treatment per NCDOT requirements and detention to meet EISA requirements.The site portion of the project is collected in a wet detention basin which is sized to provide quantity control to meet EISA requirements. Below sections detail the design of the selected BMPs. Treatment Swale Design Vegetated stormwater swales are proposed to treat and detain the roadway drainage and provide compliance with NCDOT and EISA regulations. The treatment swales meet the design criteria outlined in the NCDOT Stormwater Best Management Practices Toolbox Chapter 6 for Swales. The swales will be vegetated and lined with an erosion control matting. The side slopes vary with a maximum side slope of 3H:1V. The swales are trapezoidal in shape and the base width varies from 2-6 feet wide. The longitudinal slope is less than 4%to comply with a maximum design velocity of 2.0 ft/s for the 2-year storm event and 4.0 ft/s for the 10-year storm event. The treatment swales are sized to treat the 2-year discharge at low velocities and to convey the 10-year discharge at nonerosive velocities with a minimum of 6 inches of freeboard or 1 foot of freeboard where possible. The swales will convey the 100-year storm event without overtopping. The swale calculations are included in Appendix E. Where further detention is required to comply with EISA regulations, outlet control structures are proposed at the swale outfall locations to detain the 95th percentile storm event. The outlet control structures consist of a riser structure with a trash rack and a low flow orifice. Refer to the"Outlet Control Structure Information" Table on the design plans and the routing results in Appendix C for more information. Wet Detention Pond 1 Design Wet Pond 1 is located south of the visitor center and west of new Slocum Road, outside of the clear recovery zone for the roadway. Wet Pond 1 will utilize an outlet control structure. The outlet control structure has a riser with trash rack and a permanent pool orifice to stabilize the ground water elevation. The riser elevation is elevated to attenuate the 95th percentile EISA storm.A gabion basket forebay is proposed at the point of concentrated inflow. An emergency spillway is not required and therefore not proposed; however,the pond is designed to provide 6 inches of freeboard between the top of the pond and the pond water surface elevation in the 100-year storm event. Wet Detention Pond 2 Design Pond 2 is located southeast of the gate house, between the proposed Slocum Road and the proposed Alexander Road relocation, outside the roadway clear recovery zone. Pond 2 is designed per Chapter 12-Wet Detention Basin of the NCDOT Stormwater Best Management Practices Toolbox to provide stormwater quality treatment for the contributing drainage area. Refer to Appendix C for design calculations.The basin has been sized to provide temporary storage for the water quality volume(WQv)above the permanent pool and to release this volume over 2 to 5 days via a properly designed outlet control structure. The water quality volume is based on the runoff generated from the new built upon area for 80 to 90% average annual rainfall as calculated per the guidance in Chapter 2 of the NCDOT Stormwater Best Management Practices Toolbox. For this project location, the water quality design storm is the 1.5" rainfall event.Additionally,the basin has been sized to provide 1 foot of freeboard during the 50-year storm event. The basin will have a permanent pool depth of 3 feet with 1 foot of additional depth provided for storage of sediment.The basin is designed with 4H:1V side slope above the permanent pool with a 10 feet wide vegetated shelf that extends 6 inches above and below the permanent pool elevation. Below the permanent pool elevation and vegetated shelf, a 3H:1V side slope will extend to the bottom of the proposed basin. Forebays at each point of concentrated inflow are designer per Chapter 7-Forebay of the NCDOT Stormwater Best Management Practices Toolbox. Pond 2 utilizes an outlet control structure with low-flow orifices to attenuate the 95th percentile EISA storm and NCDEQ water quality storm. The outlet control structure will have two low flow orifices (drawdown device) set at the permanent pool elevation. The top of the structure will be set above the WQv elevation. The outlet structure will be equipped with a track rack. The structure is sized to safely convey large storm events. An emergency spillway is not required or proposed since a minimum of 6 inches of freeboard between the top of bank and 100-year water surface elevation is provided. Stormwater Management Compliance — By Point of Analysis Based on the existing points of discharge from the project site, the stormwater runoff is evaluated at seven (7) points of analysis. At each of these discharge points, the applicable stormwater requirements are met and discussed in further detail below. Outfall 1 Drainage area 1 consists of existing Slocum Road between project Station 103 to 122. The road is being realigned and widened through this section of the project to connect the proposed Slocum Road alignment to the existing road. Stormwater management controls in this drainage area are designed to meet the design requirements of EISA and NCDOT Regulations for Linear Design. The impervious area is reduced in the post-development condition due a section of existing Slocum Road to the east of the project limits being rerouted to Outfall 3A; therefore, no stormwater management controls are required for Outfall 1. There are proposed conveyance swales on both sides of the road to safely convey the road runoff.The swales are designed in accordance with Chapter 6-Swales of the NCDOT Stormwater Best Management Practices Toolbox to satisfy the NCDOT stormwater requirements. The post-development runoff is reduced from the pre-development runoff, thus satisfying the EISA component of the design. See table below for a summary of peak flows in the pre- and post-developed conditions. Existing (cfs) Proposed (cfs) EISA 3.70 2.56 10-year 50.12 33.24 100-year 106.37 70.22 Outfall 2A Drainage area 2A consists of a section of the existing Alexander Road and grass and forested areas in the pre-development condition which discharges into the residential storm sewer system which ultimately outfalls to Central Gates Road Pond.The discharge point for drainage area 2A is a storm system that is not sized appropriately so it experiences flooding in existing conditions at the intersection of Hertford Road and Alexander Road. In the post-developed condition,the area that discharges to outfall 2A is reduced by directing the site improvements in this area to Outfall 3. See table below for a summary of peak flows in the pre- and post-developed conditions. Note that this area is part of an existing permit which will be modified to account for the change in drainage area. The increase in peak flow during the EISA storm is attributed to the calculation methodology and negligible. Existing (cfs) Proposed (cfs) EISA 0.26 0.57 10-year 36.23 22.57 100-year 95.22 54.18 Outfall 2B Drainage area 2B consists of a section of existing Catawba Road and grass areas in the pre-development condition which discharges into the residential storm sewer system that ultimately discharges to Chatham Road Pond. In the post-developed condition, the residential street remains per the base bid or is reconfigured per the Alexander Road Bid Option. In the bid option scenario, an increase in impervious area occurs so,the peak flow calculations were performed based on the increase in impervious area. See table below for a summary of peak flows in the pre-and post-developed conditions. Note that this area is part of an existing permit which will be modified to account for the additional impervious area. Existing (cfs) Proposed (cfs) EISA 0.74 1.60 10-year 14.78 21.53 100-year 32.83 45.71 The change in land cover condition increases the peak flow rate within the existing storm system so, the downstream system was analyzed to confirm adequacy.The existing storm pipe at this outfall point has a diameter of 24" and was modeled with the peak flow calculated above.A downstream tailwater of 0.8*D plus the invert elevation was used in the analysis. The calculation confirms the hydraulic grade line is contained and no flooding will occur due to the increase in peak flow. Refer to Appendix H for downstream analysis data. Outfall 3a Drainage area 3a consists of grass and forested areas in the existing condition and discharges into the natural conveyance system located centrally in the project area. In the proposed condition, drainage area 3a includes portions of Slocum Road that discharged to outfall 1 in the pre-developed condition but are directed to this outfall in the post-developed condition due to a change in the road profile which prohibits the existing ditches from discharging to outfall 1. No proposed improvements occur in this drainage area besides the ditch grading necessary to direct flows to the proposed bypass ditch. See table below for a summary of peak flows in the pre- and post-developed conditions. The increase in peak flow during the EISA storm is attributed to the calculation methodology and negligible. Existing (cfs) Proposed (cfs) EISA 0.09 0.74 10-year 39.36 29.70 100-year 103.93 70.65 Outfall 3 Drainage area 3 consists of grass and forested areas in the existing condition and discharges into the natural conveyance system located centrally in the project area. In the proposed condition, Drainage area 3 includes the proposed visitor center and associated parking area and a section of proposed Slocum Road. The road portion complies with NCDOT regulations by providing treatment swales that are designed in accordance with Chapter 6-Swales of the NCDOT Stormwater Best Management Practices Toolbox. The visitor center and parking lot are considered low-density site development and therefore no stormwater controls are required.This area is directed into wet pond 1 which is designed for detention only,to lower the post-development runoff flows to the extent practical to satisfy EISA requirements. See table below for a summary of peak flows in the pre-and post-developed conditions. Existing (cfs) Proposed (cfs) EISA 1.18 0.41 10-year 42.53 57.29 100-year 99.23 81.60 Due to the high groundwater in this area and natural resources constricting the site improvements, the BMPs are limited in size and depth so, the peak flow rate in the design storm events is attenuated to the maximum extent practical. A downstream analysis of the natural stream is performed to confirm adequacy in the 10-year storm.The total drainage area to this outfall point in the pre-developed condition is approximately 33 acres, including on site area. This area equates to roughly 96 cfs of peak flow in the 10-year storm. During the same storm event, the peak flow contributing to this outfall point in the post- developed condition from on-site increases by 15 cfs. So, the stream was analyzed for 111 cfs to confirm adequacy.The stream at this outfall point has a 6' bottom width and 3:1 side slopes and is approximately 5' deep. In the 10-year storm during pre-developed conditions, the stream has a normal depth of 2.3'. In the post-developed conditions the stream has a normal depth of 2.5'.The water surface elevation remains within the banks for the 10-year storm so, the stream is adequate for the post-developed peak flow rate. Refer to Appendix H for downstream analysis data. Outfall 4 Drainage area 4 consists of a section of the existing Alexander Road and a portion of the residential area to the south of the project area in the pre-development conditions. This area discharges to the existing stream that crosses under the existing Alexander Road.Stormwater management controls in this drainage area are designed to meet the design requirements of EISA and NCDOT Regulations for Linear Design. In the post-development conditions, Drainage area 4 collects runoff from the proposed Slocum Road and from a portion of the residential area to the south of the project area. Most of drainage area 4 is collect in the proposed roadway storm drainage system and discharged into Pond 2. Pond 2 is designed in accordance with Chapter 12-Wet Detention Basin of the NCDOT Stormwater Best Management Practices Toolbox to satisfy the NCDOT stormwater requirements. Pond 2 then discharges downstream to a treatment swale. The other areas of Slocum Road within the drainage area are collected in treatment swales on both sides of the road.The treatment swales are designed in accordance with Chapter 6-Swales of the NCDOT Stormwater Best Management Practices Toolbox to satisfy the NCDOT stormwater requirements. Storage provided in Pond 2 and the swales along with outlet control structures with low- flow orifices in both Pond 2 and at the low points in the swales is utilized to detain the EISA storm event and control discharge to Outfall 4. Drainage area 4 will also consist of the proposed realigned Alexander Road, if the bid option is constructed. A portion of Alexander Road will be collected in a storm drainage system and discharged to Pond 2. The remaining portion of Alexander Road will be collected in a storm drainage system and discharged directly to Outfall 4 due to site constraints and existing and proposed topography. Overall, the control measures implemented throughout drainage area 4 will control post- development flows to below pre-development flows at Outfall 4. See table below for a summary of peak flows in the pre-and post-developed conditions. Existing (cfs) Proposed (cfs) EISA 6.92 2.81 10-year 59.08 42.34 100-year 117.24 90.13 Outfall 5 Drainage area 5 consists of a section of the existing Alexander Road and forested areas in the pre- development conditions. Stormwater management controls in this drainage area are designed to meet the design requirements of EISA and NCDOT Regulations for Linear Design. In the post-development conditions, Drainage area 5 collects runoff from the proposed Slocum Road in treatment swales on both sides of the road. Near the intersection west of the bridge, roadway runoff is collected via a storm drain system and conveyed to a treatment swale downstream.The treatment swales are designed in accordance with NCDOT Stormwater Best Management Practices Toolbox to satisfy the NCDOT stormwater requirements. Outlet control structures at the low points in the swales are utilized to control discharge through a low-flow orifice to Outfall 5 for the EISA storm event. See table below for a summary of peak flows in the pre-and post-developed conditions. Existing (cfs) Proposed (cfs) EISA 0.19 0.31 10-year 29.35 53.97 100-year 76.77 123.56 Note that the area discharging to this outfall point includes offsite area that is upstream of the project and directed through the project site as bypass flow.The road improvements in this area are collected in the treatment swales which treat and attenuate the peak flow rates to the maximum extent practical. Natural resource areas occur on both sides of the roadway so,the site is constrained and unable to provide additional attenuation onsite. Due to the increase in peak flows, a level spreader is proposed to disperse the velocity at the discharge point and not cause damage to the downstream wetlands. Outfall 6 Drainage area 6 consists of a section of the existing Alexander Road to the intersection with Slocum Road prior to the bridge in the pre-development conditions.A small portion of forested area makes up drainage area 6 in the pre-development conditions. In the post-development conditions, there is no Drainage area 6 and no discharge to the manmade Outfall 6. Due to the rerouting of drainage area from this discharge point, it meets EISA and NCDOT requirements. See table below for a summary of peak flows in the pre- and post-developed conditions. Existing (cfs) Proposed (cfs) EISA 0.34 0.00 10-year 7.76 0.00 100-year 17.50 0.00 Outfall 7 Drainage area 7 consists of existing Slocum Road east of the bridge across Alligator Gut. In the post- developed condition, the roadway is widened so there is an increase in impervious area. Stormwater management controls in this drainage area are designed to meet the design requirements of EISA and NCDOT Regulations for Linear Design. The existing road is crowned and runoff is collected in drainage swales and flows west where it outfalls directly into Alligator Gut. In the proposed condition the roadway runoff is collected in a treatment swale on the south side of the road. The treatment swale is designed in accordance with NCDOT Stormwater Best Management Practices Toolbox to satisfy the NCDOT stormwater requirements. A check dam functions as an outlet control structure at the low point in the swale to control discharge to Outfall 7 to comply with EISA and NCDOT.See table below for a summary of peak flows in the pre-and post-developed conditions. Existing (cfs) Proposed (cfs) EISA 3.70 2.41 10-year 45.02 44.06 100-year 95.78 91.13 Closed Stormwater Conveyance System A closed stormwater conveyance system is proposed on-site in combination with the treatment swales to collect and convey stormwater across the site. Bentley StormCAD computer software was utilized for the hydraulic analysis of the stormwater pipes. The collection system is designed to contain the 10-year storm hydraulic grade line within the system except at the inlets located within swales. The rim elevation of these inlets is slightly higher than the tailwater elevation so, minimal flooding occurs in the 10-year storm. Since this flooding occurs within the swales, it is acceptable and not a hazard to the roadway.A minimum time of concentration value of 5.0 minutes was used. Calculations for the storm system are in Appendix F. Riprap outlet protection is provided at all pipe discharge locations per NCDOT standards. The inlet capacities, spacing, and gutter spreads were analyzed for the proposed stormwater structures. Bentley FlowMaster computer software was utilized for the analysis. The gutter spread calculations were designed using the 10-year storm event, a minimum time of concentration of 10 minutes, an intensity of 4 inches/hour, and 50% inlet blockage per Table 10-1 "Design Frequency and Spread Criteria for Inlet Placement" in the "NCDOT Guidelines for Drainage Studies and Hydraulic Design." The maximum allowable spread is half a lane width plus gutter width which is 8'. Inlets located on grade and in sag are sited to provide less than 8' spread at all inlet locations. Refer to Appendix G for spread calculations. Conclusion Due to the proposed improvements, stormwater BMPs are provided to comply with NCDOT, NCDEQ and EISA regulations. The treatment swales provide treatment and attenuation for the linear portion of the roadway in accordance with NCDOT requirements.Wet ponds are proposed to detain peak flow rates and meet NCDOT and NCDEQ requirements.The stormwater BMPs provide EISA compliance to the maximum extent practical by attenuating the 95th percentile storm event to pre-developed conditions. APPENDIX A - DRAINAGE AREA SUMMARY AND DRAINAGE AREA MAPS Slocum Road - Drainage Areas By: K Bourke& K Wong Date: 11/6/2020 Pre - Drainage Areas Pre-Development Condition Area (ac) Total Area CN Tc(min) Pre-Area 1 13.57 71 Impervious 3.66 98 20 Turf B 9.69 61 Forest B 0.22 55 Pre-Area 2A 21.41 59 Impervious 1.17 98 34 Turf B 7.08 61 Forest B 13.16 55 Pre-Area 28 4.96 68 Impervious 0.99 98 25 Turf B 3.97 61 Forest B 0.00 55 Pre-Area 3A 13.81 57 Impervious 0.30 98 9 Turf B 1.47 61 Forest B 12.04 55 Pre-Area 3 11.38 64 Impervious 1.39 104.15 98 10 Turf B 6.96 61 Forest B 3.03 55 Pre-Area 4 12.23 76 Impervious 5.11 98 15 Turf B 7.01 61 Forest B 0.11 55 Pre-Area 5 15.26 59 Impervious 1.22 98 28 Turf B 1.42 61 Forest B 12.62 55 Pre-Area 6 2.45 67 Impervious 0.59 98 21 Turf B 0.85 61 Forest B 1.01 55 Pre-Area 7 9.08 71 Impervious 2.67 98 8 Turf B 5.00 61 Forest B 1.41 55 *CN calculated in Pond Pack *Tc calculated in PondPack Slocum Road - Drainage Areas By: K Bourke& K Wong Date: 11/6/2020 Post- Drainage Areas Post-Development Condition Area (ac) Total Area CN Tc(min) Post-Area 1 7.91 71 Impervious 2.20 98 15 Turf B 5.67 61 Forest B 0.03 55 Post-Area 2A 10.39 63 (Ultimately to Central Gates Road Pond) Impervious 1.17 98 33 Turf B 5.58 61 Forest B 3.64 55 Post-Area 2B(Ultimately to Chatham Road Pond) 4.64 70 Impervious 1.14 98 10 Turf B 3.50 61 Forest B 0.00 55 Post-Area 3A(Bypass) 12.80 64 Impervious 1.69 98 30 Turf B 6.08 61 Forest B 5.03 55 Post-Area 3B(to Pond 1) 6.34 71 Impervious 1.76 98 9 Turf B 4.58 61 Forest B 0.00 55 Post-Area 3C(to Treatment Swale 1) 6.53 81 Impervious 3.55 98 6 Turf B 2.98 61 Forest B 0.00 55 Post-Area 3D (to Pond 1) 10.40 68 Impervious 2.40 98 11 Turf B 6.09 61 Forest B 1.91 55 Post-Area 4A(to Pond 2) 13.38 77 Impervious 5.88 108.27 98 11 Turf B 7.50 61 Forest B 0.00 55 Post-Area 4B(to Treatment Swale 4 Eastbound) 3.30 73 Impervious 1.10 98 6 Turf B 2.21 61 Forest B 0.00 55 Post-Area 4C(to Treatment Swale 4 Westbound) I 2.97 69 Impervious 0.67 98 6 Turf B 2.30 61 Forest B 0.00 55 Post-Area 4D (to Culvert) 1.32 83 Impervious 0.80 98 6 Turf B 0.52 61 Forest B 0.00 55 Post-Area 5A&5D (Bypass) 9.24 55 Impervious 0.00 98 20 Turf B 0.00 61 Forest B 9.24 55 Post-Area 5B&5C(to Treatment Swales) 9.65 76 Impervious 4.10 98 6 Turf B 4.06 61 Forest B 1.49 55 Post-Area 6 0.00 N/A Impervious 0.00 98 N/A Turf B 0.00 61 Forest B 0.00 55 Post-Area 7 9.40 72 Impervious 2.99 98 7 Turf B 5.00 61 Forest B 1.41 55 *CN calculated in Pond Pack *Tc calculated in PondPack 1I 2I 3I 4 I 5 a a a w a D D Z O P a E U w a 61111111 ill WAN &Nu, — III•rA— ��' z� ' OA 1 i _,..._ �. _. �.__ _ _ �� _ RE-FINA IL.! - 7r. — — — o . _ SUBMITTAL ' r n° 4 G t D /� 1 O �I NOVEMBER 10, 2020 � lk DA 3A itR,,li 6. o v � �fhastestr -0''k-\\\N:'.'\_...1......• , i.,........: OA 6 • '411. ."--. -- iv / OA3A o ,) - ' e ................... \ 4/ „.......„...........„, oi.i."....c., iiii,, - ....:,,,,,,,......,......44. , .. Cil �� I� / � o f ., ,„..,..,__. , _ ,,- - .. , ,, ., 14.1 ii.a NAVY 14.1 � \,.. frfilkt TRANSPORTATION � �, �+!a• .... ° 1( " , ;`•- PARTNERS JV 14...J.:_l -. c -----...- ri*:\ �Z• V' ),..,„ )( w ►�t WE NFO APPROVED _ :,:kil ---,,,,* -2,-,r, — _ ----._ , gi -I ',Pr', 1 ' ''- 4,„07 I 1 D A 7 • • �-` „� .t. w ; '}ram -� ,fir . . '''...r.---:::41:441-111:1-1141:.1' -IC :, N "" 'a ��� �•. ������I J � � �-�i\ —f� '�'�� � � �— fnR COMMANDER NAVFAC ACTMIY Nk, lex 8 4 '\''''''\\\-,‘ 1 OA 2A k `\ i.=• -.�L—'��f-=/'� ® I �r o f �' ao �— ¢�w.�� 1 ,� ;rf 5J r „.\IIN,: 4 I) D A 102 - D A 2 Bfag I D `tio,,,_ :zip._ o f:s SAIISfACTORY TO DALE oo ♦ DES DRW CHK_ e„. DA 4 `1 I i \ . , EAS TMG RMN o Q �, . � r ,. (,G / �� a �l �� .o j °s PM/DM v i ' -ii ��� ter`Al` ae�♦� �� � BRANCH MANAGER O ) �0,0. �. \ \\ �°V:`° , 1.ti ..- 3 f"or OA ��� CHIEFENG/ARCH \ FIRE PROTECTION lfZi Q. POA 2B 6:9 , =� DA105 a J 2 1— z z W • zz c. • —I IC7) W z CO�DA103 wQz 05 Xo Wl w U s < w Q en Q � Up CD 1Q Q z � z O 0 Q z D 2 z o CC C� Oto z oM C _I _1 cil w al c w U � o Q. w io o — Lv Cc el fY a w a 0_ Q -el Z (� ct H- LL w J a II 0 a M ° > � oM o> T 2 Q o LJ_I 1 z w Z • z r en Q 0, SCALE: GRAPHIC EPROJECT NO.: 1565548 j CONSTR.CONTR.NO. L.1 N40085-19-D-9008 Q NAVFAC DRAWNG NO CO il.; SHEET 1 OF 361 14.1 DA100 1 I 2 I I I 3 5 DRAWFORM REVISION 25 AUG 2020 1 2I 3I 4 I 5 a a a w F- a D D z 0 a a E 0 w w a 2 >- 1111111,Aft- MIN &viaElm- isw.„,„,.... - RE-FINA \�f/ POA 1 \ \ \ o Il o SUBMITTAL o \ \ \ o \ o o o\ PRE-DEVELOPMENT o \ \ �q EIME NOVEMBER 10, 2020 FLOW PATH TYP. C \ ( ) C �.�,� OH OH OH �iiiTT6 Aar _— _-9H �a17. = o7 m�°t� _ ate m; pIiirr rarau 2:—...�Ia - III' - — - - 1..,..../....6a1— run A7 —: crmr 28 - cue MY .wB4 �"� cue as A CAWS Er 3 III& �_ 1 ■ d - _ 26 — — Z26 - - - - - - - ._ — - - - - - - ..` _ — Oro rs ii_it 24 _ c5 — . • JIIII!"1" IOW PRE-DA 1 26 28 2 _ ' NI, �� — - 24 _ - . 28 _ - - an� M?.b� - z— 10F - - -- _ - - - :ALM NAVY o «,� - - .�.�„ - - - 24- � � — — - - - - - �_- - - —28r =28— �,, .,,.� - - -28- = =— - - — — _ 77 R� 26 - - — - - — ,.. -- - -28 — �,� TRANSPORTATION �� — �� a 26 ..� LX �,,T - —> .r — — — _�-�� �1111111111111M11111111111111 ........�T.•, � � ------ 1� - - ., 1 _ _ PARTNERS JV A/E Rim — APPROVED �� — _ ir wi„d"F"' wr / ,� 4 4 4. l % 28 'AObJ "�\ — -- 26 26 \ . ,, bit ,�.,�,� - - - N PRE-DA 3 -\ 4 • _ `'� DRAINAGE . ' - - - - + " - -• - •~� - . - cn et.co � . FtR COMMANDER RAVFAC rj / AICIIVIIY I \ AREA (TYP.) �t- � MATCHLINE SEE SHEET DA102 v yv v - . . SATISFACTORY TO DATE tri I \ \� - DES EAS DRW TMG CHK RMN \ \ \ V PM/DM 2 \ \(- �\ BRANCH MANAGER CHIEF ENG/ARCH \ \ \ \ FIRE PROTECTION ' \ • \ o Y U B \ QU L z B L 1 2 I— z 0 z z — in -A I I o 0 Uer ¢ E / I I . � g � zI— J zQ ? wQ p o J I" =, L U COw � o w Z 1 \ \\ J Q,� a O Q w en •Tti> � Up Q I Z �Ts Q w Op CD CI - - /-K--:---------0—\77)...------* w UD o z U z m- rn I z w Q (/) o o \-- CD o U ICI o Qa w ct Q Q o Mo AA w aU Td- . Q o w N�' EQ 0 0 SCALE: GRAPHIC cn 2 EPROJECT NO.: 1565548 :-Si CONSTR.CONTR.NO. L1 N40085-19-D-9008 m1 Q NAVFAC DRAWING NO. iG � SHEET 1 OF 361 LLJ DA101 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUG 2020 1I 2I 3I 4 I 5 a a a w MATCHLINE SEE SHEET DA101 _ . . . _ , , \, \ - F.....,,, \ - -\\ ..X_... ' x i<lsx 4 . . .c.. , . . . 7 . - - _ . . . ..\\ \ - 11, . . . c., \ tk . . .. 7 . . . . . .. . lir - . . . - _ . . . \- - N.- ' ,j/\- , - - - 4. 401110:- - - * - -. _ - ':‘`I : ' - . , . ' - \\ * • Ns's. lik . * ' . 0 * "\\\.. ' . „ . „ (.) C----C.i)) ow . �� ..4 \ \ PRE-DA 3A . :.- -. : . ...::r j,/-. \,..shs,......›,7 -------- ------T---- ` ` „ . . „ . , . . - . immenri /ill . 'i r . . . 0 n ' ,, . . . .„7 - .a a " s l MI IS Nto (. . r r .. . ' r . A MINI 121 \A , - ci - 0 - - ./) LEM' „‘ ., - Ns.\N.., - .. . 0. . „ . . V\ ......\. -------4,‘—___ - . ,, ' - . IrlialLaw ` mil,- 711) . ,,, c-.5 \ - , . - . , k .. , ,... r _ . CV \lb% ve4,- ---.. 1o, -•frie. 4 - - - - -` POA 3Ar: ft ''‘k _ \,...-.: -'' \\ L__ 'RE-FINA - o - o SUBMITTAL C *4. " - . . _ ` ` - - ' - . _ y ` . " NOVEMBER 10, 2020 Q .-- ..:/e"...- d )3 .d { " . " . C 6� " \ (._li SEAL . : ' ' '' - • _ . \ ____ ___ ,---Tdii,f notti (.(.(t_ \ ,,, ...__________.......---_ _..... . ... * ' * - - - /1 ,. -______ ii-t \ \ A , . .. . ., /t \ •••..""' .....„ ..-----_---- ,,... ,______ ,3 ------- ...—:------ -____ NAVY \ so- � - N ` - \� I � /\\\\\,c,\\ \ /A' \_ . .. . . . - * " . - . - . _ . / / i 4,, g / ;/ TRANSPORTATION - . PARTNERS JV WE„� j / / nraRovEo ��, -\ ` " . . IR, E-DEVELOPMENT - " 41141‘ " "d \\ \\ _ " \� I I ► � — \�� FOR COMMANDER NAVFAC \ , LOW PATH TYP. - . ' ` " - - ` ` ' _ ,, #\ ,* ` ( ) PRE DA 2A . . " - . _ � � N. ri. th. * . . * - . -_____,....406 ‘1 :14 4 , :41' :�' . ` ` " - " - - �� _ / SATISFACTORY TO DATE \t , o � / - _ �_ �, DEs EAS DRw TMG cHK RMN N. . . _ . . BRANCH MANAGER c.2 ; \ ® �� - . . ` ' ` - . - ` 1,________ „_,,,,,,.._ �. . , �_ �__ \ CHIEF ENG/ARCH Cs ` \ soft -11 A - " - . _ L FIRE PROTECTION 1114o, i 4/ —Ar"---;--- ----------- . 4 --NI \\is, dd *1.411114N°6*---------- -"ft ,t t. A . " 411 b ‘1A‘NN,.. O z W r ahr / c. .d d .d 4 .d eil ) I " MATCHLINE SEE SHEET DA103 = — z w Q W d '' �• � . ,d N z U J m 1 -s# 1 k 'a''''. (C( \ cg , 0 4( ' -..ti ---- ais_ =1 a I ilr . <----7 sty \ Q /w� 3 \ Q 41/ 4 I a\ OF -2 �n .d.d O �` O 0 CI 1-1.-r1C C � z -Lc 0. M0 ILI z u) O z /� 9 1-1-1 o o P A2A _ � ®ii.) j E c-- Z CL oU � w rILI as Z (� 2 W ct iQ Q0_ r 0 cn A i --. -- ° > g2 o M A c W r M O/ijM , 2 Q o 11.1 1 �s' m z v Z CL 0 0 SCALE: GRAPHIC EPROJECT NO.: 1565548 CONSTR.CONTR.NO. L1 calN40085-19-D-9008 Q :::::m - F 361 14.1 DA102 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION 25 AUG 2020 1 2 3 4 I 5 a a a w F- a D D z 0 P a MATCHLINE SEE SHEET DA102 MATCHLINE SEE SHEET DA104 w a \ \ - . z \- A . >_ . .. ( , , .) \I \ -_,„4:, , . . . .__________ . _ _ . _ 2.3— =`!! \ , c.....„ , \. \ . ---' '' ------ \ . _ / _ - = �� "" �� ,,. aim. .11) N — -lit ��� c,°,� �� - I I fir, \� - _ I / �� / �i 611111111:5 �;. - _ WAN , PRE-DA 3 _ - ,.--- < , 1 _.. 1;\� ,\ ) _ _ - � • k [ 011k - -_-__„„---- - W-_ 4**--- ........,‘.. -- �� �. _ �� - ` �,�� �._ PRE DA 5iiiajim • ry----- < — Z.." ',:g-irg"mia• CP:. 41 ilit % ---------------- ____-------- ---- ' \ '''' '..—.---___—. "-- — ---_....-_-----,-..-_-_-.7-%-------- ---- s 2Ligliria 417 a' • 28 - 2 _ L 1 �_� \ 0 !� ,,, ill,. , ,...„....,... Q �irml ._ �,' f \'r -�� -f 4 % . �O 'f . _-fi r ��_ v ' Ntilimiiiiimummii - . \ \ 11 V /��A , Np. ,...... ff a —28 f �� �f \ t. \ rs I A _ 174 <1.C.4 11111,11":":4111. It" - ',. ..., ----------N 4..., .,e6 -4 LLJ 0 iri • ____,-. ..zin. & . "..\\., :- 14 7- - ilk ,' & CL a 7,8 , , 0 C) .1......_.-- 4 PRE-DEVELOPMENT � �,, ;.a.�,, f iii kr $ _ �� A RE.FINA ........ .,.., C. FLOW PATH TYP. 9- ,-, - - p '� _-- — e� ��2 A•. ,- ALEXANDo ND M lip F � ': 2 f f I/ ' of +ac 2\ ��� �7Q a / r2G � =•� - .� "\:), 1 �s� �� y, �,2 � c , SUBMITTAL 6 _": 18_7. M M 0 icia 26 �' `� -►'—� o J NOVEMBER 10, 2020 C # .ram ' • n -a.: +? . 12�y�e � �, , C p s . ''moo "�'`.} :- c � •.�� � J m� • M_____r_._----------s----asrffios PRE D A 2 B � �� i ALEXANDER ROAD ® l n f r., 1104 0 Ow.., 0 Alt#12..,_J.6,1c\ic\jII N ----------------„:...r......, 16 IMIE:1-1W---.7%" -'1'1""".. ;rill!',11-7/ D 0" ‘ Q i i4Z . / *44 P., ,, a Cb P' 6--26 ___--- - J .. ii 0., ..,„ »� . r . • ti ems' o 0 (-1, ,.� fr a l'�� - �:,nrraisi ;�� � c , r� , i ll . ‘‘‘, \ �S`� fob ,r..p .. ......,„viig, _ / gar ----------1--- ki. i to ..12 ; y� I y.WNYU 0....E Jr , '.'WO . 0or roan G> , cATAwsAaonD a a.•, �o �O it\ '0 I WAND: 'I �� -/ = W 6 ,Jii .- 7,t,..- �` •• PRE-DA 4 POA 4 _ .�� w NAVY 2 -w mac. t v ___,..., \IN-...- *kit' 0-11(71 :4 st „� No L s �. tip II � C TRANSPORTATION � 3„� .,.. / was- ��� �,� � �`}� i+ii ' I r �`s ' PA RT N E RS J V n/E NFo W �- C� // Cij �'o\ H s...r 8 ti ?i� j� f y +,mow APPROVED 14.1 SS C(�p� /� �mr ��\ :411%., y ,pro rrrhr _ '_�tyy. �1 . �- ♦. �'M.. - �,arLY�VI / �. f 4 a' T �rwr ✓°am re . r't`, *, ' ♦:' �, or o�f,f r h `„ `;y'' �\ �� i _._ I/ r- � Ite s'`' rwF°` Tt '\�.r k '"�t'' ?iS� ��itL '�•� f+•^,o�u. ' - �� �l "'�## ' "'^rryi + '�t.- -- �jK+�„� °M arw,r ♦ m•. �; �k1141, "'°" .2- I I ;i 4 �` YI' w2O ° "? �I.y,�`+ w� i\t, IfnR COMMANDER NAVFAC ® ar '°' wr., ru•."� ''j '� _, .�.iy1� �1.+ NIPTOWk SS' u'rnr"� 0.2, /114iArw"` �t i .,"S!+.1� w..a .,i Y. r h7R ' q;,r s` ; • \ t" - "cT"m, `'�- 0 , /Amu.n.... \ ar.. ,,,•„M. rxs7!' ., .by ,r �. 3 ."'"' �,7 = '°" a O sL r + rv' r fir ® tJ .... irr� _ sw,r +rar '® ........ �'/7:ozedits- s•ar '`7�w•F��` nr , •a. t 'r• "7�-•fl \ `� Y`.�c'x 'i :,'�� / �T'�, 47 Uj OMM a* :�"7 n \ rsnw ro. r t xi Yy �k .»•we Qrw�c SA11SfACTORY TO Q�TEPOA 2B .` ' !t i' .. 1v, :,?y�+�r^, ,, .;�, .4,4 ? _ r+w DES EAS DRw TMG cHKRMN E • I4, \111111111111* /� rmu ��•' rwr N.. y t. H, ^r � n' �s'.r PM/DM Pr ®� 7 � ' �Mbq.* rs BRANCH MANAGER 2 (4 .m' \ Al 1 evg/ it ae � ' a a CHIEF ENG/ARCH 1 0Q . ,t G / '.�w,r FIRE PROTECTION 474 0H'a, e 3 rwe Z e; i „� QUo z � I- � zw z O :7', ` ozo OU erg ¢ o , z p ? w Q I— iii DRAINAGE 3 — w U m AREA (TYP.) Ld s < Q w Up 3 Q Q I Z Q a. w 1 CD O a 0 z I CC UD w W v in J a_ cn w U Cr) o Cc ino Cr) LLI w ct WQ a � r a Q Z 0 2 W 0 y A iLL oM A d LT, Q a U 1_M O w 1 CI 2 z w Z CL I d z CC Q O 0 SCALE: GRAPHIC EPROJECT NO.: 1565548 j CONSTR.CONTR.NO. L1 co N40085-19-D-9008 Q NAVFAC DRAWING NO. 1.1i SHEET 1 OF 361 DA103 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION 25 AUG 2020 1 2 3 4 I 5 a a a w F- a . d N4111\4 41 Le:� ------ ...=gy4 4. / , s�'�+o . ! r\ -7 ' r�+RRa D 7..., 1*, \i • ,-,_ D ,,,,4,1.::\, ‘,,,,,s,,,,.4_0,_,.$,,, ,„,....„,,,,,, ...,.,., , % ..„....- um/ St‘v 1111\::IV/‘ -.._ o -'''''''':44 1imilillelp 1:/° '''':°''';:" / � �� . . . � . ; '-teTiblitp --------\ y- : MIN PRE-DA 6 v • - \ 2- 4,)/ i ' i — � POA6 dim � I Z.vi I. .. I LEM I% Ilkiiik, ,k‘,.. . ... 10.1. 111°? \ o v ,\ -_-_,\6.-------- • , 41*.N-Li` '......N, ..,: it,p„, Npnwriraii...".. Alai ilf111wW0matt.... *a-., I i 1 .41 .d / 'RE-FINA 11111, /a,/,_ i ap 1 co 1-,r / , l/ %� / ,00‘ ,.„ .)• SUBMITTAL I i , ,,•# 2 dd NOVEMBER 10, 2020 d•C d •d C __? I 4 d / r /l , ...,/ .d d d• 1E( IVIL l t , d / d ��t 1 SEAL ic‘l , - . t.. (1011 \\ / \ / / ., / , 21_ _______)b .i.,1 (Th,I, oi 1, • / //7---—- /-- j I ) i . ,A, TO / ;i4' ,-c P//jr/t4 1 ri - 4* R / zfr / 0 NAVY al O/ / < APPROVED TRANSPORTATION mil• \\ D RAI NAG E \ s / �' `� ��� PARTNERS JV .0 // �1 ^ /1,E INFO AREA TYP.14.1 \Pito\l'iliar 4 1\ 7 ar \ \ ` �p / fnR COMMANDER NAVFAC \ / O \ w® it/ ir POA 5 w PRE-DA 5 N ,, / I141104\x/ _ \:\ o �� lCO �61A 1'�� SATISFACTORY TO DALE (6 q t \ ...). / / DES EAS DRW TMG CHK RMN \ l. C / I/ W PM/DM ��\ PRE-DEVELOPMENT / 1 -. BRANCH MANAGER z / \ / I w CHIEF ENG/ARCH FLOW PATH (TYP.) /,‘ /^ % \\\� z FIRE PROTECTION e , II -..."7 ., UNT ',...._ z0 /\ \\\ ,„ B ClikN- , ,______, v // it i f , w Nt- / A -,--- -„ I/ / „v 1 1 ,/ - / / 2 Zo ¢ W Q 1— iii MATCHLINE SEE SHEET DA103 W CO , r W 1 x z • / -` P 1 \I U z -,cc / / Q / U / ;o/ 'y / V Q w 11 _ ?0 _ Q c c,i Q U _ k / z C -Lc i 1.11 U C'3 J J 03 o w UO o a LLI W o cn A 11W. / ° a oM A f w > g2 w U T d / 2 Q O 1 r E- z w z 0_ 0 0 en SCALE GRAPHIC EPROJECT NO.: 1565548 j CONSTR.CONTR.NO. L1 / co N40085-19-D-9008 Q NAVFAC DRAWING NO. Qi SHEET 1 OF 361 14.1 2 1 DA104 14. 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION 25 AUG 2020 1 I 2 I 3 I 4 I 5 a a a w , a D D Z ? ii H 4 �\r a \ / ��\\\ POA 7 o o in I / / \V A�\\ E ' 7 1777774, ;�'N. ,, 'RE-PIMA ,,. '� � � ,,,z_,;. ' - IP SUBMITTAL s%rc,4h•Hl ' _':�•, NOVEMBER 10, 2020 • \ \14....„\ ("z/41 \ \ s, - S4., , Oro -- Ill W - � .r W , ---.... ..... ,...._ Allik ..„ 1 ' ..t. V �. ��, DRAINAGE NAVY W ''l N` • TRANSPORTATION u, AREA (TYP. (n \ ) PARTNERS JV , „� CfE W �-�.► PRE-DA 7J — 14.1 E ��� • N. \ • co c J . • •♦ FOR COMMANDER NAVFAC ACTRMY N _,�„ ' V '444,,,,______N-- PRE-DEVELOPMENT tzi FLOW PATH (TYP.) �, M sAnsFACTORY TO DAIE ...tri 2 .,I ` A • \ DES EAS DRW TMG CHK RMN gyp `� PM/DM 2 %' , + _ BRANCH MANAGER �, CHIEF ENG/ARCH O ®� FIRE PROTECTION Z c. �u ,��� �E•j lg i_ o H Lo �► 0 WSJ � Z U CO it -7- , ,-.,N, ,,, ,_,,.... . , ci_ „.b ,,,:,,i,„) .4, Ai ilkibtzi a L_Li th 1.014 L-----7 > LLi \ I _ a Q w • Q� � z - to w0 LLJ W� U in ci '111/4‘ z O LLJ z o f�o J o z Q _1w v) Or Uw .., eL ZS- Q o ct = Q a0_ r A � J � � � � A T Q o w 1 12 z w Z a Z r: Q 0 0 § M 0, SCALE: GRAPHIC EPROJECT NO.: 1565548 CONSTR.CONTR.NO. mA N40085-19-D-9008 Q NAVFAC DRAWING NO. t'L; SHEET 1 OF 361 14.1 DA105 14. 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUG 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 2 3 I 4 5 a a a w a D D . 0 F- a 0 U w Lu a Npiriiiiic t„,„„iiii,,,„ OA _ • .�`o. A CA no ,,,,. ; �� :ate ,,,. 2�8 _... ►,��t��- �>_.�a ��::�r • 4 =,, '" -...".-.-:.-...•.-.: Wilk . _ : , �.�_ . �E - —fir--' ��i; = - -z i,...::::::::;...:„.?•:. • • - SEAL • • DA109G�\ DA 3A 6 .. >- MA a o �. .� ��� a� ti 57... � . �. D4r` a',:,, 11j11111111A� SEAL j %vir-,,;..;."7-- 'I( •,,,. . ,Sll'i-kik1/4 \''',N\\ ,,,,,,, .. . ' Oro• O CO ��� i DA3D � .' J LLI / ,i 44r- DA1 06 '7 \,.' ' I - / . '';',;*--..-:-..-::,,-*---*:.-.- \\ 0 \ VAN . OA 3A 2_,, 11 / '\\ �j( ♦ _ �/ �' 4� /// lx :,,,,,,, '"Tif,.,„,,,,,, ,t, / J✓ `�� !�/ U DA ,�.• .: ��� _� ' NAVY�� �P' �� POND , �' Y� ' . �:�;� -� A 3�'�_. ... �� s �/ � !s�: �` TRANSPORTATION'�S�.`" `�a:• �N� `�� '1 ► . u � tip ;�. PA RT N E RS J V „�E iHFo APPROVED ct ' , ' ' ' --------""! 'l ----''''-*---2;"-:---- -77.....„....1LA ci DA 2A \' *' o t 7 DA 5B ---1. ----, .,... ...a,-7,..iih.4itk,7./i4k.- �� _ � "Er ♦ oat ravrac _ 4C .';:41r*/.111:11di LLI _ 0. cis -. D POA 2A '� 4fAiim.- DA 4A ;_�� ,�= G� '� ,,,-25-- k< '. X, :�. a o LLc \ ♦` �",�\ ,� � .ter.. CO— CO' � ��° - � 7 ♦ • SATISFACTORY TO rah MMIDDIYY "' `,�' PON�T;�Id' ` DA 4B 1 Q N �� o DES DRW CHK EAS TMG RMN r DA 10 7 �.-- DA 2 B -� � �� �,� �� �!� DA 4 D 1\ �t rott � �'�/ i1i< `'� * v ; car °o • v � \ ' BRANCH MANAGER Z �i� � �., s' �` :Y 1 '` c��� tc.`'loy PaA 4 CHIEF ENG/ARCH FIRE PROTECTION rr POA2B i `° B - `, - Q J z B H O 0 z V. s u) zz o 2 zo d � Q � L.L.i g Z w m W 2 z U Q X Z p J w z Q Q o 63Ld 5 w 0 Q DA108 >- Q ui • w >• I— CCC z Z x C z w (j 1— °C J 0 w w JME z QU) 0_ i Cr5 z 0 CD z 2 rip— o S w co " = w a in 1 z U Q C~/) IA oaw A cE WQo c� U w 2 z U z F �a H CA FL Q a Q 0_ J S o SCALE: GRAPHIC F. EPROJECT NO.: 1565548 CONSTR.CONTR.NO. �? N40085-19-D-9008 °fit NAVFAC DRAWING NO. ]C CaSHEET ---- OF 387 DA106 1 I 2 I V I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1I 2I 3I 4 I 5 a a a w F- a D D . 0 F- a a 0 w a 2 >- IITA, I I IN I ```��IIII11///Id, ' OQ: S S • I ::: 70f/ POA 1 �Q S a L ,0508/927052/ / .,-, ‘ y / C. O o — , , — , __ w • ••• cIN,3 C C 111.1.11 a 1°1111 (gi rV°9 ------N \ \ , , 490 •* 011/11111.111r L _-9H rn� X • OHS ///11u�� SEAL • `2- IA- _ _ —; , _ _� J — mm. - �� >a,.. Qce X�� X �C �. EX� = - x T sue- — — — 26 = &O OW —00 p 0 _D �r� — 28 ® Cn P ST A 126 __ _ .�. r �� • �- L4 426 �`''��,-` $1rt -_ ST DA_._ . ... .. _ __ ....... ,,,... __:, .,_„....... ______________ _ ..__ ,...._______. _ ________ ,_________ . . _, _, 11111k `�. .,ice 5 '..77:1, _• _,IM=EL I - 27 NAVY _.. -T.„... ..... 1- " . :.......„,____,______-_-____-______ U _ TRANSPORTATION _� • • , Li_ _ — — >. — LX . .��J —� a.t — 1111111111111 — --- - ,: ������. -� ANYW r` r ���. X �, , _ _• PARTNERS JV Nr Me.. ,, ..',.:.,.: - _26` o ��o .d od .dd.•r .dd. � . - \ ,. _ ..� - E INFO — "26 �v 26 bd �� - . � � _.1.- 10 CN) r-- . - _ APPROVED FY `1' \�� �� ) i - _ _ r� ( l�V ,c... ��� h�� a II ' \- - �. DRAINAGE i dO - - - x _A \.-N� . I — - FOR COMMANDER NAVFAC o ACTIVITY LLJ cn AREA (TYP.) Y__ ��� MATCHLINE SEE SHEET DA108 ,� "'• SATISFACTORY TO DATE MM/DD/YY Cl) co \ - - DES E4s DRW TMG CHK RMN J o \ . \\- - PM/DM U if \ BRANCH MANAGER Z N Z \u CHIEF ENG/ARCH B \1 \ - FIRE PROTECTION B o a U Q Y B It 2 o H- I I i \I , ° � � Z 1nzz O (--- 2 6 a- r \` z z i CO w z — U Q x I:i i \ / wci J W 7 I Up ui - \ U- Q I \ aw Z ~ ~ 0z � � QcnSI cn * CD CD L1J cc U) w \ JO A ` - w I z �zU o cn a w U) a F CL T O `��� A oaw A 2 W ¢ o v U w z z ci 217 z Et d ¢ Q 2 ----.-------- SCALE GRAPHIC n EPROJECT NO.: 1565548 CONSTR.CONTR.NO. .E N40085-1 9-D-9008 i., NAVFAC DRAWING NO. ]C y,j SHEET ---- OF 387 1 DA107 1 I 2 I 3 I (y1/1 I 5 DRAWFORM REVISION 25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 2 3 4 I 5 a \.\\\*4,11\a. a w a MAT CHLINE SEE SHEET DA107 r....,, \ - ‘ . N\ ,i) N\ . .\'' , N _ , , . \\„. ‘.., "Ai* ' - . „ . % - . _ Asti,..\,-., Ii\li' i-- 7 . \ilk - - - r \�`�F - \;. �?> - - POST-DA 3A .\.------ ..\\:\ .-. \- - ''' --..-,,.. - '... .-. ,., 41,, -<' \-+- --,,, _1,, . . . ..A - .. . . „ . , . c . . . , . „ . - - . . „ . . . .rj 17 . , 0 - . . . . ,,,,ii§ . . „ . \- . ,,.._, , . . 4.1 to-. . . . . „ . . . . . „ . . . , N, N - -- „ N.' ''' .,,...„ ,siN,, . „ -,,,,,,, , .., ... • ..,,,, ...., . . - . . r p - - ..\. . _ „,, . 4 . - . n. . .2° - - - - - . 4.1-14 ...,,. ,..., --„ 'N - - . ..,s. N\ 'i W ,c . .-2 • - POST-DA 3D - r - - + + - - r - - a \:\ , .., . % _ + ' - •,,.., , . .....- -1.--1, ,c,„ . \ \ , ,),, \\,' litilli ,i0P--. ,.. _, 1 .. ,, , , , ill / \ f �" r - - +� r ' - + r - - r - r - - - `.�`�� Q RQ��ia °V 0 ....rill IS iii,mi Fr )1 Hill .! .) _____,, ,,. ..,4\ - _ r - % •�..•..•..� , . ,,,,,,,, /le . ---'--' ,,,,,, • 4> , , . c; . 4 ., * :: . . : 0 IIW It\ .1,i: *4 1... 4* \\,`,,,,.,'' 4 . 4 , . / NIIIII.N\ 0 \‘..4 ‘, .... \\\ ' 4 . a , . b. �� _ � � � ; L It ‘_ .. o ♦ - + - - - r -� - r r ' • OQ:�DES S/ '•.��fi 2 : •4:k.. I.F# • /1' : ,� a� pie..1°./5.2.8.9/2.7.05.2.lt, ./7 .. _ :kf.":" POA3A � � o ti � .: ......- i' l* 1 .,'., .:- - - . . .. 1§skip ..______ V .••••\NC: . . . . , \ ' '41 k . - - . . _______„, - a d,6 - - ��� I � :A� - - - ( 117 ',/I1111111Aik% SEAL Sk \\\k 11,,,\\ 101,,,,,:,f= : • • . _ + r - - - \, \\\,\‘ Ofo r-r.":,.-ci) 0 Air* , ,‘ . . DRAINAGE - - - '‘\,,• ki ,- - - - - ' - r - _. . . . LLJ— �.��\\ � `� AREA TYP. _ � 4k,,, ,` �s - - tiilf.. '� `� � f44 c.) • \ , \ \ c' \ . . \ - ..,...-. . . . ... . . , ,-- � � � ,..,., ...,, NAVY4 \ . ifit: . - ' - - r � ==/ �� ''' ‘74.:,,,,, 7w TRANSPORTATION LL ,;•; A od' / \ V � PARTNERS JV ,UE IHFo��s, �� \ nrrrsovEo :� \ POST DA 2A • \'‘ .. \ , 1 ���� _ - e r - - :: ��\ — _ - - I 11 � �\ FOR COMMANDER NAVFAC #� I POST DA 3B - - _ �� � „ �•� - �y �� w / i �, '• - - POND #1 ��� N., _ - _ - _ _ yy� � , ;;f/ A o a �C �!' �.,�A �� - _ _ - _ _ _ _ `' �=��. SATISFACTORY to owe MMIDDIYY CJ� ao r - - a � d r r a I �� �.� • ' - - _ �� — �� DES DRW CHK o C. _ _ \ -�' �\ EAS TMG RMN p U N ��\ \ \ _ �,id \ — � • • • ` — \)r____ \ BRANCH MANAGERAi 7 - :°:::T:::\r1:lj):1 � , •N, .\ ,, `\ . , ; . \\ \ CHIEF ENG/ARCH tioNb__.- iit_ z„.....-- __ �- ' . ,.... . . .„___. � �, --N FIRE PROTECTION ___,,,,thit., __...v.... -1441 ./ \\:\ "FLA, .. ii&l, sc, .....„..------ . ,:-. .,__, ------_____,11----- J / 1 Ar>.--"`"--,.. .___ -----.sk, ) :\kk., <zz • oi- i \ ili.„,,,, ..$4.4 • • . / r // //01 \ W° Z ()' :0 11killik:414114' '1: 1 I 1 1- 2 ,a seas .sa ;::::=.\°)�`\ ��—: - • - - - _ .. H s ��� ��, � a \,1,0\k, � ,r \�� MATCHLINE SEE SHEET DA109 > w _ 7 :-' ,,:"'1 l, ' � oJ � Um\k\ki, ,,, >,. 441” z• � a zZ z zg .0' 1 it ' 1,;\At '4 ti 4JCL i .•.. _ zLU�` w G W vt\‘‘.\V:W:\;:t:\# � z4:1% LL, , ki _77: _. .....a. , tart /' Q � JC � a J w :\ \ ' 41 ......_ \s\ -,\ kliNtN,, -7,, z• ,_ D i2 u, CD �%�i�„ '.-� cc Cw U z o LLJ J � _ z Q POA2A T - zc� o LLJ o CL Ld <o � w• U coO A oaw A I \ Z Q o U ra Comm ,.. z ° w �0 ...1 \ ---- o . H 0 z 217 SCALE: GRAPHIC n EPROJECT NO.: 1565548 CONSTR.CONTR.NO. N40085-19-D-9008 NAVFAC DRAWING NO. ]L o v ai ^ SHEET ———— OF 387 • DA107 1 I 2 I J I /1 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY (y1 UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 2 3 I 4 5 \7 a .. . \\ . a w a MATCHLINE SEE SHEET DA106 ' - * - '\:'' ' ''-' c7 2 \--') \-\ 1\ \S- I\ , , i riik- ____ t. . 13 . . " - - \**- , 0o + 0 POST-DA 3B1\dirl': - " " - -\ _ .\\ ". s.-- s' N' uZD\''1'0N. '10, (N , :, 1\. • No Nil 0, / ' A ' • . \N ' N '-*‘• • '' ' . „ . I C___} Luu9c7 " •\\• . , ' ' . N\N .. „ - . , :1'4 ‘ cp , _ - . „ . - - . - . , . „ . . \ \ . .. . a . a •'. . a . . * 11111,-it: : - - - C:)- - - ' - - - ' - - a . . ---------- • ii01‘ +N ‘ ' 04: N a , L7°°4 61111111211 POST-DA 3D � � " !IF Allift.-IS _ - � , \ � ` ,� " ' - - " tea \�` - " " - - _ - s � � if* / • wiz,v - . . - • - - . / r \‘''..., \ - ,o, �� R o r'�p o o - - • - _ _ _ 00.00 \ \\ ..•• 11\ . i al -•.. (2 1\ N.D1.\\''--7: \ ,\ \ -7` cc'n\, "\\\\ f , ‘., - ‘ \ cg\' ' , - - . . . . - - . 0 t k.t\ CD 4 „.......4 -1, eP .,„0.11 . \ ° - . . ' . * . - . . . . . . . . . D. - . - . - . - . - . . 0 liki ......,-- - : - ' �� i‘11/4 ce - " - a SEAL .. : - .7--- \ . , . . , . . : , \ /�� ����t . - _ - - - A o'--• _. 11Pkt,', -.--Th4' • . POST-DEVELOPMENT - \ \ ;0 ....4/01 NO: .NN.�:� C r . . - . _ - ,.......- ,, \ FLOW PATH (TYP.) - _ - - - _ ��. •••....•• C /()IV II 26- ‘ - \ '., . „ .. 7\ (-,-\ r) 0, \ \\\(g) It ' et I r _i ll,, • C.-)1 � DRAINAGE AREA - - \ 1\` 0 �� \ � - - - \ �.� W1\V------- ----- - N / j 5.0 \ kV - . _ - ' - - - / \ Itl -.1, 9 , \., \\ \\\\ 46 . - - / , _ -- T. ....-'---=-- �� 1\\\• :1:*.1:1'.1:-------.1::\---------.: NAVY (....) -''''' ........... (rq-L-I A • 0 ‘ \ Ni k-k. - _ �\`'i� _ \� //i TRANSPORTATION ‘;':35: ' \ - .� " , VA\\ il\ f v PARTNERS JV NE INfOLL O i / � A � �O� - _ _ APPROVED y .� \ POST DA 2A \\\ \\\ - • - \ \\:\ - - ---,U0 , \ - �� -4 ostS \ \\ - - - _ _ �� I FOR COMMANDER NAVFAC#\ , POST DA 3E - - _ 1--::---:-1---- �.� -47 �� \v�� .� - POND #1 \" \ _ _ _ _ - - ► — yam � � , LL A o s �C �! �� cP - - _ _ - - �� � �\: SATISFACTORY TO owe MMIDDIYY Cn a{ •{• `�� - 4 \ \ ► A \ �o�• '� "'� _ - - _ \ _ DES EA$ DRW TMG CHK RMN sf Q - : - . . .: liimieloptiN N :4\�\ \ - I � � N d .. - , V AV PM/DM V _ — _ _ BRANCH MANAGER Z 7 4 - A . � _ fti 11 — CHIEF ENG/ARCH 11111111 SEAL C ® _ JJ ¢{{ j _ - � ', Agoc - - ; (\\ 4/ `Ian _-_ \ ` FIRE PROTECTION abli B i X # \ ,_„_____ k iik / 40 ____Ar%/ ''''----.. .. 121 ..:e 0 1 iliv / i / 2 — E 0 L,oi I-- 1 - 71.1i1 ------.-:WiE%-__ 0 ett---''' / \‘ i...64.,‘ 0 i= Z ift \.1,1-----..-,- - / ilAir kii -----. z - 0 6 `mi = uftwommiii,was......_ 30 / r / )),..„. ,„,.4 „ ofik,,, ,k0 30 _1-7 A 1 f - - _ o , 90 ( .4.4 �„ _ � , MATCHLINE SEE SHEET DA108A �, w_ _ Nc7 i co z U Q X s. 4I► ► �j i' `ern w M 1r .. w4 { s. ,____ � e` \-, ,,,,.,„„, \ , 3 wo Jw-\‘ \.-..N.1 .. -.............„..„...7:„..7 ..... wgz � ww . O. : ' '.4*:. . : . :'' :. . 1 *'‘ ''' \'\' \\ \n.\\\ , 0 ,,,\\*. O CC CC o \ LLJ *4\\ , 0 . el : '-- - - . :- -* * ' - - ' * cn ‘ 3,-,--, < — < .., - 1— __ e , ) E 7 ,_________ , 3 z 0 0 �• z " woCOtiM . . Z a ct 211 g Q o1 \ '---- SCALE: GRAPHIC EPROJECT NO.: 1565548 g CONSTR.CONTR.NO. N40085-19-D-9008 1 9 /y o NAVFAC DRAWING NO.—— 53 ]L o r Cii ^ SHEET ———— OF 387 DA107A 1 I 2 I V I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY c : ,Th‘l \ i _ UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 2 3 4 I 5 a a w a D D Z 0 c MATCHLINE SEE SHEET DA108 MATCHLINE SEE SHEET DA110 w 0 -\ JO' ........"!-Cal"" 1 611111175 * 1 . * N \/ \ \°� ♦ � �, J k ,,, y 7 - . , jr-..., .. / \tk • ���� !FA In _ �i , ,,,,....(..14 -----\ \t‘A \-\-c _______, _,--- --_,, --7-____...,...... ..,,,... ---=-----_-__- OP' -.*.4 ae ' -"NM. . ._ �,' ` ��'. 111141 -; _‘�\ \�� 7...----- �� \� - \ .� 1,.F' . ens v �u*`, moil Fr ���_,+���,.,,,,� - ,�---{- -- \� �� -=- DRAIN � � ��► /� - � - 28— .$ � f � GE - ? • - 4 AREA TYP. m v �. •� ` � ,�_ ,,� ) -,� POST-DA 5 �� .E �. POST DA 4A - _�1 � A - 111►11 1111L " '\ \\\\ ���1 • •'pia•'. ® 1�... �_ �- ' i T ,,r �� �.. ALEXgN ERROq� i'J�` _'III—tea '/ � � �� L. N. ; rr - T� _ , ��♦♦♦♦� ���0'',�II \ .Aill!' 04,..'VI.•• . ... • N.a :��'� - - - _ ► -'•- __.,,..... .. __. .. .. . . • I,CP...... \ !���-��1� " � • ,,..... -. $ 1� 12 14 � CQk� "Oi - /110 /', ,� ♦ .•.•.•.•. �' I ... 4 .:.......___...,.,t,hi%.71/0 ,„..„„,•:„......s.._,. lifil i I ____.: 4'.' ' / \ GlIV "1- ?L� / k1� ♦ - �I ��-..� • -`'.^ riwe:--Ik.._ice_Wall `-- — , 4 _ �% � �� i •�'� • i � i - i SEAL • - %/fr 1;41, ' - It� - j'i -. u,� .�.. mil. liar"4414 i s. .►�- jr • • sad GM Alt ... `... —1 ♦ rto l■��✓ •, I f/ '.� ice _ r . . \ �. -- ` �� / � — ` _ • • — �- -.. I� _ - �� _✓ .� "/ . AO/28/2024. ; y �.1'47 _ �� � 26 k = - mow-. ' - �, _ • O '• �i/1 • 1 1 0" _„.....1,.....4,„. k _ z._..i. :1: . 0 . A i.1-r .6) .,..• gsr•rrr 14r " +,..--..- 28. xas' xnr�J il , 7; CV x ` ,✓r- / Ir`i.►.�=- '..:,`_ '�.. , * • - _ :*‘81117 \' I �� !\ le i' ` �` ". •nrro.or �'' ` //�' �i w��` �,Q = �; �/, i���� y� C111111 SEAL - \ 11 , -� ► - /.-.gin .. \ �� � �� � "°" •• � j„i. � ` - �. jam - - 16 i:G-' "=,.�` 7�, ..�., J .. ware,2 = _ — _ +� 5.2 xar x M•'�/ 407 �I!;l jl .� .,E�+�`` N.,� —; ;�� �� 1` ��� °M ••,.,, ril Or `y: tuf 1 • a, r •'.r r+ r a• At+ / �,' \ '' —_ `� /� -- .+� ,1 • \ , fJ SJl O ,]�r �� ;ow i ���� POST-DA 4 B _.-� �, x,�,� L� / C7:x.c - ■ xn. �' , // I 'I,, ...wt.) - y' " 'fir' -26 I � � \ ,....0 . ,,,.... POND #2 POST-DA 2B � A �:. x�., . �6 lot D �.�- _ . e, , r ..`...,.. ®\ .+'a. 1'11 .ifi" I S ,� 1� ®xs .. x / 11c ! N/ .�. +•.. • NAVY „„_ EC, 1 . �Ps\ • ��..�,.. W ■ \ ��; O Iridobw,v_ �� tr e��K TRANSPORTATION ■ IMmi -1""-- �� ,� r �. Q�_—:� . ` �.. � :� P OA 4 PA RT N E RS J V ,UE INFO ■ : �c \ N.... t ,.............: 'JO =:114;16473031, * 7CP ,r"` I " r,aa. APPR ■ * co s• �;k�j i. '.4 *i / OVER 1SS ® '��. s x.F ,. `�+��1.�,'ii�. ■' \".A � � � �r.rt S x�` ��0./�4.7. ,`,.,, ar ♦x� I y44.:4:114..04.: ; ,.•°.�AC ofty ®� yn�o !a'^s..-. !�' C mir r�ll. � °"'°'�+,F O ®� '°'.rrd 1 'r"c Al . .. rot O � , ♦.r.e I ,,r ,A. �/�, 1 1.•�. ♦'r°. 9Noe W �/ '�/' it ` ,v r, 7T� g4 fir. • . ...eo .w cRY+�C' ". �` 1fOR COMYIWOER NAVFAC® , uM ® xar �di iip s. ® ® •, r}r-�f A��4♦ .r r t '7,, S FORACT CO CIj{� sY� r tx ..•u New 0, ilie. W - .�`.u"ffi..•ea.�,•� ?�_ /4 ,•,.••. ,r y !. ' w� �, a. X ` _ -�./ f4'°•. \ +�, � ,�wl� u1�� JW ' .: -----------------T--- --- -': ------ a x.. �.. x .� • " Y7 .r a•°tj:�• eY;wAP ' r xar ,7� 1..4 +'`'.M aaor ar /�..r ar ws �s • ♦�. 'Y a^ en x La - J i1<t� T �,^' ' S [i� � V J °0POA 2B \ s ,r r, \ .,r ���w/�k `*l SATISFACTORY TO GATE CI) :: { w x r $ ► r• x n ... MMIDDIYY �• �' ':. r . ",• x vii',Vtt �' „�„ . 1tu..mr �i DES DRW CHK ''�E r..-;„,,‘:--;, ,,it„,--. • . � T EAS TMG RMN J lV �� �.. rmu ra. .. .. .rs'a. PM/DM .I , y�wyj - .0 # rr �� ♦ T yY. TA +iF / art �� ti �+ w� ,�V.r. BRANCH MANAGER s `} �� �X '-Nib , y��`s ! S -a Jo, ° CHIEF ENG/ARCH le Mgr FIRE PROTECTION B +EN �:� • c JB d G O ti° C' f ty _ � ° U1 z O�w ` HO �, Z . O whoCL H I- / CO '''',. LLI a DRAINAGE1*' �o Z000 � > w z ai AREA TYP. w o z " w s "u O CC QO Up w cn Q u_ O I_L.I � � cc cc z Z � U o 0 W 0 1— axi °C O w w LLI J —I i (� V O w 7 U3 w c cn Q w E w � = 1 9c9 } I CL I z U QCn 8 o Q 0 x A zQo o A U w Lu z U o Z a Q a Q D_ J 0 SCALE: GRAPHIC EPROJECT NO.: 1565548 n CONSTR.CONTR.NO. N40085-19-D-9008 NAVFAC DRAWNG NO. ]C a; SHEET ---- OF 387 DA108 1 I 2I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 I 2 3 4 5 --.1-7--------- ---'''''''''' '.------------------ - -1------------- a ._.......Hi \ \10 a a a a D D z 0 • c 1 Allill•N IT 4 MATCHLINE SEE SHEET DA109 0 MATCHLINE SEE SHEET DA107A w o __,,1 # \ , ,\„, v . _ .. ,. . , if : . .. 1:.( ----- ---,4-7-."'"vai.- 77------------ \ A ___A____ :____________ . __ ___„.....3....... . SD _ - 7z WAIN \_ ________________ ----- / 1 .„....._:..... „_______ __ ....,...,... ,... , , 2 „___________ ____________, III , . , .. \ ___,,,„,_________ .f4 \\ &NI Irlir pil cA � • �/ »�� i- ..�� le, — ���iFe - +L+. SS- 0 _ :\ = �_ �� ..� \::::----------- --NN ��� GE AREA - \\ �d•����,' \ �1g —_ . d .� / - 28 F 28 =— _� ,„ (TYP.) - - - POST DA 5 ���� - POST-DA 4A - _ ,. \ : �1 `- « �� '` 1 i ems- - � ill- 'i�2 2s s�, —�/�®�, � �� � *� ..., �- _ _ - \ POST-DA 4C - — , 71 • _�► 4 e — te` i - ..--- a�.'yy �� � ■�a• .-'1� � �i����u �n�- -✓' q - / "� ` �-� _ �6 \\ A / 1 - ylY- "� . ,`,,111111 III/III�dI ---/ '\ '.4L., '` Y \/ . I - - t---.7., -mum .. _ W b ` - . ) \ L Wiff ..�'1 • $ �- 4, '�` e — I �!T / LAND ROAD �C _ ` IV�_ � "� ' � �� \ ( / r + - ,,� a II N R O ,,I� 2 �iG- ER 't �, w 26 ��►''0� �, �s� 28 �ic�i 5- ` .tea ����.� \�i `� 8 10 12� 14 � ` ' i .,s! ` ••......• � ►� j �; `� 24 26 __ is �_ \ N -a "4"." ������` �-��®ice— 11 OQ ES •'` �: - �s a ni�-I 4, �l•�, `--- .i(,'- -_ Ate' �' y. ,� • �� / ����� ® 1��- .� t i ��� • �� �`J. 28 -_!� • i �e �� l ��t•I• lT \ .-•'. ��� ® ` �.�O0's� �� _ yet •• 30 -.1.4111a111 - / XX' `! 'yL- L. n I 1'i �i �_ _ � d .. _ �_- 2�- ? .-�'� - ®�� 1$ j ':,♦� ; • SEAL ; - q —7 \ �:� �`>;� . �c�� �� ti �,'� o '1 ,�• 1ti# air Win- _ � �ti - 1g �4 ���.� = 050975 : = � ;� � IP t���l �d � � y� _ � `L� i 8 �/------4 41: 1/28/202 7 8 40 :\ . 30 q �� 26 if//1#l. ` 20A 18 �� .. �� �� :• O '•./1/ �G.: :czr: 1\i-lit' s = ..._---:, 0:7 C \�3g136=34-32� 28` = // l. • � s, a .. f' C Illi • ` � 2$ .� :, lX^•�t�'sz 1Nrw �' �=r� 22i_%y \\-` � �� , �� ��6ov. s_ 16 ,\ 'dd//11111111111� SEAL Ate► - XIJ•0 gr.. .� Facer 4✓ r J j•_. �.� - - / _.....,e 11 z POST-DA 2B , Xq. X�• �.. 11/ lit.,„„,__/ 1 I I ffi/4.4 �.JT-DA1:!...,,....,-- ' B` _� ;0\'''''''' yy��i ia...,.. ,. • rr. q� X ^air -N� Q e il kl'4114 ellirMr_,InT*/if „.. _NA \ 1 ck -,, 0 _ , i„„„,---...,,,,,,_ iir- .---. .--,.-- .. ...„...,....- -- i --------------,__-______ ----_____,----.------.------- s, _________-...,'-i- � l • . \ liplyilli" —_ _ CqT - 44 . s� •�, !' POST-DA 4D — qw._ ii �� � /. POND #2 !ill / ��: + .� ia. • • ' : ! of :T.:. ,� \ )1%."..41111-;:-41111.11111- 4 -.--- X / 4 / 6 ''fit: . _ rwiJQ® � ® 24 ... `� X•• 1 �"`'�1 Erg .,, ,,„„waill�,�► 'I I- .;.,", +►C ? ,.PZP Xp„q Ill , 1 � N X�. •�� ��r ,,�.� �'K �.ft 4114k,,,,, \ 'SA' TRANSPORTATION �Ct / o - A .Q__:� %� ,,4 ,M PA RT N E RS J V ,yE INFO X 24. C © ® sew y SST' :1:W ;. y,�1 �. t �, �" / f ��S/ • ;� o�F,« �;is Y ` �>j 0 .. 181.5 . 1/,. ••• \ 26 ,l���,�i,� ' ` /i-�. -.;�� - ,l! ,� ,..- .^. I �k �x y�'c f, X.» o 14, _ C votrill1414 0, .0, � ��L r ��]c741�G�1:{ / X ( O °` { `z �.," SS 11\A FOR COMMANDER NAVFAC Q iirX • .+ r ,yam. ® p ® \•X.r /� =. /® .�, Y." rtr �?yi+�tillik t� _ ���C , ."` ACTMIY L� If. -.0 , ,,, 441f. •b.. 7 "", .-•, v.*..., _AIL"k elott," Jo P,„ . . ad 1,. �` ,�y. .• SATISFACTORY TO DATE MMIDDIYY _ �/✓/ A... .At* tt• x•0��•• ••.r7.: r .� � •�. {Yl'� rq, T�•,PXMr ..e'wir O "�"e' , . �� c, e �y.'*`' p w a Y�* r•� .” 4'°Y . \ , ''FAN' t Y ,' ^ra DES EAS DRw TMG cHK RMN (y v+wv t, . 7T� tili!le,"4 CNI ICI �g9pq� /� // rnav �. rer .• �`yt 'y a•ar XPM/DM‘ \- -\ ."'"4114 _ at',':'k.'."--,--e, , v,,,,„...:77 ....,,A. / CNI ®� '11FA x,�r �'r`a' r. \� �� ZLi, \�*F ��� *xz �•� ^ Ar BRANCH MANAGER Z iemw C sn { .. O ° CHIEF ENG/ARCH \:".4111,„/s. \ Or ..• °" S 0047 �EIlA X,„„, FIRE PROTECTION illtt,4V.,.... z > z G y� �,O \oY AINAGE AREA 0 0 o j • 0 2 - r/ v P.) N O / . � W• O . o ¢ � U m 1....i w U Q x Zo w Li ; U � °C C/, O w I w J J z o0 � Cl- .17. C'3 w H `-" w co Q , w m w � = w Q co M o T e A oQa, O /"` ULij I..L.I ce z U A F o H FL Q a Q LU J SCALE: GRAPHIC n EPROJECT NO.: 1565548 CONSTR.CONTR.NO i.) N40085-19-D-9008 NAVFAC DRAWING NO.-- ]C Ca SHEET ———— OF 387 DA108A 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 2 3 4 I 5 a ....:,.: a a w F- a ‘ d d 1 ��� d•dd �C. .. D _ `�t� i � ;� dd ° D 1 .....- ...„,., :. ,:,,,,,;iiti,„,.:27„k --‘4).19 .44.,,,/ iiii, . ,.‘74N!-=- d 10,4\ ..,,,,/:— . ti„„iiiiii:ti, 'al a .''''' �' .,99 . .+,_ IC / 7® '}, , . ate`` , gr -6* �� fin,/ ...v. 8 ,, , ..,,,a, ....., ,,,„______:: , ..4... 4 ' 4,\`, N7;‘ ,, •1 IITA k /r-' 4 0%,I.. \ ..,04 / ,J z_ 7114:4;17*\;'- '1°r tP144:. ‘'N '':--;----'1%''''' 1 : fi r' 14 .' ' -" "'**4'-, IN I 1 1"4 4) i o ,� sue; ) i , ' . ` ,A,i_,,,,,, A00,, , Afia ,..,..-----, -,..SITI'a-... `N‘ CA R l'i• 11111.1.1/1111.°11111.1 4 , tiv '., -,c-04 " _ _ ,. _ :; , °0d /'. (iit) • , 4 . ;Y � . y . C --<7____( 1---------- 1:1 • POST-DA 5A - i .4 , d L 411 ,,,,M,;,,.�,7 SEAL • i��f�a .d d d d iko /* 4 ' T.. \ ), 4:%" , W! at I '7-N 7 / 7d .n. 1 ii r.s i POST-DA 5B',',„///i.- ---7-______-Li-/----4,/-,/ 4 Fr',,' ) -, - • 111) GI .71 LL iiii � i lit-2 7 // :/ li,,, f- .-- � NAVY 0 \ \ // TR PARTNERS JV�N .t r 1 ` WE INFO O // ��/ i , � � _ QAPPROVEDN, ll, I l/// fCI e/ ! / - - II �� _ FOR COMMANDER NAVFAC )111c1"11"</, / 111.111, �,%rr, �, q _ � W W i7 • .�.� POA 5 z LL "� "' '# r /. / - SATISFACTORY to owe MMIDDIYY t POST-DA 5Clif - ILI DES R,q$ DRw TMG cHK RMN CZA \ PM/DM BRANCH MANAGER Z /11.1.1.1 •- / CHIEF ENG/ARCH JQ EN �� �� �� � ,._ _....7ihpo\\ FIRE PROTECTION i B s\r , , /\ 0 POST-DA 5D1,,,(,/ 77 Of \\ _1 z > z i , ..,N 00 A N .y„ i . 1$1 S MATCHLINE SEE SHEET DA109 �� z .. i z z W _ Zo � J w 3z /<6.11111:- DRAINAGE Z Q Q '-I-' ...:/:1:1:111: AREA TYP. W o Q s /�,�_10 Q / ( ) J0 Uo - o - • w CD a , ifile._.... .. ,", CC CC o J��IS w J O W E. � �_%i z o (U o / LU I) LLI Q � > w cl J ct T cD x A / z 0 A U w d 2 z U z H ▪ H FL d• J , SCALE: GRAPHIC EPROJECT NO.: 1565548 F. 2 CONSTR.CONTR.NO. LI N40085-19-D-9008 al NAVFAC DRAWING NO. ]C ai SHEET ———— OF 387 DA109 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 2 3 4 I 5 a a a w F- a D D Nat v�� �; ° ate \\ vOi ip ///4/ _ �o POA 7 IrA k - ,...:a% 1 , ,, „,,,,,, sp, . '-'4,6`, 4/1% '-- ,, ,, , IILN I ,„ /N. . _ ,,, ,, . loili ,44., -- ,,.....,....„‹....., ,,.) ' " v/ 6„0„. co._ , \ DRAINAGE A , al ` 4 AREA TYP. :/*%,1&%t 4g' t;41 ,.....--42-ksii‘„ .: _ .• i _ 1. O ;•9 °�,T, . 04, : \ ` -- ♦ - (..• .444k SEAL 9 WO �� • � � • � �1/28/202� • y - O D44 \ \ ei - �\ N M . < 1 NsAt., - . - -.-A EvANa%%i ' sliNttia. \-/ .. >- 0 wrzy____411. _ :* , 14112 . -', , N te - ( _1,,, -....„ 14116.C� ` +1M O i �rj�J, 0 _ , --N- .,\. \\_,,, -v.-.... ..1 --\ ---A IFN.4,. NI IR, co w POST-DA 7 NAVY w \ TRANSPORTATION LL LL 0) // PARTNERS JV A/E INFO NON a 0 ;5 �� ���3� FOR COMMANDER ruvrwc 0 g . � "crnm W gQ - 4/ SATISFACTORY TO DATE MM/DD/YY U) C r G '_ N N ` DES E4$ DRW TMG CHK RMN PM/DM 0 R - \ 4BRANCH MANAGER Z N � CHIEF ENG/ARCH .., FIRE PROTECTION Z > B ' ®_ Q Y z B - /-1 j lici h 1 \7 N, N., ♦J �. t6 .sN6Aq U [) . Z z O go. ) ..„ . .44. ji..... w: S 0 1, \� � � ¢ c=� Q CO LLI J a <, a „� 1 \N'''' C9141,1-11 I V ,4 ',,,,,A, U H ,Igi wT. 1 „Y--- ii / 4.. < co ..::z z >_ D , 12 u) 1 x 0 0._ • „.. . .... z OLu wwI • Q �i zoUo 1 _sii-- 1)n Lu E w = 1 r Tgii , 08 AoQ oEL , > . Ax U w u' ZU A o z F- CC a Q - J S S SCALE: GRAPHIC EPROJECT NO.: 1565548 F.. CONSTR.CONTR.NO. .E N40085-19-D-9008 Cyr NAVFAC DRAWING NO. Si ]C y,j SHEET ---- OF 387 DA111 1 I 2 I 3 I (y1/1 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY BRIDGE PLANS ( PARTIAL SET) UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 I 2 I 3 4 5 c a a w PHYSICAL SECURITY COMPLIANCE / D D P134 - SLOCUM Z O a E U u) w a 2 MCAS CHERRY POINT NC 3 3 imoi , liWill IN miry SUBMISSION : FINAL DESIGN A .111 i ````►►►1111////4� V". itSS/6•. y :, VOLUME 2 OF 370b . O A'•. 9 • • 050975 13: /28/2021. co 1/111111111%%%‘ SEAL 1 J or0 z O_ 2 .. • • `' ' li • U W r} : _ � _ •. NAVY e `�• ' .: '-'1 I. • ,�:��' : — - 1 • .. _"•� • , ` -,ram TRANSPORTATION U_ . . ;'�' ' - . . _ - . . _ Iti � PA RT N E RS J V „�E INFO 0 • d L JL _•.L IT. IA�•' APPRUVQ� comliiii•-,-..• - .1. . 1 . -.I-.. • • ' .... %; f t 1111:' Sg:g4 •" ';,y {{yyl•77�_ - nkr' e t FOR COMMA110ER NAVFAC n • , . _ '� SIT r}, _ _ �.__. • . . r `' acn �•�--� • Li A II _ rr. LOCATION — 1 . . . ti _ — — I1M ' loirov , . sAmfAcratr TO DATE MM/DDNY CO 11 . .. : i - ' _• _ _ �' • 'ti • •. DES EAS DRw TMG cHK RMN ' �. - I F` + 7 r - •� �'• - .♦ t' BRANCH MANAGER Z tIy" - Alt SITE - D ' { rr n J' '�1 1 - j }` • LOCATION .� FIRE PROTECTION_ B •. _ } • • 71#410 Z01 1 1:' • '--IFIL ______ GamatimitioNsik_ .•_ _ _ . . 2 0 f,D_ H I. •Ir. . ;.• -'-11.- . - Z• • - ..• . (n q Z FI r•� :: •). -' j 474 ' ti -.• ,.., - _ M1 • , .,.. � - t • { 'tip - 1� (n - C 3: • • ,r,8 + ry L :y4. w �4 .F;y:+ y 1 ti r 1 r 1 (J > L�LJ IP rart _...„ 3 {•-.: • • '_. w _ A _q .Iti 7.iY tiro} :c _ c. <} :EL' • � r. ; . iik7 Iti • Z LU J - r • -# '; f L. ;r ' =ti kv- }C'r k G■r L. N II • .lr .YI:_ , .r lr': '•'s d:. S�_ �i .r 1G` ..•. • Y v.t {• '• 'i Fl••"'r• - '•• ~. i 1 1 1 •J .� L ' . h s 114 } _ 3 y v: _ •L , 'r7.: •: + ` fib. • ,1� �;7r-�_ • 'i' •'_ : ' • • • •TS Lu O L1J • .4 'Y•. ram- 1 N. '} 1 $f ' <6 _ti • '+1 _. . J. _ _ • :. ... ■ , U 0 • �,•_ �••7 Lr _,.a� f: _ ,.�'�1�}�'� i�'I� i'�. y ,ir • .:r ••n.;• 5:.:11 . .. ` _ r ;+.n `r••', �j• - _ _ 1� 1..i. _ f 1.111( 1 J M1 -3 �: �' , lr .. :' •R•r+, �. .•�Rl .. •J •.y; �.I X••._�' { + T- ,C / +. r L i. .0. • i - . • .� 'i _ , _f = ?• = -1 •• _ •7-�T C J :ji: "' y + . Ft : - � M1 L r •V' • i.' • ''f +f+ f '7. • ti , 1 �•- _ Q O O r • ._ • • •.• _.,,•,..1.40..,..., • /i,•t, \••• • 1..i k .. li_ •• .aah • ... ..r....fej:s'i:W. .._K. :r z> >_I— SIC CC I _ . ... • 1%. 'Itif ..& a-1r ..ji. ._-.• ..: . . :. .... • •'.....L.•11-lie. 1 mi • Old.491 1'. i .11....hi - ii,_. .__ !_ mir drid , . . 1 (-) D 1_ ..•.• _ • ,. ..•1 kr. -... .ik:•.fr.a. •fr I r".2.41.111atil !1.1".&• 1.• 41.i.f-ILip.1:1:::1 41117:1111L: • _ • • W 1 • . • _-..••. •••.• _ . . . 1/4. • 7.7. ... "II r_-_ - ..... ... . .,. •... . y• _L,N.e. cl--, . . .i. di% 0 •Microsoft Corporation © 2020 Digital lobe o NES (2020) Distribution Airbus D © 2020 HERE 11? lT113:; , _ :. :ram _ • L!• IN-Irsitttcil - i .. , = s 2020 Microsoft Corporation © 2020 Digita16Iobe ©CNES (2020) Distribution Airbus DS © 2020 HERE . =Y z Q LIJ j `�' w o U) 1- 1- 1 LOCATION MAP LOCATION MAP w _ 1 " = 2,000' 1 " = 500' a Z ci) CO oa o � 8A zQo 0 A 0 wZ w A F- o Z i- a Q a Q w o o, SCALE: GRAPHIC n EPROJECT NO.: 1565548 2 CONSTR.CONTR.NO t N40085-19-D-9008 1 NAVFAC DRAWING NO. = 12837811 al SHEET 1 OF 105 G002 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1I 2I 3I 4 I 5 a a SHEET NUMBER SHEET NAME SHEET"X"of SHEET NUMBER SHEET NAME SHEET"X"of a G002 TITLE SHEET-VOLUME 2 1 SS153 BRIDGE-GUARDRAIL ANCHORAGE EXTERIOR PARAPET 1 OF 2 55 w F- SS154 BRIDGE-GUARDRAIL ANCHORAGE INTERIOR PARAPET 2 OF 2 56 0 G014 SHEET INDEX-VOLUME2 2 SS155 BRIDGE-EXPANSION JOINT SEAL DETAILS 1 OF 4 57 SS101 BRIDGE-GENERAL DRAWING 1 OF 6 3 SS156 BRIDGE-EXP.JT. DETAILS EXTERIOR PARAPET(LEFT)2 OF 4 58 SS102 BRIDGE-GENERAL DRAWING 2 OF 6 4 SS157 BRIDGE-EXP.JT. DETAILS INTERIOR PARAPET 3 OF 4 59 SS103 BRIDGE-GENERAL DRAWING 3 OF 6 5 SS158 BRIDGE-EXP.JT. DETAILS EXTERIOR PARAPET(RIGHT)4OF 4 60 SS104 BRIDGE-GENERAL DRAWING 4OF6 6 SS159 BRIDGE-SUPERSTRUCTURE BILL OF MATERIAL 1 OF 3 61 SS105 BRIDGE-GENERAL DRAWING 5 OF 6 7 SS160 _BRIDGE-SUPERSTRUCTURE BILL OF MATERIAL 2OF 3 62 DSS106 BRIDGE-GENERAL DRAWING 6OF 6 8 SS161 BRIDGE-SUPERSTRUCTURE BILL OF MATERIAL OF 3 63 D SS107 BRIDGE-LRFR(RATING)SUMMARY 9 SS162 BRIDGE-END BENT 1-1 OF 3 64 SS108 BRIDGE-TYPICAL SECTION 1 OF 3 10 SS163 BRIDGE-END BENT 1 DETAILS-2 OF 3 65 z SS109 BRIDGE TYPICAL SECTION 2 OF 3 11 SS164 BRIDGE END BENT 1 DETAILS 3 OF 3 66 a SS110 BRIDGE-TYPICAL SECTION 3 OF 3 12 S5165 BRIDGE-BENT 1-1 OF 2 67 E w SS111 BRIDGE-CONCRETE DECK PANELS 13 SS166 BRIDGE-BENT 1 DETAILS-2 OF 2 68 zi SS112 BRIDGE-PLAN OF SPAN 1 OF 6 14 SS167 BRIDGE-BENT 2-1 OF 2 69 a SS113 BRIDGE-PLAN OF SPAN 2 OF 6 15 SS168 BRIDGE-BENT 2 DETAILS-2 OF 2 70 SS114 BRIDGE-PLAN OF SPAN 3 OF 6 16 S5169 BRIDGE-BENT 3-1 OF 2 71 SS115 BRIDGE-PLAN OF SPAN 4 OF 6 17 SS170 BRIDGE-BENT 3 DETAILS-2 OF 2 72 SS116 BRIDGE-PLAN OF SPAN 5 OF 6 18 SS171 BRIDGE-BENT4-1 OF 2 73 ::_j SS117 _BRIDGE-PLAN OF SPAN 6 OF 6 19 SS172 BRIDGE-BENT4 DETAILS-2 OF 2 74 my , SS118 BRIDGE-LIGHT POLE BASE DETAILS 1 OF 2 20 SS173 BRIDGE-BENT 5-1 OF 2 75 SS119 BRIDGE-LIGHT POLE BASE DETAILS 2 OF 2 21 SS174 BRIDGE-BENT 5 DETAILS-2OF 2 76 SS120 PLAN OF DRAINAGE SYSTEM-1 OF 6 22 SS175 BRIDGE-BENT 6-1 OF 2 77 SS121 ELEVATION OF DRAINAGE SYSTEM-2OF6 23 SS176 BRIDGE-BENT 6 DETAILS-2OF2 78 __ SS122 ELEVATION OF DRAINAGE SYSTEM-30F6 24 SS177 BRIDGE-BENT7-1OF2 79 ````,littiiiiiirli,, SS123 ELEVATION OF DRAINAGE SYSTEM-4OF6 25 SS178 BRIDGE-BENT7DETAILS-2OF2 80 `,�N`�ti CARo"•,,�� SS124 DRAINAGE SYSTEM DETAILS-5OF6 26 S5179 BRIDGE-BENT8-1OF2 81 ;;� Q`•.•''•••��''••. ��1 SS125 DRAINAGE SYSTEM DETAILS-6OF6 27 SS180 BRIDGE-BENT 8 DETAILS-2OF2 82 ;' O �';9 SS126 BRIDGE-FRAMING PLAN 1OF 2 28 SS181 BRIDGE-BENT 9-1 OF 2 83 _ • SS127 BRIDGE-FRAMING PLAN 2 OF 2 29 SS182 BRIDGE-BENT 9 DETAILS-2OF2 84 • 050975 SS128 _BRIDGE-SPAN A GIRDERS-10F 7 30 ' O.'vQy�28I28i' _y SS183 BRIDGE-BENT 10- 1 OF 2 85 � • C SS129 BRIDGE-SPANS B-C, F-K, N &0 GIRDERS 2 OF 7 31 SS184 BRIDGE-BENT 10 DETAILS-2 OF 2 86 -,r le, 40 a.•... .. ��••�`_`., C tON SS130 BRIDGE-SPANS D&L GIRDERS 3 OF 7 32 SS185 BRIDGE-BENT 11-1OF2 87 ,'tit 111M1•010- SEAL SS131 BRIDGE-SPANSE&MGIRDERS 40F7 33 SS186 BRIDGE-BENT 11 DETAILS-20F2 88 J SS132 BRIDGE-SPAN P GIRDERS 5OF 7 34 SS187 BRIDGE-BENT 12-1 OF 2 89 SS133 _BRIDGE-GIRDER DETAILS 60F 7 35 SS188 BRIDGE-BENT 12 DETAILS-2OF 2 90 Oro a SS134 BRIDGE-GIRDER INTERMEDIATE DIAPHRAGM DETAILS 7 OF 7 36 SS189 BRIDGE BENT 13 10F 2 91GI C/3 SS135 BRIDGE-GIRDER DEFLECTION &CAMBER 37 SS190 BRIDGE-BENT 13 DETAILS-2 OF 2 92 D it SS136 BRIDGE-ELASTOMERIC BRG. DETAILS 1 OF 2 38 SS191 BRIDGE-BENT 14-1 OF 2 93 9 SS137 BRIDGE-ELASTOMERIC BRG. DETAILS 2 OF 2 39 SS192 BRIDGE BENT 14 DETAILS 2 OF 2 94 NAVY E SS138 _BRIDGE-2 BAR METAL RAIL DETAILS 1 OF 9 40 SS193 BRIDGE BENT 15 1 OF 2 95 TRANSPORTATION r5 SS194 BRIDGE-BENT 15 DETAILS-2 OF 2 96 PARTNERS JV 0 SS139 BRIDGE-2 BAR METAL RAIL DETAILS2OF9 41 A/eiNFo 0 i SS140 BRIDGE-2 BAR METAL RAIL DETAILS 3OF 9 42 SS195 BRIDGE-END BENT 2-1 OF 3 97 APPROVED c SS196 BRIDGE-END BENT DETAILS-20F 3 98 0 SS141 BRIDGE-2 BAR METAL RAIL DETAILS4OF9 43 SS142 BRIDGE SS197 BRIDGE-END BENT DETAILS-30F 3 99 METAL RAIL POST SPACING 5 OF 9 44 FOR COMMANDER NAVFAC CI Z SS143 _BRIDGE-METAL RAIL POST SPACING6OF9 45 SS198 BRIDGE 12" PRESTRESSED CONCRETE PILE DETAILS 100 ACTRCY w SS199 BRIDGE-24" PRESTRESSED CONCRETE PILE DETAILS 101 SS144 BRIDGE METAL RAIL POST SPACING 7 OF 9 46 L.L 6 SS145 BRIDGE-METAL RAIL POST SPACING AND DETAILS 8 OF 9 47 SS200 BRIDGE-RIP RAP DETAILS 102 (f) 3 SS201 BRIDGE-APPROACH SLAB 1 OF 2 103 SAOSFACTORY TO DATE MM/DDIYY Cl) SS146 BRIDGE-END OF RAIL DETAILS 9 OF 9 48 SS202 BRIDGE APPROACH SLAB DETAILS 2 OF 2 104 DES EAS DRW TMG CHK RMN U SS147 _BRIDGE CONCRETE PARAPET PLAN 1 OF 6 49 PM/DM es- SS148 _BRIDGE-CONCRETE PARAPET PLAN 2 OF 6 50 SS203 BRIDGE STANDARD NOTES 105 BRANCH MANAGER Z c�i SS149 BRIDGE-CONCRETE PARAPET PLAN 3 OF 6 51 CHIEF ENG/ARCH FIRE PROTECTION SS150 BRIDGE-CONCRETE PARAPET PLAN 4OF 6 52 o I B SS151 BRIDGE CONCRETE PARAPET DETAILS 5 OF 6 53 < > Z B SS152 BRIDGE-CONCRETE PARAPET DETAILS6OF6 54 2 0 o � o i o Z u) Z 0 c z w o d 1- 1— a >- Q ct W 6 � pi- cU 2 J w Z w p 5 z 9 W � `N' s W 0 L_LI � � I- ¢0 o z � cc cc � � I 1 0 W ; w cc u) o 75 w J 0 z Z 0 W w P VJ _ a w C/) z U Q = LL d T o � A Q I- > c, o �E A Cl) WQ8 w A F o a ¢ . Q 0_ J D o SCALE: GRAPHIC F. EPROJECT NO.: 1565548 2 CONSTR.CONTR.NO. 1 N40085-19-D-9008 col NAVFAC DRAWING NO. ;2 12837812 al SHEET 2 OF 105 1 G014 1 I 2 I 3 I (y1/1 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 I 2 I 3I 4I 5 !---- I I I I I I I I I 7.183+00 184+00 185+00 186+00 (+)0.7000% A (-)1.6500% W � " � 0 P.I. STA. = 187+82.63 -EB BASELINE- EL. = 24.20' V.C. = 500.002 FILL FACE @ -EB BASELINE- GRADE DATA END BENT 1 ...- D STA. 182+68.96 D -EB BASELINE- SPAN A SPAN B SPAN C SPAN D SPAN E SPAN F SPAN G SPAN H SPAN G.P. EL. 20.60' BEGIN Z 0 P a FRONT SLOPE INN— _ _1'-7" MIN. cn - 40 STA. 182+58.51 BERM W 0 _ -EB BASELINE- 2 G.P. EL. 20.53' LOW CHORD - 30 EL. 15.99' MEAN LOW WATER BASE DISCHARGE PROPOSED \ MEAN HIGH WATER EL. 4.2' (Q100) EL. 13.46' riM I= GRADE i 1'/2:1 SLOPE EL. 6.4' - 20 ` I 0 I NORMAL FIX FIX FIX FIX FIX FIX EXP. EXP. FIX FIX FIX FIX FIX FIX FIX FIX .A,, - - - Li ' TO CAPMN FILL J ,�� _1 - 1 p i �,- y ► 24" PRESTRESSED ,��1• o T 7 ' � TYPC INT. BENTS)RETE PILES ��. /§1%:-74: ( V - /4 til li , _ _ _ _ - ow%iiiiiii,„ 12" PRESTRESSED in I 3 ,,,`�6N CARS, ',' IL �. : O ••FESs/Oti:/4�-; CONCRETE PILES 4v' Off' APPROX. � ' • ?�`�'�Q���L� j �� - -10 .. CLASS II NATURAL SCOUR CRITICAL = SEAL 1 -0 MIN. RIP RAP �V 6+ (TYP.) - 1/28/2021 GROUND PILE EL. -3.60' TYP. : - EARTH BERM (2'-0" THICK) �O•••• ���:NEe- ��Q,� '.,, IN L PN \‘. //////111111%00 END BENT 1 BENT 1 BENT 2 BENT 3 BENT 4 BENT 5 BENT 6 BENT 7 BENT 8 SEAL (INTEGRAL) J SECTION ALONG -EB BASELINE- oro o ® cw VQ 2 N AVY J n k TRANSPORTATION L.L o W PARTNERS JV Aft INFO O Ct EXISTING co t0 IX � � \ STRUCTURE _ _ _ _ _ _ - - - - - - - - — — — -• _ FOR LOYYARDER NAVFAL 0 ju- TO ALEXANDER DRIVE I I I I I I I I I I m II I I I I I I co I I I SATISFACTORY TO DATE v) I I 755'-1" I I I I DES PDC DRW DDL CHK ALP —I I , TOTAL LENGTH OF BRIDGE (FILL FACE © END BENT 1 TO FILL FACE © END BENT 2) I I I I I -- BRA CH MANAGER z o I CHIEF ENG/ARCH g II I I 189'- 1/2 " CONTINUOUS 4 SPAN UNIT - UNIT 1 I I �� I 377'-0" CONTINUOUS 8 SPAN UNIT - UNIT 2 I I I ____ FIRE PROTECTION W.P. #1 TO W.P. #5) - -I-1 - - - - - - (W.P. #5 TO W.P. #13) - - - - - - - o a U Q• U Y B N T11 47'-8" I I 47'-1 1/2 " I I 47'-1 1/2 " 7 7 47'-1 1/2 " I I 47'-1 1/2 " 7 7 47'-1 1/2 " I I 47'-1 1/2 " I 47'-1 1/2 " I 47'-1 1/2 " 2 - - z TIE TO EXISTING �� �� �� �� � � � � � � � � �� 0• - - SPAN A _ - - �r - — SPAN B -I SPAN C �i - — SPAN D SPAN E _ - - I - - SPAN F SPAN G SPAN H - SPAN 1 W o a W RIP RAP SLOPE _ _ _ Q ¢ ct U co N ci PROTECTION 1 • - - -7T - - - - - - -77 - - - - - - - - - - - -\ j- - - - - _ 0 aco APPROACH SLAB BENT 1 I BENT 2 I BENT 3 I BENT 4 I BENT 5 I BENT 6 I BENT 7 I BENT 8 I z = - � 0 U J CONTROL LINE I CONTROL LINE I CONTROL LINE I CONTROL LINE I CONTROL LINE I CONTROL LINE I CONTROL LINE I CONTROL LINE z < 0 STA. 182+54.80 -EB BASELINE- (P.G.L.) Z -EB BASELINE- 65°18'57" W 0 _ S E (TYP. _ W o '-, Kr / / v- / / 7- I W. P. #2 / //71.- / / 7- ///7 / / 4w FU - Q � I- Q z HO W. P. #1 I STA. 183+16.63 W. P. #3 W. P. #4 / W. P. #5 W. P. #6 W. P. #7 W. P. #8 //7 W. P. #9 & BRIDGE > Ct Q -EB BASELINE- ' ' ' ' ' ' ' ' z STA. 182+68.96 STA. 183+63.75 STA. 184+10.88 STA. 184+58.00 STA. 185+05.13 STA. 185+52.25 STA. 185+99.38 STA. 186+46.50 U o -EB BASELINE- I 1 I / -EB BASELINE- -EB BASELIN -EB BASELINE- -EB BASELINE- -EB BASELINE -EB BASELINE- -EB BASELINE- o LL 90°00'00" I I I 1 I / I I I v, z 1 (TYP.) / w J O w FILL FACE @ I c� z U w END BENT 1 — /1 �� 1 1 1 1 1 1 I I w o C� Lil :- / _i_ _i_ _i_ _i_ > —I CD - A 1'-0" MIN. EARTH BERM / / 1_ > o ov m /`\ zo z 0 EL. 10.83' (LEVEL) �� ///PLAN , z z `g // PILES NOT SHOWN IN PLAN VIEW FOR CLARITY o o CLASS II RIP RAP SCALE: NOT TO SCALE EPROJECTNO.: 1565548 (2■-0■■ R R THICK)_ o CONSTR.CONTR.NO. i, /// / / / N40085-19-D-9008 o NAVFAC DRAWING NO. lit 12837813 L,,15 LIMITS OF TEMPORARY SHEET 3 OF 105 z w CONSTRUCTION IMPACTS -101 1 I I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 202D UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1I 2 I 3I 4I 5 r---- I I I I I I I 187+00 188+00 189+00 190+00 7 (+)0.7000% A (-)1.6500% W � " � 0 P.I. STA. = 187+82.63 -EB BASELINE- EL. = 24.20' V.C. = 500.00' -EB BASELINE- GRADE DATA FILL FACE @ END BENT 2_ D STA. 190+24.05 D SPAN I SPAN J SPAN K SPAN L SPAN M SPAN N SPAN 0 SPAN P -EB BASELINE- G.P. EL. 20.22' 1'-7" MIN. BEGIN FRONT SLOPE - 40 BERM STA. 190+34.54 0 -EB BASELINE- - 11/2:1 SLOPE G.P. EL. 20.04' BASE DISCHARGE MEAN LOW WATER (Q100) EL. 13.46' MEAN HIGH WATER NORMALA TO - 30 EL. 4.2' CAP LOW CHORD PROPOSEDI'M - EL. 6.4' GRADE FIX FIX FIX FIX EL. 15.62' MIN FIX FIX FIX FIX FIX FIX EXP. EXP. FIX FIX - 20 ► MN FILL 24" PRESTRESSED �4J. - 1° CONCRETE PILES ► �� o 770,7, ��- (TYP. INT. BENTS) = ► ��' � .N- - - Z ' I111111////\\11. I �.'�• CLASS 11 12" PRESTRESSED ss;off<%yamAPPROX. SCOUR CRITICAL �' CL RAP CONCRETE PILES - _NATURAL E- -10 , .. 1'-0" MIN. - EALGROUND 4- PILE EL. -3.60' TYP. (2 -0 THICK) ► = 0769 _ - ( ) EARTH BERM ; /2021G.NE�E:••�¢ lNLPN /i/iiiiIII111o0 BENT 9 BENT 10 BENT 11 BENT 12 BENT 13 BENT 14 BENT 15 END BENT 2 SEAL (INTEGRAL) J SECTION ALONG -EB BASELINE- oro oilit, o V ® , w J G Q 2 N AVY OJ 0 k TRANSPORTATION LT '\ 0 W PARTNERS J V A/E INFO Q to vC EXISTING APPROVED IIY STRUCTURE O — — - FOR COMMANDER NAVFAL Q ss _ _ _ _ r r _ __ _ - -1 - - - . _ _ _ _n_ _ _ _ _ _ H H H 1 1W I I SATISFACTORY TO DATE U) I I I I 755'-1" I I DES PDC DRW DDL CHK ALP J �� PM/DM U TOTAL LENGTH OF BRIDGE (FILL FACE @ END BENT 1 TO FILL FACE @ END BENT 2) I I I BRANCH MANAGER r, E� 377'-0" CONTINUOUS 8 SPAN UNIT - UNIT 2 I I I I 189'-0 1/2 " CONTINUOUS 4 SPAN UNIT - UNIT 3 I I CHIEF ENG/ARCH - FIRE PROTECTION B - - (W.P. #5 TO W.P. #13) - I-I - - - r_ -• ._ -(W.P. #13 TO W.P. #17) - - r I 47'-1 1/2 " 47'-1 1/2 " I I 47'-8" TIE TO EXISTING o 47 •1 1/2 I I 47 •1 1/2 47 •1 1/2 47 •1 1/2 � 1 47 •1 1/2 z . ► ► - .... ... ►► ►► ►► ►► ► RIP RAP SLOPE ° z SPAN I - - - SPAN J _ - SPANK - -SPAN L - - -I - _ SPAN M - - � - - SPAN N - - L SPAN O - - - - SPAN P W Q o o LLI PROTECTION 0 < z - T / - - - N moo ¢ � ,Nu cp \ / > 7i ct� z w Q z = - O o I I I I 1 � BENT 14 I END APPROACH SLAB z �z U � N \ BENT 9 I BENT 10 I BENT 11 BENT 12 BENT 13 CONTROL LINE I BENT 15 z < CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE -EB BASELINE- (P.G.L.) CONTROL LINE STA. 190+38.21 Z S 65°18'57'. E (TYP.) . 67-EB BASELINE- F U O z '-' // o / 7 771 ¢ QIL- W. P. #10 / / W. P. #11 7 W. P. #12 W. P. #13 W. P. #14 VW/M P. #15 W. P. #16 I W. P. #17 Q >- 0: Q STA. 186+93.63 I STA. 187+40.76 I STA. 187+87.88 I STA. 188+35.00 I STA. 188+82.13 I STA. 189+29.26 I STA. 189+76.38 /F, STA. 190+24.05 z � U J -EB BASELINE- -EB BASELINE- -EB BASELINE- -EB BASELINE- -EB BASELINE- -EB BASELINE- -EB BASELINE- ° '. 1 -EB BASELINE- z W z I I I I I I I 9(TYP.) I TO ROOSEVELT BLVD. � W J O Z 1 (MCAS CHERRY POINT) � z U � � 0 Q co I I I I I I I W o rills"— FILL FACE @ , _ I 1 END BENT 2 CD } � 0_ w Q 1 , o m A / 1'-0" MIN. EARTH BERM 1- a o 0 /`\ U PLAN EL. 10.46' (LEVEL) z o z O PILES NOT SHOWN IN PLAN VIEW FOR CLARITY W � Q o SCALE: NOT TO SCALE o CLASS II RIP RAP EPROJECT NO.: 1565548 • ■■ CONSTR.CONTR.NO. (2.-0" THICK)/ / N40085-19-D-9008 °\ NAVFAC DRAWING NO. i 12837814 ,15 L, LIMITS OF TEMPORARY SHEET 4 OF 105 z w CONSTRUCTION IMPACTS -102 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 I 2 I 3I 4I 5 !---- W I- D D z ❑ E a E U N W ❑ \ 2 w IIIIM MIN MN �_A i \\IIIIIIll,,, BENT 1 I BENT 2 I BENT 3 I BENT 4 I BENT 5 I BENT 6 I BENT 7 I BENT 8 I ,,�``ow CARo'i',, -EB BASELINE- (P.G.L.) CONTROL LINE I CONTROL LINE I CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE � O��oFEss;off<%y'-; S 65°18'57" E _ : e L ' 1111"-- - °' SEAL 1 T W. P. #2 A M 1 AM AM A AM A A :. 1/28/2021 : W. P. #1 W. P. #3 / W. P. #4 W. P. #5 W. P. #6r.k ','A•••''•••• \, 00 STA 183+16 63 ao ao co le ao ao 0o ao •••' I I I I I f:41 I I i • •. GINS .• �, s W. P. #7 W. P. #8 W P. #9 4 i- it2 -EB BASELINE- r i� r iAr itsirer iAr i� `- i� r '%,,w L. PN��.�` STA. 182+68.96 STA. 183+63.75 STA. 184+10.88 STA. 184+58.00 STA. 185+05.13 STA. 185+52.25 STA. 185+99.38 STA. 186+46.50 ���IIIII���� -EB BASELINE- co 4.„: ji co to -EB BASELINE- I co co: -EB BASELINE- o0 0o -EB BASELINE- I co co -EB BASELINE- I co co: -EB BASELINE- o0 00 -EB BASELINE- I co co -EB BASELINE- I co bo SEAL g © 90°00'00" aM aM aM aM aM aM aM aM aM 0 z (TYP.) I 11 ,I, 0. 11 I a. 11 tdn 11 I 11 I 11 11 I 11 I 11 oro O°' O ei Tr TFILL FACE @ I ( ) 1. ]T q T q T q T q T q T q ® \ CW END BENT 1 I - - - - I - ' 1E}L - - I - - � I I I I I I NAVY PDA TEST PILE �" I I - , t 12" PRESTRESSED E 24" PRESTRESSED t 24" PRESTRESSED f 24" PRESTRESSED c 24" PRESTRESSED t 24" PRESTRESSED f 24" PRESTRESSED c 24" PRESTRESSED I LT (SEE NOTES) TRANSPORTATION u_ CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES I PARTNERS JV ,,,E INFO 0 APPROVED Ct PDA TEST PILE PDA TEST PILE f 24" PRESTRESSED -IN- (SEE NOTES) (SEE NOTES) CONCRETE PILES 1 2 FOR COMMANDER NAVFAC 0 ACTMTY W SPAN A SPAN B SPAN C SPAN D SPAN E SPAN F SPAN G SPAN H SPAN I E Cn SATISFACTORY TO DATE Cr) DES PDC DRW DDL CHK ALP J PM/DM U FOUNDATION LAYOUT BRANCH MANAGER CHIEF ENG/ARCH g ALL BENTS ARE PARALLEL FIRE PROTECTION EL czi B FOUNDATION NOTES: PILES ARE DIMENSIONED FROM WORK POINT TO i OF PILE AT BOTTOM OF CONCRETE CAP Q v Y z B g - J SEE SITE LAYOUT PLAN (CS) SHEETS AND SECTION 235 OF THE NCDOT INSTALL PILES AT BENT NO.1 THROUGH BENT NO.15 TO A TIP ELEVATION TESTING THE FIRST PRODUCTION PILE WITH THE PDA DURING DRIVING, a pQ z z STANDARD SPECIFICATIONS FOR THE SETTLEMENT GAUGES AND NO HIGHER THAN -50 FT. RESTRIKING AND/OR REDRIVING IS REQUIRED AT END BENT NO. 1. FOR z a u N SURCHARGES REQUIRED AT END BENT NO. 1 AND END BENT NO. 2. PDA TESTING, SEE SECTION 450 OF THE NCDOT STANDARD SPECIFICATIONS. IT o o >- U INSTALL PILES AT END BENT NO.1 AND END BENT NO.2 TO A TIP ELEVATION CC Z OBSERVE A 4 MONTH WAITING PERIOD AFTER CONSTRUCTING THE NO HIGHER THAN -50 FT. TESTING THE FIRST PRODUCTION PILE WITH THE PDA DURING DRIVING, Z i = Q co EMBANKMENT, END BENT AND REINFORCED BRIDGE APPROACH FILL, RESTRIKING AND/OR REDRIVING IS REQUIRED AT END BENT NO. 2. FOR W �z o _1 w O IF APPLICABLE, BEFORE BEGINNING APPROACH SLAB CONSTRUCTION STEEL PILE TIPS ARE REQUIRED FOR PRESTRESSED CONCRETE PILES AT PDA TESTING, SEE SECTION 450 OF THE NCDOT STANDARD SPECIFICATIONS. AT END BENT NO. 1. FOR BRIDGE WAITING PERIODS, SEE SITE LAYOUT BENT NO.1 THROUGH BENT NO.4. FOR STEEL PILE TIPS, SEE SECTION 450 ino 0 r0 PLAN (CS) SHEETS AND SECTION 235 OF THE NCDOT STANDARD OF THE NCDOT STANDARD SPECIFICATIONS. PREDRILLING FOR PILES IS REQUIRED AT END BENT NO.1. PREDRILL PILE i= (-) U CI O LOCATIONS TO AN ELEVATION NO LOWER THAN 28 FT WITH EQUIPMENT J "' > _z SPECIFICATIONS. Q THE SCOUR CRITICAL ELEVATION FOR BENTS NO.1 THROUGH BENT NO.15 THAT WILL RESULT IN A MAXIMUM PREDRILLING DIAMETER OF 8 INCHES u_ W ~ O OBSERVE A 4 MONTH WAITING PERIOD AFTER CONSTRUCTING THE IS ELEVATION -3.6 FT. SCOUR CRITICAL ELEVATIONS ARE USED TO MONITOR (4 INCHES LESS THAN PILE DIAMETER). FOR PREDRILLING FOR PILES, SEE Q EMBANKMENT, END BENT AND REINFORCED BRIDGE APPROACH FILL, POSSIBLE SCOUR PROBLEMS DURING THE LIFE OF THE STRUCTURE. SECTION 450 OF THE NCDOT STANDARD SPECIFICATIONS. z u) C.) IF APPLICABLE, BEFORE BEGINNING APPROACH SLAB CONSTRUCTION z W z AT END BENT NO. 2. FOR BRIDGE WAITING PERIODS, SEE SITE LAYOUT THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A HAMMER WITH IF NECESSARY, PREDRILL PILE LOCATIONS AT BENT N0.1 THROUGH N0.4 w _10 m PLAN (CS) SHEETS AND SECTION 235 OF THE NCDOT STANDARD THE APPROPRIATE EQUIVALENT RATED ENERGY TO DRIVE THE PILES AT THE TO AN ELEVATION NO LOWER THAN 20 FT WITH EQUIPMENT THAT WILL Lu z Q J z SPECIFICATIONS. END BENTS AND BENTS. SEE UFGS SPECIFICATION 31 62 13.20 AND NCDOT RESULT IN A MAXIMUM PREDRILLING DIAMETER OF 20 INCHES (4 INCHES LESS c.D z U Cr) w STANDARD SPECIFICATION SECTION 450 FOR HAMMER REQUIREMENTS. THAN PILE DIAMETER)". FOR PREDRILLING FOR PILES, SEE SECTION 450 OF V3,z o CD FOR PILES, SEE SECTION 450 OF THE NCDOT STANDARD SPECIFICATIONS. THE NCDOT STANDARD SPECIFICATIONS.EL w < = TESTING THE FIRST TWO PRODUCTION PILES WITH THE PDA DURING } 1 u) 0 w PILES AT END BENT NO.1 AND BENT NO.2 ARE DESIGNED FORA FACTORED DRIVING, RESTRIKING AND/OR REDRIVING IS REQUIRED AT BENT NO. 1. THE SCOUR CRITICAL ELEVATION FOR END BENT NO. 1 IS ELEVATION 0.87 FT. Q J O RESISTANCE OF 100 TONS PER PILE. FOR PDA TESTING, SEE SECTION 450 OF THE NCDOT STANDARD SCOUR CRITICAL ELEVATIONS ARE USED TO MONITOR POSSIBLE SCOUR W Q u) CY) 0 SPECIFICATIONS. PROBLEMS DURING THE LIFE OF THE STRUCTURE. a Q w m APILES AT BENT NO.1 THROUGH BENT NO.15 ARE DESIGNED FOR A U 0 m A FACTORED RESISTANCE OF 145 TONS PER PILE. TESTING THE FIRST PRODUTION PILE WITH THE PDA DURING DRIVING, THE SCOUR CRITICAL ELEVATION FOR END BENT NO. 2 IS ELEVATION -1.82 FT. z z o z RESTRIKING AND/OR REDRIVING IS REQUIRED AT BENT NO. 5. FOR PDA SCOUR CRITICAL ELEVATIONS ARE USED TO MONITOR POSSIBLE SCOUR c0 DRIVE PILES AT BENT NO. 1 THROUGH BENT NO.15 TO A REQUIRED DRIVING TESTING, SEE SECTION 450 OF THE NCDOT STANDARD SPECIFICATIONS. PROBLEMS DURING THE LIFE OF THE STRUCTURE. W o Q RESISTANCE OF 247 TONS PER PILE. THIS REQUIRED DRIVING RESISTANCE a o SCALE: NOT TO SCALE INCLUDES ADDITIONAL RESISTANCE FOR DOWNDRAG OR SCOUR. TESTING THE FIRST PRODUTION PILE WITH THE PDA DURING DRIVING, PIER SCOUR PROTECTION IS REQUIRED FOR FOOTINGS AT END BENT NO. 1 EPROJECTNO.: 1565548 RESTRIKING AND/OR REDRIVING IS REQUIRED AT BENT NO. 12. FOR PDA AND END BENT NO.2. DO NOT PLACE RIP RAP ABOVE THE STREAM BED. CONSTR.CONTR.NO. DRIVE PILES AT END BENT NO. 1 AND END BENT NO.2 TO A REQUIRED TESTING, SEE SECTION 450 OF THE NCDOT STANDARD SPECIFICATIONS. N40085-19-D-9008 DRIVING RESISTANCE OF 170 TONS PER PILE. THIS REQUIRED DRIVING NAVFAC DRAWING NO. RESISTANCE INCLUDES ADDITIONAL RESISTANCE FOR DOWNDRAG OR 12837815 SCOUR. SHEET 5OF 105 z SS-103 1 I I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 202D UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 I2 I 3 4 5 !----- a a NOTES: W FOR FOUNDATION NOTES, SEE SHEET SS-103. o D D z 0 P a ce U W \ 2 w IIIIM WAIN WIN Npar�_A i BENT 9 BENT 10 BENT 11 BENT 12 BENT 13 BENT 14 BENT 15 ..`\`N�IIIIII,,,,,'/', CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE -EB BASELINE- (P.G.L.) ��,�`�-�N.�ARp� I I I I I I I � Q • SS/ / -i S 65°18'57" E = e L V '7 MP- °' SEAL /-14)? ' tail. IItri... I iO • FNGINEe': 4�W. P. #10W. P. #11 W. P. #12W. P.ao #13 co W. P. #14 co W. P. #15co W. P. #16 co co W. P. #17 ,,,. •..L PN\� C STA. 186+93.63 "— u? STA. 187+40.76 T STA. 187+87.88 r E9 STA. 188+35.00 42 STA. 188+82.13 r ii? STA. 189+29.26 r E9 STA. 189+76.38 t? �? r STA. 190+24.05 -EB BASELINE- co 00 -EB BASELINE- co ao -EB BASELINE- ji co 0o -EB BASELINE- I co ao -EB BASELINE- co co -EB BASELINE- I co 0o -EB BASELINE- co ao co an, I -EB BASELINE- SEAL a M 4 Q M 4 01 4 ' Q M 4 01 a M 90°00'00" A Z II . II I . II I II . II I . II I II - II oc-- fko O Cl) Cl) co co co co co co I (TYP.) T q T q T q T q T q T q T q Tr0 1 �� FILL FACE @ V GI , LLI ' ' I ' 'I` ' ' I ' ' ' —_�I'I END BENT 2 J NAVY U 1--- t 24" PRESTRESSED t 24" PRESTRESSED c 24" PRESTRESSED c 24" PRESTRESSED c 24" PRESTRESSED ( 24" PRESTRESSED c 24" PRESTRESSED I- u t 12" PRESTRESSED TRANSPORTATION U_ CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES CONCRETE PILES PARTNERS JV ,,,E INFO 0 PDA TEST PILE PDA TEST PILE aPD Ct (SEE NOTES) (SEE NOTES) 0 U_ FOR COMMANDER NAVFAC Q ACTMTY w SPAN I SPAN J SPAN K SPAN L SPAN M SPAN N SPAN 0 SPAN P LJ_ CO SATISFACTORY TO DATE CO DES PDC DRW DDL CHK ALP J PM/DM U FOUNDATION LAYOUT BRANCH MANAGER CHIEF ENG/ARCH a ALL BENTS ARE PARALLEL FIRE PROTECTION ILL LEI cza B PILES ARE DIMENSIONED FROM WORK POINT TO t OF PILE AT BOTTOM OF CONCRETE CAP Q v Y z B g — J N o Z oo Z 0 z Q O— 1 W 1— 6o_ J N co ap a r U N Zi = Q CO W O z U J^ ^ I-'- z Q O w O d- w OU V H Q CD z w uw O z � 0 Q U z LJJ C/) U < z w JOLu w z Q J z Q 5 Z U CD W w Or -% CD W I- = I m > J W w Q u M 0 A taw O � °° A ZQo 0 w �' W g " Z o H a ct Q z _1 a Q a o o SCALE: NOT TO SCALE 0 c EPROJECT NO.: 1565548 0 a CONSTR.CONTR.NO. i N40085-1 9-D-9008 °a' NAVFAC DRAWING NO. 12837816 a w SHEET 6 OF 105 z SS-104 1 I I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1I 2 I 3I 4I 5 TBENCHMARK : CONTROL POINT 19-93 SLOCUM ROAD BENCHTIE TO 10" PINE, ELEV. 20.80' (NORTHING 431642.386, EASTING 2625380.956) STRUCTURAL NOTES 7 LIVE LOAD = HL-93 OR ALTERNATE LOADING. i 0 G THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO O LRFD BRIDGE DESIGN SPECIFICATIONS AND THE NCDOT STANDARD W SPECIFICATIONS. U. W CC THIS BRIDGE IS LOCATED IN SEISMIC ZONE 1. U D FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET SS-203. D 8 , THIS STRUCTURE CONTAINS THE NECESSARY CORROSION PROTECTION EXISTING m U) REQUIRED FOR A CORROSIVE SITE. o _ TO ALEXANDER DRIVE STRUCTURE m W � THE CLASS AA CONCRETE IN THE BRIDGE DECK SHALL CONTAIN FLY _ m ,--r m- __ m m n �__- rr ,-, I I T ��, �' ASH OR GROUND GRANULATED BLAST FURNACE SLAG AT THE 1 1 I 1 1 1 1 1 1 1 SUBSTITUTION RATE SPECIFIED IN ARTICLE 1024-1 AND IN i 1 I I -EB BASELINE- 1 I I I I I 1 1 1 1 1 , , 1 I I I I 1 i ACCORDANCE WITH ARTICLES 1024-5 AND 1024-6 OF THE NCDOT I I 1 1 (P.G.L.) 1 1 1 I I I I ' 1 STANDARD SPECIFICATIONS. NO PAYMENT WILL BE MADE FOR THIS ,' I I I -1 1_-___ _ I I I I I I I ,_1_-1- --a =- CC=- t = -Ci-- C -- --CC- CC- i=t- I --HI----- ---C-� a�-- CC--- ---C�--- T I 1 1 1 1 1 1 I 1 1 1 1 I I SUBSTITUTION AS IT IS CONSIDERED INCIDENTAL TO THE COST OF -14 - "�J THE REINFORCED CONCRETE DECK SLAB. 7L IzI _ I i:' / 7 90 // ( /J / t ter, - - - - I AND END BENT CAPS AND SHALL CONTAIN CALCIUM NITRITE ""'��,, STA. 186+46.50 / CORROSION INHIBITOR. FOR CALCIUM NITRITE CORROSION ...R�<,''�,, -EB BASELINE siVIITrio„,02.,..:11.,;; ss'�ti:2/ /////////� / � INHIBITOR, SEE NCDOT SPECIAL PROVISIONS. � � ,y °' SEAL CLASS II PRESTRESSED CONCRETE GIRDERS ARE DESIGNED FOR 0 PSI TENSION = v z. 040769 _ LIMITS OF TEMPORARY ; 21• 1/28/2021 0) RIP RAP IN THE PRECOMPRESSED TENSILE ZONE UNDER ALL LOADING = O'••.FNGINEEE: A (TYP.) CONSTRUCTION IMPACTS (TYP.) %,�p�••........• \\��, C I\— WETLAND LIMITS (TYP.) CONDITIONS. , Ill TO ROOSEVELT BLVD. _ Po C ' ///1111111�� ` (MCAS CHERRY POINT) PRECAST PANELS SHALL BE DESIGNED FOR AN ALLOWABLE TENSILE SEAL STRESS OF 0 PSI TENSION IN THE PRECOMPRESSED TENSILE ZONE >- UNDER ALL LOADING CONDITIONS. S` A , Z 00 0o O THE WATER/CEMENT RATIO FOR THE CONCRETE PILES SHALL NOT ® \ Cw FOR UTILITIES INFORMATION, SEE UTILITY PLAN" (CU) SHEETS. EXCEED 0.40. V U) J ALL BAR SUPPORTS USED IN THE PARAPET, DECK,END BENT CAPS, Q LOCATION SKETCH AND BENT CAPS AND ALL INCIDENTAL REINFORCING STEEL SHALL NAVY BE EPDXY COATED IN ACCORDANCE WITH THE NCDOT STANDARD TRANSPORTATIONLT A/E INFO 0 SPECIFICATIONS. PARTNERS JV APPROVED Ct ALL INSERTS AND MISCELLANEOUS REINFORCING STEEL EMBEDDED 0 IN CAST-IN-PLACE CONCRETE SHALL BE CORROSION PROTECTED. FOR COMMANDER NAVFAC Q INSERTS MAY BE HOT DIPPED GALVANIZED. REINFORCING STEEL AUNTY W SHALL BE EPDXY COATED. LT PRESTRESSED CONCRETE GIRDERS, PRECAST DECK PANELS, AND PILES DESTA SATISFACTORY TO DRATEDDL CHK ALP CO SHALL CONTAIN CALCIUM NITRITE CORROSION INHIBITOR. SEE NCDOTJ SPECIAL PROVISIONS FOR CALCIUM NITRITE CORROSION INHIBITOR. PM/DM 0 BRANCH MANAGER CHIEF ENG/ARCH THE CONCRETE IN THE BENT CAPS AND PILES OF THE BENTS SHALL FIRE PROTECTION CONTAIN SILICA FUME. SILICA FUME SHALL BE SUBSTITUTED FOR 5% o a B OF THE PORTLAND CEMENT BY WEIGHT. IF THE OPTION OF ARTICLE z c� J z A 1024-1 OF THE NCDOT STANDARD SPECIFICATIONS TO PARTIALLY z o z SUBSTITUTE CLASS F FLY ASH FOR PORTLAND CEMENT IS EXERCISED, Q z z THEN THE RATE OF FLY ASH SUBSTITUTION SHALL BE REDUCED TO 1- 6 0_ al Iao 1.0 LB OF FLY ASH PER 1.0 LB OF CEMENT. NO PAYMENT WILL BE MADE ' D `` r z FOR THIS SUBSTITUTION AS IT IS CONSIDERED INCIDENTAL TO THE (2' i w Q VARIOUS PAY ITEMS. o z 0 J O W z Q Cl_ a NEEDLE BEAMS WILL NOT BE ALLOWED UNLESS OTHERWISE CALLED W O FOR ON THE PLANS OR APPROVED BY THE ENGINEER. F 00 U u) >_ CI z THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH w I— Q ,17 -HEC 18-EVALUATING SCOUR AT BRIDGES." Q z (J) v � o FOR EROSION CONTROL MEASURES, SEE EROSION CONTROL PLAN z W (CE) SHEETS. w u) U < z u, _iO w DURING CONSTRUCTION, AT LEAST ONE SPAN IN THE MIDDLE UNIT cz� z U j z SHALL REMAIN FULLY OPEN AND ACCESSIBLE TO VESSEL TRAFFIC z O — W ALONG SLOCUM CREEK. w Q > w ciPln ALL REFERENCES TO THE NCDOT STANDARD SPECIFICATIONS, REFER ; J p TO THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) W Q 47 M E Q 2018 STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. a N CO J A taw O0 A ALL REFERENCES TO THE NCDOT SPECIAL PROVISIONS, REFER TO THE Iz Q o NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) 2018 z o z PROJECT SPECIAL PROVISIONS. ct a m Q 0 o o SCALE: NOT TO SCALE - ---'= EPROJECT NO.: 1565548 0 o CONSTR.CONTR.NO. i N40085-19-D-9008 °o NAVFAC DRAWING NO. i 12837817 SHEET 7 OF 105 z SS-105 f 1 I I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 I 2 I 3I 4I 5 !---- NOTES: 70, FOR BRIDGE DRAINAGE SYSTEM NOTES, SEE SHEET SS-124. 0 STA. 182+75.00 ND- FOR DECK DRAIN LOCATIONS, SEE SHEETS SS-112 THRU SS-117 �� -EB BASELINE- PIPED HANGER ASSEMBLY LOCATIONS SPA. @ 6'-0" MAX. ._ D LONGITUDINAL RESTRAINT (SEE SHEET SS-125) SEE SHEET SS-109 FOR DETAILS OF a P BRIDGE DRAINAGE SYSTEM THRU INTEGRAL END BENT DIAPHRAGM I 1, Li Li Li Li Li LiLiLiu ow 4" DIA. PVC DECK <> ' DRAIN (TYP.) .-. . 1 1•; 111110W 1\r:1 _____ (0 _ • it ! , 11 , . 0 ic I 41 .A,, . , . , . . ...____ ___ .., -r L _ — IM — EXPANSION JOINT COUPLER DIRECTION I ���..w WYE WITH CLEANOUT I SPA. @ 100'-0" */ (TYP.) � � (SEE SHEET SS-125) OF FLOW (SEE SHEET SS-125) ,.�`�� wliiAII,,,,, ,, ,�N Rp, O I L •oFESs/O4/%7i , , �QQQ 1 /2:1 SLOPE NORMAL TO CAP BENT 2 �.,z -� ;y ) ::= — O;O (2'-0" THICK CLASS II RIP RAP) BENT 1 CONTROL LINE _ SEAL . CONTROL LINE =32 28/09 Q I 1/28/2021 ,Q 8" DIA. PVC COLLECTOR PIPE FROM BRIDGE �� APPROX. NATURAL I ',,,��AF•. •::::•�\\�;,' C DRAINAGE SYSTEM SHALL MAINTAIN A MIN. N�(2Q. GROUND C SLOPE OF 1% AND OUTLET INTO APPROACH -.0 '/ ����'�PN `` ROADWAY DRAINAGE STRUCTURE P7 AT �Qo. I I SEAL A MIN. INVERT ELEVATION OF 16.1 FT (SEE ‘ n SHEET CG118) • SPAN A _/\/_ SPAN B _i\i_ pro z -14 O V1;i \ LLI END BENT 1 BENT 1 BENT 2 J (INTEGRAL) NAVY Q U DRAINAGE PARTIAL ELEVATION TRANSPORTATION PARTNERS JV Aft INFO ±U_ O (INTERIOR PARAPET NOT SHOWN FOR CLARITY) aPD Ct 0 U- FOR COMMANDER NAVFAL 0 ACTMTY w U— FOR DECK DRAIN LOCATIONS, SEE SHEETS SS-112 THHRU SS-117 CO E� �11.-- SATISFACTORY TO DATE CO DES PDC DRW DDL CHK ALP J PM/DM U BRANCH MANAGER 0 CHIEF ENG/ARCH FIRE PROTECTION co B a _UY z B cn El z > J o CI 2 I— 2_2 I— - 0 u u u u u u ll u u u u u ° Q 2 - CO Z w N cp c~oCi ¢ rV O wQ --. z Q _e. �I W p .,,, _ w w � U UCI 7 cG o Q SEE SHEETS SS-124 I DIRECTION 8� SS-125 (TYP.) 8 DIA. PVC COLLECTOR Q D _ OF FLOW I PIPE (TYP.) z C.) CD z W < - E u) U Z z j BENT 4 I z Q O CC CONTROL LINE Cr) } BENT 3 c� z _U CONTROL LINEBENT 2 CONTROL LINE w — C/) E. I I-I-I H = O } I U) 0_ Z > —I Et_ w Q Q ' O A I I Oo a w Q 0- W A H > , U 0. SPAN C SPAN D z z w o o SCALE: NOT TO SCALE BENT 2 BENT 3 BENT 4 o EPROJECTNO.: 1565548 o CONSTR.CONTR.NO. i N40085-19-D-9008 DRAINAGE PARTIAL ELEVATION NAVFAC DRAW IIN2 81N37832 (15 w SHEET 2 2 OF 105 z SS-120 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1I 2 I 3I 4I 5 r---- NOTES: 7,,,- FOR BRIDGE DRAINAGE SYSTEM NOTES, SEE SHEET SS-124. 0 FOR DECK DRAIN LOCATIONS, SEE SHEETS SS-112 THRU SS-117�� �� D �� PIPE HANGER ASSEMBLY LOCATIONS SPA. @ 6'-0" MAX. ._ D u u u u u u u II II I I u u a U <> W ' 4" DIA. PVC DECK DRAIN (TYP.) � , -.. 111 I J.I ••r \-1 • IPA In EXPANSION JOINT COUPLER I _j DIRECTION i SPA. @ 100'-0" '' (TYP.) OF FLOW (SEE SHEET SS-125) i WYE WITH CLEANOUT IBENT 6 �`0,0% CqRo,/''/ LOCATED @ 90'-0" CTS. + --j �.•••Ess;••;<i '' BENT 4 BENT 5 CONTROL LINE �Qe°� °ti���y rill CONTROL LINE (TYP.) (SEE SHEET SS-125) CONTROL LINE - SEAL i _ 040769 _ I I 1/28/2021 Z4 NGINE �••' miiiiiimoNs I I SEAL A �� SPAN E �� SPAN F �� or'o �,. p NIGil \ LLI BENT 4 BENT 5 BENT 6 J Q NAVY DRAINAGE PARTIAL ELEVATION TRANSPORTATION ± PARTNERS JV LL Aft INFO O APPROVED Ct LL FOR COMMANDER NAVFAL Q ACTMTY w LT FORDECK DRAIN LOCATIONS, SEE SHEETS SS-112 THRU SS-117 CO E� �� SATISFACTORY TO DATE CO DES PDC DRW DDL CHK ALP J LONGITUDINAL RESTRAINT PM/DM 0 (SEE SHEET SS-125) BRANCH MANAGER 0 CHIEF ENG/ARCH a FIRE PROTECTION R U Q U Y zB g — J I . N o Z o Q z (.0 n II I ' 1 Wz mm LLJ _ __h_mm_ I— SEE SHEETS SS-124 J u) (n I ,� I DIRECTION I Q Q >- P & SS-125 (TYP.) 8 DIA. PVC COLLECTOR ► J O PIPE (TYP.) OF FLOW > Ct ct z , U CD v a I I z LUJ < - E u) U _z z BENT 7 BENTS w J O Q BENT 6 CONTROL LINE I CONTROL LINE I CONTROL LINE z Q _I CC (7, z U w O co w I- = O I I I I U) 0_ z } 1 > — Et Q ¢ �o- w M 0 I Eu A I I I td °- = w A SPAN G SPAN H z z w a o a o SCALE: NOT TO SCALE BENT 6 BENT 7 BENT 8 o [PROJECT NO.: 1565548 a CONSTR.CONTR.NO. i N40085-1 9-D-9008 ca DRAINAGE PARTIAL ELEVATION NAVFAC DRAW IIN28378133 w SHEET 2 3 OF 105 z SS -121 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1I 2 I 3I 4I 5 r---- NOTES: 7 FOR BRIDGE DRAINAGE SYSTEM NOTES, SEE SHEET SS-124. 0 -.0-.0 FOR DECK DRAIN LOCATIONS, SEE STA. 186+65.00 STA. 186+85.00 ► FOR DECK DRAIN LOCATIONS, SEE SHEETS SS-112 THRU SS-117 �� SHEETS SS-112 THRU SS-117 -EB BASELINE- -EB BASELINE- PIPE HANGER ASSEMBLY LOCATIONS PIPE HANGER ASSEMBLY LOCATIONS SPA. @ 6'-0" MAX. SPA. @ 6'-0" MAX. D D u II .0 _ I I u .1I u u u u u u a ZU 0 r-: F-. t-. F-. p-. F-i r. �i - � --: - *T) 7 MIll IS -NODIRECTION DIRECTION 8" DIA. PVC COLLECTOR M,, OF FLOW OF FLOW PIPE (TYP.) !I'M I LONGITUDINAL RESTRAINT A i+ TYPE 2 CLEANOUT AT END OF (SEE SHEET SS-125)kilj I Wt. � ► SYSTEM (SEE SHEET SS-125) BENT 8 BENT 9 BENT 10 ��\\%%� ITT1,,, TYPE 2 CLEANOUT AT END OF \.,' R:CN•.... (k / CONTROL LINE CONTROL LINE CONTROL LINE O;•oFEss,o•.,4 SYSTEM (SEE SHEET SS-125) I ' : ?.QQ- '`'-17•:-� ; 3 SEAL 1 040769 t = 1/28/2021 4 I I I j •'• FNG1NEEe•'• C l'vLpN NN (`/' //////111111 0 I I I SEAL A �� SPAN I �� SPAN J �� oro o VGil \ LLI BENT 8 BENT 9 BENT 10 J NAVY Q DRAINAGE PARTIAL ELEVATION TRANSPORTATION PARTNERS JV LL A/E INFO O APPROVED Ct 0 Li_ FOR COMMANDER NAVFAC p ACTMTY w FOR DECK DRAIN LOCATIONS, SEE SHEETS SS-112 THRU SS-117 LL CO SATISFACTORY TO DATE CO DES PDC DRW DDL CHK ALP J PM/DM 0 BRANCH MANAGER 0 CHIEF ENG/ARCH I-i FIRE PROTECTION ELo B B u u u u u u I u u u u u Q• _U Y z 4" DIA. PVC DECK o I— z SQz z CU DRAIN (TYP.) <> W• I- o a u. - Nr1 ri 1--.O i•I t•f t•f ;•; ;•; ; ; -� . i ..-. Cn CIl'c N NO o . _i. .}_t. _�-�- 1 ��� �� `=` �•� j LPL '- 1 , . II I I ` I C - I I Z ¢ _ � LOz UJ �J! z Q eL 1 _ _ — — 7 w 0_—__..._ cn W O W (.) U EXPANSION JOINT COUPLER SPA. I SEE SHEETS SS-124 7, Cn C @ 100'-0" */ (SEE SHEET SS-125) mil.- 8� SS-125 (TYP.) u_ DIRECTION Q LLJ O OF FLOW Q D C w I I I z u) C.) c CD z LI Z z ki BENT 10 E U) U CONTROL LINE I BENT 11 BENT 12 w J OJCC CONTROL LINE I CONTROL LINE z Q c.D z _U w O C/� Ii w I- = O coln > J � � z w Q Q O M I o_ = Li d Q _000A I I I OQ O �_1 I w Aw SPAN K _ SPAN L z• z8w w a E o Q a SCALE: NOT BENT 10 BENT 11 BENT 12 SCALE EPROJECT NO.:.: 1565548 0 a CONSTR.CONTR.NO. i N40085-1 9-D-9008 DRAINAGE PARTIAL ELEVATION NAVFAC DRAW IIN28378134 w SHEET 2 4 OF 105 z —122 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1I 2 I 3I 4I 5 !---- NOTES: 70, FOR BRIDGE DRAINAGE SYSTEM NOTES, SEE SHEET SS-124. 0 �� FOR DECK DRAIN LOCATIONS, SEE SHEETS SS-112 THRU SS-117 0.--0.-- D D J11. II II 1 U 11 J11. II 1 U 1 11 11 11 11 11 .E U Z }i Illmilill!lp Fr 1 .,r, 1 _-__..._ `` , WillIS - -- ma rd - . _ EXPANSION JOINT COUPLER SPA. @ I SEE SHEETS SS-124 iiiMM 100'-0" */ �(TYP.) (SEE SHEET SS-125) DIRECTION (TYP.) I & SS-125 TYP. OF FLOW �� WYE WITH CLEANOUT LOCATED @ 90'-0" */ CTS. ,\```..o.\ CA T���''% TYP. (SEE SHEET SS-125 BENT 13 I ;�O��o ESS%o����''� (TYP.) ) BENT 14 _ ;Q ��•:� , CONTROL LINE CONTROL LINE = ? SEAL i 040769 3 = V. 1/28/2021 I I �,�v0•. FiyGIN�.� - AF . �' BENT 12 ,,,' .... N\\ , , CONTROL LINE %,, L. P �‘` C '1//IIII111��` I I _I s >- EAL �� SPAN M �� SPAN N �� oro o V R \ LLI BENT 12 BENT 13 BENT 14 J Q NAVY DRAINAGE PARTIAL ELEVATION TRANSPORTATION PARTNERS JV Aft INFO ±U_ O APPROVED Ct 0 LL FOR COMMANDER NAVFAC Q ACTMTY w L.L FOR DECK DRAIN LOCATIONS, SEE SHEETS SS-112 THRU SS-117 CO E� I STA. 190+15.00 SATISFACTORY TO DATE CO -EB BASELINE- DES PDC DRW DDL CHK ALP PIPE HANGER ASSEMBLY LOCATIONS SPA. @ 6'-0" MAX. PM/DM 0 �� BRANCH MANAGER 0 CHIEF ENG/ARCH g WYE WITH CLEANOUT FIRE PROTECTION (SEE SHEET SS-125) o a v < Q Y z z > g — J ■ ■ ■ ■ ■ ■ ■ ■ ■ SEE SHEET SS-109 FOR DETAILS OF a Q 2 o .. LJ- � ■ ■ •■ •■ •M • ■����� BRIDGE DRAINAGE SYSTEM THRU z a 4" DIA. PVC DECK M • M •MEr INTEGRAL END BENT DIAPHRAGM co o n r W 0 U DRAIN (TYP.) c� ¢ w o ,-, f-• z 1 = Q !LLI <9 Z ° iii • ra ' iy , , V Ci I IP r--a.. E;j- !Er ❑ I 10 1 jr <� U I w 0 (n '-) - --h-M.- IL- LD I Q ~ � � 8" DIA. PVC COLLECTOR DIRECTION LONGITUDINAL RESTRAINT Z U CD No—PIPE (TYP.) OF FLOW w (SEE SHEET SS-125) z � U z z I 11/2:1 SLOPE NORMAL o"� w J O Q BENT14 ( _ Q� - — — — z zUJ CC TO CAP 2'-0" THICK 1 z CONTROL LINE BENT 15 CLASS II RIP RAP) Do - w o co LJ- 7F h I CONTROL LINE O 0 w Q >- O c. I I 0 8" DIA. PVC COLLECTOR PIPE FROM BRIDGE ► � u) 0 z DRAINAGE SYSTEM SHALL MAINTAIN A MIN. Q J E O M APPROX. NATURAL Do o Z c� . Nk, SLOPE OF 1% AND OUTLET INTO APPROACH W Q u) CY) I GROUND ROADWAY DRAINAGE STRUCTURE Q1 AT 2 J 0_ N- A I A MIN. INVERT ELEVATION OF 6.6 FT (SEE t a w o C Wo w 11-1 A SHEET CG120) z w SPAN 0 SPAN P Qz� � V .� a 0-1Ct a o o SCALE: NOT TO SCALE BENT 14 BENT 15 END BENT 2 o EPROJECT NO.: 1565548 a CONSTR.CONTR.NO. (INTEGRAL) N40085-19-D-9008 DRAINAGE PARTIAL ELEVATION NAVFAC DRAW IIN28378135 (INTERIOR PARAPET NOT SHOWN FOR CLARITY) SHEET 25 OF 105 z SS-123 Llb- 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 2 I 3 4 5 PIPE SADDLE / OPENING • Q 8" DIA. PVC _ CL 6'-0" _ COLLECTOR PIPE n g (TIED)R OPENINGS ► MAXIMUM F DRAIN MOUNTING 1' SCREWS (TYP.) APPROVED o 0 0 0 0 0 0 ® �r STRUCTURAL BOTTOM OF DECK SLAB 10 ;i4ii) O[� === ===i INSERT E= = [� = [�O = [� =i 4" DIA. PVC PIPE CENTERED IN SLOTTED E� o 0 0 0 o E�o D HOLE (REGARDLESS OF TEMPERATURE AT TIME OF INSTALLATION) 9" ADAPTER FOR 4" D ► ► DIA. PVC OPENING SQUARE HOLE GRATE (TO BE HEEL-PROOF SECURED WITH LOCATION OF INSERTS FOR HANGERS PIPE OPENING DETAIL 3 SCREWS FASTENED INTO EXACT SPACING MAY VARY SLIGHTLY TO Z DRAIN COVER PIPE INSERT) ENSURE THAT INSERTS AVOID DECK DRAINS a • FABRICATOR SHALL DETERMINE PIPE SADDLE / REINFORCEMENT AND DRAINAGE ELEMENTS THAT PREVENT W FOR OPENING SIZE INDICATED. FABRICATOR SHALL SUBMIT SHOP PROPER FIT UP OF HANGERS. DRAWINGS OF PIPE SADDLE / OPENING FOR REVIEW PRIOR TO BEGINNING FABRICATION. > w>-2 STRUCTURE DRAINAGE SYSTEM DETAILS BRIDGE DECK TOP O F DRAIN COVER DETAILS 1113::::: < M ,D3i 1 (DECK DRAIN COVERS AND ALL HARDWARE ARE TO MEET M 1MANUFACTURER'S RECOMMENDATIONS AND SHALL BE STAINLESS r STEEL (OR GALVANIZED) WITH CLEAR OPENINGS APPROX. 5j6' IAND NO GREATER THAN 1/3") �(GRATE TO BE FASTENED TO PVC ADAPTOR MANUFACTURED � � iiiM �,-1 E FOR THE SPECIFIC GRATES. GRATES AND ADAPTORS TO BE .. ,,��""""��4" DIA. PVCFITTED FOR 4" DIA. PVC OPENING) 1 0 $ " `\`�,o0.�o CAo 4 - �/2" LUGS (SEE "DRAIN DETAILS") /4 ?•Q� 9' ; DECK DRAIN ► TOP OF DRAIN = • SEAL ... TYP. = i 040769 N . CI: .P. iv > PIPE SADDLE / OPENING /�Zo 1/. �8 N2�02�1��;; C ~ (SEE PIPE OPENING DETAIL) p �i �� .. I ° I '%,,w L. PN��,�` ti kr /2 SQUARE ���,,,,,,,�� + :-;1#\ � LUG (TYP.) •I I• SEAL 8" DIA. PVC I COLLECTOR PIPE _ _ _ _ z _ oro �, O - - - - - - - - - - - - M >- PIPE DETAIL21 ® � 0 4 - /2 SQUARE LUGS TO BE GLUED TO THE PVC PLASTIC PIPE AT EQUAL SPACES AROUND THE —I Q PIPE DRAIN APPROXIMATELY 4" FROM THE TOP NAVY OF THE PIPE. TRANSPORTATION LJ- PARTNERS JV Aft INFO 0 ELEVATION PLAN OF RECESS "° D Ct DRAIN OUTLET & PIPE CONNECTION (BOTTOM OF SLAB OVERHANG) 0 FOR COMMANDER NAVFAC DRAIN DETAILS ACTMTY o U) SATISFACTORY TO DATE U) NOTES: DES PDC DRW DDL CHK ALP PM/DM U THE ENTIRE COST FOR THE LABOR AND MATERIALS NECESSARY TO FABRICATE AND INSTALL DECK DOWN-DRAIN PIPES SHALL BE CENTERED IN SLOTTED OPENING IN COLLECTOR PIPE PVC PIPE SHALL BE PAINTED TO MATCH THE FINAL SURFACE FINISH OF THE STRUCTURE WITH BRANCH MANAGER CHIEF ENG/ARCH g PVC PIPE, PIPE SUPPORT AND PIPE ANCHOR ASSEMBLIES SHALL BE INCLUDED IN THE LUMP REGARDLESS OF TEMPERATURE AT TIME OF INSTALLATION. TWO COATS OF AN ACRYLIC OR LATEX PAINT THAT IS CHEMICALLY COMPATABLE WITH PVC FIRE PROTECTION EL SUM PRICE BID FOR THE -STRUCTURE DRAINAGE SYSTEM". SEE NCDOT SPECIAL PROVISIONS PRODUCTS AND MEETS THE REQUIREMENTS OF ARTICLE 1080-12 OF THE NCDOT STANDARD B FOR STRUCTURE DRAINAGE SYSTEM. HANGER RODS SHALL BE ASTM A193, GRADE B7 OR CARBON STEEL ALL-THREAD HANGER RODS. SPECIFICATIONS. EACH COAT SHALL BE 2 DRY MILS THICK. DECK DRAINS SHALL BE ROUGHENED Q C) Y z B PRIOR TO PAINTING. 2 I- o ALL COLLECTOR PIPES, ELBOWS, COUPLERS, AND TEES SHALL BE PVC PIPE MEETING THE NUTS SHALL BE ASTM A194, GRADE 2H, HEAVY HEX NUTS. S Q z z SPECIFICATIONS OF ASTM D2665, SCHEDULE 40, AND THE ACCELERATED UV WEATHERING ALL METALLIC COMPONENTS IN THE DRAINAGE SYSTEM, EXCEPT STAINLESS STEEL AND co z a �j PERFORMANCE REQUIREMENTS OF ASTM D4329-05 PER PROCEDURE ASTM G154. THE DETAILS OF ALL PIPING, HARDWARE, OR OTHER MATERIAL SHALL BE PROVIDED BY THE MALLEABLE IRON PARTS, ARE REQUIRED TO BE HOT-DIPPED GALVANIZED PER NCDOT STANDARD IT o o >- U to N CONTRACTOR AND IS SUBJECT TO APPROVAL OF THE ENGINEER. SPECIFICATIONS. ELECTRO-PLATE COATING ON STEEL RODS, STEEL YOKE TYPE PIPE ROLLS, c cL Z EACH PIPE SECTION SHALL HAVE A MINIMUM OF TWO HANGERS. BRACKETS, OTHER STEEL HARDWARE IS CONSIDERED AS TOO THIN FOR OUTDOOR APPLICATIONS. Z / = Q p WORKING DRAWINGS FOR THE DRAINAGE SYSTEM AND LAYOUT PLANS INCLUDING, BUT NOT W o CL v COLLECTOR PIPE SHALL BE SUPPORTED FROM THE CONCRETE DECK SLAB. LIMITED TO, PIPE SUPPORT BRACKETS, PIPE ALIGNMENT, PIPE LENGTHS, AND ALL NECESSARY ALL PVC PIPE SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. z Q FITTINGS, ELBOWS, WYES, ADAPTERS, GUIDES, RESTRAINTS, WEAR PADS, COUPLERS AND JOINTS W CONTRACTOR SHALL PROVIDE PVC COUPLINGS CAPABLE OF HANDLING THE ANTICIPATED SHALL BE DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE STATE OF NORTH ALL STRUCTURAL STEEL SHALL BE ASTM A36 OR APPROVED EQUAL UNLESS NOTED OTHERWISE. F O MOVEMENTS. ADDITIONALLY, PVC COUPLINGS SHALL PROVIDE HORIZONTAL ALIGNMENT CAROLINA AND SUBMITTED FOR APPROVAL PRIOR TO ORDERING MATERIALS. 7, CI U) TOLERANCES SUCH THAT THE 8" DIA. PVC COLLECTOR PIPE AND COUPLINGS CAN CLOSELY ALL GALVANIZED SURFACES SHALL BE CLEANED TO (SSPC SP-1) PRIOR TO COATING. Q Q J FOLLOW THE VERTICAL CURVE OF THE STRUCTURE. PIPE MANUFACTURER SHALL ENSURE THE PIPE AND THE PIPE SUPPORT BEARING AREA IS LLJ > 0 Q DESIGNED IN ACCORDANCE WITH THE HANGER SPACING PROVIDED IN THESE PLANS. ALL FABRICATION SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE NCDOT STANDARD z > D I w THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE HORIZONTAL AND VERTICAL SPECIFICATIONS. ALIGNMENT OF THE DRAINAGE SYSTEM USING NECESSARY FITTINGS, TEES, AND WYES TO PIPE DESIGN MUST ALLOW VERTICAL FLEXURE FROM THE SUPERSTRUCTURE. z W PROVIDE A CONTINUOUS DRAINAGE SYSTEM. ALL PVC PIPE SIZES ARE SHOWN AS INSIDE DIAMETER SIZES. E u) U w J O THE COLLECTOR PIPE SHALL CLOSELY FOLLOW THE LONGITUDINAL GRADE OF THE STRUCTURE z Q CD CONCRETE INSERTS SHALL HAVE A MINIMUM WORKING LOAD TENSION CAPACITY OF 4.5 KIPS. WHILE MAINTAINING A MINIMUM OF 0.5% SLOPE AT ALL TIMES. FOR DECK DRAIN LOCATIONS AND ADDITIONAL INFORMATION, SEE SHEETS SS-112 THRU SS-117. c-D z U w pco U) CONTRACTOR SHALL VERIFY LOCATION OF CONCRETE INSERTS IN REGARDS TO ADJACENT COUPLERS SHALL BE DESIGNED TO ACCOMMODATE A TURN AT EACH BENT IN ORDER TO FOLLOW THE DRAINAGE SYSTEM DETAILS ARE SCHEMATIC DRAWINGS ONLY AND IS A REPRESENTATION i E.o INSERTS AND DECK DRAINS. IF SPACING/LOCATION OF INSERTS RESULTS IN REDUCED INSERT THE VERTICAL CURVATURE OF THE BRIDGE OVERHANG. OF THE DRAINAGE SYSTEM THAT IS REQUIRED FOR THE BRIDGE. SEE SHEETS SS-120 THRU SS-126 w � 2 � co CAPACITY, CONTRACTOR SHALL SUBMIT INSERT SYSTEM WITH APPROPRIATE CAPACITY, GIVEN FOR REQUIRED ELEMENTS. J CO CL Q CONSTRAINTS, OR PROVIDED ALTERNATE CONNECTION/SUPPORT DETAIL FOR REVIEW AND THE PIPE MANUFACTURER SHALL ENSURE THE FRICTIONAL FORCE REQUIRED TO ACTIVATE THE Z 7 Q M Z APPROVAL OF THE ENGINEER PRIOR TO INSTALLATION. EXPANSION COUPLERS DOES NOT OVERSTRESS THE COUPLER WALL BUILD-UP, DRAINAGE DISTANCE BETWEEN THE LONGITUDINAL RESTRAINT AND EXPANSION COUPLER SHALL NOT = a N— SYSTEM BRACKETS, SUPPORTS, OR LATERAL RESTRAINTS. EXCEED 120 FEET. a a o p _ A DECK DRAIN PIPE SHALL BE ASTM D1785, SCHEDULE 40. ALL PVC FITTINGS SHALL BE MINIMUM Z Q o 0 A ASTM D2665, SCHEDULE 40. WASHERS SHALL BE ASTM F436 OR APPROVED EQUIVALENT. PROVIDE LONGITUDINAL RESTRAINTS IN DRAINAGE SYSTEM PIPE AT A MAXIMUM SPACING OF z o z c 200 FEET. z - EXPANSION JOINT COUPLERS IN THE COLLECTOR PIPE SHALL HAVE A MINIMUM CAPACITY TO BOLTS, NUTS, AND WASHERS SHALL BE GALVANIZED IN ACCORDANCE WITH THE NCDOT W o Q ACCOMMODATE 6-INCHES OF TOTAL MOVEMENT (3-INCHES EXPANSION/3-INCHES CONTRACTION). STANDARD SPECIFICATIONS. TOP OF DECK DRAINS TO BE SET %" BELOW SURFACE OF SLAB. a o SCALE: NOT TO SCALE 0 AN OPTIONAL DETAIL FOR THE LONGITUDINAL RESTRAINTS AND THE LATERAL GUIDE MAY BE BOLT THREADS SHALL BE BURRED TO PREVENT LOOSENING. EPROJECTNO.: 1565548 SUBMITTED FOR APPROVAL. CONSTR CONTR. O. N-19-D-9008 COLLECTOR PIPE SUPPORTS SHALL BE LOCATED WITHIN 12-INCHES, +/4-INCHES, OF A NAVFAC DRAWING 37836 NO. w COLLECTOR PIPE JOINT. SHEET 26 OF 105 z SS-124 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 1 I 2 I 3 I 4 I 5 r---- NOTES: 7 2'-0" 2'-0" (SEE SHEETS SS-112 THRU SS-117 (SEE SHEETS SS-112 THRU SS-117 �� FOR DECK DRAIN SPACING) �� _ FOR DECK DRAIN SPACING) ow.- FOR BRIDGE DRAINAGE SYSTEM NOTES, SEE SHEET SS-124. 0 / BRIDGE DECK BRIDGE DECK I d 1 1 ' ' d ' 6 dab I I I , I III kin Al D N N ' t TYPE 2 CLEAN OUT _ L -_ - -- _ L.J -- Z a MP.W/ REMOVABLE CAP - - - - - - - - - Cii I - — - - - - ' - - - - - - - - - - - - - - - U I L-- I--- - L o O I I g '■ 8" DIA. PVC COLLECTOR PIPE EXPANSION JOINT COUPLER (SEE COLLECTOR PIPE TOP OF BRIDGE DECK NMI PIPE STANDOFF NOTES) (CENTER BETWEEN DRAINS) DIRECTION I I \______ OF FLOW ' �4" DIA. DECK DRAIN —111..-1 1 i -1 t 4" DIA. DECK DRAIN I (TYP.) i APPROVED 7/8" DIA.STRUCTURAL INSERTSLI R I SYSTEM ENDS DETAIL EXPANSION COUPLERigr 71.;&W70:‘,c,_::::;_4‘07.E9s.111Ss77/:°i/ii\ lir 7/8" ROD, FIELDkr i I SEALL 28/2O i;i i;0/ MEASURE FOR �2 .�/2s/2o2� 411 BRIDGE DECK ASSEMBLY %�4,4,••�":::;:• Q C -- /'% wL. PN �.. MP. y ( TOP OF BRIDGE DECK I- 8" DIA. PVC I SQL J 1/1 CONCRETE INSERT d 6 COLLECTOR PIPEII z APPROVED 7/8" DIA. (TYP.) I I ;; oro �°' O I I � STRUCTURAL INSERTS s _ _ E 8" DIA. PVC I PIPE HANGER ® \ Cw COLLECTOR PIPE �� (SEE PIPE HANGER -� RIGID ROD DETAIL) STRUT _� 4" DIA. DECK DRAIN � NAVY TRANSPORTATION T_ 4 j o PIPE STANDOFF & HANGER PARTNERS JV ,,,E INFO O I , JALL COMPONENTS SHALL BE GALVANIZED AFTER FABRICATION FWD Ct _ _ _ _ _ _ _ _ _ _ _ 0 RIGID ROD STRUTS LJ_ - - FOR COMMANDER NAVFAC \ / T PIPE RESTRAINT ° CT""TM LIJ �T� ** PIPE WALL BUILDUP li CLAMP 8 DIA. PVC (TYP. EA. SIDE OF PIPE COLLECTOR PIPE CT) ^ _ _ RESTRAINT CLAMP) SATISFACTORY TO DATE CO — //— -� A DES PDC DRW DDL CHK ALP J V T / Ell' DIA. PVC PIPE STANDOFF CLAMP(S) PM/DM C.)BRANCH MANAGER COLLECTOR PIPE 411, CHIEF ENG/ARCH PIPE WALL BUILDUP — FIRE PROTECTION EL cr) B t8" DIA. PVC i auY z B COLLECTOR PIPE —11.-I PIPE HANGER I 2• 1— 2 (SEE PIPE HANGER I ° Q z z DETAIL) • z a ai- 1 /8 DIA. HANGER ROD ► /8 DIA. HANGER ROD ; r z SECTION A-A ELEVATION VIEW I 7 " 7 " `� w I � oz = — 0 U J _ WELDLESS EYE NUT Z LONGITUDINAL RESTRAINT DETAIL WELDLESS EYE NUT 0 0 STANDOFF NOT REQUIRED AT LONGITUDINAL RESTRAINT STEEL CLEVIS �� F U U J "' CI ** CONTRACTOR SHALL ENSURE PIPE WALL BUILDUP IS SUFFICIENT 3/8" MIN. THICK R [� 0 ¢ 1— Q �� TO ENGAGE PIPE RESTRAINT CLAMP AT LONGITUDINAL RESTRAINT 0 -'-I't- \` J/ EE � x LOCATIONS. � - _ - z u) 0 LI 0 CLEANOUT W/ Qj z W REMOVABLE CAP * '�/4' PVC WEAR PAD _ - - _ - _ LU w J O I- (TYP. @PIPE HANGER z Q J 6" DIA. PVC PIPE ��`o ril 3/8 Ilini ' MIN. ) Q / MIN. THICKO- _ z z U LOCATIONS / 3 ■■ ,-1,- -_\_.__\_ p s o -- THICK R Ali, G HANGER - - Q › w * . , ' ./4' r - 8" DIA. PVC w Q r) C� Q ' 0z U Q i� �i COLLECTOR PIPE a Q A DIRECTIONI Z Q o o A .OF FLOW SPACER SIZED TO ACCOMMODATE • z Li j z - 8 DIA. PVC COLLECTOR PIPE SECTION B-B 1/- GAP BETWEEN HANGER AND Q (STEEL CLEVIS & 7/8' DIA. HANGER ROD COLLECTOR PIPE SCALE: NOT TO SCALE NOT SHOWN FOR CLARITY) PIPE HANGER DETAIL EPROJECTNO.: 1565548 a CONSTR.CONTR.NO. WYE WITH CLEANOUT DETAIL * DIMENSIONS TO BE DETERMINED ALL COMPONENTS SHALL BE GALVANIZED AFTER FABRICATION N40085-19-D-9008 BY MANUFACTURER. NAVFAC DRAWING NO. 12837837 SHEET 27 OF 105 z SS-125 1 I 2 I 3 I 4 I 5 DRAWFORM REVISION:25 AUGUST 2020 UNCLASSIFIED//FOR OFFICIAL USE ONLY COPY OF US COAST GUARD SUBMITTAL •• NAVY TRANSPORTATION J PARTNERS JV July 16, 2021 Mr. Hal Pitts Commander, United States Coast Guard District 5 431 Crawford Street Portsmouth, VA 23704-5004 RE: New Bridge at Slocum Road over Slocum Creek Project P134—Perimeter Security Compliance, Slocum Road Entry Control Facility Advance Approval(33 CFR 115.70) Permit Exemption and Bridge Lighting Exemption US Marine Corps Air Station (MCAS) Cherry Point, Craven County, North Carolina Mr. Pitts: On behalf of the United States Marine Corps (USMC), Kimley-Horn is requesting an Advance Approval (33 CFR 115.70) Permit Exemption and a Bridge Lighting Exemption for the above referenced project located on MCAS Cherry Point, Craven County, North Carolina. As part of the proposed project, a new concrete two-lane bridge with pedestrian lane will be constructed to carry eastbound traffic on Slocum Road over Slocum Creek. The proposed bridge is immediately adjacent and south (inland) of the existing Slocum Road bridge over Slocum Creek. The new bridge will be designed utilizing current NCDOT Structural Standards and Specifications. Due to Federal and State requirements for Slocum Creek, the bridge will be designed and detailed to have a closed drainage system to avoid any direct drainage into the waterway below. No improvements to the existing bridge are anticipated. The existing bridge structure is constructed of cast-in-place reinforced concrete caps on prestressed concrete piles, and the new bridge will be constructed to match the existing. The existing bridge has a minimum vertical clearance of 7.41 feet (above mean high water elevation) and a minimum horizontal clearance of 45.08 feet between concrete support piles. The new bridge at Slocum Road will be constructed adjacent to the existing bridge, with traffic flow remaining on the existing bridge during the construction period. To facilitate construction of the new bridge, it is anticipated that a temporary work bridge will be constructed south of the proposed bridge and/or a barge will be utilized during construction to maintain traffic flow and base access on the existing bridge. This temporary work bridge and/or barge will be placed such one span in the middle of the bridge will remain fully open and accessible to vessel traffic along Slocum Creek throughout construction. The temporary work bridge and/or barge will be removed once project construction is complete. The proposed new bridge over Slocum Creek is slightly wider than the existing bridge due to the addition of a pedestrian lane and is approximately 2 feet taller than the existing bridge due to resiliency requirements. The proposed new bridge will have a minimum vertical clearance of 9.22 feet (above mean high water elevation) and a minimum horizontal clearance of 45.125 feet between concrete support piles, with the total length of the bridge being 755.083 feet spanning over Slocum Creek The base of the bridge structure on the banks of Slocum Creek will be stabilized with riprap, with minimal riprap being placed within the creek or below the existing edge of water. Navy Transportation 4525 Main Street, Suite 1000,Virginia Beach, VA 23462 757 213 8600 Partners, JV .. i NAVY v7TRANSPORTATION PARTNERS JV Page 2 The current bridge structure does not have navigation lighting and does not support significant nighttime navigation. The bridge plans do not propose to install bridge lighting on the new structure, so MCAS Cherry Point is requesting a Bridge Lighting Exemption for the project. The proposed bridge replacement project will have no significant effect on the natural or human environment. An Environmental Assessment document for Project P134 — Perimeter Security Compliance, Slocum Road Entry Control Facility, which includes the construction of the new bridge, describing all proposed impacts is being prepared as prescribed by Section 102(2)(c) of the National Environmental Policy Act of 1969, and will be completed and approved prior to construction. There are no publicly owned lands from parks, recreational areas, wildlife or waterfowl refuges, or any lands from a historic district within the project area or in the vicinity of the project area. No displacements or relocations of residences, businesses, or people are proposed, and the project will not affect minority or low-income populations under the Environmental Justice requirements. The following information is included as part of the application submittal: • US Coast Guard Bridge Project Questionnaire • Location Maps • Proposed Bridge Plan Sheets • Adjacent Property Owner Map and Contact Information • Photo Pages If there is any additional information that you need to assist in the processing of this Advanced Approval Permit Exemption and Bridge Lighting Exemption request, please do not hesitate to contact me at 919- 678-4155 or Jason.Hartshorn@Kimley-Horn.com. Sincerely, Jason Hartshorn, PWS CC: Robyn Niss, P.E., LEED AP, Kimley-Horn Jessica E. Guilianelli, CIV, Marine Corps Air Station Cherry Point Navy Transportation 4525 Main Street, Suite 1000,Virginia Beach,VA 23462 757 213 8600 Partners, JV U.S. Department of Commander 431 Crawford Street Homeland Security United States Coast Guard Portsmouth,Va.23704-5004 e"\ Fifth Coast Guard District Staff Symbol: (dpb) Phone:757-398-6222 United States Email: Hal.R.PItts@uscg.mil Coast Guard BRIDGE PROJECT QUESTIONNAIRE Please provide the following information: A. NAVIGATION DATA: 1. Name of Waterway: Slocum Creek la. Mileage along waterway measured from mouth or confluence: -3.17 miles from the existing Slocum Creek bridge to the mouth of Slocum Creek where it converges with the Neuse River. lb. Tributary of: Slocum Creek is a tributary of the Neuse River. 2. Geographic Location: Slocum Road, Havelock, Craven County,North Carolina (34.917476, -76.911467) (Road Number, City, County, State) and (Latitude and Longitude in NAD 83 form) 3. Township, section and range, if applicable: N/A 4. Tidally influenced at proposed bridge site? Yes Range of tide: 2.17 feet Tidal data source: NOAA Tides and Currents: Core Creek Bridge,NC - Station ID: 8656084 (https://tidesandcurrents.noaa.gov/stationhome.html?id=8656084) 5. Depth and width of waterway at proposed bridge site: Depths Widths At Mean High Tide 14.79 ft 696 ft . At Mean Low Tide 11.83 ft 652 ft . 6. Character of present vessel traffic on waterway. If none, so state: None Canoe Rowboat Small Motorboat X Cabin Cruiser Houseboat Pontoon Boat Sailboat. 6a. Provide vertical clearance requirement for largest vessel using the waterway: Slocum Creek is not listed on the list of Guidance Clearances provided by the US Coast Guard. Additionally, Slocum Creek is only navigated by logs, log rafts, rowboats, canoes, and small motorboats, and not large vessels. 6b. Provide photograph of each type of vessel using the waterway. See attached photo pages (Photos 1-3). 7. Are these waters used to transport interstate or foreign commerce? No, Slocum Creek is only navigated by logs, log rafts, rowboats, canoes, and small motorboats, and not large vessels. 7a. Are these waters susceptible to use in their natural condition or by reasonable improvement as a means to support interstate or foreign commerce? No 7b. Any planned waterway improvements to permit larger vessels to navigate (to your knowledge)? No If so,what are they? 8. Any natural or manmade obstructions, bridges, dams,weirs, etc. downstream or upstream? Yes 8a. If yes,provide upstream/downstream location with relation to the proposed bridge. The existing bridge at Slocum Road over Slocum Creek is located downstream and directly adjacent to the proposed new bridge over Slocum Creek. There are no bridges, or other natural or manmade obstructions, located within 1.0 mile downstream or upstream of the proposed Slocum Road bridge over Slocum Creek. 8b. If bridges are located upstream or downstream, provide vertical clearance at mean high water and mean low water and horizontal clearance normal to the axis of the channel. The minimum vertical clearance for the existing bridge at Slocum Road over Slocum Creek is 7.41 feet and the minimum horizontal clearance is 45.08 feet between piles. 8c. Provide a photograph of the bridge from the waterway showing channel spans. See attached photo pages (Photos 4-5). 9. Will the structure replace an existing bridge? No, the proposed project will construct a new bridge over Slocum Creek adjacent to the existing bridge at Slocum Road. 9a. Provide permit number and issuing agencies of permits for bridge(s)to be replaced. The proposed project is not replacing the existing bridge at Slocum Road over Slocum Creek. The project is proposing the construction of a new bridge upstream, directly south of, and almost identical in design to the existing bridge at Slocum Road. 9b. Provide vertical clearance at mean high water and mean low water and horizontal clearance normal to the axis of the channel for the proposed bridge. The minimum vertical clearance for the proposed new bridge at Slocum Road over Slocum Creek is 9.22 feet and the minimum horizontal clearance is 45.125 feet between piles. 2 10. List names and addresses of persons whose property adjoins bridge right-of-way. U.S. Government Property—U.S. Naval Reservation Site Address: Coolidge Court, Havelock, Craven County,NC Mailing Address: 141 E. Fisher Avenue,New Bern,NC 28560 11. List names and addresses/location of marinas,marine repair facilities,public boat ramps,private piers/docks along the waterway within '/2 mile of the bridge site. There do not appear to be any marinas, marine repair facilities, public boat ramps, or private piers/docks within 1/2 mile of the proposed bridge. However, there are several recreational water access points along Slocum Creek on the MCAS Cherry Point Base within 1/2 mile of the proposed bridge. 12. Attach location map and plans for the proposed bridge; including vertical clearances above mean high water and mean low water and horizontal clearance normal to axis of the waterway. See attached figures. 13. Attach three (3)photographs taken at the proposed bridge site: one looking upstream, one looking downstream, and one looking along the alignment centerline across the bridge site. See attached photo pages (Photos 6-9). Name of applicant: Marine Corps Air Station Cherry Point; Jessica E. Guilianelli, CIV Name of agent completing questionnaire: Jason Hartshorn, PWS Name of agent's firm: Kimley-Horn Agent's telephone number: (919) 678-4155 Address for correspondence: 421 Fayetteville Street, Suite 600, Raleigh,NC 27601 Applicant's telephone number: (252) 466-4826 Date: Signature: PLEASE NOTE:MISSING INFORMATION AND REQUIRED SIGNATURES WILL DELAY PROCESSING • Attachments: Location Maps Proposed Bridge Plan Sheets Adjacent Property Owner Map and Contact Information Photo Pages 3 NI`r�o� ` Beaufort County a Catfish Rd ��ws/ • — vo c_ w 0 .� e4- `te es,Ce -FR b t . NSF ec c c� mT , E c'j 4C-. m �. - N. �j o o,Access Rd %p o GN Slocum G3 ,P'0 0 C Z \ o `� v J I ( �0 Stlll GUt op �"• �,.` . D.IIs Gu C> G, 3 a1► c.,.. ,.., Ni ►V1 V �\ CDPe Branch 4al, I I U .s .,✓,l Legend �d �r an S II q oe�� °ks Branch gCy i• li n Havelock cm , 41( Craven County r 0 1.75 3.5 1 Project Study Area o Rd,\ I I I o�thGara Miles V Ohio 7rti:1\ r HYDE West Virginia .Maryland PITT BEAUFORT MidlaftAiiiiii Virginia LENOIR VIMMICID 1041r11111111 lOrtrirelor arniF a� North Carolina4416 4 �� �� �6 CRAVEN PAMLICO ���01* JONES South Carolina �J Craven County Project Location Georgia v Atlantic Ocean L �r r ONSLOW CARTERET NA VY Figure 1: Vicinity Map a I �`w�AV i Project P134— Perimeter Security Compliance TRANSPORTATION Slocum Road Entry Control Facility V• PARTNERS JV Marine Corps Air Station, Cherry Point, Craven County, NC November 2020 -: ,b qf: 1 �'fir! V ff i. '_• i ".`.....,•:- ..y .�-, r I': -•Ait k. ♦ �Ow i \. i a 'r6T L 4`a Mti• v,•. r,y�\�} 1` 'f. "#.-Ss1'� '�•.• �y r Z1 ' 1 )t S* `.( ,,, {' a. [Yyar. {. .0 � t �h�y4�•1'.'Y\ ` t• \ �5• v , 2 l� �V � -•�' K` 'p ±- 3r fl.• �.,�1�1r` a\ ..'.[• 3' ;~ 2 i •4•7e. �1- •-•1 ,.'fv. ` ' .t 1�� 'e�. th`.N•!q�r :,.... J.'K4 r`. �'�• " - •.. �,r. . 1t ? L ' - mot ' ,'ice a,{v> ;r !,' � - ,� �vWi`a :, -. .- '%f".il* •r .,- •,`• ,- ai'.. 4.1,..♦ �, 4%, `t— � jl r{:St 1.� '? ,,,,,f,,, ,`�C,f•tc,�'i•4.►,,,� •�.vy'•, .'�'y`r.s!2'3: � ,� , ��' -• '-. Figure 5.1 't ,. '0y.'•; '!. ' %, ,ts4`47,,w 4 (.:�; ': �"�►.,,� ut IL•• X�,i'..l; �'tl'� .. � rv�` ;;" c x'„ , R ��t y C • Y • • r+" a Figure 52 • ., A ' fir.+' • 1 Slo cum•Rd +t 1 4 44 r w. —"tea: "� "•)* � "- W 11 - t.., , Ror ,--, W1 , Pamlic°tea Wan Orr - \ / W2 �:,' W8. 4 W4 , ¢F , '01 W9 W5 Y j . 1 ►�, f • . .- ,�,"` �• . , U t W/c a a" _ � f�G, a ` '`* , W10 I/ M / - ' $ 4w f 0 VAP \ • . F ,, o,[. �^ W L a i ` ` N 'ck Y.°tC,- - ` yY , _o ,Cataw Rd-.II za pav "• Ga a ` j ` �j irx a v ..„,....,z, .20,0 , _ -*/, A. _ , - . ..,. ._ .! 8 4,1 .c . 4.1 .. -- 'if ., , ' . Ati. .,,4.C.e.. ' t. .I.t • � ` n , " svd . . ./ems.y - z � _ , _ ',,. ''' ► ofr te U + , a • , V. ^, *• i ;r� . , 'Legend I • '.. :t , • F� ss -./fir•— Jurisdictional Streams (a)(2) r•r� �; . •:, , - �.� ,."..:5r,� - 0�` 5�ac\ a ._" s ',i, 1"► a; ,; �. ``/ r' y C�;�• • ��' DNS. G.Q r *F` t e 7"'h ^� �`'V Jurisdictional Ditches + ,, 'C ' •c%i Ra �a at`� w>,.. ,s• •'''` \ �".T �j Jurisdictional Wetlands (a)(4) ', y'. 4,4r �+`,"L• i' r " f ,xti '11 E ` '" .;. s .s. t ik �_ti , .1 0 900 1,800 r J . . Project Study Area " , , :�, re .. ` v +` , ' ,;� ,,, . -+ z.. �' Feet Figure 5: Jurisdictional Features Map • • • NAVY Project P134— Perimeter Security Compliance Ni ur. TRANSPORTATION Slocum Road Entry Control Facility PARTNERS JV Marine Corps Air Station Cherry Point, Craven County, NC 05/28/2021 � q. Sw lei 19 Z. IVAlp, dw AL all It us -VAT Alm At Feet Legend 016- Jurisdictional Streams (a)(2) Jurisdictional Ditches ZX/ Jurisdictional Wetlands (a)(4) Project Study Area 50N:�., rj Figure S.1: Juhsdicdno| Features Map NAVY Project P134— Perimeter Security Compliance --- ��� TRANSPORTATION Slocum Road Entry Control Facility �=� PARTNERSJV Marine Corps Air Station, Cherry Point, Craven County, NC et ♦r_,�*djy'► +yam;}a s �i L *% ,;-rl - • ,6`. - • �- * _ r . M •� � , r �� �11 , Legend ., , ...ill, . • ' ,,, tip . -t1 �oi, ,,,,, , r `�•��S' + I�� w+ysq � �• `� „ ,r'., ,•" mow— Jurisdictional Streams (a)(2) �•• ••6.;�• 1" %; il� Jurisdictional Ditches " .‘.,, • 4444 . • 4 t • '. •A 4� �`} y �, II- . F 7�� Jurisdictional Wetlands (a)(4) • • ' 31101, '' " C: J..• ems;+'' Project Study Area Itl yr //*/ " • , ,� �, �i►, '� •` '` •! ``.SI t . ` �; • 0 325 650 r•, . -.t� �„�. •' 1 i 1 Feet +5 • 47/' ,4;',4,1 ... ,i/;:// ' . t`'s. da J •' ' . ; t- '*I.:, . • ir, 1141 ' `° � �f �""rocY`f^ '1i r ,fit'. ;pm: ' ,i•-::.•,. % 1 a `Ti i., . .. . ito :: 4. 2., ,. ,;, 41. ,,.. • / if a/ ..---...1-'- -Ai, . %di— R. iv /.„ ,/-7;//7/ , „.. . . . . .,-. . ,,, • ./ 7,/;"///4",.>° .1.' ' •"V, r‘ ..)":.44,Y4 ' •4' t '..1 ' • . ,,:4.1It% '.t ..„4., .A' .44". 4 ilt wik " * 44 ' - b• . ' . •* ,'-' -t4.,- .1‘.: •I'.q,k' ‘. 1.XilV\181%_..Pts Ala rt , :, . _ �,,� �»,��, .A. - ;�.;; sr).0. ' �• • *:r..:4:.-;: 1 '••~xt fr A• a! ••• le*"h •K � � C r cif �y�►+� ' 1 dil • �� Pik 15....... ter•.• Y'�.' ��i •' , . / ''"' "Nid 141 I . g• IIV • . t \ ok -.. ' t4"'' r . g ‘, . , N- - * .: it it,..aL , , e. . I, k: v., ,,,t -41. • ,., Ilk 4- ______iiit • 1. � M' is '!v '�_ ha • . .. 4_ Figure 5.2: Jurisdictinal Features Map A NAVY Project P134— Perimeter Security Compliance TyTRANSPORTATION Slocum Road Entry Control Facility PARTNERS JV Marine Corps Air Station, Cherry Point, Craven County, NC 05/28/2021 ti t Y' """1114.12:11151powskatid... r : - , ► .t • Legend t `� eet' x •,„ !'r 1 i"� R--4, + it.. - ^is-•- Jurisdictional Streams (a)(2) ► ` • . , ,' Jurisdictional Ditches Fv4\40:1 k .. • 't r� �; �6 Jurisdictional Wetlands (a)(4) 46. s ,-'' it �' ,; i Project Study Area . a. � .* ° "fi r -T 0 325 650 • - ,. ,f • W11 '� :'��„ r 1 Feet .di i �' Y` �� r+ '• y' . _. ' . .46(v>- ' 4"111. '1► .•-• a ,• • aisk "•,- \ t.k. r -, .10. ' * it 1 . • ` . . '1a W4 lRWS�ZZ,.., } ` _ r ',t_eiy",to T r ,I },r,- -'' 7, `• 1 !, , 1 %` '► 1 44-- :h, '' > `r.k r . . 1 r 441 i ' 6 • A lite, . • •S ft: rx: .,,...ct. - - ,.. .- .• lk...Itz4. ,r, : .., A 4r ',, .,.0.4. . . ......- . . , ... . , , lOks,.. : yr- t , ,11, ,,,,-_,.,-, :i. , .- • „.....„ .,,,,,,,,.... ..„„,„,,-.- 14„;,.,:„. ,,, , . ,...0. f .. .. • IS - -r Tt rlletik i iri \ •. •,. , ik ' 411w;.: -110:‘" - - .. 1 e ''' l4 r jl t� s. V As, Figure5.3: Jurisdictinal Features Map NAVY Project P134— Perimeter Security Compliance TyTRANSPORTATION Slocum Road Entry Control Facility PARTNERS JV Marine Corps Air Station, Cherry Point, Craven County, NC 05/28/2021 ' 'e�� A� �. - (. II 4 J y _ \ O�� c'` , 4'... , >:fir ' '1/// �I a �t t �`_ '.� ,,I' U S• GOVERNMENT PROPERTY., % , \\,_,_,,_, ..,_. ..--- 4\1:111114+ m„— `" "U SfGOVERNMENT PROPERTY .- ,, . 2i _jA• U A` y U Y O \ eel • tc cn Legend - 410. _� "� - e i ea Project Study Area Parcel • ` ;_ .I'' , Adjacent Property Parcels , f. - l • %t 0 1,500 3,000 Ifl Project Study Area ""t I I I "*'� , • ‘ Feet I itiFigure 3: Adjacent Property Parcel Map NAVY Project P134— Perimeter Security Compliance Iii TRANSPORTATION Slocum Road Entry Control Facility PARTNERS JV Marine Corps Air Station, Cherry Point, Craven County, NC November 2020 Parcel Number Legal Description Owner Name Source Reference Mailing Address City State Zip Code 6-060-065 U S NAVAL RESERVATION U S GOVERNMENT PROPERTY Deed Book/Page 0336/0061 141 E FISHER AVE NEW BERN NC 28560 04 4 'L ,.. Y ..� } ' R 4 -r lip Photo 1 —This photo depicts the type of vessel using Slocum Creek at the new bridge location. • Photo 2—This photo depicts the type of vessel using Slocum Creek at the new bridge location. Advance Approval Permit Exemption New Bridge at Slocum Road(Project P134) Page 1 of 5 US MCAS Cherry Point,Craven County,NC Photo 3—This photo depicts the type of vessel using Slocum Creek at the new bridge location. a_ Photo 4—This photo depicts the channel span at the existing bridge at Slocum Road over Slocum Creek from the west bank. The new bridge at Slocum Road will be constructed directly upstream,and south of the existing bridge. Advance Approval Permit Exemption New Bridge at Slocum Road(Project P134) Page 2 of 5 US MCAS Cherry Point,Craven County,NC fc-,,.., : • r= , ',:,,, . i K \ N,. Photo 5—This photo depicts another view of the channel span along the existing bridge at Slocum Road over Slocum Creek from the west bank.The new bridge at Slocum Road will be constructed directly upstream,and south of the existing bridge. ' • Y -741}Apigi IIIINir ..,::- ,. - . ,,.. . .-. , jib g 't. '.nq ell T,, .5_ ,, „ , _, _ ____ _ _____:_________, _ ___ _______ 5 I — -----=------ ,., a . ;s y ti L - _ a ' is Photo 6—This photo depicts upstream of the existing bridge at Slocum Road over Slocum Creek,standing on the existing bridge.The new bridge at Slocum Road will be constructed directly upstream,and south of the existing bridge. Advance Approval Permit Exemption New Bridge at Slocum Road(Project P134) Page 3 of 5 US MCAS Cherry Point,Craven County,NC a 1 "R` F , ', 4, a 44, as ` � LLB. ' =et, allow- ,' ` - , � ip , , .. ,,, ,,,, .1„, ,, ,z, i,,,,, ,,,, ,,,....,r,,,k,,„ , 1 ., 4 , I ,....... '' kaYt ,f �tl- 47 _ - _- ____L-_—_--i--: -= _r---,_ , tr-4_ - - sik - ar4€ �` Iti4 -- - t' - 41!pal / _ &, fi -,' f Photo 7—This photo depicts upstream of the existing bridge at Slocum Road over Slocum Creek from the east bank.The new bridge at Slocum Road will be constructed directly upstream,and south of the existing bridge. 111.111111111 & a, ► may Photo 8—This photo depicts downstream of the existing bridge at Slocum Road over Slocum Creek,standing on the existing bridge.The new bridge at Slocum Road will be constructed directly upstream,and south of the existing bridge. Advance Approval Permit Exemption New Bridge at Slocum Road(Project P134) Page 4 of 5 US MCAS Cherry Point,Craven County,NC „ , _,i to _.t,. ,0„t., ,14,,14,0115.111 ,,,..„.....,,i ,..:.,..1...,, I Q A, t. : 1. fix' t di 4 ;�� } k, - eil : s ss � SiC r, Photo 9—This photo depicts the alignment centerline of the existing bridge at Slocum Road over Slocum Creek from the west bank.The new bridge at Slocum Road will be constructed directly upstream,and south of the existing bridge. Advance Approval Permit Exemption New Bridge at Slocum Road(Project P134) Page 5 of 5 US MCAS Cherry Point,Craven County,NC